TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
1 of 111
Tank Farm Plant Operating Procedure (if required) System
USQ #
At the request of the Washington Department of Ecology and the DOE,
this unapproved procedure is accessible from the procedures web page.
It “IS NOT” approved for use.
It is only meant as an emergency starting point, in case a leak was to
occur from a Primary Tank into an Annulus Tank.
A 72 hour window has been provided by the Washington Department of
Ecology and the DOE to have an approved procedure in place, if a leak
were to occur.
Justification:
Template Update
Summary of Changes:
New first time use box, updated verb formatting, updated step limits, and added records section.
Next Periodic Review Date — mm/dd/yyyy Click for copy of Word (native) file
TABLE OF CONTENTS PAGE
1.0 PURPOSE AND SCOPE..........................................................................................................4
1.1 Purpose.........................................................................................................................4
1.2 Scope ...........................................................................................................................4
2.0 INFORMATION......................................................................................................................4
2.1 Terms and Definitions ...................................................................................................4
2.2 General Information ......................................................................................................4
3.0 PRECAUTIONS AND LIMITATIONS ....................................................................................5
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
2 of 111
3.1 Personnel Safety ...........................................................................................................5
3.2 Radiation and Contamination Control ............................................................................5
3.3 Environmental Compliance ...........................................................................................6
3.4 Limits ...........................................................................................................................7
4.0 PREREQUISITES....................................................................................................................9
4.1 Special Tools, Equipment and Supplies ..........................................................................9
4.2 Performance Documents ...............................................................................................9
4.3 Field Preparations ....................................................................................................... 10
5.0 PROCEDURE........................................................................................................................ 11
5.1 Prepare to Transfer...................................................................................................... 11
5.2 Transfer from AW Tank Annulus to 241-AP-108 ......................................................... 20
5.3 Shut Down Transfer .................................................................................................... 31
5.4 Flush Pump and Transfer Line ..................................................................................... 33
5.5 Drain the 241-AW Flush Pit and Flush Lines ............................................................... 43
5.6 Data Sheet Retention ................................................................................................... 46
Additional AW Farm Annulus Equipment Checklist ........................................................................... 48
Routing Board Jumper Checklists ...................................................................................................... 49
Transfer Control Checklist ................................................................................................................. 52
241-AW Annulus to 241-AP-108 Transfer Data Sheet 1 ..................................................................... 53
Annulus Gallons per Inch Level Data Sheet........................................................................................ 55
241-AW Farm Annulus Conductivity Probe Position Data Sheet ......................................................... 56
Transfer Route Excavation Inspection Checklist* ............................................................................... 57
Physically Connected Tank Liquid Level Monitoring Data Sheet ........................................................ 58
Physically Connected Tank Liquid Level Monitoring Data Sheet (Cont.)............................................. 59
Physically Connected Tank Liquid Level Monitoring Data Sheet (Cont.)............................................. 60
Pre-Transfer Cover Inspection Checklist*........................................................................................... 61
Intra-Transfer Cover Inspection Checklist**....................................................................................... 61
Transfer Supplemental Cover Inspection Checklist* ........................................................................... 62
Intra-transfer Supplemental Cover Inspection Checklist** .................................................................. 63
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
3 of 111
241-AP-108 Temperature Monitoring Data Sheet ............................................................................... 64
Valve Position Checklists .................................................................................................................. 65
Flush Valve Position Checklists ......................................................................................................... 83
241-AW Flush Pit Drain Valving Checklist (Cont.) ............................................................................ 88
Post Transfer/Flush Valve Position Checklist ..................................................................................... 89
Figure 1 - 241-AW-101 Annulus Transfer Route ................................................................................ 90
Figure 2 - 241-AW-102 Annulus Transfer Route ................................................................................ 91
Figure 3 - 241-AW-103 Annulus Transfer Route ................................................................................ 92
Figure 4 - 241-AW-104 Annulus Transfer Route ................................................................................ 93
Figure 5 - 241-AW-105 Annulus Transfer Route ................................................................................ 94
Figure 6 - 241-AW-106 Annulus Transfer Route ................................................................................ 95
Figure 7 - 241-AW -101, 102, 103, and 105 to 241-AP-108 Transfer Route ......................................... 96
Figure 8 - 241-AW -104 and 106 to 241-AP-108 Transfer Route ......................................................... 98
Figure 9 - 241-AW Flush Pit Valving ................................................................................................. 99
Figure 10 - 271-AW-801 Service Building ....................................................................................... 100
Figure 11 - 241-AW-101 to 241-AP-108 Excavation Walkdown ....................................................... 102
Figure 12 - 241-AW-102 to 241-AP-108 Excavation Walkdown ....................................................... 104
Figure 13 - 241-AW-103 to 241-AP-108 Excavation Walkdown ....................................................... 105
Figure 14 - 241-AW-104 to 241-AP-108 Excavation Walkdown ....................................................... 107
Figure 15 - 241-AW-105 to 241-AP-108 Excavation Walkdown ....................................................... 109
Figure 16 - 241-AW-106 to 241-AP-108 Excavation Walkdown ....................................................... 110
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
4 of 111
1.0 PURPOSE AND SCOPE
1.1 Purpose
This procedure provides instructions for flushes and emergency pumping transfers of
waste from the annulus of Double-Shell Storage Tanks 241-AW-101 through 241-AW-106 to Double-Shell Storage Tank 241-AP-108.
1.2 Scope
This procedure involves Double-Shell Waste Storage Tank 241-AP-108 and the annuli of
241-AW-101 through 241-AW-106, transfer lines SN-261, SN-263, SN-264, SN-265, SN-266, SN-267, SN-268, SN-609, SN-610, SN-618, PW-471, PW-472, PW-473, PW-474, PW-475, and PW-476, the transfer route between the tanks; and all associated valving and instrumentation. Details of field preparation necessary to allow annulus
pumping are covered in section 4.3. This includes document references and locations of equipment.
2.0 INFORMATION
2.1 Terms and Definitions
ENRAF - (Company Name for Liquid Level Gauge) LDE - Level Detection Element LLE - Liquid Level Element
LIT - Level Indicating Transmitter MBD - Material Balance Discrepancy RWP - Radiological Work Permit VTP - Ventilation Tank Primary
2.2 General Information
Pumping the appropriate annulus will require installing an electric pump(s) and an air driven pump in the annulus pump pit, connecting a rigid jumper with a crane operated 3-way valve from the annulus transfer pumps to the annulus pump pit wall nozzle “A”
which connects the existing transfer line to the central pump pit. Then, installation of the appropriate rigid jumper in the central pump pit from nozzle “C” to nozzle "A" (for transfer to designated emergency spare tank). The annulus electric pumps will be powered from a portable annulus pump controller. The air driven pump will be powered
from a portable air compressor receiving power from the portable annulus pump controller. The annulus pit pumps, jumper, and portable annulus pump controller installation activities will be performed by the Job Control System Work Package process. Transfer routes with the extended pumping distances (i.e., AN Farm to AP
Farm) will utilize dual electrical pumps in series to ensure adequate pumping head.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
5 of 111
3.0 PRECAUTIONS AND LIMITATIONS
3.1 Personnel Safety
Warning - The material being transferred is a hazardous material, caustic, radioactive,
thermally warm, and under pressure.
Warning - In addition to contamination hazards, Operators should be aware of the possibility of muscle strain when positioning valve handles, and of coming
into contact with poisonous snakes and spiders. If injured or bitten, report to First Aid, then notify the Shift Manager/OE, and Health Physics Technician.
3.1.1 Refer to TF-SJHA-0001 GENERAL TANK FARM HAZARDS (JHA)
3.2 Radiation and Contamination Control
3.2.1 When performed without a work package, this procedure is limited to
radiological areas and work activities permitted by a general radiation work permit
3.2.2 When work is performed in or when work will result in a high contamination,
high radiation, or an airborne radioactive area, then an approved Job Control System work package must be developed which is reviewed by Radiological Control per the ALARA procedure HNF-IP-0842, Volume 7, Section 17.1.
Caution - Valving must be performed in the order specified as found on the 241-AW
Flush Pit Drain Valving Checklist to prevent possible contamination of the 271-AW-801 Service Building and the associated raw water piping in this building.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
6 of 111
3.3 Environmental Compliance
3.3.1 Environmental Compliance must be notified in the event of a leak during
transfer operations per the Environmental Compliance On-Call List. Environmental Compliance will make the appropriate leak or release notification.
3.3.2 To meet the requirements of Washington Administrative Code (WAC),
Chapter 173-303, Dangerous Waste Regulations, spilled or leaked waste must be removed from transfer piping secondary containment, with the exception of catch tanks, within twenty-four hours of detection.
3.3.3 Catch tanks which accumulate leakage or spilled waste during
transfer/recirculation operations must be pumped within the agreed-to frequencies of the Silver Working Group Close-Out Item 27, dated April 17, 1997 (Closeout Form: Environmental Compliance Issues, Identifier,
Department Of Energy - Richland (DOE/RL) Letter 95-PCA-342, Tracking # 27, April 17, 1997). This agreement, which brings catch tank operation into compliance with WAC 173-303, has been signed by the Washington State Department of Ecology, and Department Of Energy - Richland. If any waste
is accumulated in catch tank(s) during a transfer, contact Environmental Operations Compliance Services per the Environmental Compliance On-Call List. Environmental Operations Compliance Services will inform the appropriate organizations to initiate pumping as required under the
agreements.
3.3.4 Regulatory requirements under the Resource Conservation Recovery Act (RCRA) and Washington Administrative Code (WAC), Chapter 173-303 do not recognize CAMs as part of the compliant leak detection system. A
Resource Conservation Recovery Act compliant leak detection system is defined as;
1. Three continuously operating conductivity probes, or equivalent,
installed in each annulus within one quarter (3) of an inch off the annulus floor, with allowance for normal engineering tolerances.
AND
2. One continuously operating in-tank surface level monitor installed
within the primary Double Shell Tank.
The Resource Conservation Recovery Act requirements, being more restrictive than the Final Safety Analysis Report (FSAR) Technical Safety Requirements (TSRs), take precedence.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
7 of 111
3.4 Limits
Technical Safety Requirements
HNF-SD-WM-TSR-006 Tank Waste Remediation System Technical Safety
Requirements
LCO 3.0.7 Emergency Exceptions
LCO 3.1.2 Service Water Pressure Detection Systems
LCO 3.1.3 Transfer Leak Detection Systems
LCO 3.1.4 Ventilation Stack Continuous Air Monitor (CAM) Interlock Systems
LCO 3.1.6 204-AR Backflow Prevention System
LCO 3.2.1 DST and AWF Tank Ventilation Systems
LCO 3.2.4 DCRT Ventilation Systems
LCO 3.2.6 Primary Tank Leak Detection Systems
LCS/LCO 3.3.2 DST and AWF Tank WASTE Temperature Controls
HNF-IP-1266, Tank Farms Operations Administrative Controls
AC 5.7 Nuclear Criticality Safety
AC 5.10 Ignition Controls
AC 5.11 Flammable Gas Monitoring Controls
AC 5.12 Transfer Controls
AC 5.13 Encasement Seal Loop Controls
AC 5.20 Administrative Lock Program
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
8 of 111
3.4 Limits (Cont.)
Operating Specification Documents
OSD-T-151-00007, Operating Specifications for the Double Shell Storage Tanks
2.1.1 Maximum Primary Tank Waste Liquid Level
2.1.2 Minimum Primary Tank Waste Liquid Level
2.3 Primary Tank Vapor Space and Annulus Pressure
2.4.2 Temperature Changeover Time and Gradients For Solution and Concrete
OSD-T-151-00015, Operating Specifications For Miscellaneous Facilities
7.2 Tank Liquid Volumes
OPERATIONAL LIMITS
NOTE -The following Operational Limit supports implementation of requirement AC 5.12.3.c.
