is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

35
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 21 – 9 – 2011 College Of Computer Science and Information, Information Systems Department

description

is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011. College Of Computer Science and Information, Information Systems Department. Lessons Learnt from Lecture2. What does Legacy System mean? - PowerPoint PPT Presentation

Transcript of is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

Page 1: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS

LECTURER : NOUF ALMUJALLY

21 – 9 – 2011

College Of Computer Science and Information, Information Systems Department

Page 2: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

Lessons Learnt from Lecture2

What does Legacy System mean? Obsolete, old , and traditional information system where

its data cannot be changed to newer or standard formats, or its application programs cannot be upgraded.

What are the ERP implementation methodologies? big bang Phased

• explain:• GAP Analysis• Evaluating the ERP package

Page 3: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

3

Objectives ERP Lifecycle (Con.) Critical Success Factors of ERP

Page 4: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

4

Different phases of ERP Lifecycle

1. Pre-Evaluation Screening2. Package Evaluation3. Project Planning Phase4. Gap Analysis5. Reengineering 6. Configuration7. Implementation Team Training8. Testing9. End-User Training 10. Going Live 11. Post Implementation Phase

Page 5: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

5

8- TESTING• Here we reach a point where we are testing real

case scenarios.• The system is configured & now we must come

up with extreme case scenarios:• system overloads• multiple users logging on at the same time with the

same query• users entering invalid data• hackers trying to access restricted areas & so on.

• The test case must be designed specifically to find the weak links in the system & these bugs should be fixed before going live.

Page 6: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

6

9- GOING LIVE• On the technical side, the work is almost

complete- data conversions is done, databases are up & running.

• on the functional side, the configuration is complete & testing is done.

• The system is officially announced.• But once the system is ‘live’, the old

system is removed & the new system is used for doing business.

Page 7: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

7

10- END USER TRAINING• Success & failure

• The success or failure of an ERP system depends on how the actual users use the system.

• The most successful implemented ERP packages fail due to lack of end user training.

• People are divided into groups• ERP system changes the job descriptions of the people,

so it is important to identify the people who are going to use the system. The current skills of the people are identified & they are divided into groups.

• Every group is provided training on the new system. • Training sections

• The training section gives the overall view of the system & how the individual actions will be affecting the entire system.

Page 8: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

8

11- POST IMPLEMENTATION (MAINTENANCE MODE)• Important factors

• One important factor that should be kept in mind is that the post implementation phase is very critical.

• Once the implementation is over the vendors & the hired consultants will go.

• Necessary enhancements & upgrades• There should be people within the company who have the technical

processes to make the necessary enhancements to the system as & when required.

• The system must be upgraded as & when new versions or technologies are introduced.

• Training is needed• Everyone who uses these systems needs to be trained on how they

work, how they relate to the business process & how a transaction ripples through the entire company whenever they press a key.

• The training will never end; it is an ongoing process; new people will always be coming in & new functionality will always be entering the organization.

Page 9: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

Critical Success Factors

Page 10: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

Critical Success Factors of ERP1. Top Management Support2. Project Champion3. User Training and Education4. Management of Expectation5. Vendor and Customer Partnerships6. Use of Vendor Development Tools7. Selection of the appropriate package8. Project Management9. Steering Committee10. Use of Consultants11. Minimal Customization12. Data analysis and Conversion

Page 11: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

Critical Success Factors of ES (Cont.)

13. Business Process Re-engineering14. Dedicated Resources15. Project Team Competence16. Clear Goals and Objectives17. Change Management18. Education on New Business Processes19. Inter-departmental Communication20. Inter-departmental Corporation21. On-going Vendor support

Page 12: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

1 .Top Management Support• Top management support has been identified as the most important

and crucial success factor in ERP system implementation projects

• The role of top management in IT implementations include:• From deciding to purchase the new enterprise system to ERP

going live step• Direct and coordinate all activities to meet the objectives of the

project within budget and schedule• Establishing the goals for IT systems• providing leadership• Top management should monitor the implementation progress

and provide clear direction of the project.

Page 13: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

2 .Project Champion• the project champion is the project sponsor.• project sponsor is the person devoted to promote

the ERP project• Project champions should understand both the

technology as well as the business and organizational context.

• The project champion must resolve conflicts and manage resistance against the project.

• Top management should have sufficient commitment to allocate required and valuable resources to project

Page 14: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

3 .User Training and Education• Everyone who uses ERP systems needs to be

trained on how they work and how they relate to the business process early on in the implementation process.

• Many companies use consultants to help during the implementation process.

• it is important that knowledge is transferred from the consultant to internal employees.

• The main reasons for training program is:• to make the user comfortable with the system• increase the expertise and knowledge level of the

people.

Page 15: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

Con.• Basic training forms are as

• Web-based virtual training• Computer-based training• Video courses• Self-study books• Pop-up help screens

Page 16: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

5 .Vendor/Customer Partnerships• The relationship between the software buyer and

vendor should be strategic in nature with the ERP provider enhancing an organization's competitiveness and efficiency.

