IH 635 Managed Lanes Project Preliminary Project Baseline...

32
WBS Code WBS Name 1 IH 635 Managed Lanes Project 1.0 Project Wide Activities 1.0.1 Summary Schedule 1.0.1.1 CDA Milestones 1.0.1.2 DB Contract Milestones 1.0.1.3 Schedule Summary 1.0.1.3.1 Segment 1 1.0.1.3.2 Segment 2 1.0.1.3.3 Segment 3 1.0.1.3.4 Segment 4 1.0.1.9 Milestone Intervals 1.0.2 Project Management 1.0.2.1 Mobilization 1.0.2.2 Administration 1.0.2.3 Finance 1.0.2.4 Insurance 1.0.2.5 Project Controls 1.0.2.6 Property Acquisition 1.0.2.7 Environmental 1.0.2.8 Utility Relocation 1.0.2.9 Design 1.0.2.10 Survey 1.0.2.11 Construction 1.0.2.12 QA / QC 1.0.2.13 Safety 1.0.2.14 Operations 1.0.2.15 Maintenance 1.1 IH35E Section 1.1.1 Property Aquisition 1.1.2 Utility Relocation 1.1.2.1 Preliminary Work 1.1.2.1.1 SUE Investigation 1.1.2.1.2 Conceptual Relocation Plan 1.1.2.2 Charter Communications 1.1.2.2.3 Adjustment Assemblies 1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design & Assembly Preparation 1.1.2.2.4 Perform Relocations 1.1.2.2.4.3 Distribution 1.1.2.2.4.4 Transmission 1.1.2.3 Oncor UG 1.1.2.3.3 Adjustment Assemblies 1.1.2.3.3.1 Master Utility Adjustment Agreement 1.1.2.3.3.2 Design & Assembly Preparation 1.1.2.3.4 Perform Relocations 1.1.2.3.4.3 Distribution 1.1.2.3.4.4 Transmission 1.1.2.4 Atmos Energy IH 635 Managed Lanes Project Preliminary Project Baseline Schedule LBJ Development Partners Page 1 of 32

Transcript of IH 635 Managed Lanes Project Preliminary Project Baseline...

Page 1: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1 IH 635 Managed Lanes Project

1.0 Project Wide Activities

1.0.1 Summary Schedule

1.0.1.1 CDA Milestones

1.0.1.2 DB Contract Milestones

1.0.1.3 Schedule Summary

1.0.1.3.1 Segment 1

1.0.1.3.2 Segment 2

1.0.1.3.3 Segment 3

1.0.1.3.4 Segment 4

1.0.1.9 Milestone Intervals

1.0.2 Project Management

1.0.2.1 Mobilization

1.0.2.2 Administration

1.0.2.3 Finance

1.0.2.4 Insurance

1.0.2.5 Project Controls

1.0.2.6 Property Acquisition

1.0.2.7 Environmental

1.0.2.8 Utility Relocation

1.0.2.9 Design

1.0.2.10 Survey

1.0.2.11 Construction

1.0.2.12 QA / QC

1.0.2.13 Safety

1.0.2.14 Operations

1.0.2.15 Maintenance

1.1 IH35E Section

1.1.1 Property Aquisition

1.1.2 Utility Relocation

1.1.2.1 Preliminary Work

1.1.2.1.1 SUE Investigation

1.1.2.1.2 Conceptual Relocation Plan

1.1.2.2 Charter Communications

1.1.2.2.3 Adjustment Assemblies

1.1.2.2.3.1 Master Utility Adjustment Agreement

1.1.2.2.3.2 Design & Assembly Preparation

1.1.2.2.4 Perform Relocations

1.1.2.2.4.3 Distribution

1.1.2.2.4.4 Transmission

1.1.2.3 Oncor UG

1.1.2.3.3 Adjustment Assemblies

1.1.2.3.3.1 Master Utility Adjustment Agreement

1.1.2.3.3.2 Design & Assembly Preparation

1.1.2.3.4 Perform Relocations

1.1.2.3.4.3 Distribution

1.1.2.3.4.4 Transmission

1.1.2.4 Atmos Energy

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 1 of 32

Page 2: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.1.2.4.3 Adjustment Assemblies

1.1.2.4.3.1 Master Utility Adjustment Agreement

1.1.2.4.3.2 Design & Assembly Preparation

1.1.2.4.4 Perform Relocations

1.1.2.4.4.3 Distribution

1.1.2.4.4.4 Transmission

1.1.2.5 AT&T

1.1.2.5.3 Adjustment Assemblies

1.1.2.5.3.1 Master Utility Adjustment Agreement

1.1.2.5.3.2 Design & Assembly Preparation

1.1.2.5.4 Perform Relocations

1.1.2.5.4.3 Distribution

1.1.2.5.4.4 Transmission

1.1.2.6 Level 3 Communications

1.1.2.6.3 Adjustment Assemblies

1.1.2.6.3.1 Master Utility Adjustment Agreement

1.1.2.6.3.2 Design & Assembly Preparation

1.1.2.6.4 Perform Relocations

1.1.2.6.4.3 Distribution

1.1.2.6.4.4 Transmission

1.1.2.7 Carrollton / Farmer's Branch ISD

1.1.2.7.3 Adjustment Assemblies

1.1.2.7.3.1 Master Utility Adjustment Agreement

1.1.2.7.3.2 Design & Assembly Preparation

1.1.2.7.4 Perform Relocations

1.1.2.7.4.3 Distribution

1.1.2.7.4.4 Transmission

1.1.2.8 Verizon Communications

1.1.2.8.3 Adjustment Assemblies

1.1.2.8.3.1 Master Utility Adjustment Agreement

1.1.2.8.3.2 Design & Assembly Preparation

1.1.2.8.4 Perform Relocations

1.1.2.8.4.3 Distribution

1.1.2.8.4.4 Transmission

1.1.2.9 XO Communications

1.1.2.9.3 Adjustment Assemblies

1.1.2.9.3.1 Master Utility Adjustment Agreement

1.1.2.9.3.2 Design & Assembly Preparation

1.1.2.9.4 Perform Relocations

1.1.2.9.4.3 Distribution

1.1.2.9.4.4 Transmission

1.1.2.10 AboveNet

1.1.2.10.3 Adjustment Assemblies

1.1.2.10.3.1 Master Utility Adjustment Agreement

1.1.2.10.3.2 Design & Assembly Preparation

1.1.2.10.4 Perform Relocations

1.1.2.10.4.3 Distribution

1.1.2.10.4.4 Transmission

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 2 of 32

Page 3: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.1.2.11 Time Warner Communications

1.1.2.11.3 Adjustment Assemblies

1.1.2.11.3.1 Master Utility Adjustment Agreement

1.1.2.11.3.2 Design & Assembly Preparation

1.1.2.11.4 Perform Relocations

1.1.2.11.4.3 Distribution

1.1.2.11.4.4 Transmission

1.1.2.12 Alpheus

1.1.2.12.3 Adjustment Assemblies

1.1.2.12.3.1 Master Utility Adjustment Agreement

1.1.2.12.3.2 Design & Assembly Preparation

1.1.2.12.4 Perform Relocations

1.1.2.12.4.3 Distribution

1.1.2.12.4.4 Transmission

1.1.2.13 City of Dallas

1.1.2.13.3 Adjustment Assemblies

1.1.2.13.3.1 Master Utility Adjustment Agreement

1.1.2.13.3.2 Design & Assembly Preparation

1.1.2.13.4 Perform Relocations

1.1.2.13.4.3 Distribution

1.1.2.13.4.4 Transmission

1.1.2.14 City of Farmer's Branch

1.1.2.14.3 Adjustment Assemblies

1.1.2.14.3.1 Master Utility Adjustment Agreement

1.1.2.14.3.2 Design & Assembly Preparation

1.1.2.14.4 Perform Relocations

1.1.2.14.4.3 Distribution

1.1.2.14.4.4 Transmission

1.1.3 Design

1.1.3.0 Preliminary Design Activities

1.1.3.0.1 Surveying

1.1.3.0.2 Geotechnical

1.1.3.0.3 Specifications & Standards

1.1.3.1 Roads

1.1.3.1.1 Demolition

1.1.3.1.2 Roadway Layout

1.1.3.1.3 Landscaping

1.1.3.1.5 Pavement

1.1.3.1.7 Illumination & Traffic Signals

1.1.3.1.8 Signing & Pavement Marking

1.1.3.1.9 ITS / TCS

1.1.3.3 Structures

1.1.3.3.1 Bridges

1.1.3.3.2 Retaining Walls

1.1.3.3.3 Noise Walls

1.1.3.2 Drainage

1.1.3.2.1 Culverts

1.1.3.2.2 Storm Sewer

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 3 of 32

Page 4: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.1.3.2.3 Special Features

1.1.3.2.4 SWPPP

1.1.3.4 Traffic Management and Sequencing

1.1.3.4.1 Phase 1

1.1.3.4.2 Phase 2

1.1.3.4.3 Phase 3

1.1.3.4.4 Phase 4

1.1.3.8 Design Packages

1.1.3.8.1 Schematics

1.1.3.8.2 60% Design Package (Early Construction)

1.1.3.8.3 90% Design Package (All Disciplines)

1.1.3.8.4 100% Design Package (Final Package)