TK-A-350 Liquid Level: Maximum: 48 inches (536 gallons)
(Transfer Limit 70% level)
204-AR TK-1 Liquid Level: Maximum 740 gallons
(Transfer Limit 50% level)
TK-ER-311 Liquid Level: Maximum: 54 inches (8835 gallons)
(Transfer Limit 50% level)
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
9 of 111
4.0 PREREQUISITES
4.1 Special Tools, Equipment and Supplies
The following supplies may be needed to perform this procedure:
Calculator for Material Balance calculations
Radios, cellular phones, or equivalent for communication between assigned personnel
4.2 Performance Documents
The following documents will be needed to perform this procedure:
TO-025-005, Perform Equipment Verification For East Tank Farm Transfers
TO-040-540, Water Surveillance And Usage
National Fire Protection Association code, NFPA-77, Recommended Practice on
Static Electricity
H-14-0020802, Sheets 1 through 6, Waste Transfer System (WT) O&M System P&ID
H-2-70401, Sheet 1
H-2-70411, Sheet 1
H-2-70426, Sheet 2
H-2-70429, Sheet 1
H-2-90732, Sheet 1
H-2-90562, Sheet 1
H-2-90563, Sheet 1
H-2-90596, Sheet 1
H-2-90598, Sheet 1 & 2
H-2-90599, Sheet 1
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
10 of 111
4.3 Field Preparations
4.3.1 The document RPP-5842 "Time Deployment Study for Annulus Pumping"
addresses the time frames and key activities that must occur to prepare for pumping a DST annulus. A synopsis of these activities are as follows;
Pressure test selected annulus transfer line
Upgrade annulus leak detectors
Fabricate rigid jumpers
Perform waste compatibility analysis
Test annulus pumps
Install pumps and jumpers
Leak-test selected transfer route
Operations preparation activities
Transport and connect electrical/pneumatic skid
4.3.2 The pieces of equipment for annulus pumping are staged in trailer HO-64-07008. The drawings associated with annulus pumping are summarized in Drawing Index H-14-104118. Other key documents
summarizing details associated with annulus pumping are HNF-3484 Double Shell Tank Emergency Pumping Guide; RPP-6485 Technical Information to Support DST Emergency Annulus Pumping
4.3.3 The following equipment and systems must be installed, tested and prepared
for use through appropriate work packages prior to commencing the transfer addressed by this procedure;
Annulus electric pump(s) with connected piping assembled and installed in the affected tank annulus pump pit
Annulus air operated pump with connected piping assembled and
installed in the affected tank annulus pump pit
Crane operated 3-way valve and annulus pit jumper installed that connects the 3-way valve, electric pump(s),and air operated pump to
the appropriate transfer line to the central pump pit
Annulus pump controller skid placed in the affected Tank Farm and connected to an appropriate 480 volt electrical source.
Air compressor to supply the air operated pump installed and
electrically connected to the annulus pump controller skid
Dilution water system installed and connected to an appropriate hose bib
The appropriate JUMPERS installed that connect the transfer route between 241-AW Farm and 241-AP Farm.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
11 of 111
5.0 PROCEDURE
NOTE- - The Procedure Performer Signature Sheet must be completed by ALL personnel, before performing this procedure.
5.1 Prepare to Transfer
NOTE- - Steps 5.1.1 through 5.1.24 may be performed in any order.
5.1.1 ENSURE that the Shift Manager/OE has reviewed that the current equipment verification has been performed per procedure TO-025-005, Perform Equipment Verification For East Tank Farm Transfers prior to transfer, AND
INITIAL the "T0-025-005 equipment verification complete" box on the
Transfer Data Sheet 1.
5.1.2 VERIFY the any additional AW Farm equipment listed in the Additional AW Farm Annulus Equipment Checklist has been appropriately tested, AND
INITIAL the top box in the last column of Additional AW Farm Annulus
Equipment Checklist.
5.1.3 VERIFY that NO leak detectors on the transfer route are bypassed by checking the "Temporary Modification and Bypass Logs" at 272-AW, the Liquid Waste Processing Facility (LWPF), and the Shift Turnover and
Timely Order Sheets at 242-A.
Shift Manager /OE: / Signature Date
5.1.4 NOTIFY an HPT of the location of all temporary pit covers, AND
VERIFY an HPT has completed a pre-transfer dose rate survey of temporary
covers prior to transfer.
Survey number:_______________ Completed: ___________/________
Date Time
Operator: / Initial Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
12 of 111
5.1 Prepare to Transfer (Cont.)
5.1.5 VERIFY the Engineer has completed and signed the Transfer Control
Checklist.
Operator: / Initial Date
LIMIT - AC 5.11 Flammable Gas Monitoring Controls
5.1.6 VERIFY that a barrier has been erected at a minimum of 9 feet (18 diameters) from the ventilation intake filter for applicable tank(s) to prohibit vehicles or other ignition sources near the intake during the transfer. Signs
on the barricade should read: "KEEP OUT. NO IGNITION SOURCES ALLOWED PER AC CONTROL. CONTACT SHIFT MANAGER PRIOR TO ENTRY."
Operator: /
Initial Date
LIMIT - AC 5.12 Transfer Controls
5.1.7 RECORD PHYSICALLY CONNECTED tank levels and 204-AR
Unloading Facility West exterior rollup door and West exterior personnel access door are closed, AND
INITIAL on Physically Connected Tank Liquid Level Monitoring Data Sheet in column marked “AT START.”
LIMIT - LCS/LCO 3.3.2 DST and AWF Tank WASTE Temperature Controls
LIMIT - OSD-T-151-00007, 2.4.2 Maximum Temperature Changeover Time and
Gradients For Solution and Concrete
5.1.8 RECORD the instrument serial number and calibration due date (of hand held potentiometer), and initial temperature readings in the START column of the 241-AP-108 Temperature Monitoring Data Sheet, AND
INITIAL with Date and Time in column marked “START.”
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
13 of 111
5.1 Prepare to Transfer (Cont.)
NOTE - The sending 241-AW tank annulus level readings may be taken using the
installed conductivity probes. Initial conductivity probe positions can be obtained from the 241-AW Farm Annulus Conductivity Probe Positions Data Sheet
LIMIT - AC 5.12 Transfer Controls
5.1.9 OBTAIN the following tank liquid levels AND
RECORD in the "START" column of Transfer Data Sheet 1:
Sending 241-AW Farm tank annulus level, in inches, from Manual
Tape or conductivity probe. If a conductivity probe is used for level readings, indicate which probe on Transfer Data Sheet 1.
Sending 241-AW Farm primary tank level (inches, from Level
Indicating Transmitter or ENRAF)
241-AP-108 level (inches, from Level Indicating Transmitter or 241-AP-108 ENRAF)
Operator's initials
LIMIT - AC 5.12 Transfer Controls
5.1.10 COMPUTE the equivalent DST level for cumulative annulus volume in
inches and the starting material balance AND
RECORD and INITIAL on Transfer Data Sheet 1 in “START” column.
LIMIT - AC 5.12 Transfer Controls
5.1.11 ENSURE an Operator and Shift Manager/OE have verified on the official Transfer Routing Board that jumpers are installed per appropriate Routing Board Jumper Checklist and are proper for this transfer (N/A non-applicable Routing Board Jumper Checklists).
Operator: / Initial Date
Shift Manager /OE: / Signature Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
14 of 111
5.1 Prepare to Transfer (Cont.)
LIMIT - LCO 3.1.4 Ventilation Stack Continuous Air Monitor (CAM) Interlock
Systems
LIMIT - LCO 3.2.1 DST and AWF Tank Ventilation Systems
5.1.12 VERIFY from daily roundsheets the following Primary Tank ventilation fan
systems are operating prior to transfer:
Tank Farm Ventilation System
AN Tank Farm Ventilation Tank Primary (VTP)
AP Tank Farm Ventilation Tank Primary (VTP)
AW Tank Farm Ventilation Tank Primary (VTP)
702-AZ
244-CR
Operator Initials and Date:
NOTE - If the waste level in the annulus covers the annulus ventilation inlet(s), the
inlet(s) must be isolated and an alternate method of supplying air to the annulus must be used.
5.1.13 IF required, VERIFY the sending tank annulus ventilation intake(s) have been isolated AND a breather filter has been installed in an annulus riser to
supply the air for annulus ventilation.
Work Package #: ____________________
Shift Manager /OE: /
Signature Date
5.1.14 INITIAL in the "Physically Connected Ventilation Systems Operating Yes/No Checkbox” on Transfer Data Sheet 1.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
15 of 111
5.1 Prepare to Transfer (Cont.)
LIMIT - LCO 3.2.4 DCRT Ventilation System
5.1.15 VERIFY from daily roundsheets the following inlet air supply to DCRTs is 3.0
Cubic Feet per Hour (CFH):
244-BX () _______ 244-A () ________ CR-003 () ________
Verified by: /
Initial Date
NOTE - The following transfer route excavation inspection will be performed once before the start of the transfer and every 24 hours during the transfer.
- See Figures 11 through 16 for excavation walkdown of transfer route.
5.1.16 PERFORM walkdown of the applicable intended waste transfer route per appropriate 241-AW tank from Figures 11 through 16, AND
INITIAL the Transfer Route Excavation Inspection Checklist.
5.1.17 ENSURE the transfer system cover check is or has been performed within 72 hours prior to removing an administrative lock from a physically connected waste transfer pump and every ten days thereafter per procedure
TO-025-005.
5.1.18 RECORD the following information on the Pre-transfer Cover Inspection Checklist:
Inspection date
Time of inspection
Operator's Initials
5.1.19 ENSURE the supplemental cover inspection is or has been performed 72 hours prior to removing an administrative lock from a physically connected
waste transfer pump, and every 72 hours thereafter per the Transfer Supplemental Cover Inspection Checklist.
5.1.20 RECORD the following information on the Transfer Supplemental Cover Inspection Checklist:
Inspection date
Time of inspection
Operator's Initials
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
16 of 111
5.1 Prepare to Transfer (Cont.)
LIMIT - AC 5.12 Transfer Controls
5.1.21 ENSURE that NEWLY INSTALLED jumpers been leak checked prior to use.
Shift Manager /OE: /
Signature Date
5.1.22 REQUEST Engineer to establish Dilution Water Flow rate
______________________ (gpm). Dilution Water Flow Rate
Eng.: /
Signature Date
5.1.23 VERIFY annulus pump pit leak detector and annulus conductivity probes have been upgraded to intrinsically safe condition.
Work Package #: ___________________
Shift Manager /OE: /
Signature Date
5.1.24 VERIFY annulus electrical submersible pump(s) were checked for correct phase rotation.
Work Package #: _______________________
Shift Manager /OE: /
Signature Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
17 of 111
5.1 Prepare to Transfer (Cont.)
WARNING
In addition to contamination hazards, operators should be aware of the
possibility of muscle strain when positioning valve handles, and of coming
into contact with poisonous snakes and spiders. If injured or bitten, report to
First Aid, then notify the Shift Manager/OE, and Health Physics Technician.
NOTE - When the valving is completed, the applicable blocks on the appropriate Valve
Position Checklist must be initialed by the Operator positioning the valves, and the Operator performing independent verification of the valves position. Figures 1 to 10 show the Transfer Route valving.
Electric Pump Valving
5.1.25 IF the waste level of the annulus to be pumped is greater than 8 inches and/or the ELECTRIC PUMP is to be used for the transfer, perform the following valve line up.
5.1.25.1 POSITION the appropriate annulus pump pit Crane Operated
3-Way Valve to provide flow from the Electric Pump to Nozzle “A” and BLOCK flow from the Air Operated Pump.
Operator: /
Initial Date
Independent Verifier: /
Initial Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
18 of 111
5.1 Prepare to Transfer (Cont.)
Air Operated Pump Valving
5.1.26 IF the waste level of the annulus to be pumped is less than or equal to 8
inches and/or the AIR OPERATED PUMP is to be used for the transfer, perform the following valve line up.
5.1.26.1 POSITION the appropriate annulus pump pit Crane Operated
3-Way Valve to provide flow from the Air Operated Pump to Nozzle “A” and BLOCK flow from the Electric Pump.
Operator: /
Initial Date
Independent Verifier: /
Initial Date
5.1.27 POSITION the remaining transfer valves as specified on the appropriate VALVE POSITION CHECKLIST listed in the table below,
AND INITIAL in the "Operator Initials" column when each component is in
the position specified.
From (Annulus) To Valve Position Checklist
241-AW-101 241-AP-108 Transfer from 241-AW-101 TO 241-AP-108
241-AW-102 241-AP-108 Transfer from 241-AW-102 TO 241-AP-108
241-AW-103 241-AP-108 Transfer from 241-AW-103 TO 241-AP-108
241-AW-104 241-AP-108 Transfer from 241-AW-104 TO 241-AP-108
241-AW-105 241-AP-108 Transfer from 241-AW-105 TO 241-AP-108
241-AW-106 241-AP-108 Transfer from 241-AW-106 TO 241-AP-108
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
19 of 111
5.1 Prepare to Transfer (Cont.)
LIMIT - AC 5.12 Transfer Controls
5.1.28 INDEPENDENTLY VERIFY the transfer valve positions as specified on the appropriate Valve Position Checklist, AND
INITIAL in the "Independent Verifier Initials" column when each
component is in the position specified.
LIMIT - LCO 3.0.7 Emergency Exceptions
5.1.29 OBTAIN Shift Manager approval to invoke Limiting Condition for
Operation (LCO) 3.0.7 as required to commence AW Tank Farm annulus pumping.
