Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 1
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
William A. Moylan, PhD, PMP and Nadia Arafah, ABD2017 Project Management Symposium
INTEGRATED PROJECT DELIVERY: COMPLICATED COLLABORATION OR IMPROBABLE PANACEA
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 2
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Doctoral Student for PhD-Technology with focus in Interior Design, Eastern Michigan University.
Presenter – Nadia Arafah, ABD
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 3
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Executive Summary• Background to Constructed Facility
Project Delivery• Integrated Project Delivery [IPD] Primer• IPD Benefits & Challenges• Questions & Comments
Presentation Agenda
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 4
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
Background
CONSTRUCTED FACILITY PROJECT DELIVERY
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 5
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Fixed-price or lump-sum contracts.
• Unit-rate contracts.• Cost-reimbursable contracts• Time and materials contracts
Construction Contractual Arrangements
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 6
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Design-Bid-Build (traditional method)
• Design-Build• Turn-key• Construction Management • Single-source, non-competitive • Design-Build-Operate-Maintain-
Transfer
Facility Project Delivery Approaches
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 7
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
IPD – A NEW DELIVERY APPROACH OF COLLABORATION & TRUST
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 8
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Project delivery strategy that integrates people, systems, business structures, and disciplines
• Collaboratively manages the expertise of all participants in the project to reduce waste and optimize efficiency
AIA California Council (2007/2010)
Working Definition of IPD
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 9
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/ IPD Methodology
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 10
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Mutual Respect / Mutual Benefit • Early Goal Definition • Enhanced Communication• Clearly Defined Open Standards• Appropriate Technology• High performance / Leadership (AIA, 2007)
IPD Essential Principals
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 11
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Improved Project Execution– Cost Budget Performance– Execution Time Efficiency– Overall Quality of the Facility
IPD Benefits
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 12
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Trusting Partnerships– Improved Team Relations– Less Waste
IPD Benefits
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 13
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
Facility Owners • Must lead paradigm shift
– Exhibit willingness to change – Take risks – Develop culture of trust (COAA, 2016)
Challenges Using IPD
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 14
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
Designers• Joint responsibility
Design and Construction• Higher level of effort early on• Responsibilities don’t end with
issuing construction documents
Challenges Using IPD
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 15
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
Construction Firms• Involved at onset / selected on
qualifications rather than lowest price• BIM requires significant investment in
set-up time and upfront training
Challenges Using IPD
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 16
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Benefits – Improved project performance – Trusting partnership
• Costs – Early involvement with detailed planning– Team development– Investment in BIM technology– Shared risks [waiver of liability]
Conclusions
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 17
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
• Improvements in long term relationships – Leads to repeat business
• Collaborative approach allows informed decision making early in project – When most value created– Eliminates waste in the design
Conclusions
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 18
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
QUESTIONS / COMMENTS
Moylan & ArafahUMD Project Management SymposiumMay 4-5, 2017Slide 19
htt
p://
pm
sym
po
siu
m.u
md
.ed
u/p
m20
17/
Contact Nadia [email protected]
Any Further Questions?