1.1.4 Construction

1.1.4.1 Roads

1.1.4.1.1 Demolition

1.1.4.1.1.NF Northbound Frontage Roads

1.1.4.1.1.NG Northbound General Purpose Lanes

1.1.4.1.1.NM Northbound Managed Lanes

1.1.4.1.1.NR Northbound Ramps

1.1.4.1.1.NL Northbound Landscape Areas

1.1.4.1.1.SF Southbound Frontage Roads

1.1.4.1.1.SG Southbound General Purpose Lanes

1.1.4.1.1.SM Southbound Managed Lanes

1.1.4.1.1.SR Southbound Ramps

1.1.4.1.1.SL Southbound Landscape Areas

1.1.4.1.1.XU Cross Road Underpasses

1.1.4.1.1.IC Interchanges

1.1.4.1.2 Earthwork

1.1.4.1.2.NF Northbound Frontage Roads

1.1.4.1.2.NG Northbound General Purpose Lanes

1.1.4.1.2.NM Northbound Managed Lanes

1.1.4.1.2.NR Northbound Ramps

1.1.4.1.2.NL Northbound Landscape Areas

1.1.4.1.2.SF Southbound Frontage Roads

1.1.4.1.2.SG Southbound General Purpose Lanes

1.1.4.1.2.SM Southbound Managed Lanes

1.1.4.1.2.SR Southbound Ramps

1.1.4.1.2.SL Southbound Landscape Areas

1.1.4.1.2.XU Cross Road Underpasses

1.1.4.1.2.IC Interchanges

1.1.4.1.3 Landscaping

1.1.4.1.3.NF Northbound Frontage Roads

1.1.4.1.3.NG Northbound General Purpose Lanes

1.1.4.1.3.NM Northbound Managed Lanes

1.1.4.1.3.NR Northbound Ramps

1.1.4.1.3.NL Northbound Landscape Areas

1.1.4.1.3.SF Southbound Frontage Roads

1.1.4.1.3.SG Southbound General Purpose Lanes

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 4 of 32

Page 5: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.1.4.1.3.SM Southbound Managed Lanes

1.1.4.1.3.SR Southbound Ramps

1.1.4.1.3.SL Southbound Landscape Areas

1.1.4.1.3.XU Cross Road Underpasses

1.1.4.1.3.IC Interchanges

1.1.4.1.4 Subgrade & Base

1.1.4.1.4.NF Northbound Frontage Roads

1.1.4.1.4.NG Northbound General Purpose Lanes

1.1.4.1.4.NM Northbound Managed Lanes

1.1.4.1.4.NR Northbound Ramps

1.1.4.1.4.NL Northbound Landscape Areas

1.1.4.1.4.SF Southbound Frontage Roads

1.1.4.1.4.SG Southbound General Purpose Lanes

1.1.4.1.4.SM Southbound Managed Lanes

1.1.4.1.4.SR Southbound Ramps

1.1.4.1.4.SL Southbound Landscape Areas

1.1.4.1.4.XU Cross Road Underpasses

1.1.4.1.4.IC Interchanges

1.1.4.1.5 Pavement

1.1.4.1.5.NF Northbound Frontage Roads

1.1.4.1.5.NG Northbound General Purpose Lanes

1.1.4.1.5.NM Northbound Managed Lanes

1.1.4.1.5.NR Northbound Ramps

1.1.4.1.5.NL Northbound Landscape Areas

1.1.4.1.5.SF Southbound Frontage Roads

1.1.4.1.5.SG Southbound General Purpose Lanes

1.1.4.1.5.SM Southbound Managed Lanes

1.1.4.1.5.SR Southbound Ramps

1.1.4.1.5.SL Southbound Landscape Areas

1.1.4.1.5.XU Cross Road Underpasses

1.1.4.1.5.IC Interchanges

1.1.4.1.6 Barriers and Fencing

1.1.4.1.6.NF Northbound Frontage Roads

1.1.4.1.6.NG Northbound General Purpose Lanes

1.1.4.1.6.NM Northbound Managed Lanes

1.1.4.1.6.NR Northbound Ramps

1.1.4.1.6.NL Northbound Landscape Areas

1.1.4.1.6.SF Southbound Frontage Roads

1.1.4.1.6.SG Southbound General Purpose Lanes

1.1.4.1.6.SM Southbound Managed Lanes

1.1.4.1.6.SR Southbound Ramps

1.1.4.1.6.SL Southbound Landscape Areas

1.1.4.1.6.XU Cross Road Underpasses

1.1.4.1.6.IC Interchanges

1.1.4.1.7 Illumination & Traffic Signals

1.1.4.1.7.NF Northbound Frontage Roads

1.1.4.1.7.NG Northbound General Purpose Lanes

1.1.4.1.7.NM Northbound Managed Lanes

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 5 of 32

Page 6: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.1.4.1.7.NR Northbound Ramps

1.1.4.1.7.NL Northbound Landscape Areas

1.1.4.1.7.SF Southbound Frontage Roads

1.1.4.1.7.SG Southbound General Purpose Lanes

1.1.4.1.7.SM Southbound Managed Lanes

1.1.4.1.7.SR Southbound Ramps

1.1.4.1.7.SL Southbound Landscape Areas

1.1.4.1.7.XU Cross Road Underpasses

1.1.4.1.7.IC Interchanges

1.1.4.1.8 Signing & Pavement Marking

1.1.4.1.8.NF Northbound Frontage Roads

1.1.4.1.8.NG Northbound General Purpose Lanes

1.1.4.1.8.NM Northbound Managed Lanes

1.1.4.1.8.NR Northbound Ramps

1.1.4.1.8.NL Northbound Landscape Areas

1.1.4.1.8.SF Southbound Frontage Roads

1.1.4.1.8.SG Southbound General Purpose Lanes

1.1.4.1.8.SM Southbound Managed Lanes

1.1.4.1.8.SR Southbound Ramps

1.1.4.1.8.SL Southbound Landscape Areas

1.1.4.1.8.XU Cross Road Underpasses

1.1.4.1.8.IC Interchanges

1.1.4.1.9 ITC/TCS

1.1.4.1.9.NF Northbound Frontage Roads

1.1.4.1.9.NG Northbound General Purpose Lanes

1.1.4.1.9.NM Northbound Managed Lanes

1.1.4.1.9.NR Northbound Ramps

1.1.4.1.9.NL Northbound Landscape Areas

1.1.4.1.9.SF Southbound Frontage Roads

1.1.4.1.9.SG Southbound General Purpose Lanes

1.1.4.1.9.SM Southbound Managed Lanes

1.1.4.1.9.SR Southbound Ramps

1.1.4.1.9.SL Southbound Landscape Areas

1.1.4.1.9.XU Cross Road Underpasses

1.1.4.1.9.IC Interchanges

1.1.4.2 Drainage

1.1.4.2.1 Trunk Lines & Culverts

1.1.4.2.1.NF Northbound Frontage Roads

1.1.4.2.1.NG Northbound General Purpose Lanes

1.1.4.2.1.NM Northbound Managed Lanes

1.1.4.2.1.NR Northbound Ramps

1.1.4.2.1.NL Northbound Landscape Areas

1.1.4.2.1.SF Southbound Frontage Roads

1.1.4.2.1.SG Southbound General Purpose Lanes

1.1.4.2.1.SM Southbound Managed Lanes

1.1.4.2.1.SR Southbound Ramps

1.1.4.2.1.SL Southbound Landscape Areas

1.1.4.2.1.XU Cross Road Underpasses

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 6 of 32

Page 7: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.1.4.2.1.IC Interchanges

1.1.4.2.2 Laterals & Inlets

1.1.4.2.2.NF Northbound Frontage Roads

1.1.4.2.2.NG Northbound General Purpose Lanes

1.1.4.2.2.NM Northbound Managed Lanes

1.1.4.2.2.NR Northbound Ramps

1.1.4.2.2.NL Northbound Landscape Areas

1.1.4.2.2.SF Southbound Frontage Roads

1.1.4.2.2.SG Southbound General Purpose Lanes

1.1.4.2.2.SM Southbound Managed Lanes

1.1.4.2.2.SR Southbound Ramps

1.1.4.2.2.SL Southbound Landscape Areas

1.1.4.2.2.XU Cross Road Underpasses

1.1.4.2.2.IC Interchanges

1.1.4.3 Structures

1.1.4.3.1 Bridges

1.1.4.3.1.1 BR 1 - IH 35E NBGP to NBML DC Daniel's Crk

1.1.4.3.1.2 BR 2 - NW Hwy SB Ent Rmp over Daniel's Crk

1.1.4.3.1.3 BR 3 - IH 35E NBGP to NBML Dir Conn

1.1.4.3.1.4 BR 4 - Lp 12 NBGP to NBML Dir Conn

1.1.4.3.1.5 BR 5 - IH 35E SBML to SBGP Dir Conn

1.1.4.3.1.6 BR 6 - IH 35E NB Elevated Mangd Lns

1.1.4.3.1.7 BR 7 - IH 35E SB Elevated Mangd Lns

1.1.4.3.1.8 BR 8 - IH 35E NBML Walnut Hill Ent Ramp

1.1.4.3.1.9 BR 9 - IH 35E SBML Walnut Hill Exit Ramp

1.1.4.3.2 Retaining Walls

1.1.4.3.2.N1 N1

1.1.4.3.2.N2 N2

1.1.4.3.2.N3 N3

1.1.4.3.2.N4 N4

1.1.4.3.2.N5 N5

1.1.4.3.2.N6 N6

1.1.4.3.2.N7 N7

1.1.4.3.2.S1 S1

1.1.4.3.2.S2 S2

1.1.4.3.2.S3 S3

1.1.4.3.2.S4 S4

1.1.4.3.2.S5 S5

1.1.4.3.2.S6 S6

1.1.4.4 Traffic Management and Sequencing

1.1.4.4.5 Barricades, Signs and Traffic Handling

1.1.4.4.5.1 Phase 1

1.1.4.4.5.2 Phase 2

1.1.4.4.5.3 Phase 3

1.1.4.4.5.4 Phase 4

1.1.4.4.6 Temporary Detours

1.1.4.4.6.1 Phase 1

1.1.4.4.6.2 Phase 2

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 7 of 32

Page 8: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.1.4.4.6.3 Phase 3

1.1.4.4.6.4 Phase 4

1.1.4.4.7 Temporary Lighting & Signals

1.1.4.4.7.1 Phase 1

1.1.4.4.7.2 Phase 2

1.1.4.4.7.3 Phase 3

1.1.4.4.7.4 Phase 4

1.1.4.4.8 Temporary Shoring

1.1.4.4.8.1 Phase 1

1.1.4.4.8.2 Phase 2

1.1.4.4.8.3 Phase 3

1.1.4.4.8.4 Phase 4

1.1.4.9 Mobilization

1.1.4.9.1 General

1.1.4.9.1.1 Mobilization Payment

1.1.4.9.1.2 Segment Administration

1.1.5 Operations

1.1.5.1 Toll Operations

1.1.5.2 Customer Service

1.1.5.3 Incident Management

1.1.5.4 Lane Availability Management

1.1.6 Maintenance

1.1.6.1 Roads

1.1.6.2 Drainage

1.1.6.3 Structures

1.1.6.4 Traffic Management & Sequencing

1.1.6.9 Fleet & Equipment

1.2 IH635 / IH35E I/C

1.2.1 Property Aquisition

1.2.2 Utility Relocation

1.2.2.1 Preliminary Work

1.2.2.1.1 SUE Investigation

1.2.2.1.2 Conceptual Relocation Plan

1.2.2.2 Charter Communications

1.2.2.2.3 Adjustment Assemblies

1.2.2.2.3.1 Master Utility Adjustment Agreement

1.2.2.2.3.2 Design & Assembly Preparation

1.2.2.2.4 Perform Relocations

1.2.2.2.4.3 Distribution

1.2.2.2.4.4 Transmission

1.2.2.3 Oncor UG

1.2.2.3.3 Adjustment Assemblies

1.2.2.3.3.1 Master Utility Adjustment Agreement

1.2.2.3.3.2 Design & Assembly Preparation

1.2.2.3.4 Perform Relocations

1.2.2.3.4.3 Distribution

1.2.2.3.4.4 Transmission

1.2.2.4 Atmos Energy

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 8 of 32

Page 9: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.2.2.4.3 Adjustment Assemblies