Shift Manager /OE: /
Signature Date
5.1.30 Section 5.1 Reviewed by:
Shift Manager /OE: /
Signature Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
20 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108
Perform Transfer
Line Hold-up Volume 0.20 inches or 563 gallons
Estimated time of arrival - with electric pump (with air pump)
10 minutes (100 minutes)
Allowed Material Balance Discrepancy during Transfer 1.2 inches or 3,363 gallons
Allowed Material Balance Discrepancy after Transfer 0.75 inches or 2,063 gallons
5.2.1 OBTAIN Shift Manager Approval and Shift Manager/OE Signature to start the transfer on the Transfer Data Sheet 1.
5.2.2 NOTIFY the following individuals that the transfer is about to begin:
Tank Monitoring And Control System (TMACS) OPERATOR
242-A Evaporator Operator
Health Physics Technician
244-BX Operator
ER-311 Operator
5.2.3 RECORD the time of the notification in the appropriate box on the Transfer Data Sheet 1.
NOTE - See Section 3.2, Radiation and Contamination Control for warning on temporary pit covers.
- Environmental Compliance (EC) must be notified per Section 3.3
if any alarm is due to an actual leak.
5.2.4 IF any of the conditions identified in Step 5.2.5 occur, CONTACT Shift Manager, AND
REQUEST review of HNF-SD-TSR-006, to ensure entry into a Limiting
Condition of Operation (LCO) has not occurred and OSD-T-151-00007 to ensure an OSD violation has not occurred.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
21 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
5.2.5 IF any of the following conditions occur, ENSURE SHUT DOWN of the
transfer per Section 5.3, Shut Down Transfer, AND
NOTIFY the Shift Manager/OE:
Any alarms associated with instruments verified by procedure TO-025-005, are activated, including alarms and interlocks associated
with Technical Safety Requirement (TSR) class equipment/components PHYSICALLY CONNECTED to the active waste transfer route
Any alarms associated with instruments verified by this procedure are
activated, including alarms and interlocks associated with Technical Safety Requirement (TSR) class equipment/components PHYSICALLY CONNECTED to the active waste transfer route
Master Pump Shutdown Alarm received, AND the alarm is associated
with the transfer route
241-AP-108 Liquid Level reaches 416 inches as read on LIT or ENRAF.
241-AP-108 Liquid Level does NOT show a rise at the following times;
IF electric pumps are used: 10 minutes after the start of the transfer.
IF air pump is used: 100 minutes after start of the transfer
The applicable transferring (sending) AW Tank Annulus Liquid Level does NOT show a decrease at 5 minutes after the start of the transfer
The sending AW Primary Tank Liquid Level reaches 6 inches as read on LIT or ENRAF.
241-AP-108 High Pressure Alarm activates
If the electric pump amperage taken from the annulus pump controller
skid indicates out of the normal operating range of 2.0 to 3.0 Amps
Material Balance Discrepancy during the transfer exceeds 1.2
inches or 3363 gallons
Any cover blocks PHYSICALLY CONNECTED with the transfer route are discovered removed
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
22 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
Supplemental Covers, as designated on the Transfer Supplemental Cover Inspection Checklist, are not in place or physically damaged
Loss of ventilation on systems PHYSICALLY CONNECTED to the
transfer route (AP, AN, AW, 244-CR, or 702-AZ).
The inlet air supply to DCRT's 244-A, CR-003, and/or 244-BX decreases below 3.0 Cubic Feet per Hour.
An increase in Liquid Level in tanks PHYSICALLY CONNECTED
but not part of the direct waste transfer route (See Physically Connected Tank Liquid Level Monitoring Data Sheet).
An unexpected increase in radiation occurs at a temporary cover.
204-AR west exterior rollup or personnel access doors are found open.
WASTE temperature exceeds Limiting Condition for Operation
(LCO) or Operating Specification Document (OSD) limits
LIMIT - AC 5.12 Transfer Controls
5.2.6 VERIFY the 204-AR Unloading Facility West exterior rollup door and the
West exterior personnel access door are closed during the transfer.
Operator: /
Initial Date
5.2.7 VERIFY the excavation walkdown of the direct waste transfer has been
performed within 24 hours.
Operator: /
Initial Date
5.2.8 VERIFY the Pre-Transfer Cover Inspection has been performed within 72 hours prior to the removal of the appropriate AW annulus transfer pump administrative lock.
Operator: /
Initial Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
23 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
5.2.9 VERIFY the Supplemental Cover Inspection has been performed within
72 hours of the removal time for the appropriate AW annulus transfer pump administrative lock.
Operator: /
Initial Date
LIMIT - LCO 3.1.2 Service Water Pressure Detection Systems
5.2.10 VERIFY service water pressure detection systems in the 241-AP, 241-AW, and 244-BX Flush Pits were verified to be operable per TO-025-005 within
the past 72 hours before removing the appropriate AW annulus transfer pump administrative lock.
Operator: /
Initial Date
LIMIT - LCO 3.1.6 204-AR Backflow Prevention System
5.2.11 VERIFY backflow preventor in 204-AR was verified to be operable per TO-025-005 within the past 72 hours before removing the appropriate AW
annulus transfer pump administrative lock
Operator: /
Initial Date
5.2.12 VERIFY the master pump shutdown circuit is clear.
Operator: /
Initial Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
24 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
5.2.13 ENSURE an Operator is continuously stationed at the 241-AW portable
annulus pit pump controller with direct communications capability to personnel monitoring the transfer alarms/parameters (e.g., 242-A MCS and 244-BX) prior to commencing, and during, the transfer.
Shift Manager /OE: /
Signature Date
5.2.14 ENSURE Operators are continuously stationed at the Leak Detector and Service Water Pressure Alarm locations (e.g., TMACS, 242-A MCS, 244-BX) and Field Alarm locations that are identified as INOPERABLE in
the TO-025-005 procedure.
Shift Manager /OE: /
Signature Date
LIMIT - AC 5.20 Administrative Lock Program
5.2.15 OBTAIN authorization for administrative lock removal from Shift Manager,
Administrative Lock # ____________________ located on portable annulus pit pump controller skid.
(Check Applicable Pump)
Electric Pump
Air Operated Pump
Shift Manager /OE: /
Signature Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
25 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
LIMIT - AC 5.20 Administrative Lock Program
5.2.16 REMOVE the Administrative Lock identified in step 5.2.15 per HNF-IP-1266, Chapter 5.20.
5.2.17 TURN ON the Dilution Water Flow and adjust to the flow rate established in
Step 5.1.22.
5.2.18 IF using the ELECTRIC PUMP, PERFORM the following;
5.2.18.1 CLOSE (Position ON) the annulus pit sump pump circuit breaker (POR01-EDS-BKR-149) located on the portable annulus
pump controller skid.
5.2.18.2 PRESS the START button, for the annulus ELECTRIC PUMP, located on the portable annulus pump controller skid.
5.2.19 IF using the AIR OPERATED PUMP, PERFORM the following;
5.2.19.1 CLOSE (Position ON) the electric power switch to the air
compressor located on the portable annulus pump controller skid.
5.2.19.2 PRESS the START button for the Air Compressor located on the portable annulus pump controller skid.
5.2.19.3 OPEN the air supply valve to the air operated pump.
5.2.20 RECORD the Date and Time of Transfer start on the following;
Transfer Data Sheet 1,
Physically Connected Tank Liquid Level Monitoring Data Sheet,
Transfer Route Excavation Inspection Checklist,
Intra-Transfer Cover Inspection Checklist,
Intra-Transfer Supplemental Cover Inspection Checklist, and
241-AP-108 Temperature Monitoring Data Sheet.
LIMIT - AC 5.12 Transfer Controls
5.2.21 PERFORM the following actions at 30 minutes after starting transfer,
60 minutes after starting transfer, every two hours thereafter during the transfer and at end of the transfer:
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
26 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
NOTE - The sending 241-AW tank annulus level readings may be taken
using the installed conductivity probes. Initial conductivity probe positions can be obtained from the 241-AW Farm Annulus Conductivity Probe Positions Data Sheet
5.2.21.1 OBTAIN the following information, AND
RECORD in the intermediate column of the Transfer Data Sheet 1:
Date and time
Electric pumps amperage from Amp Meter on annulus pump control skid (If using annulus electric pumps)
Sending 241-AW tank annulus level, in inches, from Manual Tape or conductivity probe. If a conductivity probe
is used for level readings, indicate which probe on Transfer Data Sheet 1.
Sending 241-AW primary tank level (inches, from Level
Indicating Transmitter or ENRAF)
Dilution water volume added in gallons
241-AP-108 level (inches, from Level Indication Transmitter or ENRAF)
Operator's Initials
NOTE - The allowable Material Balance Discrepancy during the transfer must not
exceed 1.2 inches or 3,363 gallons.
5.2.21.2 COMPUTE the following;
equivalent inches of DST level for annulus volume sent,
the dilution volume added (in inches),
the material balance, and
the Material Balance Discrepancy for the transfer, AND
RECORD on the Transfer Data Sheet 1.
5.2.21.3 IF the calculated Material Balance Discrepancy exceeds the
allowable Material Balance Discrepancy during the transfer,
SHUT DOWN the transfer per Section 5.3, Shut Down Transfer,
AND
NOTIFY the Shift Manager/OE.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
27 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
5.2.21.4 RECORD the following information on the Physically
Connected Tank Liquid Level Monitoring Data Sheet:
Level reading
Date and time
204-AR Unloading Facility West exterior rollup doors and
West personnel access doors closed.
Operator's initials
LIMIT - LCS/LCO 3.3.2 DST and AWF Tank WASTE Temperature Controls
LIMIT - OSD-T-151-00007, 2.4.2 Maximum Temperature Changeover Time and
Gradients For Solution and Concrete
5.2.22 PERFORM the following actions once per shift during the transfer and at the end of the transfer:
5.2.22.1 OBTAIN the following information, AND
RECORD on the 241-AP-108 Temperature Monitoring Data
Sheet:
Date and time
Temperature readings
Operator's initials
5.2.22.2 IF the temperature differentials between any successive
thermocouples are greater than 45 F or any temperature changes
more than 10 F from the previous reading, NOTIFY the Shift
Manager/OE.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
28 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
NOTE - The following transfer route excavation inspection shall be performed once
before the start of the transfer and every 24 hours during the transfer.
- See appropriate Figure 11 through 16 for excavation walkdown route.
5.2.23 PERFORM walkdown of the direct WASTE transfer route, AND
RECORD the following information on the Transfer Route Excavation Controls Checklist:
Inspection date and time
Operator's initials
5.2.24 PERFORM the following actions at least once every 72 hours during the transfer:
5.2.24.1 IF installed, PERFORM a Transfer Supplemental Cover
Inspection, AND
RECORD the following information on the Transfer Supplemental Cover Inspection Checklist:
Inspection date and time
Operator's initials
5.2.25 PERFORM the following actions at least once per 10 days during the transfer:
5.2.25.1 VERIFY each transfer system cover identified in procedure
TO-025-005 is installed, AND
RECORD the following information on the Intra-transfer Cover Inspection Checklist:
Inspection date and time
Operator's initials
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
29 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
NOTE - The readings, monitoring, material balances, record keeping, and constant
surveillance, etc., still apply when switching from the electric pump to the air operated pump operations.
- The ELECTRICAL PUMP will only pump to a level of approximately 8
inches.
5.2.26 IF transferring waste using the ELECTRIC PUMP, AND annulus waste level of the sending tank decreases to approximately 8 inches before the desired
amount of waste specified on the Transfer Control Checklist has been transferred, PERFORM the following;
5.2.26.1 NOTIFY the Shift Manager/OE that pumping operations are being switched to the AIR OPERATED PUMP.
5.2.26.2 TURN OFF the Dilution Water Flow.
5.2.26.3 PRESS the STOP button for the annulus ELECTRIC PUMP located on the portable annulus pump controller skid.
5.2.26.4 TURN OFF the ELECTRIC PUMP circuit breaker located on
the portable annulus pump controller skid.
5.2.26.5 REPOSITION the annulus pump pit Crane Operated 3-Way Valve to provide flow from the Air Operated Pump to Nozzle “A” and BLOCK flow from the Electric Pump.
Operator: /
Initial Date
LIMIT - AC 5.12 Transfer Controls
5.2.26.6 INDEPENDENTLY VERIFY the appropriate annulus pump pit Crane Operated 3-Way Valve provides flow from the Air Operated Pump to Nozzle “A” and BLOCKS flow from the Electric Pump.
Independent Verifier: /
Initial Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
30 of 111
5.2 Transfer from AW Tank Annulus to 241-AP-108 (Cont.)
5.2.26.7 CLOSE (Position ON) the electric power switch to the air
compressor located on the portable annulus pump controller skid.
5.2.26.8 PRESS the START button for the Air Compressor located on the portable annulus pump controller skid.
5.2.26.9 OPEN the air supply valve to the air operated pump.
5.2.26.10 CONTINUE transferring waste until the desired amount of waste
specified on the Transfer Control Checklist has been transferred,
5.2.27 WHEN the desired amount of waste specified on the Transfer Control Checklist has been transferred,
SHUT DOWN transfer per Section 5.3, Shut Down Transfer.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
31 of 111
5.3 Shut Down Transfer
Abnormal Shutdown
5.3.1 IF the sending 241-AW tank annulus pit sump pump shutdown is in response to an abnormal event or alarm response, PERFORM the following:
5.3.1.1 IF the ELECTRIC PUMP is operating; PERFORM the
following;
1. PRESS the annulus pit sump pump STOP button located on the on the portable annulus pump controller skid.
2. TURN OFF the Dilution Water Flow. 3. TURN OFF the sending 241-AW annulus pit sump pump
circuit breaker, located on the portable annulus pump controller skid.