• Research has shown that a better fit between the software vendor and user organization is positively associated with packaged software implementation success and that organizations should attempt to maximize their compatibility with their vendors.

Page 17: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

6 .Use of Vendors’ Development Tools

• There are indications that rapid implementation technologies and programs provided by the vendors can significantly reduce the cost and time of deploying ERP systems.

Page 18: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

7 .Careful Selection of the Appropriate Package• The choice of the package involves important

decisions regarding:• budgets• Timeframes• Goals• and deliverables that will shape the entire project.

• Choosing the right ERP packaged software that best matches the organizational information needs and processes is critical to ensure minimal modification and successful implementation and use.

Page 19: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

8 .Project Management• A proper mange of scope is critical to avoid

schedule and cost overruns.• Effective project management refers to the

effective planning and execution of the implementation process.

Page 20: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

Con.• the areas of Project Management:

Page 21: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

9 .Steering Committee• A project management structure with a “steering committee”

consisting of senior management from across different corporate functions, project management representatives, and end users who will have daily contact with ERP, is an effective means of ensuring appropriate involvement.

• Key Focus Areas• The Steering Committee Member is primarily responsible for

understanding all important project issues and making appropriate decisions to keep the project on track

• This role entails gathering the updated action items status, communicating steering committee decisions, and ensuring that decisions are carried out

• Monitors progress, reviews reports, makes decisions if necessary and attends regular Steering Committee meetings

Page 22: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

10 .Use of Consultants• Consultants may be involved in various stages of

the implementation: performing requirements analysis, recommending a suitable solution, and managing the implementation.

• Help the project manager and provide them sufficient training and education to help the employees to accept and use the new ERP system quickly.

Page 23: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

11 .Minimal Customization• A recent survey indicates that:

• 41% of the companies re-engineer their business to fit the application,

• 37% of the companies choose applications that fit their business and customize a bit,

• and only 5% customize the application to fit their business.

• Customizations are usually associate with :• Increase the costs• long implementation time• and the inability to benefit from vendor software

maintenance and upgrades.

Page 24: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

12 .Data Analysis and Conversion

• Data problems can cause serious implementation delays, and as such, the management of data entering the ERP system represents a critical issue throughout the implementation process.• Finding proper data for the new ERP;• Selection data format for conversion; and

Page 25: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

13. Business Process Reengineering

• Business process reengineering refers to aligning the company business processes with the ERP software that will be implemented.

• Organizations should be willing to change their businesses to fit the ERP software in order to minimize the degree of customization needed.

Page 26: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

14 .Dedicated resources• One of the main critical factors for ERP

success is determining the human and financial resources needed to implement the system.

• This should be done at an early stage of the project.

• Failing to commit the required resources often results in schedule and cost overruns..

Page 27: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

15 .Project Team Competence• Another key element of ERP success or

failure is related to the knowledge, skills, abilities, and experience of the project manager and team members.

• The project team should work in a coordinated way to achieve one goal.

• Therefore, it is vital for team members to have technical and business skills to complement their work.

Page 28: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

16 .Clear goals and objectives• The initial phase of any project should begin

with a conceptualization of the goals and possible ways to accomplish these goals

• It is important to set the goals of the project before even seeking top management support.

• The three competing and interrelated goals that need to be met: scope, time, and cost goals.

• Many ERP installations face scope creep as a result of lacking a clear plan.

Page 29: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

17 .Change Management• one of the main obstacles facing ERP

implementation is resistance to change.

• Companies need to adopt a comprehensive approach toward the large-scale process and system changes associated with the ERP implementations and make change everyone’s first priority.

Page 30: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

18 .Education on New Business Processes

• When considering implementation coupled with business process reengineering, it is essential for managers to educate and communicate their goals and long-term perspectives in order to win support of all members of the organization affected by the changes.

Page 31: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

19 .Interdepartmental Communication

• Communication is the oil that keeps everything working properly.

• it is essential to communicate effectively between team members and the rest of the organization, in order to keep everything working properly.

• Poor communication between reengineering team members and other organizational members was found to be a problem in business process reengineering implementations.

Page 32: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

20 .Interdepartmental Cooperation

• As ERP systems cross-functional and departmental boundaries, cooperation and involvement of all involved appears to be critical.

Page 33: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

21 .Ongoing Vendor Support• ERP systems require ongoing vendor

support to keep them up to date with the latest modules and version

• Vendor support provides• Extended technical assistance• Emergency maintenance• Updates• And special user training.

Page 34: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

34

Questions ??

Page 35: is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 21 – 9 – 2011

What should you do this week ?• Review the lectures.• Do the Tutorial and submit it online:

[email protected] date: Friday.• Reading :

1 -The Impact of Critical Success Factors across the Stages ofEnterprise Resource Planning Implementations• Consult Lecturer if any questions related to

the subject.