1.2.2.4.3.1 Master Utility Adjustment Agreement

1.2.2.4.3.2 Design & Assembly Preparation

1.2.2.4.4 Perform Relocations

1.2.2.4.4.3 Distribution

1.2.2.4.4.4 Transmission

1.2.2.5 AT&T

1.2.2.5.3 Adjustment Assemblies

1.2.2.5.3.1 Master Utility Adjustment Agreement

1.2.2.5.3.2 Design & Assembly Preparation

1.2.2.5.4 Perform Relocations

1.2.2.5.4.3 Distribution

1.2.2.5.4.4 Transmission

1.2.2.6 Level 3 Communications

1.2.2.6.3 Adjustment Assemblies

1.2.2.6.3.1 Master Utility Adjustment Agreement

1.2.2.6.3.2 Design & Assembly Preparation

1.2.2.6.4 Perform Relocations

1.2.2.6.4.3 Distribution

1.2.2.6.4.4 Transmission

1.2.2.7 Carrollton / Farmer's Branch ISD

1.2.2.7.3 Adjustment Assemblies

1.2.2.7.3.1 Master Utility Adjustment Agreement

1.2.2.7.3.2 Design & Assembly Preparation

1.2.2.7.4 Perform Relocations

1.2.2.7.4.3 Distribution

1.2.2.7.4.4 Transmission

1.2.2.8 Verizon Communications

1.2.2.8.3 Adjustment Assemblies

1.2.2.8.3.1 Master Utility Adjustment Agreement

1.2.2.8.3.2 Design & Assembly Preparation

1.2.2.8.4 Perform Relocations

1.2.2.8.4.3 Distribution

1.2.2.8.4.4 Transmission

1.2.2.9 XO Communications

1.2.2.9.3 Adjustment Assemblies

1.2.2.9.3.1 Master Utility Adjustment Agreement

1.2.2.9.3.2 Design & Assembly Preparation

1.2.2.9.4 Perform Relocations

1.2.2.9.4.3 Distribution

1.2.2.9.4.4 Transmission

1.2.2.10 AboveNet

1.2.2.10.3 Adjustment Assemblies

1.2.2.10.3.1 Master Utility Adjustment Agreement

1.2.2.10.3.2 Design & Assembly Preparation

1.2.2.10.4 Perform Relocations

1.2.2.10.4.3 Distribution

1.2.2.10.4.4 Transmission

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 9 of 32

Page 10: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.2.2.11 Time Warner Communications

1.2.2.11.3 Adjustment Assemblies

1.2.2.11.3.1 Master Utility Adjustment Agreement

1.2.2.11.3.2 Design & Assembly Preparation

1.2.2.11.4 Perform Relocations

1.2.2.11.4.3 Distribution

1.2.2.11.4.4 Transmission

1.2.2.12 Alpheus

1.2.2.12.3 Adjustment Assemblies

1.2.2.12.3.1 Master Utility Adjustment Agreement

1.2.2.12.3.2 Design & Assembly Preparation

1.2.2.12.4 Perform Relocations

1.2.2.12.4.3 Distribution

1.2.2.12.4.4 Transmission

1.2.2.13 City of Dallas

1.2.2.13.3 Adjustment Assemblies

1.2.2.13.3.1 Master Utility Adjustment Agreement

1.2.2.13.3.2 Design & Assembly Preparation

1.2.2.13.4 Perform Relocations

1.2.2.13.4.3 Distribution

1.2.2.13.4.4 Transmission

1.2.2.14 City of Farmer's Branch

1.2.2.14.3 Adjustment Assemblies

1.2.2.14.3.1 Master Utility Adjustment Agreement

1.2.2.14.3.2 Design & Assembly Preparation

1.2.2.14.4 Perform Relocations

1.2.2.14.4.3 Distribution

1.2.2.14.4.4 Transmission

1.2.3 Design

1.2.3.0 Preliminary Design Activities

1.2.3.0.1 Surveying

1.2.3.0.2 Geotechnical

1.2.3.0.3 Specifications & Standards

1.2.3.1 Roads

1.2.3.1.1 Demolition

1.2.3.1.2 Roadway Layout

1.2.3.1.3 Landscaping

1.2.3.1.5 Pavement

1.2.3.1.7 Illumination & Traffic Signals

1.2.3.1.8 Signing & Pavement Marking

1.2.3.1.9 ITS / TCS

1.2.3.3 Structures

1.2.3.3.1 Bridges

1.2.3.3.2 Retaining Walls

1.2.3.3.3 Noise Walls

1.2.3.2 Drainage

1.2.3.2.1 Culverts

1.2.3.2.2 Storm Sewer

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 10 of 32

Page 11: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.2.3.2.3 Special Features

1.2.3.2.4 SWPPP

1.2.3.4 Traffic Management and Sequencing

1.2.3.4.1 Phase 1

1.2.3.4.2 Phase 2

1.2.3.4.3 Phase 3

1.2.3.4.4 Phase 4

1.2.3.8 Design Packages

1.2.3.8.1 Schematics

1.2.3.8.2 60% Design Package (Early Construction)

1.2.3.8.3 90% Design Package (All Disciplines)

1.2.3.8.4 100% Design Package (Final Package)

1.2.4 Construction

1.2.4.1 Roads

1.2.4.1.1 Demolition

1.2.4.1.1.NF Northbound Frontage Roads

1.2.4.1.1.NG Northbound General Purpose Lanes

1.2.4.1.1.NM Northbound Managed Lanes

1.2.4.1.1.NR Northbound Ramps

1.2.4.1.1.NL Northbound Landscape Areas

1.2.4.1.1.SF Southbound Frontage Roads

1.2.4.1.1.SG Southbound General Purpose Lanes

1.2.4.1.1.SM Southbound Managed Lanes

1.2.4.1.1.SR Southbound Ramps

1.2.4.1.1.SL Southbound Landscape Areas

1.2.4.1.1.IC Interchanges

1.2.4.1.2 Earthwork

1.2.4.1.2.NF Northbound Frontage Roads

1.2.4.1.2.NG Northbound General Purpose Lanes

1.2.4.1.2.NM Northbound Managed Lanes

1.2.4.1.2.NR Northbound Ramps

1.2.4.1.2.NL Northbound Landscape Areas

1.2.4.1.2.SF Southbound Frontage Roads

1.2.4.1.2.SG Southbound General Purpose Lanes

1.2.4.1.2.SM Southbound Managed Lanes

1.2.4.1.2.SR Southbound Ramps

1.2.4.1.2.SL Southbound Landscape Areas

1.2.4.1.2.IC Interchanges

1.2.4.1.3 Landscaping

1.2.4.1.3.NF Northbound Frontage Roads

1.2.4.1.3.NG Northbound General Purpose Lanes

1.2.4.1.3.NM Northbound Managed Lanes

1.2.4.1.3.NR Northbound Ramps

1.2.4.1.3.NL Northbound Landscape Areas

1.2.4.1.3.SF Southbound Frontage Roads

1.2.4.1.3.SG Southbound General Purpose Lanes

1.2.4.1.3.SM Southbound Managed Lanes

1.2.4.1.3.SR Southbound Ramps

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 11 of 32

Page 12: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.2.4.1.3.SL Southbound Landscape Areas

1.2.4.1.3.IC Interchanges

1.2.4.1.4 Subgrade & Base

1.2.4.1.4.NF Northbound Frontage Roads

1.2.4.1.4.NG Northbound General Purpose Lanes

1.2.4.1.4.NM Northbound Managed Lanes

1.2.4.1.4.NR Northbound Ramps

1.2.4.1.4.NL Northbound Landscape Areas

1.2.4.1.4.SF Southbound Frontage Roads

1.2.4.1.4.SG Southbound General Purpose Lanes

1.2.4.1.4.SM Southbound Managed Lanes

1.2.4.1.4.SR Southbound Ramps

1.2.4.1.4.SL Southbound Landscape Areas

1.2.4.1.4.IC Interchanges

1.2.4.1.5 Pavement

1.2.4.1.5.NF Northbound Frontage Roads

1.2.4.1.5.NG Northbound General Purpose Lanes

1.2.4.1.5.NM Northbound Managed Lanes

1.2.4.1.5.NR Northbound Ramps

1.2.4.1.5.NL Northbound Landscape Areas

1.2.4.1.5.SF Southbound Frontage Roads

1.2.4.1.5.SG Southbound General Purpose Lanes

1.2.4.1.5.SM Southbound Managed Lanes

1.2.4.1.5.SR Southbound Ramps

1.2.4.1.5.SL Southbound Landscape Areas

1.2.4.1.5.IC Interchanges

1.2.4.1.6 Barriers and Fencing

1.2.4.1.6.NF Northbound Frontage Roads

1.2.4.1.6.NG Northbound General Purpose Lanes

1.2.4.1.6.NM Northbound Managed Lanes

1.2.4.1.6.NR Northbound Ramps

1.2.4.1.6.NL Northbound Landscape Areas

1.2.4.1.6.SF Southbound Frontage Roads

1.2.4.1.6.SG Southbound General Purpose Lanes

1.2.4.1.6.SM Southbound Managed Lanes

1.2.4.1.6.SR Southbound Ramps

1.2.4.1.6.SL Southbound Landscape Areas

1.2.4.1.6.IC Interchanges

1.2.4.1.7 Illumination & Traffic Signals

1.2.4.1.7.NF Northbound Frontage Roads

1.2.4.1.7.NG Northbound General Purpose Lanes

1.2.4.1.7.NM Northbound Managed Lanes

1.2.4.1.7.NR Northbound Ramps

1.2.4.1.7.NL Northbound Landscape Areas

1.2.4.1.7.SF Southbound Frontage Roads

1.2.4.1.7.SG Southbound General Purpose Lanes

1.2.4.1.7.SM Southbound Managed Lanes

1.2.4.1.7.SR Southbound Ramps

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 12 of 32

Page 13: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.2.4.1.7.SL Southbound Landscape Areas