4. IMMEDIATELY NOTIFY Shift Manager/OE.
5.3.1.2 IF the AIR OPERATED PUMP is operating, PERFORM the
following;
1. PRESS the STOP button for the Air Compressor located on the portable annulus pump controller skid
2. OPEN (Position OFF) the electric power switch to the air compressor located on the portable annulus pump
controller skid. 3. SHUT the air supply valve to the air operated pump. 4. IMMEDIATELY NOTIFY Shift Manager/OE.
5.3.1.3 RECORD the following information on Transfer Data Sheet 1:
Date and time transfer stopped
LIMIT - AC 5.20 Administrative Lock Program
5.3.1.4 REINSTALL Administrative Lock per HNF-IP-1266, Chapter
5.20.
NOTE - Shift Manager/OE will evaluate the situation and determine whether to continue with the transfer procedure, flush and drain
valving, or pursue an alternate course of action.
5.3.1.5 IF the annulus pit sump pump shutdown is due to abnormal circumstances,
PROCEED as directed by the Shift Manager/OE.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
32 of 111
5.3 Shut Down Transfer (Cont.)
Normal Shutdown
5.3.2 IF the 241-AW annulus pit sump pump shutdown is a normal shutdown,
PERFORM the following:
5.3.2.1 IF the ELECTRIC PUMP is operating; PERFORM the following;
1. PRESS the annulus electric pump STOP button located on
the on the portable annulus pump controller skid. 2. TURN OFF the Dilution Water Flow. 3. TURN OFF the sending 241-AW annulus pit sump pump
circuit breaker, located on the portable annulus pump
controller skid. 4. NOTIFY Shift Manager/OE.
5.3.2.2 IF the AIR OPERATED PUMP is operating, PERFORM the following;
1. PRESS the STOP button for the Air Compressor located
on the portable annulus pump controller skid 2. OPEN (Position OFF) the electric power switch to the air
compressor located on the portable annulus pump controller skid.
3. SHUT the air supply valve to the air operated pump. 4. NOTIFY Shift Manager/OE.
5.3.3 RECORD the Date, Time the transfer stopped, and Operator initials on the following documents;
Transfer Data Sheet 1,
Physically Connected Tank Liquid Level Monitoring Data Sheet,
Transfer Route Excavation Inspection Checklist,
Intra-transfer Cover Inspection Checklist,
Intra-transfer Supplemental Cover Inspection Checklist, and
241-AP-108 Temperature Monitoring Data Sheet:
LIMIT - AC 5.20 Administrative Lock Program
5.3.4 RE-INSTALL Administrative Lock per HNF-IP-1266, Chapter 5.20.
5.3.5 ALLOW transfer lines to drain for one hour following the completion of the transfer.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
33 of 111
5.4 Flush Pump and Transfer Line
Transferring Annulus Pump and Transfer Line Flush
NOTE - This activity may be performed for any of the following circumstances, as directed by Shift Manager/OE:
Flush the 241-AW annulus pit pump and transfer lines without performing any transfer
Flush the 241-AW annulus pit pump and lines prior to a transfer
Flush the 241-AW annulus pit pump or lines with a different volume of water than that specified in the procedure
Flush the 241-AP-108 transfer route
- During flushing, catch tank and PHYSICALLY CONNECTED tank readings, material balances, constant surveillance requirements, etc., still apply.
- Shift Manager/OE will ensure the instructions and requirements of procedure
TO-040-540, "Water Surveillance And Usage" are followed.
- The line holdup volume from the AW-Farm Service Building is approximately
75 gallons.
- The transfer line holdup volumes for the transfer lines from the AW Farm to the AP-Farm range from 448 to 563 gallons.
- Figures 9 and 10 contain the valving for the 241-AW Flush Pit and 271-AW-801 Service Building.
5.4.1 VERIFY a Health Physics Technician has performed a post transfer survey
of temporary covered pits.
Survey number: __________ Completed: ____________ / _________
Date Time
Operator: /
Initial Date
5.4.2 RECORD the initial 241-AW Farm raw water totalizer AW801-RW-FQIT-120 reading on the Raw Water Usage Data Sheet from procedure TO-040-540.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
34 of 111
5.4 Flush Pump and Transfer Line (Cont.)
5.4.3 IF the sending tank was 241-AW-101, 103, or 105, PERFORM steps 5.4.3.1
through 5.4.3.18 to flush the system.
NOTE - The next Step will charge the flush line with water up to Valve AWA-WT-V-301 in the 241-AW-A Valve Pit.
5.4.3.1 PERFORM the flush valving as specified in the Valve Position Checklist for Flushing 241-AW-101, 103, and 105, AND
INITIAL in the "Operator Initials" column when each component is in the position specified.
Transfer Line to AP Farm Flush
5.4.3.2 NOTIFY the following individuals that the AP Farm transfer line flush is about to begin:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
5.4.3.3 CLOSE valve AWA-WT-V-303 in the 241-AW-A Valve Pit.
5.4.3.4 ENSURE valve AWA-WT-V-304 in the 241-AW-A Valve Pit is
OPEN.
NOTE - The 241-AP-108 transfer route should be flushed with 300 gallons of raw water (or an amount specified by engineering) from the
241-AW-A Valve Pit
- Flush water will begin to flow to 241-AP-108 as soon as valve AWA-WT-V-301 in the 241-AW-A Valve Pit is opened
5.4.3.5 OPEN valve AWA-WT-V-301 in the 241-AW-A Valve Pit and allow 300 gallons of raw water (or amount specified by Tank Farm Engineering) to flow to 241-AP-108.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
35 of 111
5.4 Flush Pump and Transfer Line (Cont.)
5.4.3.6 MONITOR the AW Farm raw water totalizer
AW801-RW-FQIT-120,
OR
MONITOR the 242-A-AW Water Totalizer (FQI-AW-1) via the Monitoring and Control System (MCS) located at the 242-A
Evaporator Control Room.
5.4.3.7 AFTER 300 gallons (or amount specified by Tank Farm Engineering) of raw water has been used, CLOSE valve AWA-WT-V-304 in the 241-AW-A Valve Pit.
5.4.3.8 CLOSE valve AWA-WT-V-301 in the 241-AW-A Valve Pit.
5.4.3.9 RECORD the final AW Farm raw water totalizer AW801-RW-FQIT-120 reading on the Raw Water Usage Data Sheet from procedure TO-040-540.
5.4.3.10 NOTIFY the following individuals that the AP Farm transfer line
flush is complete:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
Transfer Line and AW Farm Annulus Pump Flush
5.4.3.11 NOTIFY the following individuals that the AW Farm transfer line and annulus pump flush is about to begin:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
5.4.3.12 OPEN valve AWA-WT-V-303 in the 241-AW-A Valve Pit.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
36 of 111
5.4 Flush Pump and Transfer Line (Cont.)
5.4.3.13 ENSURE valve AWA-WT-V-304 in the 241-AW-A Valve Pit is
CLOSED.
NOTE - The 241-AW Farm transfer route and annulus pump should be flushed with 600 gallons of raw water (or an amount specified by
engineering) from the 241-AW-A Valve Pit
- Flush water will begin to flow to the appropriate 241-AW Farm annulus as soon as valve AWA-WT-V-301 in the 241-AW-A
Valve Pit is opened
5.4.3.14 OPEN valve AWA-WT-V-301 in the 241-AW-A Valve Pit and allow 600 gallons of raw water (or amount specified by Tank Farm Engineering) to flow to 241-AW Tank Farm annulus..
5.4.3.15 MONITOR the AW Farm raw water totalizer
AW801-RW-FQIT-120,
OR
MONITOR the 242-A-AW Water Totalizer (FQI-AW-1) via the
Monitoring and Control System (MCS) located at the 242-A Evaporator Control Room.
5.4.3.16 AFTER 600 gallons (or amount specified by Tank Farm Engineering) of raw water has been used, CLOSE valve
AWA-WT-V-303 in the 241-AW-A Valve Pit.
5.4.3.17 CLOSE valve AWA-WT-V-301 in the 241-AW-A Valve Pit.
5.4.3.18 PROCEED to step 5.4.6.
5.4.4 IF the sending tank was 241-AW-104 or 106, PERFORM steps 5.4.4.1
through 5.4.4.18 to flush the system.
NOTE - The next Step will charge the flush line with water up to Valve AWB-WT-V-201 in the 241-AW-A Valve Pit.
5.4.4.1 PERFORM the flush valving as specified in the Valve Position Checklist for Flushing 241-AW-102, 104 and 106, AND
INITIAL in the "Operator Initials" column when each component is in the position specified.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
37 of 111
5.4 Flush Pump and Transfer Line (Cont.)
Transfer Line to AP Farm Flush
5.4.4.2 NOTIFY the following individuals that the AP Farm transfer line
flush is about to begin:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
5.4.4.3 CLOSE valve AWB-WT-V-202 in the 241-AW-B Valve Pit.
5.4.4.4 ENSURE valve AWB-WT-V-203 in the 241-AW-B Valve Pit is OPEN.
NOTE - The 241-AP-108 transfer route should be flushed with 600 gallons of raw water (or an amount specified by engineering) from the 241-AW-B Valve Pit
- Flush water will begin to flow to 241-AP-108 as soon as valve AWB-WT-V-201 in the 241-AW-B Valve Pit is opened
5.4.4.5 OPEN valve AWB-WT-V-201 in the 241-AW-B Valve Pit and
allow 600 gallons of raw water (or amount specified by Tank Farm Engineering) to flow to 241-AP-108.
5.4.4.6 MONITOR the AW Farm raw water totalizer AW801-RW-FQIT-120,
OR
MONITOR the 242-A-AW Water Totalizer (FQI-AW-1) via the Monitoring and Control System (MCS) located at the 242-A Evaporator Control Room.
5.4.4.7 AFTER 600 gallons (or amount specified by Tank Farm
Engineering) of raw water has been used, CLOSE valve AWB-WT-V-203 in the 241-AW-B Valve Pit.
5.4.4.8 CLOSE valve AWB-WT-V-201 in the 241-AW-B Valve Pit.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
38 of 111
5.4 Flush Pump and Transfer Line (Cont.)
5.4.4.9 RECORD the final AW Farm raw water totalizer
AW801-RW-FQIT-120 reading on the Raw Water Usage Data Sheet from procedure TO-040-540.
5.4.4.10 NOTIFY the following individuals that the AP Farm transfer line flush is complete:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
Transfer Line and AW Farm Annulus Pump Flush
5.4.4.11 NOTIFY the following individuals that the AW Farm transfer
line and annulus pump flush is about to begin:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
5.4.4.12 OPEN valve AWB-WT-V-202 in the 241-AW-B Valve Pit.
5.4.4.13 ENSURE valve AWB-WT-V-203 in the 241-AW-B Valve Pit is CLOSED.
NOTE - The 241-AW Farm transfer route and annulus pump should be flushed with 300 gallons of raw water (or an amount specified by engineering) from the 241-AW-B Valve Pit
- Flush water will begin to flow to the appropriate 241-AW Farm annulus as soon as valve AWB-WT-V-201 in the 241-AW-B Valve Pit is opened
5.4.4.14 OPEN valve AWB-WT-V-201 in the 241-AW-B Valve Pit and allow 300 gallons of raw water (or amount specified by Tank Farm Engineering) to flow to sending 241-AW Tank Farm annulus.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
39 of 111
5.4 Flush Pump and Transfer Line (Cont.)
5.4.4.15 MONITOR the AW Farm raw water totalizer
AW801-RW-FQIT-120,
OR
MONITOR the 242-A-AW Water Totalizer (FQI-AW-1) via the Monitoring and Control System (MCS) located at the 242-A
Evaporator Control Room.
5.4.4.16 AFTER 300 gallons (or amount specified by Tank Farm Engineering) of raw water has been used, CLOSE valve AWB-WT-V-202 in the 241-AW-B Valve Pit.
5.4.4.17 CLOSE valve AWB-WT-V-201 in the 241-AW-B Valve Pit.
5.4.4.18 PROCEED to step 5.4.6.
5.4.5 IF the sending tank was 241-AW-102, PERFORM steps 5.4.5.1 through 5.4.5.23 to flush the system.
NOTE - Steps 5.4.5.1 through 5.4.5.7 will charge the flush line with water up to Valve APVP-WT-V-610 in the 241-AP Valve Pit.
