Implementation: Results Implementation: Results from the Using Your from the Using Your Regional ITS Architecture Regional ITS Architecture Peer Exchange Network Peer Exchange Network WorkshopWorkshop
Mac Lister Mac Lister FHWA Resource CenterFHWA Resource Center
ITS America Annual MeetingITS America Annual MeetingSession 20Session 20
May 2, 2005May 2, 2005
22
OutlineOutline
Peer Exchange BackgroundPeer Exchange Background Peer Exchange Topic AreasPeer Exchange Topic Areas Meeting Results by Major Topic Meeting Results by Major Topic
AreaArea– Overview Overview – Key FindingsKey Findings
SummarySummary
33
Peer Exchange Peer Exchange BackgroundBackground
Kansas City, MOKansas City, MO 7-8 December 20047-8 December 2004 24 Participants24 Participants 8 Regions8 Regions
44
Participants IncludedParticipants Included
Regional Transportation PlannersRegional Transportation Planners State ITS Engineers & Program State ITS Engineers & Program
SpecialistsSpecialists ITS Project EngineersITS Project Engineers City and State Traffic EngineersCity and State Traffic Engineers FHWA Area EngineersFHWA Area Engineers
55
Regions ParticipatingRegions Participating
Amarillo Amarillo Binghamton Binghamton Northeastern Illinois Northeastern Illinois Central Ohio Central Ohio Southeast Michigan Southeast Michigan Kansas City Kansas City Sacramento Sacramento Puget Sound Puget Sound
66
Purpose of the Peer Purpose of the Peer ExchangeExchange Share experiences Share experiences Gather lessons learnedGather lessons learned Document findingsDocument findings Aid regions in earlier stages of Aid regions in earlier stages of
deployment/usedeployment/use
77
Peer Exchange Topic Peer Exchange Topic AreasAreas
Linking the Regional ITS Linking the Regional ITS Architecture and the Architecture and the Transportation Planning ProcessTransportation Planning Process
Using The Regional ITS Using The Regional ITS Architecture for Project Architecture for Project DevelopmentDevelopment
Maintaining the Regional ITS Maintaining the Regional ITS ArchitectureArchitecture
88
Regional ITS Architecture Regional ITS Architecture Connection to the Transportation Connection to the Transportation Planning ProcessPlanning Process
The development of the Regional ITS The development of the Regional ITS Architecture is in collaboration with the Architecture is in collaboration with the formal transportation planning processformal transportation planning process
Integration with the planning process is Integration with the planning process is key to meeting the intent of the FHWA key to meeting the intent of the FHWA rule and FTA policyrule and FTA policy
Local stakeholders must decide how to Local stakeholders must decide how to bring both processes together to best bring both processes together to best serve the regionserve the region
99
Where Can the Regional ITS Where Can the Regional ITS Architecture be Applied ?Architecture be Applied ?
ITS ProjectImplementation(SE Process)
Funding
Region descriptionRegion description Stakeholder Stakeholder
identificationidentification System inventorySystem inventory Needs and Needs and
servicesservices Operational Operational
conceptconcept Functional Functional
requirementsrequirements Interfaces / Interfaces /
Information flowsInformation flows Maintenance planMaintenance plan AgreementsAgreements Standards Standards
identificationidentification Project sequencingProject sequencing
Regional ITS Regional ITS Architecture ProductsArchitecture Products
Conceptof Operations
High LevelRequirements
DetailedRequirements
High LevelDesign
DetailedDesign
Implementation
Operations &Maintenance
SystemVerification
SubsystemVerification
Integration &Test
ITS Strategic Planning
• Needs ID• Regional Integration
Planning• Project Definition
ITS Related Project
Transportation Planning Process
Long Range Transportation
Plan
State Transportation Improvement
Program
GoalsObjectivesPoliciesProjects
1010
Key Findings:Key Findings: Linking the Linking the Architecture and the Architecture and the Transportation Planning Transportation Planning ProcessProcess
The RA development process fosters The RA development process fosters involvement of operators/project involvement of operators/project developers in the larger transportation developers in the larger transportation planning processplanning process
The RA process has helped to get relevant The RA process has helped to get relevant stakeholders from a variety of modes stakeholders from a variety of modes involved in the ITS planning processinvolved in the ITS planning process
Posting the RA on the Internet is useful for Posting the RA on the Internet is useful for information sharing, gathering updates, information sharing, gathering updates, and making changes to both the RA and and making changes to both the RA and other transportation plansother transportation plans
1111
Key Findings:Key Findings: Linking the Linking the Architecture and the Architecture and the Transportation Planning Transportation Planning ProcessProcess The RA is useful for transportation planning in The RA is useful for transportation planning in
that it provides a complete inventory of ITS that it provides a complete inventory of ITS project elements, a description of how projects project elements, a description of how projects are integrated, and stakeholder agreement on are integrated, and stakeholder agreement on project deployment needsproject deployment needs
Some regions use their ITS Deployment Plan as Some regions use their ITS Deployment Plan as a vehicle for including RA project needs in the a vehicle for including RA project needs in the transportation planning processtransportation planning process
Different regions have their own way of Different regions have their own way of approving their RA and considering it ready for approving their RA and considering it ready for useuse
Integrating the RA project sequencing list with Integrating the RA project sequencing list with the TIP project list can help reduce redundancy the TIP project list can help reduce redundancy and aid funding decisionsand aid funding decisions
1212
Using The Regional ITS Using The Regional ITS Architecture for Project Architecture for Project DevelopmentDevelopment
FHWA Final Rule 940.11/FTA Policy and FHWA Final Rule 940.11/FTA Policy and ITS Project Implementation ITS Project Implementation – Requires all ITS projects be based on a Requires all ITS projects be based on a
systems engineering analysissystems engineering analysis on a scale on a scale commensurate with the project scope commensurate with the project scope
– All ITS projects shall accommodate the All ITS projects shall accommodate the interface requirements and information interface requirements and information exchanges as specified in the Regional ITS exchanges as specified in the Regional ITS ArchitectureArchitecture
1313
Conceptof Operations
High LevelRequirements
DetailedRequirements
High LevelDesign
DetailedDesign
Implementation
Operations &Maintenance
SystemVerification
SubsystemVerification
Integration &Test
Systems Engineering Systems Engineering LifecycleLifecycle
1414
Where can the Regional ITS Where can the Regional ITS Architecture be Applied ?Architecture be Applied ?