1.2.4.1.7.IC Interchanges

1.2.4.1.8 Signing & Pavement Marking

1.2.4.1.8.NF Northbound Frontage Roads

1.2.4.1.8.NG Northbound General Purpose Lanes

1.2.4.1.8.NM Northbound Managed Lanes

1.2.4.1.8.NR Northbound Ramps

1.2.4.1.8.NL Northbound Landscape Areas

1.2.4.1.8.SF Southbound Frontage Roads

1.2.4.1.8.SG Southbound General Purpose Lanes

1.2.4.1.8.SM Southbound Managed Lanes

1.2.4.1.8.SR Southbound Ramps

1.2.4.1.8.SL Southbound Landscape Areas

1.2.4.1.8.IC Interchanges

1.2.4.1.9 ITC/TCS

1.2.4.1.9.NF Northbound Frontage Roads

1.2.4.1.9.NG Northbound General Purpose Lanes

1.2.4.1.9.NM Northbound Managed Lanes

1.2.4.1.9.NR Northbound Ramps

1.2.4.1.9.NL Northbound Landscape Areas

1.2.4.1.9.SF Southbound Frontage Roads

1.2.4.1.9.SG Southbound General Purpose Lanes

1.2.4.1.9.SM Southbound Managed Lanes

1.2.4.1.9.SR Southbound Ramps

1.2.4.1.9.SL Southbound Landscape Areas

1.2.4.1.9.IC Interchanges

1.2.4.2 Drainage

1.2.4.2.1 Trunk Lines & Culverts

1.2.4.2.1.NF Northbound Frontage Roads

1.2.4.2.1.NG Northbound General Purpose Lanes

1.2.4.2.1.NM Northbound Managed Lanes

1.2.4.2.1.NR Northbound Ramps

1.2.4.2.1.NL Northbound Landscape Areas

1.2.4.2.1.SF Southbound Frontage Roads

1.2.4.2.1.SG Southbound General Purpose Lanes

1.2.4.2.1.SM Southbound Managed Lanes

1.2.4.2.1.SR Southbound Ramps

1.2.4.2.1.SL Southbound Landscape Areas

1.2.4.2.1.IC Interchanges

1.2.4.2.2 Laterals & Inlets

1.2.4.2.2.NF Northbound Frontage Roads

1.2.4.2.2.NG Northbound General Purpose Lanes

1.2.4.2.2.NM Northbound Managed Lanes

1.2.4.2.2.NR Northbound Ramps

1.2.4.2.2.NL Northbound Landscape Areas

1.2.4.2.2.SF Southbound Frontage Roads

1.2.4.2.2.SG Southbound General Purpose Lanes

1.2.4.2.2.SM Southbound Managed Lanes

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 13 of 32

Page 14: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.2.4.2.2.SR Southbound Ramps

1.2.4.2.2.SL Southbound Landscape Areas

1.2.4.2.2.IC Interchanges

1.2.4.3 Structures

1.2.4.3.1 Bridges

1.2.4.3.1.10 BR 10 - NB to EB Mangd Ln Dir Conn

1.2.4.3.1.11 BR 11 - SB to EB Mangd Ln Dir Conn

1.2.4.3.1.12 BR 12 - WB to SB Mangd Ln Dir Conn

1.2.4.3.1.13 BR 13 - WB to NB Mangd Ln Dir Conn

1.2.4.3.1.14 BR 14 - VV Exit Ramp over WNDC & channel

1.2.4.3.1.15 BR 15 - Ent Ramp over Valley View Lane

1.2.4.3.2 Retaining Walls

1.2.4.3.2.N8 N8

1.2.4.3.2.N9 N9

1.2.4.3.2.N10 N10

1.2.4.3.2.N11 N11

1.2.4.4 Traffic Management and Sequencing

1.2.4.4.5 Barricades, Signs and Traffic Handling

1.2.4.4.5.1 Phase 1

1.2.4.4.5.2 Phase 2

1.2.4.4.5.3 Phase 3

1.2.4.4.5.4 Phase 4

1.2.4.4.6 Temporary Detours

1.2.4.4.6.1 Phase 1

1.2.4.4.6.2 Phase 2

1.2.4.4.6.3 Phase 3

1.2.4.4.6.4 Phase 4

1.2.4.4.7 Temporary Lighting & Signals

1.2.4.4.7.1 Phase 1

1.2.4.4.7.2 Phase 2

1.2.4.4.7.3 Phase 3

1.2.4.4.7.4 Phase 4

1.2.4.4.8 Temporary Shoring

1.2.4.4.8.1 Phase 1

1.2.4.4.8.2 Phase 2

1.2.4.4.8.3 Phase 3

1.2.4.4.8.4 Phase 4

1.2.4.9 Mobilization

1.2.4.9.1 General

1.2.4.9.1.1 Mobilization Payment

1.2.4.9.1.2 Segment Administration

1.2.4.9.2 Project Specific Locations (PSLs)

1.2.4.9.2.1 Concrete Plant

1.2.5 Operations

1.2.5.1 Toll Operations

1.2.5.2 Customer Service

1.2.5.3 Incident Management

1.2.5.4 Lane Availability Management

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 14 of 32

Page 15: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.2.6 Maintenance

1.2.6.1 Roads

1.2.6.2 Drainage

1.2.6.3 Structures

1.2.6.4 Traffic Management & Sequencing

1.2.6.9 Fleet & Equipment

1.3 IH635 Section

1.3.1 Property Aquisition

1.3.2 Utility Relocation

1.3.2.1 Preliminary Work

1.3.2.1.1 SUE Investigation

1.3.2.1.2 Conceptual Relocation Plan

1.3.2.2 Charter Communications

1.3.2.2.3 Adjustment Assemblies

1.3.2.2.3.1 Master Utility Adjustment Agreement

1.3.2.2.3.2 Design & Assembly Preparation

1.3.2.2.4 Perform Relocations

1.3.2.2.4.3 Distribution

1.3.2.2.4.4 Transmission

1.3.2.3 Oncor UG

1.3.2.3.3 Adjustment Assemblies

1.3.2.3.3.1 Master Utility Adjustment Agreement

1.3.2.3.3.2 Design & Assembly Preparation

1.3.2.3.4 Perform Relocations

1.3.2.3.4.3 Distribution

1.3.2.3.4.4 Transmission

1.3.2.4 Atmos Energy

1.3.2.4.3 Adjustment Assemblies

1.3.2.4.3.1 Master Utility Adjustment Agreement

1.3.2.4.3.2 Design & Assembly Preparation

1.3.2.4.4 Perform Relocations

1.3.2.4.4.3 Distribution

1.3.2.4.4.4 Transmission

1.3.2.5 AT&T

1.3.2.5.3 Adjustment Assemblies

1.3.2.5.3.1 Master Utility Adjustment Agreement

1.3.2.5.3.2 Design & Assembly Preparation

1.3.2.5.4 Perform Relocations

1.3.2.5.4.3 Distribution

1.3.2.5.4.4 Transmission

1.3.2.6 Level 3 Communications

1.3.2.6.3 Adjustment Assemblies

1.3.2.6.3.1 Master Utility Adjustment Agreement

1.3.2.6.3.2 Design & Assembly Preparation

1.3.2.6.4 Perform Relocations

1.3.2.6.4.3 Distribution

1.3.2.6.4.4 Transmission

1.3.2.7 Carrollton / Farmer's Branch ISD

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 15 of 32

Page 16: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.2.7.3 Adjustment Assemblies

1.3.2.7.3.1 Master Utility Adjustment Agreement

1.3.2.7.3.2 Design & Assembly Preparation

1.3.2.7.4 Perform Relocations

1.3.2.7.4.3 Distribution

1.3.2.7.4.4 Transmission

1.3.2.8 Verizon Communications

1.3.2.8.3 Adjustment Assemblies

1.3.2.8.3.1 Master Utility Adjustment Agreement

1.3.2.8.3.2 Design & Assembly Preparation

1.3.2.8.4 Perform Relocations

1.3.2.8.4.3 Distribution

1.3.2.8.4.4 Transmission

1.3.2.9 XO Communications

1.3.2.9.3 Adjustment Assemblies

1.3.2.9.3.1 Master Utility Adjustment Agreement

1.3.2.9.3.2 Design & Assembly Preparation

1.3.2.9.4 Perform Relocations

1.3.2.9.4.3 Distribution

1.3.2.9.4.4 Transmission

1.3.2.10 AboveNet

1.3.2.10.3 Adjustment Assemblies

1.3.2.10.3.1 Master Utility Adjustment Agreement

1.3.2.10.3.2 Design & Assembly Preparation

1.3.2.10.4 Perform Relocations

1.3.2.10.4.3 Distribution

1.3.2.10.4.4 Transmission

1.3.2.11 Time Warner Communications

1.3.2.11.3 Adjustment Assemblies

1.3.2.11.3.1 Master Utility Adjustment Agreement

1.3.2.11.3.2 Design & Assembly Preparation

1.3.2.11.4 Perform Relocations

1.3.2.11.4.3 Distribution

1.3.2.11.4.4 Transmission

1.3.2.12 Alpheus

1.3.2.12.3 Adjustment Assemblies

1.3.2.12.3.1 Master Utility Adjustment Agreement

1.3.2.12.3.2 Design & Assembly Preparation

1.3.2.12.4 Perform Relocations

1.3.2.12.4.3 Distribution

1.3.2.12.4.4 Transmission

1.3.2.13 City of Dallas

1.3.2.13.3 Adjustment Assemblies

1.3.2.13.3.1 Master Utility Adjustment Agreement

1.3.2.13.3.2 Design & Assembly Preparation

1.3.2.13.4 Perform Relocations

1.3.2.13.4.3 Distribution

1.3.2.13.4.4 Transmission

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 16 of 32

Page 17: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.2.14 City of Farmer's Branch

