IT Briefing Agenda 4/21/05

23
Information Technology at Emory Information Technology Division Technical Services IT Briefing Agenda 4/21/05 SPAM Update Manage IT Update Manage IT Demo Web Architecture NetCom Update Alan White Karen Jenkins Al Shelton • Theresa Goriczynski Paul Petersen

description

IT Briefing Agenda 4/21/05. SPAM Update Manage IT Update Manage IT Demo Web Architecture NetCom Update. Alan White Karen Jenkins Al Shelton Theresa Goriczynski Paul Petersen. SPAM Update. Jay Flanagan Security Team Lead Tech Services / ITD. Exchange Training. - PowerPoint PPT Presentation

Transcript of IT Briefing Agenda 4/21/05

Page 1: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

IT Briefing Agenda 4/21/05

• SPAM Update• Manage IT Update• Manage IT Demo• Web Architecture• NetCom Update

• Alan White• Karen Jenkins• Al Shelton• Theresa

Goriczynski• Paul Petersen

Page 2: IT Briefing Agenda 4/21/05

Information Technology at Emory

SPAM Update

Jay FlanaganSecurity Team LeadTech Services / ITD

Page 3: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Exchange Training• June 6, 7, and 8 ($975)• New Horizons facility• Customized training for desktop support

specialist• Includes modules from:

– Implementing and Managing MS Exchange 2003– Troubleshooting MS Exchange 2003– Receive full copies of both training materials

• Contact– [email protected] (x7-4840) for more

information and to register for the class

Page 4: IT Briefing Agenda 4/21/05

Information Technology at Emory

Manage IT Update & Demo

Karen JenkinsAndrew KincaidAl Shelton

Page 5: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Manage IT Status• Data import

CTI information (100%)Person data (100%)Location data (100%)

– Magic data (0%)• Assignment matrix

CTI assignments (100%)Location assignments (100%)

LDAP integration (100%)• Interface (~90%)

Page 6: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Phase 1 Schedule

• Out of the box help desk module functionality - March 31st

• Development “playground” for ITD and campus - April 1- May 4th– Modification requests submitted

using the Change Log

• Cut-over – May 18th!!

Page 7: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Testing & Input• Please provide input and testing

assistance• Download client (ManageIT.EXE) from:

– http://software.emory.edu/techtools• Can also test using the web interface

– http://dev-remedyweb.service.emory.edu/arsys/home

– Netscape v7.2– Firefox v1.0.2– IE v6.0 (Windows only)

Page 8: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

?Questions?Questions

Page 9: IT Briefing Agenda 4/21/05

Information Technology at Emory

Web Architecture

Theresa GoriczynskiSystems Team LeadTech Services / ITD

Page 10: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

New Web Hosting Infrastructure

• Environment:– Red Hat Enterprise 3– Cold Fusion 7– JDK 1.42 (as part of CF)– Apache 2.0– PHP 4.3– Load-balanced via Netcontinuum

Page 11: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

New Web Hosting Infrastructure

• Target dates– Oak-dev: May 16– Oak-prod: May 31– Maple-dev: June 20– Maple-prod: June 30

More details to come in the next few weeks as we move forward with the install and

configuration…

Page 12: IT Briefing Agenda 4/21/05

Information Technology at Emory

NetCom Update

Paul PetersenManager, Data OperationsNetwork Communications

Page 13: IT Briefing Agenda 4/21/05

Information Technology at Emory

New Wireless TechnologyA Status Report & Road Map for Wireless Technology at Emory University

April 21, 2005

Page 14: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Agenda

• Wireless at Emory– Current Status of Wireless on Campus– Current Implementation Issues– New Wireless LAN Switch Implementation– Advantage of New Wireless LAN Switch– Technical Issues with New Technology– Impact of New Technology on Customers

Page 15: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Wireless Status

• Deployed Sites– Approximately 20 different locations– Including 3 Outdoor sites– Over 175 APs Operational and in use

• Usage– Consistently more than 200 users each day

• Mixture of Colubris and Aruba APs

Page 16: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Current Implementation Issues

• Roaming– Roaming from one building to another breaks VPN

• No Guest Access• WPA• Backend Network Issues (VLANs, etc.)• Management Issues• Scalability

Page 17: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Wireless LAN Switch Technology

• Ease of Deployment– No VLANs required to get virtual networks– No specific AP configuration required

• Ease of Management– RF management– Client Management– AP Management

• Flexible Configurations– Authentication– Networks– Security– Guest Access

Page 18: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

WLAN Switch Diagram

ROUTER

SWITCH

AP AP

ROUTER

SWITCH

AP AP

VPN WPA

1 2

WLAN

1 2

Page 19: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

WLAN Switch Diagram

ROUTER

SWITCH

AP AP

ROUTER

SWITCH

AP AP

VPN

1 2

WLAN

1 2

WPA

Guest

3

3

Page 20: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Discussion: New Technology Technical Issues

• Migrating from old to new technologies– Prove the new technology before older

technology is replaced

• Service implementation changes– VPN Login looks the same for users– WPA will be available with Aruba installs– Working on a Guest Access strategy

Page 21: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

Discussion: New Technology Customer Impact

• Changes in Client Login Setup and Procedures– VPN login is exactly the same– WPA & Guest Access will be available

• Will need to be documented

• Challenges– Mixture of Old and New Technology

Page 22: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

NetCom

?Questions?Questions

Page 23: IT Briefing Agenda 4/21/05

Information Technology at Emory

Information Technology DivisionTechnical Services

?Questions?Questions