Indonesia NEP - Least cost electrification investment plan coordinated grid & off-grid access rollout, technology choice Prepare a least-cost electrification roll-out plan for grid and off-grid communities to meet national targets by beneficiary type Key digitized geo-referenced data layers for spatial least cost electrification rollout planning and costing platform - - Where are the MV lines today Population settlements and patterns Where are the schools, clinics, administrative centers Earth Institute modeling platform – proof of concept funded and managed by World Bank (Kenya, Senegal, Rwanda)

description

PLN staff training In Kupang, West Timor office for MV line data capture and digitization

Transcript of Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access...

Page 1: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

Indonesia NEP - Least cost electrification investment plan

coordinated grid & off-grid access rollout, technology choice

• Prepare a least-cost electrification roll-out plan for grid and off-grid communities to meet national targets by beneficiary type

• Key digitized geo-referenced data layers for spatial least cost electrification rollout planning and costing platform

- - Where are the MV lines today– Population settlements and patterns – Where are the schools, clinics, administrative centers

• Earth Institute modeling platform – proof of concept funded and managed by World Bank (Kenya, Senegal, Rwanda)

Page 2: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

BEFORE: Electricity Access Maps Used Prior to EI Data Collection Efforts (Eastern Indonesia, 9/2012)

Electrified AreasArea Difficult to Reach

Medium VoltageConstrained MV Plans due to Protected ForestDiesel Plants

Page 3: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

PLN staff training In Kupang, West Timor office for MV line data capture and digitization

Page 4: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

4

EI Team Supports Local Utility Workers to Create MV Grid Map with smartphones – hands on training by doing

Page 5: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

AFTER: MV Line Map Results from EI Data Collection Efforts (Eastern Indonesia, 4/2013)

*Average line data collection rate by vehicle was

50-100km/day (varies w/ road conditions)

Page 6: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.
Page 7: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

7

• Satellite imagery or other high accuracy data source is used to geo-locate communities, including remote rural locations

Example Desa in Flores Island Group: Pondo, Lembor, NTT

Settlement Locations Data – nucleation patterns

1 km

Page 8: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

8

• Communities are designated for grid expansion or off-grid systems based on least cost analysis

Example Desa in Flores Island Group: Pondo, Lembor, NTT

Coordinated grid and off-grid planning – target driven

1 km

Page 9: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

NEP - Grid-Rollout over next 20 YearsFlores Island, Eastern Indonesia

Maps Showing Optimal Mix of Grid vs Off-Grid SystemsLeast cost technology choices

Page 10: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

10

Page 11: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

11

Page 12: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

12

Page 13: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

13

Page 14: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

14

Page 15: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

15

All Flores Island Group

Page 16: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

16

West Flores Island

Page 17: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

Indonesia NEP

Least cost electrification configurations by settlement size

Page 18: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

18

Grid “least-cost” expansion settlements

0-1011-20

21-50

51-100

101-250

251-500

501-1000>1000

0%10%20%30%40%50%60%70%80%90%

100%

Household SolarVillage Solar Mini-GridProposed GridGrid Connected

Bins: Number of Households per Settlement

Perc

enta

ge o

f Hou

seho

lds b

y Te

ch

Type

Page 19: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

19

Proposed Grid: 166,000 HHsVillage Solar Mini-Grid: 84,000 HHs

020,00040,00060,00080,000

100,000120,000140,000

Household SolarVillage Solar Mini-GridProposed GridGrid Connected

Bins: Number of Households per Settlement

Tota

l Num

ber o

f Ho

useh

olds

by

Tech

Ty

pe

Page 20: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

Grid connection in larger and densely nucleated settlements

Page 21: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

100m or 300 ft

Page 22: Indonesia NEP - Least cost electrification investment plan coordinated grid  off-grid access rollout, technology choice Prepare a least-cost electrification.

INSIDE SHED

STORAGE BATTERIESMETERING + COMM + uPROC INVERTER+CC+BREAKERS