1.3.2.14.3 Adjustment Assemblies

1.3.2.14.3.1 Master Utility Adjustment Agreement

1.3.2.14.3.2 Design & Assembly Preparation

1.3.2.14.4 Perform Relocations

1.3.2.14.4.3 Distribution

1.3.2.14.4.4 Transmission

1.3.3 Design

1.3.3.0 Preliminary Design Activities

1.3.3.0.1 Surveying

1.3.3.0.2 Geotechnical

1.3.3.0.3 Specifications & Standards

1.3.3.1 Roads

1.3.3.1.1 Demolition

1.3.3.1.2 Roadway Layout

1.3.3.1.3 Landscaping

1.3.3.1.5 Pavement

1.3.3.1.7 Illumination & Traffic Signals

1.3.3.1.8 Signing & Pavement Marking

1.3.3.1.9 ITS / TCS

1.3.3.3 Structures

1.3.3.3.1 Bridges

1.3.3.3.2 Retaining Walls

1.3.3.3.3 Noise Walls

1.3.3.2 Drainage

1.3.3.2.1 Culverts

1.3.3.2.2 Storm Sewer

1.3.3.2.3 Special Features

1.3.3.2.4 SWPPP

1.3.3.4 Traffic Management and Sequencing

1.3.3.4.1 Phase 1

1.3.3.4.2 Phase 2

1.3.3.4.3 Phase 3

1.3.3.4.4 Phase 4

1.3.3.5 Depressed Managed Lanes

1.3.3.5.1 Fire Protection System

1.3.3.6 Buildings and Enclosed Facilities

1.3.3.6.1 Administration & Maintenance Facility

1.3.3.8 Design Packages

1.3.3.8.1 Schematics

1.3.3.8.2 60% Design Package (Early Construction)

1.3.3.8.3 90% Design Package (All Disciplines)

1.3.3.8.4 100% Design Package (Final Package)

1.3.4 Construction

1.3.4.1 Roads

1.3.4.1.1 Demolition

1.3.4.1.1.EA Eastbound Access Roads

1.3.4.1.1.EF Eastbound Frontage Roads

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 17 of 32

Page 18: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.4.1.1.EG Eastbound General Purpose Lanes

1.3.4.1.1.ER Eastbound Ramps

1.3.4.1.1.EL Eastbound Landscape Areas

1.3.4.1.1.ML Eastbound/Westbound Managed Lanes

1.3.4.1.1.WA Westbound Access Roads

1.3.4.1.1.WF Westbound Frontage Roads

1.3.4.1.1.WG Westbound General Purpose Lanes

1.3.4.1.1.WR Westbound Ramps

1.3.4.1.1.WL Westbound Landscape Areas

1.3.4.1.1.XO Cross Road Overpasses

1.3.4.1.1.XU Cross Road Underpasses

1.3.4.1.1.IC Interchanges

1.3.4.1.2 Earthwork

1.3.4.1.2.EA Eastbound Access Roads

1.3.4.1.2.EF Eastbound Frontage Roads

1.3.4.1.2.EG Eastbound General Purpose Lanes

1.3.4.1.2.ER Eastbound Ramps

1.3.4.1.2.EL Eastbound Landscape Areas

1.3.4.1.2.ML Eastbound/Westbound Managed Lanes

1.3.4.1.2.WA Westbound Access Roads

1.3.4.1.2.WF Westbound Frontage Roads

1.3.4.1.2.WG Westbound General Purpose Lanes

1.3.4.1.2.WR Westbound Ramps

1.3.4.1.2.WL Westbound Landscape Areas

1.3.4.1.2.XO Cross Road Overpasses

1.3.4.1.2.XU Cross Road Underpasses

1.3.4.1.2.IC Interchanges

1.3.4.1.3 Landscaping

1.3.4.1.3.EA Eastbound Access Roads

1.3.4.1.3.EF Eastbound Frontage Roads

1.3.4.1.3.EG Eastbound General Purpose Lanes

1.3.4.1.3.ER Eastbound Ramps

1.3.4.1.3.EL Eastbound Landscape Areas

1.3.4.1.3.ML Eastbound/Westbound Managed Lanes

1.3.4.1.3.WA Westbound Access Roads

1.3.4.1.3.WF Westbound Frontage Roads

1.3.4.1.3.WG Westbound General Purpose Lanes

1.3.4.1.3.WR Westbound Ramps

1.3.4.1.3.WL Westbound Landscape Areas

1.3.4.1.3.XO Cross Road Overpasses

1.3.4.1.3.XU Cross Road Underpasses

1.3.4.1.3.IC Interchanges

1.3.4.1.4 Subgrade & Base

1.3.4.1.4.EA Eastbound Access Roads

1.3.4.1.4.EF Eastbound Frontage Roads

1.3.4.1.4.EG Eastbound General Purpose Lanes

1.3.4.1.4.ER Eastbound Ramps

1.3.4.1.4.EL Eastbound Landscape Areas

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 18 of 32

Page 19: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.4.1.4.ML Eastbound/Westbound Managed Lanes

1.3.4.1.4.WA Westbound Access Roads

1.3.4.1.4.WF Westbound Frontage Roads

1.3.4.1.4.WG Westbound General Purpose Lanes

1.3.4.1.4.WR Westbound Ramps

1.3.4.1.4.WL Westbound Landscape Areas

1.3.4.1.4.XO Cross Road Overpasses

1.3.4.1.4.XU Cross Road Underpasses

1.3.4.1.4.IC Interchanges

1.3.4.1.5 Pavement

1.3.4.1.5.EA Eastbound Access Roads

1.3.4.1.5.EF Eastbound Frontage Roads

1.3.4.1.5.EG Eastbound General Purpose Lanes

1.3.4.1.5.ER Eastbound Ramps

1.3.4.1.5.EL Eastbound Landscape Areas

1.3.4.1.5.ML Eastbound/Westbound Managed Lanes

1.3.4.1.5.WA Westbound Access Roads

1.3.4.1.5.WF Westbound Frontage Roads

1.3.4.1.5.WG Westbound General Purpose Lanes

1.3.4.1.5.WR Westbound Ramps

1.3.4.1.5.WL Westbound Landscape Areas

1.3.4.1.5.XO Cross Road Overpasses

1.3.4.1.5.XU Cross Road Underpasses

1.3.4.1.5.IC Interchanges

1.3.4.1.6 Barriers and Fencing

1.3.4.1.6.EA Eastbound Access Roads

1.3.4.1.6.EF Eastbound Frontage Roads

1.3.4.1.6.EG Eastbound General Purpose Lanes

1.3.4.1.6.ER Eastbound Ramps

1.3.4.1.6.EL Eastbound Landscape Areas

1.3.4.1.6.ML Eastbound/Westbound Managed Lanes

1.3.4.1.6.WA Westbound Access Roads

1.3.4.1.6.WF Westbound Frontage Roads

1.3.4.1.6.WG Westbound General Purpose Lanes

1.3.4.1.6.WR Westbound Ramps

1.3.4.1.6.WL Westbound Landscape Areas

1.3.4.1.6.XO Cross Road Overpasses

1.3.4.1.6.XU Cross Road Underpasses

1.3.4.1.6.IC Interchanges

1.3.4.1.7 Illumination & Traffic Signals

1.3.4.1.7.EA Eastbound Access Roads

1.3.4.1.7.EF Eastbound Frontage Roads

1.3.4.1.7.EG Eastbound General Purpose Lanes

1.3.4.1.7.ER Eastbound Ramps

1.3.4.1.7.EL Eastbound Landscape Areas

1.3.4.1.7.ML Eastbound/Westbound Managed Lanes

1.3.4.1.7.WA Westbound Access Roads

1.3.4.1.7.WF Westbound Frontage Roads

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 19 of 32

Page 20: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.4.1.7.WG Westbound General Purpose Lanes

1.3.4.1.7.WR Westbound Ramps

1.3.4.1.7.WL Westbound Landscape Areas

1.3.4.1.7.XO Cross Road Overpasses

1.3.4.1.7.XU Cross Road Underpasses

1.3.4.1.7.IC Interchanges

1.3.4.1.8 Signing & Pavement Marking

1.3.4.1.8.EA Eastbound Access Roads

1.3.4.1.8.EF Eastbound Frontage Roads

1.3.4.1.8.EG Eastbound General Purpose Lanes

1.3.4.1.8.ER Eastbound Ramps

1.3.4.1.8.EL Eastbound Landscape Areas

1.3.4.1.8.ML Eastbound/Westbound Managed Lanes

1.3.4.1.8.WA Westbound Access Roads

1.3.4.1.8.WF Westbound Frontage Roads

1.3.4.1.8.WG Westbound General Purpose Lanes

1.3.4.1.8.WR Westbound Ramps

1.3.4.1.8.WL Westbound Landscape Areas

1.3.4.1.8.XO Cross Road Overpasses

1.3.4.1.8.XU Cross Road Underpasses

1.3.4.1.8.IC Interchanges

1.3.4.1.9 ITC/TCS

1.3.4.1.9.EA Eastbound Access Roads

1.3.4.1.9.EF Eastbound Frontage Roads

1.3.4.1.9.EG Eastbound General Purpose Lanes

1.3.4.1.9.ER Eastbound Ramps

1.3.4.1.9.EL Eastbound Landscape Areas

1.3.4.1.9.ML Eastbound/Westbound Managed Lanes

1.3.4.1.9.WA Westbound Access Roads

1.3.4.1.9.WF Westbound Frontage Roads

1.3.4.1.9.WG Westbound General Purpose Lanes

1.3.4.1.9.WR Westbound Ramps

1.3.4.1.9.WL Westbound Landscape Areas

1.3.4.1.9.XO Cross Road Overpasses

1.3.4.1.9.XU Cross Road Underpasses

1.3.4.1.9.IC Interchanges

1.3.4.2 Drainage

1.3.4.2.1 Trunk Lines & Culverts

1.3.4.2.1.EA Eastbound Access Roads

1.3.4.2.1.EF Eastbound Frontage Roads

1.3.4.2.1.EG Eastbound General Purpose Lanes

1.3.4.2.1.ER Eastbound Ramps

1.3.4.2.1.EL Eastbound Landscape Areas

1.3.4.2.1.ML Eastbound/Westbound Managed Lanes

1.3.4.2.1.WA Westbound Access Roads

1.3.4.2.1.WF Westbound Frontage Roads

1.3.4.2.1.WG Westbound General Purpose Lanes

1.3.4.2.1.WR Westbound Ramps

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 20 of 32

Page 21: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.4.2.1.WL Westbound Landscape Areas