5.4.5.1 OPEN valve AWB-WT-V-203 in the 241-AW-B Valve Pit.
5.4.5.2 ENSURE valve AWB-WT-V-202 in the 241-AW-B Valve Pit is
CLOSED.
5.4.5.3 POSITION valve AW02A-WT-V-103 in 241-AW-02A Central Pump Pit to ROUTE flow from Nozzle “H” to Nozzle “U” and
BLOCK flow to AW02A-WT-V-104
5.4.5.4 ENSURE valve AW02A-WT-V-104 in 241-AW-02A Central Pump Pit is CLOSED
5.4.5.5 ENSURE valve APVP-WT-V-610 in the 241-AP Valve Pit is
CLOSED.
5.4.5.6 PERFORM the flush valving as specified in the Valve Position Checklist for Flushing 241-AW-102, 104 and 106, AND
INITIAL in the "Operator Initials" column when each
component is in the position specified.
5.4.5.7 OPEN valve AWB-WT-V-201 in the 241-AW-B Valve Pit.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
40 of 111
5.4 Flush Pump and Transfer Line (Cont.)
Transfer Line to AP Farm Flush
5.4.5.8 CLOSE valve APVP-WT-V-804 in the 241-AP Valve Pit.
5.4.5.9 NOTIFY the following individuals that the AP Farm transfer line flush is about to begin:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
NOTE - The 241-AP-108 transfer route should be flushed with 300 gallons
of raw water (or an amount specified by engineering).
- Flush water will begin to flow to 241-AP-108 as soon as valve APVP-WT-V-610 in the 241-AP Valve Pit is opened
5.4.5.10 OPEN valve APVP-WT-V-610 in the 241-AP Valve Pit and allow 300 gallons of raw water (or amount specified by Tank Farm Engineering) to flow to 241-AP-108.
5.4.5.11 MONITOR the AW Farm raw water totalizer
AW801-RW-FQIT-120,
OR
MONITOR the 242-A-AW Water Totalizer (FQI-AW-1) via the Monitoring and Control System (MCS) located at the 242-A
Evaporator Control Room.
5.4.5.12 AFTER 300 gallons (or amount specified by Tank Farm Engineering) of raw water has been used, CLOSE valve APVP-WT-V-610 in the 241-AP Valve Pit.
5.4.5.13 CLOSE valve AWB-WT-V-201 in the 241-AW-B Valve Pit.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
41 of 111
5.4 Flush Pump and Transfer Line (Cont.)
5.4.5.14 RECORD the final AW Farm raw water totalizer
AW801-RW-FQIT-120 reading on the Raw Water Usage Data Sheet from procedure TO-040-540.
5.4.5.15 NOTIFY the following individuals that the AP Farm transfer line flush is complete:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
Transfer Line and AW Farm Annulus Pump Flush
5.4.5.16 NOTIFY the following individuals that the AW Farm transfer
line and annulus pump flush is about to begin:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
5.4.5.17 OPEN valve APVP-WT-V-804 in the 241-AP Valve Pit.
5.4.5.18 CLOSE valve APVP-WT-V-620 in the 241-AP Valve Pit
5.4.5.19 OPEN AWB-WT-V-201 in the 241-AW-B Valve Pit.
NOTE - The 241-AW Farm transfer route and annulus pump should be flushed with 600 gallons of raw water (or an amount specified by engineering)
- Flush water will begin to flow to the appropriate 241-AW Farm annulus as soon as valve APVP-WT-V-610 in the 241-AP Valve Pit is opened
5.4.5.20 OPEN valve APVP-WT-V-610 in the 241-AW-B Valve Pit and allow 600 gallons of raw water (or amount specified by Tank Farm Engineering) to flow to sending 241-AW Tank Farm annulus.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
42 of 111
5.4 Flush Pump and Transfer Line (Cont.)
5.4.5.21 MONITOR the AW Farm raw water totalizer
AW801-RW-FQIT-120,
OR
MONITOR the 242-A-AW Water Totalizer (FQI-AW-1) via the Monitoring and Control System (MCS) located at the 242-A
Evaporator Control Room.
5.4.5.22 AFTER 600 gallons (or amount specified by Tank Farm Engineering) of raw water has been used, CLOSE valve APVP-WT-V-610 in the 241-AP Valve Pit.
5.4.5.23 CLOSE valve AWB-WT-V-201 in the 241-AW-B Valve Pit.
5.4.6 RECORD the final AW Farm raw water totalizer AW801-RW-FQIT-120 reading on the Raw Water Usage Data Sheet from procedure TO-040-540.
5.4.7 NOTIFY the following individuals that the AW Farm transfer line and
annulus pump flush is complete:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
5.4.8 ALLOW the transfer lines to drain for one hour.
5.4.9 AFTER the transfer lines have drained for one hour, PROCEED to Section 5.5, Drain the 241-AW Flush Pit and Flush Lines.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
43 of 111
5.5 Drain the 241-AW Flush Pit and Flush Lines
CAUTION
Valving must be performed in the order specified as found on the 241-AW
Flush Pit Drain Valving Checklist in order to prevent possible
contamination of the 271-AW-801 Service Building and the associated raw
water piping in this building.
5.5.1 PERFORM draining of the flush lines per the 241-AW Flush Pit Drain Valving Checklist, AND
INITIAL the “Operators Initials” block on the 241-AW Flush Pit Drain
Valving Checklist
5.5.2 ENSURE the 241-AW Flush Pit access plate(s) have been re-installed.
Operator: /
Initial Date
5.5.3 WHEN all of the associated valving on the 241-AW Flush Pit Drain Valving Checklist is complete, NOTIFY the following individuals:
Shift Manager/OE
Health Physics Technician
242-A Control Room Operator
244-BX Operator
Tank Monitoring and Control System (TMACS) Operator
ER-311 Operator
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
44 of 111
5.5 Drain the 241-AW Flush Pit and Flush Lines (Cont.)
NOTE - The sending 241-AW tank annulus level readings may be taken using the
installed conductivity probes. Initial conductivity probe positions can be obtained from the 241-AW Farm Annulus Conductivity Probe Positions Data Sheet
5.5.4 OBTAIN the following data, AND
RECORD in the "END" column of Transfer Data Sheet 1:
Date and time
Sending 241-AW tank ANNULUS level in inches, from manual tape
or conductivity probe. If a conductivity probe is used for level readings, indicate which probe on Transfer Data Sheet 1.
Sending 241-AW tank PRIMARY tank level (inches, from Level Indication Transmitter, Manual Tape, or ENRAF)
Dilution water volume (gallons)
Flush volume (gallons)
Receiving tank 241-AP-108 Level (inches, from Level Indication
Transmitter or Manual Tape)
Operator Initials
NOTE - The allowable Final Material Balance Discrepancy (FMBD) is + 0.75 inches or
2063 gallons.
- Conversion of the appropriate gallon readings to DST inches is accomplished
by dividing the gallons by 2750 on Transfer Data Sheet 1.
5.5.5 CALCULATE the following;
Equivalent DST level in inches for cumulative annulus volume sent,
Dilution volume in inches,
Flush volume in inches,
Material Balance in inches,
Final Material Balance Discrepancy (FMBD), AND
RECORD in the “END” column of Transfer Data Sheet 1.
5.5.6 IF the Final Material Balance Discrepancy exceeds 0.75 inches or
2063 gallons, IMMEDIATELY NOTIFY Shift Manager/OE.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
45 of 111
5.5 Drain the 241-AW Flush Pit and Flush Lines (Cont.)
LIMIT - AC 5.12 Transfer Controls
5.5.7 OBTAIN PHYSICALLY CONNECTED tank levels and 204-AR west exterior rollup door and west exterior personnel access door status, AND
RECORD on Physically Connected Tank Liquid Level Monitoring Data
Sheet.
LIMIT - LCS/LCO 3.3.2 DST and AWF Tank WASTE Temperature Controls
LIMIT - OSD-T-151-00007, 2.4.2 Maximum Temperature Changeover Time and
Gradients For Solution and Concrete
5.5.8 RECORD the date, time and final temperatures on 241-AP-108 TEMPERATURE MONITORING DATA SHEET.
5.5.9 PERFORM valving per the Post Transfer Valving Checklist AND
INITIAL the "Operator Initials" block on the Post Transfer Valving Checklist.
5.5.10 OBTAIN Shift Manager/OE signature on Transfer Data Sheet 1 for approval
of final Material Balance Discrepancy.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
46 of 111
5.6 Data Sheet Retention
NOTE - Some of the data contained in this procedure needs to be saved and filed as required by the Dangerous Waste Regulations of the Washington State Administrative Code (WAC) 173-303-380 "Facility Record Keeping" which
requires: Maintaining an operating record, until closure, at the facility consisting of:
A description and the quantity of each waste received and the date of its storage
The location of each dangerous waste and the quantity at each location
Records and results of waste analysis To comply with the requirements, the completed Working Copy of this procedure and Procedure T0-025-005 will be kept as a permanent record of this
transfer with the Technical Data Service Center.
Data Sheet/Checklist Shift Manager/OE
Transfer Control Checklist
Completed Working Copy of TO-025-005
Completed Working Copy of this procedure
Transfer Data Sheet 1 (Material Balance)
5.6.1 COMPLETE the Data Sheet Checklist AND FORWARD the completed Transfer Data Sheets to the Technical Data Service Center.
Shift Manager /OE: /
Signature Date
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
47 of 111
Procedure Performer Signature Sheet
All personnel performing this Procedure who will be initialing and signing procedure shall enter their printed name, signature and initials below.
Name (Printed) Signature Initials
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
48 of 111
Additional AW Farm Annulus Equipment Checklist
Annulus Pump Pit Leak Detection
Instrument Nomenclature Instrument Location
Calibration/Functional Test Completed: Oper. Initial
Next Due Date:
NOTE: Only select the Annulus Pump Pit leak detector connected to the transfer route and N/A the others.
AW01B-WT-LDE-162
(AW01B-WT-LDSTA-162)
241-AW-01B Annulus Pump Pit
EE-00758
AW02B-WT-LDE-165
(AW02B-WT-LDSTA-165)
241-AW-02B Annulus Pump Pit
EE-00763
AW03B-WT-LDE-170
(AW03B-WT-LDSTA-170)
241-AW-03B Annulus Pump Pit
EE-00765
AW04B-WT-LDE-173
(AW04B-WT-LDSTA-173)
241-AW-04B Annulus Pump Pit
EE-00769
AW05B-WT-LDE-177
(AW05B-WT-LDSTA-177)
241-AW-05B Annulus Pump Pit
EE-00760
AW06B-WT-LDE-180
(AW06B-WT-LDSTA-180)
241-AW-06B Annulus Pump Pit
EE-00762
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
49 of 111
Routing Board Jumper Checklists
Routing Board Jumper Checklist for 241-AW-101 Annulus to 241-AP-108 Transfer Route
LOCATION CONNECTION DRAINS TO CHECK
INSTALLED
241-AW-01B, Annulus Pump Pit RIGID from Electrical and Air Pumps to Nozzle A
241-AW-101
241-AW-01A, Central Pump Pit RIGID from Nozzle A to Nozzle E 241-AW-101
241-AW-A Valve Pit FLEX from Nozzle L16 to Nozzle D. RIGID from Nozzle D to Nozzles L1, and
L17
241-AW-102
241-AW-02A, Central Pump Pit RIGID from Nozzle J to Nozzle V and L. 241-AW-102
241-AP Valve Pit RIGID from Nozzle 14 to Nozzle 22 with connections to Nozzles 17, 18, 19, 20, 25, 30, J, H, M, P, L, N, C, D, K, 21, 22, 23,
and 24
241-AP-103 via
AP-03D Drain Pit
241-AP-08A, Central Pump Pit RIGID from Nozzle A to Nozzle E with connection to pump
241-AP-108
Routing Board Jumper Checklist for 241-AW-102 Annulus to 241-AP-108 Transfer Route
LO CATIO N CO NNECTIO N DRAINS TO CHECK
INSTALLED
241-AW-02B, Annulus Pump Pit RIGID from Electrical and Air Pumps to
Nozzle A
241-AW-102
241-AW-02A, Central Pump Pit RIGID from Nozzle E to Nozzle V for waste
transfer route.
RIGID from Nozzle H to Nozzles N and U
for flush route.
