ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

11
ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

description

ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors. Works Contract. Commencement Date:13 th June 2007 Completion Date:31 st Dec. 2009 Physical Execution:100 % Financial Execution:100 % WWTP became operational on 29 th March 2010 - PowerPoint PPT Presentation

Transcript of ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

Page 1: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

ISPA Measure 2002 BG 16 P PE 015

WWTP Popovo and main collectors

Page 2: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

Works Contract

• Commencement Date: 13th June 2007

• Completion Date: 31st Dec. 2009

• Physical Execution: 100 %

• Financial Execution: 100 %

• WWTP became operational on 29th March 2010

• 1 year DNP will expire on 29th March 2011

Page 3: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

WWTP Popovo - Completed

Page 4: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

WWTP Popovo (during DNP and operation)

Page 5: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

WWTP Popovo (during DNP and operation)

Page 6: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

WWTP Popovo (during DNP and operation)

Page 7: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

WWTP Popovo (during DNP and operation)

Page 8: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

WWTP PopovoPublicity

Page 9: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

Supervision Contract

• Commencement Date: 24th April 2007

• Completion Date: 30th April 2011

• Time elapsed: 100 %

• Financial Execution: 100 %

Page 10: ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors

Compliance with Article 8of the Financing Memorandum

Art. 8.3.a)

According to EC’s letter Ref. REGIO I2/UN/ sd (2011) 910308 dated 01.08.2011 the conditions under point 8.3.a are considered as fulfilled.

Art. 8.3.b)According to EC’s letter Ref. Reg12/SP/vg D/(2010)920241), 007401 dated 16.08.2010 the conditions under point 8.3.b are considered as fulfilled.

Art. 8.3.c)