1.3.4.2.1.XO Cross Road Overpasses

1.3.4.2.1.XU Cross Road Underpasses

1.3.4.2.1.IC Interchanges

1.3.4.2.2 Laterals & Inlets

1.3.4.2.2.EA Eastbound Access Roads

1.3.4.2.2.EF Eastbound Frontage Roads

1.3.4.2.2.EG Eastbound General Purpose Lanes

1.3.4.2.2.ER Eastbound Ramps

1.3.4.2.2.EL Eastbound Landscape Areas

1.3.4.2.2.ML Eastbound/Westbound Managed Lanes

1.3.4.2.2.WA Westbound Access Roads

1.3.4.2.2.WF Westbound Frontage Roads

1.3.4.2.2.WG Westbound General Purpose Lanes

1.3.4.2.2.WR Westbound Ramps

1.3.4.2.2.WL Westbound Landscape Areas

1.3.4.2.2.XO Cross Road Overpasses

1.3.4.2.2.XU Cross Road Underpasses

1.3.4.2.2.IC Interchanges

1.3.4.2.3 Special Drainage Features

1.3.4.2.3.EF Eastbound Frontage Roads

1.3.4.2.3.ML Eastbound/Westbound Managed Lanes

1.3.4.2.3.WF Westbound Frontage Roads

1.3.4.3 Structures

1.3.4.3.1 Bridges

1.3.4.3.1.16 BR 16 - EB/WB ML over IH 35E & Denton/UPRR

1.3.4.3.1.17 BR 17 - EBGP over Denton/UPRR

1.3.4.3.1.18 BR 18 - WBGP over Denton/UPRR

1.3.4.3.1.19 BR 19 - EB Collector IH 35E to W of Josey

1.3.4.3.1.20 BR 20 - WB Collector IH 35E to W of Josey

1.3.4.3.1.21 BR 21 - EB Collector Elev Ramp to IH635 EBML

1.3.4.3.1.22 BR 22 - IH 635 WBML Elev Ramp to WB Collector

1.3.4.3.1.23 BR 23 - EB/WB ML W of Grissom to over Josey

1.3.4.3.1.24 BR 24 - EBGP over Josey Ln

1.3.4.3.1.25 BR 25 - WBGP over Josey Ln

1.3.4.3.1.26 BR 26 - EB Bypass Ramp over Josey Ln

1.3.4.3.1.27 BR 27 - WB Bypass Ent Ramp over Josey

1.3.4.3.1.28 BR 28 - WB Bypass Exit Ramp over Josey

1.3.4.3.1.29 BR 29 - EBGP over Webb Chapel

1.3.4.3.1.29T BR 29T - Temp EBGP over Webb Chapel

1.3.4.3.1.30 BR 30 - WBGP over Webb Chapel

1.3.4.3.1.30T BR 30T - Temp WBGP over Webb Chapel

1.3.4.3.1.31 BR 31 - EB Bypass over Webb Chapel

1.3.4.3.1.32 BR 32 - WB Bypass over Webb Chapel

1.3.4.3.1.33 BR 33 - Webb Chapel over EB/WB ML

1.3.4.3.1.34 BR 34 - Joe Ratcliff Walkway

1.3.4.3.1.35 BR 35 - Marsh Ln over GP+ML+BP

1.3.4.3.1.36 BR 36 - Rosser Rd over GP+ML+BP

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 21 of 32

Page 22: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.4.3.1.37 BR 37 - Valley View over EB/WB ML

1.3.4.3.1.38 BR 38 - Midway Rd over EB/WB ML

1.3.4.3.1.39 BR 39 - EBGP over Valley View and Midway

1.3.4.3.1.40 BR 40 - WBGP over Valley View and Midway

1.3.4.3.1.41 BR 41 - EBML to GP Ramp over Valley View

1.3.4.3.1.42 BR 42 - WBGP to FR Exit over Midway & VV

1.3.4.3.1.43 BR 43 - WBFR over Valley View

1.3.4.3.1.44 BR 44 - WB Bypass over Midway Rd

1.3.4.3.1.45 BR 45 - WBBP over GP-FR Exit

1.3.4.3.1.45B BR 45B - DNT Ramp over GP-FR Exit

1.3.4.3.1.46 BR 46 - Welch Rd over IH 635 GP+ML+BP

1.3.4.3.1.47 BR 47 - EBGP over DNT

1.3.4.3.1.48 BR 48 - WBGP over DNT

1.3.4.3.1.52 BR 52 - Montfort Dr over IH 635 GP+ML+BP

1.3.4.3.1.53 BR 53 - WBFR to GP Ramp over WB Bypass

1.3.4.3.1.54 BR 54 - Preston Rd over IH 635 GP+ML+BP

1.3.4.3.1.55 BR 55 - EBGP over ML Exit Rmp

1.3.4.3.1.56 BR 56 - WBGP over ML Ent Rmp

1.3.4.3.1.57 BR 57 - EBGP over ML Ent Rmp

1.3.4.3.1.58 BR 58 - WBGP over ML Exit Rmp

1.3.4.3.1.59 BR 59 - EBGP over Hillcrest Rd

1.3.4.3.1.60 BR 60 - WBGP over Hillcrest Rd

1.3.4.3.1.61 BR 61 - EB/WB ML over Hillcrest Rd

1.3.4.3.1.62 BR 62 - EBGP over Park Central

1.3.4.3.1.63 BR 63 - WBGP over Park Central

1.3.4.3.1.64 BR 64 - EBML over Park Central

1.3.4.3.1.65 BR 65 - WBML over Park Central

1.3.4.3.1.66 BR 66 - EBFR over Park Central

1.3.4.3.1.67 BR 67 - WBFR over Park Central

1.3.4.3.1.68 BR 68 - EB Ramp over White Rock Creek

1.3.4.3.1.69 BR 69 - WB Ramp over White Rock Creek

1.3.4.3.1.CDE BR CDE - EBCD over DNT

1.3.4.3.1.CDE-R BR CDE-R - EBCD over DNT (Removal of Temp)

1.3.4.3.1.CDW BR CDW - WBCD over DNT

1.3.4.3.1.CDW-R BR CDW-R - WBCD over DNT (Removal of Temp)

1.3.4.3.1.DNT BR DNT - DNT over Managed Lanes

1.3.4.3.1.GE1 BR GE1 - GP EB over ML Ent Ramp

1.3.4.3.1.GW1 BR GW1 - GP WB over ML Ext Ramp

1.3.4.3.1.GWR BR GWR - WBGP under Rosser & over ML Ent R...

1.3.4.3.1.MEF BR MEF - ML EB over Farmers Branch Crk

1.3.4.3.1.MWF BR MWF - ML WB over Farmers Branch Crk

1.3.4.3.1.UE1 BR UE1 - EB U-wall Overhang 100+00 to 151+00

1.3.4.3.1.UE2 BR UE2 - EB U-wall Overhang 162+00 to 181+00

1.3.4.3.1.UE4 BR UE4 - EB U-wall Overhang 215+00 to 250+00

1.3.4.3.1.UE5 BR UE5 - EB U-wall Overhang 275+00 to 334+81

1.3.4.3.1.UW1 BR UW1 - WB U-wall Overhang 101+00 to 151+00

1.3.4.3.1.UW2 BR UW2 - WB U-wall Overhang 162+00 to 166+00

1.3.4.3.1.UW3 BR UW3 - WB U-wall Overhang 181+00 to 197+05

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 22 of 32

Page 23: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.4.3.1.UW4 BR UW4 - WB U-wall Overhang 215+00 to 250+00