241-AW-102
241-AW-B Valve Pit(For Flushing
Route)
RIGID from Nozzle R17 to Nozzle D and
Nozzle R1
241-AW-102
241-AP Valve Pit RIGID from Nozzle 14 to Nozzle 22 with
connections to Nozzles 17, 18, 19, 20, 25, 30,
J, H, M, P, L, N, C, D, K, 21, 22, 23, and 24
241-AP-103 via
AP-03D Drain Pit
241-AP-08A Pump Pit RIGID from Nozzle A to Nozzle E with
connection to pump
241-AP-108
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
50 of 111
Routing Board Jumper Checklist for
241-AW-103 Annulus to 241-AP-108 Transfer Route
LOCATION CONNECTION DRAINS TO CHECK
INSTALLED
241-AW-03B, Annulus Pump Pit RIGID from Electrical and Air Pumps
to Nozzle A 241-AW-103
241-AW-03A, Central Pump Pit RIGID from Nozzle A to Nozzle E 241-AW-103
241-AW-A Valve Pit FLEX from Nozzle L14 to Nozzle D. RIGID from Nozzle D to Nozzles L1,
and L17
241-AW-102
241-AW-02A, Central Pump Pit RIGID from Nozzle J to Nozzle V and L. 241-AW-102
241-AP Valve Pit
RIGID from Nozzle 14 to Nozzle 22 with connections to Nozzles 17, 18, 19, 20, 25,
30, J, H, M, P, L, N, C, D, K, 21, 22, 23, and 24
241-AP-103
viaAP-03D Drain Pit
241-AP-08A, Central Pump Pit RIGID from Nozzle A to Nozzle E with connection to pump
241-AP-108
Routing Board Jumper Checklis t for 241-AW-104 Annulus to 241-AP-108 Transfer Route
LOCATION CONNECTION DRAINS TO CHECK
INSTALLED
241-AW-04B, Annulus Pump Pit RIGID from Electrical and Air Pumps to Nozzle A
241-AW-104
241-AW-04A, Central Pump Pit RIGID from Nozzle A to Nozzle E 241-AW-104
241-AW-B Valve Pit
FLEX from Nozzle R14 to Nozzle D.
RIGID from Nozzle D to Nozzles R1, and R17
241-AW-102
241-AW-02A, Central Pump Pit RIGID from Nozzle H to Nozzles U and N.
241-AW-102
241-AP Valve Pit
RIGID from Nozzle 14 to Nozzle 22 with connections to Nozzles 17, 18, 19, 20, 25, 30, J, H, M, P, L, N, C, D, K, 21, 22, 23,
and 24
241-AP-103 viaAP-03D Drain
Pit
241-AP-08A, Central Pump Pit RIGID from Nozzle A to Nozzle E with connection to pump
241-AP-108
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
51 of 111
Routing Board Jumper Checklist for 241-AW-105 Annulus to 241-AP-108 Transfer Route
LOCATION CONNECTION DRAINS TO CHECK
INSTALLED
241-AW-05B, Annulus Pump Pit RIGID from Electrical and Air Pumps to Nozzle A
241-AW-105
241-AW-05A, Central Pump Pit RIGID from Nozzle A to Nozzle E 241-AW-105
241-AW-A Valve Pit
FLEX from Nozzle L15 to Nozzle D.
RIGID from Nozzle D to Nozzles L1, and L17
241-AW-102
241-AW-02A, Central Pump Pit RIGID from Nozzle J to Nozzle V and L.
241-AW-102
241-AP Valve Pit
RIGID from Nozzle 14 to Nozzle 22 with connections to Nozzles 17, 18, 19, 20, 25, 30, J, H, M, P, L, N, C, D, K, 21,
22, 23, and 24
241-AP-103 viaAP-03D
Drain Pit
241-AP-08A, Central Pump Pit RIGID from Nozzle A to Nozzle E with
connection to pump 241-AP-108
Routing Board Jumper Checklist for 241-AW-106 Annulus to 241-AP-108 Transfer Route
LOCATION CONNECTION DRAINS TO CHECK
INSTALLED
241-AW-06B, Annulus Pump Pit RIGID from Electrical and Air Pumps
to Nozzle A 241-AW-106
241-AW-06A, Central Pump Pit RIGID from Nozzle A to Nozzle E 241-AW-106
241-AW-B Valve Pit FLEX from Nozzle R15 to Nozzle D. RIGID from Nozzle D to Nozzles R1,
and R17
241-AW-102
241-AW-02A, Central Pump Pit RIGID from Nozzle H to Nozzle U and
N. 241-AW-102
241-AP Valve Pit
RIGID from Nozzle 14 to Nozzle 22 with
connections to Nozzles 17, 18, 19, 20, 25, 30, J, H, M, P, L, N, C, D, K, 21, 22, 23, and 24
241-AP-103
viaAP-03D Drain Pit
241-AP-08A, Central Pump Pit RIGID from Nozzle A to Nozzle E with connection to pump
241-AP-108
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
52 of 111
Transfer Control Checklist
Transfer Log No.:
TRANSFER CONTROL CHECKLIST
Active receiver tank list
Volume of Transfer (gallons)
Estimated flush volume (gallons)
Estimate of dilution water volume (gallons)
241-AP-108 estimated final level (inches)
* LIMIT: 416 inches
Pre-transfer fissionable material content in 241-AP-108 (grams)
Total Fissionable Material Content in Transfer (grams)
Pu concentration in transfer Concentration:
Post transfer fissionable material content in 241-AP-108 tank
Waste Compatibility Evaluation completed
Memo #:
Expiration Date:
Waste compatibility Evaluation requirements fulfilled
Estimate of Final Tank 108-AP Total Organic Carbon Content (< 52 g/L)
Estimate of Final Tank 108-AP Heat Generation (< 70,000 BTU/hr)
Engineer Signature:
Date:
* OSD-T-151-00007, 2.1.1
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
53 of 111
241-AW Annulus to 241-AP-108 Transfer Data Sheet 1
241-AW Annulus to 241-AP-108 Transfer Data Sheet 1 Sheet of Date:
TO -025-005 equipment verification complete.
Initial: __________________
Physically Connected Ventilation Systems Operating:
Check one
YES NO Initial: ________________
Shift Manager Approval to start
transfer (Shift Manager/OE
Signature):
Time ER-311
Notified:
Time 244-BX
Notified:
Time HPT
Notified:
Time TMACS
Notified:
Time 242-A
Notified:
START END
Time:
Date:
Annulus conductivity probe height reading Annulus Conductivity Probe number
(If used)***: A= A=
Sending 241-AW Tank Annulus
Liquid Level (in inches) : A1= [Maximum annulus depth*** -
A]
A1= A1=
Sending 241-AW Primary Tank liquid level (inches) (1) LIMIT - MINIMUM 6 INCHES A2= A2=
[NO TE - “B” is the equivalent DST level ( in inches) for Annulus Sending Volume
**
B (inches) = Cumulative Annulus Volume (gal)* 2750
B = B =
Dilution Volume (gallons) N/A C =
Dilution Volume (inches) D = C 2750 N/A D =
Flush Volume (gallons) N/A E =
Flush Volume (inches) F = E 2750 N/A F =
241-AP-108 Liquid Level (inches) (2) LIMIT - MAXIMUM 416 INCHES G = G =
Material Balance (inches) = A2 + B + G H = I =
Final MBD (inches) FMBD = I - H -D - F N/A FMBD =
O perator Initials
Shift Manager/OE Final Material Balance Discrepancy Review (Signature/Date) N/A
* Cumulative Annulus Volume determined from Annulus Gallons per Inch Level Data Sheet and A1 (Annulus level). ** One inch level in the Annulus equivalent gallons is obtained from the ANNULUS GALLONS PER INCH LEVEL DATA SHEET. One inch in the
241-AP-108 Primary Tank is equivalent to 2750 gallons. *** See AW Farm Annulus Conductivity Probe Positions Data Sheet for nomenclature and annulus maximum depth.
(1) OSD-T-151-00007, 2.1.1
(2) OSD-T-151-00007, 2.1.2
NOTE - Allowable Material Balance Discrepancy during Transfer = 1.2 inches ( 3,363 gallons)
- Allowable Final Material Balance Discrepancy = 0.75 inches ( 2063 gallons)
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
54 of 111
241-AW Annulus to 241-AP-108 Transfer Data Sheet 1 (Cont.) Sheet of Date:
Intermediate Readings +
______
hours
+ ______
hours
+ ______
hours
+ ______
hours
+ ______
hours
+ ______
hours
+ ______
hours
Time:
Date:
Annulus Electric Pump Amperage (normal 2.0 to 3.0
Amps):
Annulus conductivity
probe height reading
Annulus Conductivity Probe
number (If used)***: A= A= A= A= A= A= A=
Sending AW Tank Annulus Level (inches) A1= [Maximum annulus depth*** - A]
A1 = A1 = A1 = A1 = A1 = A1 = A1 =
Sending AW Tank PRIMARY Level (inches) (1) LIMIT - MINIMUM 6 INCHES
A2 = A2 = A2 = A2 = A2 = A2 = A2 =
[NOTE: “B” is the equivalent DST level ( in inches) for the
corresponding Annulus Sending Volume (in gallons) **]
B (inches) = Cumulative Annulus Volume* (gal) 2750
B = B = B = B = B = B = B =
Dilution Volume (gallons) C = C = C = C = C = C = C =
Dilution Volume (inches) D = C 2750 D = D = D = D = D = D = D =
241-AP-108 Liquid Level (inches) (2) LIMIT - MAXIMUM 416 INCHES
G = G = G = G = G = G = G =
Material Balance (inches) = [A2 + B + G] - D J = J = J = J = J = J = J =
Material Balance Discrepancy (MBD) MBD = MBD = MBD = MBD = MBD = MBD = MBD =
(inches) = J - H (from previous page) H=
O perator Initials
Shift Manager/OE Review (Signature)
* Cumulative Annulus Volume determined from ANNULUS GALLONS PER INCH LEVEL DATA SHEET.
** One inch level in the Annulus equivalent gallons is obtained from the ANNULUS GALLONS PER INCH LEVEL DATA SHEET.
One inch in the 241-AP-108 Primary Tank is equivalent to 2750 gallons.
*** See AW Farm Annulus Conductivity Probe Positions Data Sheet for nomenclature and annulus maximum depth. (1) OSD-T-151-00007, 2.1.1
(2) OSD-T-151-00007, 2.1.2
NOTE - See section 3.2, RADIATION AND CONTAMINATION CONTROL.
- Allowable Material Balance Discrepancy during Transfer = 1.2 inches ( 3,363 gallons)
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
55 of 111
Annulus Gallons per Inch Level Data Sheet
Level “A” in Inches (from
Bottom of Annulus)*
Waste Volume
per Inch (gallons)
Cumulative Annulus Volume
(gallons)
1 323 323
2 347 670
3 364 1,034
4 377 1,410
5 387 1,797
6 396 2,193
7 402 2,595
8 408 3,003
9 375 3,378
10 378 3,756
11 379 4,135
12 380 4,515
Above 12 Inches 380 4,515 + [380 L1(inches)**]
* Level “A” is obtained from TRANSFER DATA SHEET 1.
** L1 (inches) = [Annulus Level “A” (inches) - 12 inches] NOTE - At 12 inches and above in the Annulus, the volume is equal to a constant 380 gallons per
inch.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
56 of 111
241-AW Farm Annulus Conductivity Probe Position Data Sheet
AW10( )-WSTA-LIS-10( )
LDE ( )-( )
Maximum Annulus
Depth
AW10( )-WSTA-LIS-10( )
LDE ( )-( )
Maximum Annulus
Depth
AW101-WSTA-LIS-104: 101-2 57 ft -6 and 3/8 in. AW104-WSTA-LIS-104: 104-2 57 ft - 6 and 1/4 in.
AW101-WSTA-LIS-105: 101-3 57 ft - 5 and 7/8 in. AW104-WSTA-LIS-105: 104-3 57 ft - 6 and 1/8 in.
AW101-WSTA-LIS-106: 101-4 57 ft - 5 and 5/8 in. AW104-WSTA-LIS-106: 104-4 57 ft - 5 and 3/4 in.
AW102-WSTA-LIS-104: 102-2 57 ft - 5 and 7/8 in. AW105-WSTA-LIS-104: 105-2 57 ft - 6 in.
AW102-WSTA-LIS-105: 102-3 57 ft - 6 and 1/4 in. AW105-WSTA-LIS-105: 105-3 57 ft - 4 and 3/4 in.
AW102-WSTA-LIS-106: 102-4 57 ft - 6 and 3/8 in. AW105-WSTA-LIS-106: 105-4 57 ft - 6 and 5/8 in.
AW103-WSTA-LIS-104: 103-2 57 ft - 5 and 7/8 in. AW106-WSTA-LIS-104: 106-2 57 ft - 6 and 1/4 in.
AW103-WSTA-LIS-105: 103-3 57 ft - 6 and 3/8 in. AW106-WSTA-LIS-105: 106-3 57 ft - 6 in.
AW103-WSTA-LIS-106: 103-4 57 ft - 6 and 1/8 in. AW106-WSTA-LIS-106: 106-4 57 ft - 5 and 5/8 in.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
57 of 111
Transfer Route Excavation Inspection Checklist*
TRANSFER ROUTE
INSPECTION** DATE & TIME
OPERATOR INITIALS TRANSFER START
DATE & TIME TRANSFER END
DATE & TIME
N/A
N/A
* Transfer Route Inspection for Excavation activities shall be performed once prior to transfer and every 24 hours during the transfer.