Conceptof Operations
High LevelRequirements
DetailedRequirements
High LevelDesign
DetailedDesign
Region descriptionRegion description Stakeholder identificationStakeholder identification System inventorySystem inventory Needs and servicesNeeds and services Operational conceptOperational concept Functional requirementsFunctional requirements Interfaces / Information Interfaces / Information
flowsflows Maintenance planMaintenance plan AgreementsAgreements Standards identificationStandards identification Project sequencingProject sequencing
Regional ITS Regional ITS Architecture ProductsArchitecture Products
1515
Key Findings:Key Findings: Using The Regional ITS Using The Regional ITS Architecture for Project Architecture for Project DevelopmentDevelopment
The RA development process allows The RA development process allows operators/project developers to operators/project developers to understand how a project fits in the understand how a project fits in the overall deployment vision for a overall deployment vision for a region/stateregion/state
Having an identified RA coordinator Having an identified RA coordinator helps ensure that ITS and/or enabling helps ensure that ITS and/or enabling technologies are considered in capital technologies are considered in capital projects projects
State DOT project development State DOT project development manuals need to be updated to reflect manuals need to be updated to reflect ITS, RA and systems engineeringITS, RA and systems engineering
1616
Key Findings:Key Findings: Using The Regional ITS Using The Regional ITS Architecture for Project Architecture for Project DevelopmentDevelopment
State IT departments can be engaged State IT departments can be engaged as partners/stakeholders in project as partners/stakeholders in project developmentdevelopment
FHWA assistance welcomed in getting FHWA assistance welcomed in getting the RA and systems engineering the RA and systems engineering message out to other stakeholdersmessage out to other stakeholders
Training is a key to widespread Training is a key to widespread acceptance and using the RA and acceptance and using the RA and systems engineeringsystems engineering
1717
Key Findings:Key Findings: Using The Regional ITS Using The Regional ITS Architecture for Project Architecture for Project DevelopmentDevelopment
Setting aside project money for Setting aside project money for training can help minimize project risktraining can help minimize project risk
RA and systems engineering benefits RA and systems engineering benefits need to be documented and sharedneed to be documented and shared
Methods need to be found to Methods need to be found to encourage RA and systems encourage RA and systems engineering for projects where no engineering for projects where no federal funds are usedfederal funds are used
1818
Maintaining the Maintaining the Regional ITS Regional ITS ArchitectureArchitecture
Maintenance procedures needs to be Maintenance procedures needs to be developed and implemented (per the Rule) developed and implemented (per the Rule) to to – Keep RA current as needs and plans evolve Keep RA current as needs and plans evolve
within the regionwithin the region– Expand the RA to include new stakeholders as Expand the RA to include new stakeholders as
they are identified or engagedthey are identified or engaged– Reflect changes as projects are designed and Reflect changes as projects are designed and
implementedimplemented– Reflect changes in project priority or status Reflect changes in project priority or status
1919
Key Drivers of Regional Key Drivers of Regional ITS Architecture ITS Architecture MaintenanceMaintenance
Transportation Planning
ITS Project Implementation
Regional ITS Architecture
Other Drivers(technology, new service,
political etc.)
Border RA & Statewide
Architecture
2020
Key Findings:Key Findings: Regional ITS ArchitectureRegional ITS Architecture MaintenanceMaintenance
In-house RA development may provide In-house RA development may provide some maintenance benefits, although staff some maintenance benefits, although staff turnover could be an issue. Consultants turnover could be an issue. Consultants can be consideredcan be considered
Changes in the National ITS Architecture Changes in the National ITS Architecture and Turbo Architecture do not require a and Turbo Architecture do not require a change the RA unless the changes affect change the RA unless the changes affect the components in the RAthe components in the RA
RA maintenance needs to be carried out RA maintenance needs to be carried out through a well defined configuration through a well defined configuration management processmanagement process
All sources for changes should be All sources for changes should be consideredconsidered
2121
Key Findings:Key Findings: Regional ITS ArchitectureRegional ITS Architecture MaintenanceMaintenance
Tracking changes on a project by Tracking changes on a project by project basis and correspondingly project basis and correspondingly updating the RA is a challengeupdating the RA is a challenge
Some agencies have had success in Some agencies have had success in funding RA maintenance from SPR or funding RA maintenance from SPR or MPO work plan fundsMPO work plan funds
Finding funding and resources for RA Finding funding and resources for RA maintenance is a common issuemaintenance is a common issue
2222
SummarySummary
Lots of valuable information and Lots of valuable information and lessons learned resulted from workshoplessons learned resulted from workshop
Workshop summary will be made Workshop summary will be made available available
DOT is factoring findings into future DOT is factoring findings into future programs/effortsprograms/efforts
Contact Mac Lister for more informationContact Mac Lister for more information– [email protected]@fhwa.dot.gov– Phone 708-283-3532Phone 708-283-3532