1.3.4.3.1.UW5 BR UW5 - WB U-wall Overhang 275+00 to 334+50

1.3.4.3.2 Retaining Walls

1.3.4.3.2.E1 E1

1.3.4.3.2.E2 E2

1.3.4.3.2.E4 E4

1.3.4.3.2.E3 E3

1.3.4.3.2.E5 E5

1.3.4.3.2.E6 E6

1.3.4.3.2.E7 E7

1.3.4.3.2.E8 E8

1.3.4.3.2.E9 E9

1.3.4.3.2.E10A E10A

1.3.4.3.2.E10B E10B

1.3.4.3.2.E10C E10C

1.3.4.3.2.E11 E11

1.3.4.3.2.E12 E12

1.3.4.3.2.E13 E13

1.3.4.3.2.E14 E14

1.3.4.3.2.E15A E15A

1.3.4.3.2.E15B E15B

1.3.4.3.2.E16 E16

1.3.4.3.2.E17 E17

1.3.4.3.2.E18 E18

1.3.4.3.2.E19 E19

1.3.4.3.2.E20 E20

1.3.4.3.2.E21 E21

1.3.4.3.2.E22A E22A

1.3.4.3.2.E22B E22B

1.3.4.3.2.E22C E22C

1.3.4.3.2.E23 E23

1.3.4.3.2.E24 E24

1.3.4.3.2.E25 E25

1.3.4.3.2.E27 E27

1.3.4.3.2.E28 E28

1.3.4.3.2.E29 E29

1.3.4.3.2.E30 E30

1.3.4.3.2.E31 E31

1.3.4.3.2.E32 E32

1.3.4.3.2.E33 E33

1.3.4.3.2.E34 E34

1.3.4.3.2.E35 E35

1.3.4.3.2.E36 E36

1.3.4.3.2.E37 E37

1.3.4.3.2.E38 E38

1.3.4.3.2.E39 E39

1.3.4.3.2.E40 E40

1.3.4.3.2.E41 E41

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 23 of 32

Page 24: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.4.3.2.E42 E42

1.3.4.3.2.E43 E43

1.3.4.3.2.W1 W1

1.3.4.3.2.W2 W2

1.3.4.3.2.W3 W3

1.3.4.3.2.W4 W4

1.3.4.3.2.W5 W5

1.3.4.3.2.W6 W6

1.3.4.3.2.W7 W7

1.3.4.3.2.W8 W8

1.3.4.3.2.W9 W9

1.3.4.3.2.W10 W10

1.3.4.3.2.W11A W11A

1.3.4.3.2.W11B W11B

1.3.4.3.2.W11C W11C

1.3.4.3.2.W13 W13

1.3.4.3.2.W14 W14

1.3.4.3.2.W15 W15

1.3.4.3.2.W16 W16

1.3.4.3.2.W17 W17

1.3.4.3.2.W19 W19

1.3.4.3.2.W20 W20

1.3.4.3.2.W21 W21

1.3.4.3.2.W22 W22

1.3.4.3.2.W23A W23A

1.3.4.3.2.W23B W23B

1.3.4.3.2.W24 W24

1.3.4.3.2.W25 W25

1.3.4.3.2.W26A W26A

1.3.4.3.2.W26B W26B

1.3.4.3.2.W26C W26C

1.3.4.3.2.W28 W28

1.3.4.3.2.W29 W29

1.3.4.3.2.W30 W30

1.3.4.3.2.W31 W31

1.3.4.3.2.W32 W32

1.3.4.3.2.W33 W33

1.3.4.3.2.W34 W34

1.3.4.3.2.W35 W35

1.3.4.3.2.W36 W36

1.3.4.3.2.W37 W37

1.3.4.3.2.W38 W38

1.3.4.3.2.W39 W39

1.3.4.3.2.W40A W40A

1.3.4.3.2.W40B W40B

1.3.4.3.2.W41 W41

1.3.4.3.2.W42 W42

1.3.4.3.2.W43 W43

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 24 of 32

Page 25: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.4.3.2.W44 W44

1.3.4.3.2.W45 W45

1.3.4.3.2.W46 W46

1.3.4.3.2.W47 W47

1.3.4.3.2.W48 W48

1.3.4.3.2.W49 W49

1.3.4.3.2.W50 W50

1.3.4.3.2.W51 W51

1.3.4.3.2.W52 W52

1.3.4.3.2.W53 W53

1.3.4.3.3 Noise Walls

1.3.4.3.3.EF Eastbound Frontage Roads

1.3.4.3.3.WF Westbound Frontage Roads

1.3.4.4 Traffic Management and Sequencing

1.3.4.4.5 Barricades, Signs and Traffic Handling

1.3.4.4.5.1 Phase 1

1.3.4.4.5.2 Phase 2

1.3.4.4.5.3 Phase 3

1.3.4.4.5.4 Phase 4

1.3.4.4.6 Temporary Detours

1.3.4.4.6.1 Phase 1

1.3.4.4.6.2 Phase 2

1.3.4.4.6.3 Phase 3

1.3.4.4.6.4 Phase 4

1.3.4.4.7 Temporary Lighting & Signals

1.3.4.4.7.1 Phase 1

1.3.4.4.7.2 Phase 2

1.3.4.4.7.3 Phase 3

1.3.4.4.7.4 Phase 4

1.3.4.4.8 Temporary Shoring

1.3.4.4.8.1 Phase 1

1.3.4.4.8.2 Phase 2

1.3.4.4.8.3 Phase 3

1.3.4.4.8.4 Phase 4

1.3.4.5 Depressed Managed Lanes

1.3.4.5.1 Fire Protection System

1.3.4.5.1.EF Eastbound Frontage Roads

1.3.4.5.1.ML Eastbound/Westbound Managed Lanes

1.3.4.5.1.WF Westbound Frontage Roads

1.3.4.6 Buildings and Enclosed Facilities

1.3.4.6.1 Administration & Maintenance Facility

1.3.4.6.1.1 Buildings

1.3.4.6.1.2 Site Work

1.3.4.9 Mobilization

1.3.4.9.1 General

1.3.4.9.1.1 Mobilization Payment

1.3.4.9.1.2 Segment Administration

1.3.5 Operations

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 25 of 32

Page 26: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.3.5.1 Toll Operations

1.3.5.2 Customer Service

1.3.5.3 Incident Management

1.3.5.4 Lane Availability Management

1.3.6 Maintenance

1.3.6.1 Roads

1.3.6.2 Drainage

1.3.6.3 Structures

1.3.6.4 Traffic Management & Sequencing

1.3.6.5 Depressed Managed Lanes

1.3.6.6 Buildings and Enclosed Facilities

1.3.6.9 Fleet & Equipment

1.4 IH 635 / US 75 I/C

1.4.1 Property Aquisition

1.4.2 Utility Relocation

1.4.2.1 Preliminary Work

1.4.2.1.1 SUE Investigation

1.4.2.1.2 Conceptual Relocation Plan

1.4.2.2 Charter Communications

1.4.2.2.3 Adjustment Assemblies

1.4.2.2.3.1 Master Utility Adjustment Agreement

1.4.2.2.3.2 Design & Assembly Preparation

1.4.2.2.4 Perform Relocations

1.4.2.2.4.3 Distribution

1.4.2.2.4.4 Transmission

1.4.2.3 Oncor UG

1.4.2.3.3 Adjustment Assemblies

1.4.2.3.3.1 Master Utility Adjustment Agreement

1.4.2.3.3.2 Design & Assembly Preparation

1.4.2.3.4 Perform Relocations

1.4.2.3.4.3 Distribution

1.4.2.3.4.4 Transmission

1.4.2.4 Atmos Energy

1.4.2.4.3 Adjustment Assemblies

1.4.2.4.3.1 Master Utility Adjustment Agreement

1.4.2.4.3.2 Design & Assembly Preparation

1.4.2.4.4 Perform Relocations

1.4.2.4.4.3 Distribution

1.4.2.4.4.4 Transmission

1.4.2.5 AT&T

1.4.2.5.3 Adjustment Assemblies

1.4.2.5.3.1 Master Utility Adjustment Agreement

1.4.2.5.3.2 Design & Assembly Preparation

1.4.2.5.4 Perform Relocations

1.4.2.5.4.3 Distribution

1.4.2.5.4.4 Transmission

1.4.2.6 Level 3 Communications

1.4.2.6.3 Adjustment Assemblies

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 26 of 32

Page 27: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.4.2.6.3.1 Master Utility Adjustment Agreement

1.4.2.6.3.2 Design & Assembly Preparation

1.4.2.6.4 Perform Relocations

1.4.2.6.4.3 Distribution

1.4.2.6.4.4 Transmission

1.4.2.7 Carrollton / Farmer's Branch ISD

1.4.2.7.3 Adjustment Assemblies

1.4.2.7.3.1 Master Utility Adjustment Agreement

1.4.2.7.3.2 Design & Assembly Preparation

1.4.2.7.4 Perform Relocations

1.4.2.7.4.3 Distribution

1.4.2.7.4.4 Transmission

1.4.2.8 Verizon Communications

1.4.2.8.3 Adjustment Assemblies

1.4.2.8.3.1 Master Utility Adjustment Agreement

1.4.2.8.3.2 Design & Assembly Preparation

1.4.2.8.4 Perform Relocations

1.4.2.8.4.3 Distribution

1.4.2.8.4.4 Transmission

1.4.2.9 XO Communications

1.4.2.9.3 Adjustment Assemblies

1.4.2.9.3.1 Master Utility Adjustment Agreement

1.4.2.9.3.2 Design & Assembly Preparation

1.4.2.9.4 Perform Relocations

1.4.2.9.4.3 Distribution

1.4.2.9.4.4 Transmission

1.4.2.10 AboveNet

1.4.2.10.3 Adjustment Assemblies

1.4.2.10.3.1 Master Utility Adjustment Agreement

1.4.2.10.3.2 Design & Assembly Preparation

1.4.2.10.4 Perform Relocations

1.4.2.10.4.3 Distribution

1.4.2.10.4.4 Transmission

1.4.2.11 Time Warner Communications

1.4.2.11.3 Adjustment Assemblies

1.4.2.11.3.1 Master Utility Adjustment Agreement

1.4.2.11.3.2 Design & Assembly Preparation

1.4.2.11.4 Perform Relocations

1.4.2.11.4.3 Distribution

1.4.2.11.4.4 Transmission

1.4.2.12 Alpheus

1.4.2.12.3 Adjustment Assemblies

1.4.2.12.3.1 Master Utility Adjustment Agreement

1.4.2.12.3.2 Design & Assembly Preparation

1.4.2.12.4 Perform Relocations

1.4.2.12.4.3 Distribution

1.4.2.12.4.4 Transmission

1.4.2.13 City of Dallas

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 27 of 32

Page 28: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.4.2.13.3 Adjustment Assemblies

1.4.2.13.3.1 Master Utility Adjustment Agreement

1.4.2.13.3.2 Design & Assembly Preparation

1.4.2.13.4 Perform Relocations

1.4.2.13.4.3 Distribution

1.4.2.13.4.4 Transmission

1.4.2.14 City of Farmer's Branch

1.4.2.14.3 Adjustment Assemblies

1.4.2.14.3.1 Master Utility Adjustment Agreement

1.4.2.14.3.2 Design & Assembly Preparation

1.4.2.14.4 Perform Relocations

1.4.2.14.4.3 Distribution

1.4.2.14.4.4 Transmission

1.4.3 Design

1.4.3.0 Preliminary Design Activities

1.4.3.0.1 Surveying

1.4.3.0.2 Geotechnical

1.4.3.0.3 Specifications & Standards

1.4.3.1 Roads

1.4.3.1.1 Demolition

1.4.3.1.2 Roadway Layout

1.4.3.1.3 Landscaping

1.4.3.1.5 Pavement

1.4.3.1.7 Illumination & Traffic Signals

1.4.3.1.8 Signing & Pavement Marking

1.4.3.1.9 ITS / TCS

1.4.3.3 Structures

1.4.3.3.1 Bridges

1.4.3.3.2 Retaining Walls

1.4.3.3.3 Noise Walls

1.4.3.2 Drainage

1.4.3.2.1 Culverts

1.4.3.2.2 Storm Sewer

1.4.3.2.3 Special Features

1.4.3.2.4 SWPPP

1.4.3.4 Traffic Management and Sequencing

1.4.3.4.1 Phase 1

1.4.3.4.2 Phase 2

1.4.3.4.3 Phase 3

1.4.3.4.4 Phase 4

1.4.3.8 Design Packages

1.4.3.8.1 Schematics

1.4.3.8.2 60% Design Package (Early Construction)