** During walkdown of the intended waste transfer route, inspect for the following: Waste transfer
line uncovered by excavation activities, Any exposed waste transfer lines that do not have adequate barriers and postings, Any excavations within 15 ft of waste transfer route
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
58 of 111
Physically Connected Tank Liquid Level Monitoring Data Sheet
Liquid levels of tanks physically connected to the transferring (sending) 241-AW ANNULUS to 241-AP-108 receiving tank (from ENRAFS, LITS, TMACS, or MCS) in inches
Sheet 1 of 3
DATE
TIME
TANK ID# AT
START
AT 30
MINUTES
AT 60
MINUTES
+ _____
HOURS
+_____
HOURS
+_____
HOURS AT END
241-AP-101**
241-AP-102**
241-AP-103**
241-AP-104**
241-AP-105**
241-AP-106**
241-AP-107**
241-AP-108** N/A N/A N/A N/A N/A N/A N/A
OPERATORINITIALS
* - Reports to TMACS Limits: DST <0.3" ** - Manual Readings Catch Tanks <0.5" *** - Reports to Evaporator
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
59 of 111
Physically Connected Tank Liquid Level Monitoring Data Sheet (Cont.)
Liquid levels of tanks physically connected to the transferring (sending) 241-AW ANNULUS to 241-AP-108 receiving tank (from ENRAFS, LITS, TMACS, or MCS) in inches
Sheet 2 of 3
DATE
TIME
TANK ID#
AT START
AT 30 MINUTES
AT 60 MINUTES
+ HOURS
+ HOURS
+ HOURS
AT END
241-AW-102**
241-AW-106**
241-AY-101*
241-AY-102*
241-AZ-102*
244-A DCRT***
Catch Tank A-350***
Catch Tank TK-1
In 204-AR**
Verify 204-AR West Exterior
roll-up door and personnel access door are closed
Catch Tank ER-311 **
244-BX DCRT**
244-CR Tank, CR-003
OPERATORS INITIALS
* - Reports to TMACS Limits: DST <0.3"
** - Manual Readings Catch Tanks <0.5"
*** - Reports to Evaporator, If both 241-A-350 and 244-A water intrusion exceeds the guideline limit of 0.5 inches during the transfer, the Shift Manager may give approval to continue the transfer if the catch tank increase can be attributed to water intrusion or normal fluctuations.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
60 of 111
Physically Connected Tank Liquid Level Monitoring Data Sheet (Cont.)
Liquid levels of tanks physically connected to the transferring (sending) 241-AW ANNULUS to 241-AP-108 receiving tank (from ENRAFS, LITS, TMACS, or MCS) in inches
Sheet 3 of 3
DATE
TIME
TANK ID# AT
START
AT 30
MINUTES
AT 60
MINUTES
+_______
HOURS
+ ______
HOURS
+ ______
HOURS AT END
241-AN-101**
241-AN-102**
241-AN-103**
241-AN-104**
241-AN-105**
241-AN-106**
241-AN-107**
OPERATORS
INITIALS
** - Manual Readings Limits: DST <0.3"
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
61 of 111
Pre-Transfer Cover Inspection Checklist*
COVER LOCATION DATE INSPECTION
PERFORMED TIME INSPECTION
PERFORMED OPERATOR
INITIALS
Inspection Performed Per TO-025-005
* Verify covers are installed prior to transfer
Limit - Surveillance shall be once within 72 hours prior to start of transfer.
Intra-Transfer Cover Inspection Checklist**
COVER INSPECTION DATE & TIME
OPERATOR INITIALS TRANSFER START
DATE & TIME TRANSFER END
DATE & TIME
N/A
N/A
** Verify covers are installed at least once every 10 days during transfer.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
62 of 111
Transfer Supplemental Cover Inspection Checklist*
SUPPLEMENTAL COVER LOCATION DATE TIME OPERATOR INITIALS
AW241-WT-COB-510
AY241-WT-COB-312 (Located in AX Complex)
241-ER-311 Pump Pit
AN241-WT-COB-501
AN241-WT-COB-502
AN241-WT-COB-503
AN241-WT-COB-504
AN241-WT-COB-505
AN241-WT-COB-506
AN241-WT-COB-507
AN241-WT-COB-508
AN241-WT-COB-509
AZ241-WT-COB-501
AZ241-WT-COB-502
AZ241-WT-COB-503
AZ241-WT-COB-504
AZ241-WT-COB-505
AZ241-WT-COB-506
AZ241-WT-COB-507
AZ241-WT-COB-508
AZ241-WT-COB-509
AZ241-WT-COB-510
* Verify Supplemental covers are installed prior to transfer: Control - Surveillance shall be once within 72 hours prior to removal of administrative lock from transfer pump and once per 72 hours thereafter. OPERABILITY is defined as: In place, secure, free from physical damage, and
extending to the ground.
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
63 of 111
Intra-transfer Supplemental Cover Inspection Checklist**
COVER INSPECTION DATE & TIME OPERATOR INITIALS
TRANSFER
START DATE & TIME
TRANSFER END
DATE & TIME
N/A
N/A
** Verify Supplemental covers are installed at least once per every 72 hours during transfer
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
64 of 111
241-AP-108 Temperature Monitoring Data Sheet
Using a Hand Held Potentiometer (type E)
O btain the following readings
[O nce per shift and at the end of the transfer]
Instrument Serial #
Calibration Due Date
241-AP-108 START _____ HO URS
_____ HO URS
END
DATE:
TIME:
LCS/LCO 3.3.2 LIMIT*
<195F <195F <195F <195F AP108-WST-SS-101
SELECTO R
SWITCH PO SITIO N NUMBER
**TEMP. ELEMENT NUMBER
HEIGHT IN TANK (Inches from bottom)
9 AP108-WST-TE-037 414
8 AP108-WST-TE-043 246
7 AP108-WST-TE-047 150
6 AP108-WST-TE-049 102
5 AP108-WST-TE-051 54
4 AP108-WST-TE-052 30
3 AP108-WST-TE-053 6
Tank Farm O perator Initials:
Engineer Signature
and Date:
* If any monitored solution temperature changes are greater than 10F, CONTACT Shift Manager/OE to determine if the average bulk temperature has
approached the 10F/hr OSD-T-151-00007, 2.4.2 Limit. If the temperature difference between any successive thermocouples is greater that 45F,
determine if the solution/vapor interface has approached the 55F OSD-T-151-00007, 2.4.2 Limit. ** REFERENCE DRAWING H-14-020603 SHEET 8, IDENTIFIES THE TEMPERATURE ELEMENTS (TE ) IN THE TANK BEING
MONITORED ( NO LABELS CAN BE PHYSICALLY INSTALLED ON EQUIPMENT IDENTIFIED )
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
65 of 111
Valve Position Checklists
Valve Position Checklist
Transfer From 241-AW-101 Annulus to 241-AP-108
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep. Verif Initials/Date
AW FARM
AWA-WT-V-303: 241-AW-A Valve Pit
OPEN
AWA-WT-V-304: 241-AW-A Valve Pit
OPEN
AWA-WT-V-301: 241-AW-A Valve Pit
CLOSED
AW02A-WT-V-101: 241-AW-02A Central Pump Pit
ROUTE flow from Nozzle J to Nozzle V and BLOCK flow to AW02A-WT-V-102
AW02A-WT-V-102:
241-AW-02A Central Pump Pit CLOSED
AW02A-WT-V-103: 241-AW -02A Central Pump Pit
ROUTE flow from AW02A-WT-V-104 to Nozzle “H” and BLOCK flow to Nozzle “U”.
NOTE - The following Leak Detector/Check Valve Assembly is required for flammable gas controls under AC 5.11 and AC 5.12.
Leak Detector/Check Valve Assembly:
241-AW-801 Service Pit
OVER DRAIN
NOTE - The following six valves at the 241-AW Flush Pit are positioned to protect the Service Water Detection System,
which is required to be operable per LCO 3.1.2.
AWFP-RW-V-208: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-204 to
DRAIN and BLOCK flow from Valve AWFP-RW-V-211
AWFP-RW-V-210: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to Valve AWFP-RW-V-213 and BLOCK flow to
Nozzle R-17 in the 241-AW-B Valve Pit
AWFP-RW-V-211: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to
AWFP-RW-V-214 and BLOCK flow to Nozzle L-17 in the 241-AW-A Valve Pit
AWFP-RW-V-212: 241-AW Flush Pit
CLOSED
AWFP-RW-V-213: 241-AW Flush Pit
CLOSED
AWFP-RW-V-214: 241-AW Flush Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
66 of 111
Valve Position Checklist
Transfer From 241-AW-101 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location
Valve Position Operator
Initials/Date Indep. Verif Initials/Date
244-BX
NOTE - The following two valves at the 244-BX Flush Pit are positioned to protect the Service Water Detection System, which is required to be operable per LCO 3.1.2.
BX244-RW-V-229 Flush
Pit Isolation Valve: 244-BX Flush Pit
CLOSED
BX244-WT-V-206 Pump
Pit Flush Valve: 244-BX Pump Pit
CLOSED
AP FARM
APVP-WT-V-609: 241-AP Valve Pit
OPEN
APVP-WT-V-603:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-601 to APVP-WT-V-613
and BLOCK flow to APVP-WT-V-619
APVP-WT-V-619: 241-AP Valve Pit
CLOSED
APVP-WT-V-610: 241-AP Valve Pit
CLOSED
NOTE - Any positioning of APVP-WT-V-803 must be coordinated through the Shift Manager/OE due to missing
valve positioning funnel. Valve verified to be in a partial OPEN position during a water flush test.
APVP-WT-V-803: 241-AP Valve Pit
OPEN N/A N/A
NOTE - Any positioning of APVP-WT-V-802 must be coordinated through the Shift Manager/OE due to a slight
misalignment causing leak through. Valve verified to be in CLOSED position by water leak check.
APVP-WT-V-802: 241-AP Valve Pit
CLOSED N/A N/A
NOTE - Any positioning of APVP-WT-V-805 must be coordinated through the Shift Manager /OE due to missing valve positioning funnel. Valve verified by Operations to be in the CLOSED position.
APVP-WT-V-805:
241-AP Valve Pit CLOSED N/A N/A
APVP-WT-V-801: 241-AP Valve Pit
CLOSED
APVP-WT-V-804: 241-AP Valve Pit
OPEN
APVP-WT-V-620:
241-AP Valve Pit OPEN
APVP-WT-V-606: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-620 to APVP-WT-V-608 and BLOCK flow to APVP-WT-V-616
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
67 of 111
Valve Position Checklist
Transfer From 241-AW-101 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator Initials/Date
Indep.Verif Initials/Date
APVP-WT-V-616:
241-AP Valve Pit CLOSED
APVP-WT-V-608: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-606 to APVP-WT-V-618 and BLOCK flow to
APVP-WT-V-607
APVP-WT-V-607: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-617 to APVP-WT-V-615 and BLOCK flow to
APVP-WT-V-608
APVP-WT-V-618: 241-AP Valve Pit
OPEN
APVP-WT-V-132 (AP Valve Pit
Floor Drain): 241-AP Valve Pit
Drain Sealed (No orange paint visible on drain
handle
AP08A-WT-V-108: 241-AP-108 Central Pump Pit
ROUTE flow from Nozzle A to Nozzle E and BLOCK flow to pump
NOTE - The following two valves at the 241-AP Flush Pit are positioned to protect the Service Water Detection System,
which is required to be operable per LCO 3.1.2.
APFP-RW-V-201: 241-AP Flush Pit
CLOSED
APFP-RW-V-202 (DRAIN
VALVE): 241-AP Flush Pit CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
68 of 111
Valve Position Checklist
Transfer From 241-AW-102 Annulus to 241-AP-108
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep. Verif Initials/Date
AW FARM
AW02A-WT-V-103: 241-AW -02A Central Pump Pit
ROUTE flow from AW02A-WT-V-104 to Nozzle “U” and BLOCK flow to Nozzle “H”.
AW02A-WT-V-104:
241-AW-02A Central Pump Pit CLOSED
NOTE - The following Leak Detector/Check Valve Assembly is required for flammable gas controls under AC 5.11 and AC 5.12.
Leak Detector/Check Valve
Assembly: 241-AW-801 Service Pit OVER DRAIN
NOTE - The following six valves at the 241-AW Flush Pit are positioned to protect the Service Water Detection System, which is required to be operable per LCO 3.1.2.
AWFP-RW-V-208: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-204 to
DRAIN and BLOCK flow from Valve AWFP-RW-V-211
AWFP-RW-V-210: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to
Valve AWFP-RW-V-213 and BLOCK flow to Nozzle R-17 in the 241-AW-B Valve Pit
AWFP-RW-V-211:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to
AWFP-RW-V-214 and BLOCK flow to Nozzle L-17 in the 241-AW-A Valve Pit
AWFP-RW-V-212: 241-AW Flush Pit
CLOSED
AWFP-RW-V-213: 241-AW Flush Pit
CLOSED
AWFP-RW-V-214: 241-AW Flush Pit
CLOSED
244-BX
NOTE - The following two valves at the 244-BX Flush Pit are positioned to protect the Service Water Detection System, which is required to be operable per LCO 3.1.2.
