Indonesia NEP - Least cost electrification investment plan
coordinated grid & off-grid access rollout, technology choice
• Prepare a least-cost electrification roll-out plan for grid and off-grid communities to meet national targets by beneficiary type
• Key digitized geo-referenced data layers for spatial least cost electrification rollout planning and costing platform
- - Where are the MV lines today– Population settlements and patterns – Where are the schools, clinics, administrative centers
• Earth Institute modeling platform – proof of concept funded and managed by World Bank (Kenya, Senegal, Rwanda)
![Page 2: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/2.jpg)
BEFORE: Electricity Access Maps Used Prior to EI Data Collection Efforts (Eastern Indonesia, 9/2012)
Electrified AreasArea Difficult to Reach
Medium VoltageConstrained MV Plans due to Protected ForestDiesel Plants
![Page 3: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/3.jpg)
PLN staff training In Kupang, West Timor office for MV line data capture and digitization
![Page 4: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/4.jpg)
4
EI Team Supports Local Utility Workers to Create MV Grid Map with smartphones – hands on training by doing
![Page 5: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/5.jpg)
AFTER: MV Line Map Results from EI Data Collection Efforts (Eastern Indonesia, 4/2013)
*Average line data collection rate by vehicle was
50-100km/day (varies w/ road conditions)
![Page 6: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/6.jpg)
![Page 7: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/7.jpg)
7
• Satellite imagery or other high accuracy data source is used to geo-locate communities, including remote rural locations
Example Desa in Flores Island Group: Pondo, Lembor, NTT
Settlement Locations Data – nucleation patterns
1 km
![Page 8: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/8.jpg)
8
• Communities are designated for grid expansion or off-grid systems based on least cost analysis
Example Desa in Flores Island Group: Pondo, Lembor, NTT
Coordinated grid and off-grid planning – target driven
1 km
![Page 9: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/9.jpg)
NEP - Grid-Rollout over next 20 YearsFlores Island, Eastern Indonesia
Maps Showing Optimal Mix of Grid vs Off-Grid SystemsLeast cost technology choices
![Page 10: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/10.jpg)
10
![Page 11: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/11.jpg)
11
![Page 12: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/12.jpg)
12
![Page 13: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/13.jpg)
13
![Page 14: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/14.jpg)
14
![Page 15: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/15.jpg)
15
All Flores Island Group
![Page 16: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/16.jpg)
16
West Flores Island
![Page 17: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/17.jpg)
Indonesia NEP
Least cost electrification configurations by settlement size
![Page 18: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/18.jpg)
18
Grid “least-cost” expansion settlements
0-1011-20
21-50
51-100
101-250
251-500
501-1000>1000
0%10%20%30%40%50%60%70%80%90%
100%
Household SolarVillage Solar Mini-GridProposed GridGrid Connected
Bins: Number of Households per Settlement
Perc
enta
ge o
f Hou
seho
lds b
y Te
ch
Type
![Page 19: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/19.jpg)
19
Proposed Grid: 166,000 HHsVillage Solar Mini-Grid: 84,000 HHs
020,00040,00060,00080,000
100,000120,000140,000
Household SolarVillage Solar Mini-GridProposed GridGrid Connected
Bins: Number of Households per Settlement
Tota
l Num
ber o
f Ho
useh
olds
by
Tech
Ty
pe
![Page 20: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/20.jpg)
Grid connection in larger and densely nucleated settlements
![Page 21: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/21.jpg)
100m or 300 ft
![Page 22: Indonesia NEP - Least cost electrification investment plan coordinated grid off-grid access rollout, technology choice Prepare a least-cost electrification.](https://reader036.fdocuments.net/reader036/viewer/2022081507/5a4d1b877f8b9ab0599bd31b/html5/thumbnails/22.jpg)
INSIDE SHED
STORAGE BATTERIESMETERING + COMM + uPROC INVERTER+CC+BREAKERS