1.4.3.8.3 90% Design Package (All Disciplines)

1.4.3.8.4 100% Design Package (Final Package)

1.4.4 Construction

1.4.4.1 Roads

1.4.4.1.1 Demolition

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 28 of 32

Page 29: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.4.4.1.1.ML Eastbound/Westbound Managed Lanes

1.4.4.1.1.IC Interchanges

1.4.4.1.2 Earthwork

1.4.4.1.2.ML Eastbound/Westbound Managed Lanes

1.4.4.1.2.IC Interchanges

1.4.4.1.3 Landscaping

1.4.4.1.3.ML Eastbound/Westbound Managed Lanes

1.4.4.1.3.IC Interchanges

1.4.4.1.4 Subgrade & Base

1.4.4.1.4.ML Eastbound/Westbound Managed Lanes

1.4.4.1.4.IC Interchanges

1.4.4.1.5 Pavement

1.4.4.1.5.ML Eastbound/Westbound Managed Lanes

1.4.4.1.5.IC Interchanges

1.4.4.1.6 Barriers and Fencing

1.4.4.1.6.ML Eastbound/Westbound Managed Lanes

1.4.4.1.6.IC Interchanges

1.4.4.1.7 Illumination & Traffic Signals

1.4.4.1.7.ML Eastbound/Westbound Managed Lanes

1.4.4.1.7.IC Interchanges

1.4.4.1.8 Signing & Pavement Marking

1.4.4.1.8.ML Eastbound/Westbound Managed Lanes

1.4.4.1.8.IC Interchanges

1.4.4.1.9 ITC/TCS

1.4.4.1.9.ML Eastbound/Westbound Managed Lanes

1.4.4.1.9.IC Interchanges

1.4.4.2 Drainage

1.4.4.2.1 Trunk Lines & Culverts

1.4.4.2.1.ML Eastbound/Westbound Managed Lanes

1.4.4.2.1.IC Interchanges

1.4.4.2.2 Laterals & Inlets

1.4.4.2.2.ML Eastbound/Westbound Managed Lanes

1.4.4.2.2.IC Interchanges

1.4.4.3 Structures

1.4.4.3.1 Bridges

1.4.4.3.2 Retaining Walls

1.4.4.4 Traffic Management and Sequencing

1.4.4.4.5 Barricades, Signs and Traffic Handling

1.4.4.4.5.1 Phase 1

1.4.4.4.5.2 Phase 2

1.4.4.4.5.3 Phase 3

1.4.4.4.5.4 Phase 4

1.4.4.4.6 Temporary Detours

1.4.4.4.6.1 Phase 1

1.4.4.4.6.2 Phase 2

1.4.4.4.6.3 Phase 3

1.4.4.4.6.4 Phase 4

1.4.4.4.7 Temporary Lighting & Signals

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 29 of 32

Page 30: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.4.4.4.7.1 Phase 1

1.4.4.4.7.2 Phase 2

1.4.4.4.7.3 Phase 3

1.4.4.4.7.4 Phase 4

1.4.4.4.8 Temporary Shoring

1.4.4.4.8.1 Phase 1

1.4.4.4.8.2 Phase 2

1.4.4.4.8.3 Phase 3

1.4.4.4.8.4 Phase 4

1.4.4.9 Mobilization

1.4.4.9.1 General

1.4.4.9.1.1 Mobilization Payment

1.4.4.9.1.2 Segment Administration

1.4.4.9.2 Project Specific Locations (PSLs)

1.4.4.9.2.1 Concrete Plant

1.4.5 Operations

1.4.5.1 Toll Operations

1.4.5.2 Customer Service

1.4.5.3 Incident Management

1.4.5.4 Lane Availability Management

1.4.6 Maintenance

1.4.6.1 Roads

1.4.6.2 Drainage

1.4.6.3 Structures

1.4.6.4 Traffic Management & Sequencing

1.4.6.9 Fleet & Equipment

1.5 IH 35E Capacity Improvement Section

1.5.3 Design

1.5.3.0 Preliminary Design Activities

1.5.3.0.1 Surveying

1.5.3.0.2 Geotechnical

1.5.3.0.3 Specifications & Standards

1.5.3.1 Roads

1.5.3.1.1 Demolition

1.5.3.1.2 Roadway Layout

1.5.3.1.3 Landscaping

1.5.3.1.5 Pavement

1.5.3.1.7 Illumination & Traffic Signals

1.5.3.1.8 Signing & Pavement Marking

1.5.3.1.9 ITS / TCS

1.5.3.3 Structures

1.5.3.3.1 Bridges

1.5.3.2 Drainage

1.5.3.2.1 Culverts

1.5.3.2.2 Storm Sewer

1.5.3.2.3 Special Features

1.5.3.2.4 SWPPP

1.5.3.4 Traffic Management and Sequencing

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 30 of 32

Page 31: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.5.3.4.1 Phase 1

1.5.3.4.2 Phase 2

1.5.3.4.3 Phase 3

1.5.3.4.4 Phase 4

1.5.3.8 Design Packages

1.5.3.8.1 Schematics

1.5.3.8.2 60% Design Package (Early Construction)

1.5.3.8.3 90% Design Package (All Disciplines)

1.5.3.8.4 100% Design Package (Final Package)

1.5.4 Construction

1.5.4.1 Roads

1.5.4.1.1 Demolition

1.5.4.1.1.ER Eastbound Ramps

1.5.4.1.1.NM Northbound Managed Lanes

1.5.4.1.1.SM Southbound Managed Lanes

1.5.4.1.2 Earthwork

1.5.4.1.2.ER Eastbound Ramps

1.5.4.1.2.NM Northbound Managed Lanes

1.5.4.1.2.SM Southbound Managed Lanes

1.5.4.1.3 Landscaping

1.5.4.1.3.ER Eastbound Ramps

1.5.4.1.3.NM Northbound Managed Lanes

1.5.4.1.3.SM Southbound Managed Lanes

1.5.4.1.4 Subgrade & Base

1.5.4.1.4.ER Eastbound Ramps

1.5.4.1.4.NM Northbound Managed Lanes

1.5.4.1.4.SM Southbound Managed Lanes

1.5.4.1.5 Pavement

1.5.4.1.5.ER Eastbound Ramps

1.5.4.1.5.NM Northbound Managed Lanes

1.5.4.1.5.SM Southbound Managed Lanes

1.5.4.1.6 Barriers and Fencing

1.5.4.1.6.ER Eastbound Ramps

1.5.4.1.6.NM Northbound Managed Lanes

1.5.4.1.6.SM Southbound Managed Lanes

1.5.4.1.7 Illumination & Traffic Signals

1.5.4.1.7.ER Eastbound Ramps

1.5.4.1.7.NM Northbound Managed Lanes

1.5.4.1.7.SM Southbound Managed Lanes

1.5.4.1.8 Signing & Pavement Marking

1.5.4.1.8.ER Eastbound Ramps

1.5.4.1.8.NM Northbound Managed Lanes

1.5.4.1.8.SM Southbound Managed Lanes

1.5.4.1.9 ITC/TCS

1.5.4.1.9.ER Eastbound Ramps

1.5.4.1.9.NM Northbound Managed Lanes

1.5.4.1.9.SM Southbound Managed Lanes

1.5.4.2 Drainage

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 31 of 32

Page 32: IH 635 Managed Lanes Project Preliminary Project Baseline ...ftp.dot.state.tx.us/pub/txdot-info/dal/lbj_635/lbj...1.1.2.2.3.1 Master Utility Adjustment Agreement 1.1.2.2.3.2 Design

WBS Code WBS Name

1.5.4.2.1 Trunk Lines & Culverts

1.5.4.2.1.ER Eastbound Ramps

1.5.4.2.1.NM Northbound Managed Lanes

1.5.4.2.1.SM Southbound Managed Lanes

1.5.4.2.2 Laterals & Inlets

1.5.4.2.2.ER Eastbound Ramps

1.5.4.2.2.NM Northbound Managed Lanes

1.5.4.2.2.SM Southbound Managed Lanes

1.5.4.3 Structures

1.5.4.3.1 Bridges

1.5.4.3.1.6B BR 6B - IH 35E NB Elevated ML (Cap Imp)

1.5.4.3.1.7B BR 7B - IH 35E SB Elevated ML (Cap Imp)

1.5.4.3.1.10B BR 10B - NB to EB ML Dir Conn (Cap Imp)

1.5.4.3.1.12B BR 12B - WB to SB ML Dir Conn (Cap Imp)

1.5.4.3.1.19B BR 19B - EB Collector IH 35E to W of Josey (Cap ...

1.5.4.4 Traffic Management and Sequencing

1.5.4.4.5 Barricades, Signs and Traffic Handling

1.5.4.4.5.1 Phase 1

1.5.4.4.5.2 Phase 2

1.5.4.4.5.3 Phase 3

1.5.4.4.5.4 Phase 4

1.5.4.9 Mobilization

1.5.4.9.1 General

1.5.4.9.1.1 Mobilization Payment

1.5.4.9.1.2 Administration

1.5.5 Operations

1.5.5.1 Toll Operations

1.5.5.2 Customer Service

1.5.5.3 Incident Management

1.5.5.4 Lane Availability Management

1.5.6 Maintenance

1.5.6.1 Roads

1.5.6.2 Drainage

1.5.6.3 Structures

1.5.6.4 Traffic Management & Sequencing

1.5.6.9 Fleet & Equipment

IH 635 Managed Lanes Project Preliminary Project Baseline Schedule

LBJ Development Partners Page 32 of 32