BX244-RW-V-229 Flush Pit
Isolation Valve: 244-BX Flush Pit
CLOSED
BX244-WT-V-206 Pump Pit Flush Valve:
244-BX Pump Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
69 of 111
Valve Position Checklist
Transfer From 241-AW-102 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep. Verif Initials/Date
AP FARM
APVP-WT-V-609:
241-AP Valve Pit OPEN
APVP-WT-V-603:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-601 to
APVP-WT-V-613 and BLOCK flow to APVP-WT-V-619
APVP-WT-V-619:
241-AP Valve Pit CLOSED
APVP-WT-V-610: 241-AP Valve Pit
CLOSED
NOTE - Any positioning of APVP-WT-V-803 must be coordinated through the Shift Manager/OE due to missing valve positioning funnel. Valve verified to be in a partial OPEN position during a water flush test.
APVP-WT-V-803:
241-AP Valve Pit OPEN N/A N/A
NOTE - Any positioning of APVP-WT-V-802 must be coordinated through the Shift Manager/OE due to a slight misalignment causing leak through. Valve verified to be in CLOSED position by water leak check.
APVP-WT-V-802: 241-AP Valve Pit
CLOSED N/A N/A
NOTE - Any positioning of APVP-WT-V-805 must be coordinated through the Shift Manager/OE due to missing valve
positioning funnel. Valve verified by Operations to be in the CLOSED position.
APVP-WT-V-805: 241-AP Valve Pit
CLOSED N/A N/A
APVP-WT-V-801: 241-AP Valve Pit
CLOSED
APVP-WT-V-804:
241-AP Valve Pit OPEN
APVP-WT-V-620: 241-AP Valve Pit
OPEN
APVP-WT-V-606: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-620 to APVP-WT-V-608 and BLOCK flow to
APVP-WT-V-616
APVP-WT-V-616: 241-AP Valve Pit
CLOSED
APVP-WT-V-608: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-606 to APVP-WT-V-618 and BLOCK flow to APVP-WT-V-607
APVP-WT-V-607: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-617 to APVP-WT-V-615 and BLOCK flow to APVP-WT-V-608
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
70 of 111
Valve Position Checklist
Transfer From 241-AW-102 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep. Verif Initials/Date
APVP-WT-V-618:
241-AP Valve Pit OPEN
AP08A-WT-V-108: 241-AP-108 Central Pump Pit
ROUTE flow from Nozzle A to Nozzle E and BLOCK flow to pump
APVP-WT-V-132 (AP Valve Pit Floor Drain): 241-AP Valve Pit
Drain Sealed (No orange paint visible on drain handle
NOTE - The following two valves at the 241-AP Flush Pit are positioned to protect the Service Water Detection System,
which is required to be operable per LCO 3.1.2.
APFP-RW-V-201: 241-AP Flush Pit
CLOSED
APFP-RW-V-202 (DRAIN VALVE): 241-AP Flush Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
71 of 111
Valve Position Checklist
Transfer From 241-AW-103 Annulus to 241-AP-108
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep. Verif Initials/Date
AW FARM
AWA-WT-V-303:
241-AW-A Valve Pit OPEN
AWA-WT-V-304:
241-AW-A Valve Pit OPEN
AWA-WT-V-301: 241-AW-A Valve Pit
CLOSED
AW02A-WT-V-101: 241-AW-02A Central Pump
Pit
ROUTE flow from Nozzle J to Nozzle V and BLOCK flow to AW02A-WT-V-102
AW02A-WT-V-102: 241-AW-02A Central Pump
Pit CLOSED
AW02A-WT-V-103: 241-AW -02A Central Pump
Pit
ROUTE flow from AW02A-WT-V-104 to Nozzle “H” and BLOCK flow to Nozzle “U”.
NOTE - The following Leak Detector/Check Valve Assembly is required for flammable gas controls under AC 5.11 and AC 5.12.
Leak Detector/Check Valve
Assembly: 241-AW-801 Service Pit
OVER DRAIN
NOTE - The following six valves at the 241-AW Flush Pit are positioned to protect the Service Water Detection System,
which is required to be operable per LCO 3.1.2.
AWFP-RW-V-208:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-204 to
DRAIN and BLOCK flow from Valve AWFP-RW-V-211
AWFP-RW-V-210:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to
Valve AWFP-RW-V-213 and BLOCK flow to Nozzle R-17 in the 241-AW-B Valve Pit
AWFP-RW-V-211:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to
AWFP-RW-V-214 and BLOCK flow to Nozzle L-17 in the 241-AW-A Valve Pit
AWFP-RW-V-212:
241-AW Flush Pit CLOSED
AWFP-RW-V-213: 241-AW Flush Pit
CLOSED
AWFP-RW-V-214: 241-AW Flush Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
72 of 111
Valve Position Checklist
Transfer From 241-AW-103 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep.Verif
Initials/Date
244-BX
NOTE - The following two valves at the 244-BX Flush Pit are positioned to protect the Service Water Detection System,
which is required to be operable per LCO 3.1.2.
BX244-RW-V-229 Flush Pit Isolation Valve:
244-BX Flush Pit
CLOSED
BX244-WT-V-206 Pump Pit Flush Valve:
244-BX Pump Pit
CLOSED
AP FARM
APVP-WT-V-609:
241-AP Valve Pit OPEN
APVP-WT-V-603:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-601 to APVP-WT-V-613 and BLOCK flow to
APVP-WT-V-619
APVP-WT-V-619: 241-AP Valve Pit
CLOSED
APVP-WT-V-610: 241-AP Valve Pit
CLOSED
NOTE - Any positioning of APVP-WT-V-803 must be coordinated through the Shift Manager/OE due to missing valve
positioning funnel. Valve verified to be in a partial OPEN position during a water flush test.
APVP-WT-V-803: 241-AP Valve Pit
OPEN N/A N/A
NOTE - Any positioning of APVP-WT-V-802 must be coordinated through the Shift Manager/OE due to a slight misalignment causing leak through. Valve verified to be in CLOSED position by water leak check.
APVP-WT-V-802:
241-AP Valve Pit CLOSED N/A N/A
NOTE - Any positioning of APVP-WT-V-805 must be coordinated through the Shift Manager/OE due to missing valve
positioning funnel. Valve verified by Operations to be in the CLOSED position.
APVP-WT-V-805: 241-AP Valve Pit
CLOSED N/A N/A
APVP-WT-V-801: 241-AP Valve Pit
CLOSED
APVP-WT-V-804:
241-AP Valve Pit OPEN
APVP-WT-V-620: 241-AP Valve Pit
OPEN
APVP-WT-V-606: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-620 to APVP-WT-V-608 and BLOCK flow to APVP-WT-V-616
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
73 of 111
Valve Position Checklist
Transfer From 241-AW-103 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep.Verif
Initials/Date
APVP-WT-V-616:
241-AP Valve Pit CLOSED
APVP-WT-V-608:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-606 to APVP-WT-V-618 and BLOCK flow to
APVP-WT-V-607
APVP-WT-V-607:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-617 to APVP-WT-V-615 and BLOCK flow to
APVP-WT-V-608
APVP-WT-V-618: 241-AP Valve Pit
OPEN
AP08A-WT-V-108: 241-AP-108 Central Pump Pit
ROUTE flow from Nozzle A to Nozzle E and BLOCK flow to pump
APVP-WT-V-132 (AP Valve Pit
Floor Drain): 241-AP Valve Pit
Drain Sealed (No orange paint visible on drain
handle
NOTE - The following two valves at the 241-AP Flush Pit are positioned to protect the Service Water Detection System,
which is required to be operable per LCO 3.1.2.
APFP-RW-V-201: 241-AP Flush Pit
CLOSED
APFP-RW-V-202 (DRAIN VALVE): 241-AP Flush Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
74 of 111
Valve Position Checklist
Transfer From 241-AW-104 Annulus to 241-AP-108
Valve Nomenclature: Location Valve Position Operator
Initials/Date
Indep.Verif
Initials/Date
AW FARM
AWB-WT-V-202:
241-AW-B Valve Pit OPEN
AWB-WT-V-203: 241-AW-B Valve Pit
OPEN
AWB-WT-V-201: 241-AW-B Valve Pit
CLOSED
AW02A-WT-V-103:
241-AW -02A Central Pump Pit
ROUTE flow from to Nozzle “H” to Nozzle “U”
and BLOCK flow to AW02A-WT-V-104.
AW02A-WT-V-104: 241-AW-02A Central Pump Pit
CLOSED
NOTE - The following Leak Detector/Check Valve Assembly is required for flammable gas controls under AC 5.11 and AC 5.12.
Leak Detector/Check Valve
Assembly: 241-AW-801 Service Pit OVER DRAIN
NOTE - The following six valves at the 241-AW Flush Pit are positioned to protect the Service Water Detection System, which is required to be operable per LCO 3.1.2.
AWFP-RW-V-208: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-204 to DRAIN and BLOCK flow from Valve AWFP-RW-V-211
AWFP-RW-V-210: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to Valve AWFP-RW-V-213 and BLOCK flow to Nozzle R-17 in the 241-AW-B Valve Pit
AWFP-RW-V-211: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to AWFP-RW-V-214 and BLOCK flow to Nozzle
L-17 in the 241-AW-A Valve Pit
AWFP-RW-V-212: 241-AW Flush Pit
CLOSED
AWFP-RW-V-213: 241-AW Flush Pit
CLOSED
AWFP-RW-V-214:
241-AW Flush Pit CLOSED
244-BX
NOTE - The following two valves at the 244-BX Flush Pit are positioned to protect the Service Water Detection System,
which is required to be operable per LCO 3.1.2.
BX244-RW-V-229 Flush Pit Isolation Valve:
244-BX Flush Pit
CLOSED
BX24-WT-V-206 Pump Pit Flush Valve:
244-BX Pump Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
75 of 111
Valve Position Checklist
Transfer From 241-AW-104 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep.Verif Initials/Date
AP FARM
APVP-WT-V-609:
241-AP Valve Pit CLOSED
APVP-WT-V-619: 241-AP Valve Pit
CLOSED
APVP-WT-V-610: 241-AP Valve Pit
OPEN
APVP-WT-V-804:
241-AP Valve Pit CLOSED
NOTE - Any positioning of APVP-WT-V-803 must be coordinated through the Shift Manager/OE due to missing valve positioning funnel. Valve verified to be in a partial OPEN position during a water flush test.
APVP-WT-V-803: 241-AP Valve Pit
CLOSED N/A N/A
NOTE - Any positioning of APVP-WT-V-802 must be coordinated through the Shift Manager/OE due to a slight
misalignment causing leak through. Valve verified to be in CLOSED position by water leak check.
APVP-WT-V-802: 241-AP Valve Pit
CLOSED N/A N/A
NOTE - Any positioning of APVP-WT-V-805 must be coordinated through the Shift Manager/OE due to missing valve positioning funnel. Valve verified by Operations to be in the CLOSED position.
APVP-WT-V-805:
241-AP Valve Pit CLOSED N/A N/A
APVP-WT-V-801: 241-AP Valve Pit
CLOSED
APVP-WT-V-620: 241-AP Valve Pit
OPEN
APVP-WT-V-606: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-620 to
APVP-WT-V-608 and BLOCK flow to APVP-WT-V-616
APVP-WT-V-616:
241-AP Valve Pit CLOSED
APVP-WT-V-608:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-606 to
APVP-WT-V-618 and BLOCK flow to APVP-WT-V-607
APVP-WT-V-607:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-617 to
APVP-WT-V-615 and BLOCK flow to APVP-WT-V-608
APVP-WT-V-618:
241-AP Valve Pit OPEN
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
76 of 111
Valve Position Checklist
Transfer From 241-AW-104 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep.Verif Initials/Date
AP08A-WT-V-108:
241-AP-108 Central Pump Pit
ROUTE flow from Nozzle A to Nozzle E and BLOCK flow to pump
APVP-WT-V-132 (AP Valve Pit Floor Drain): 241-AP Valve Pit
Drain Sealed (No orange paint visible on drain handle
NOTE - The following two valves at the 241-AP Flush Pit are positioned to protect the Service Water Detection System, which is required to be operable per LCO 3.1.2.
APFP-RW-V-201:
241-AP Flush Pit CLOSED
APFP-RW-V-202 (DRAIN VALVE): 241-AP Flush Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
77 of 111
Valve Position Checklist
Transfer From 241-AW-105 Annulus to 241-AP-108
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep.Verif
Initials/Date
AW FARM
AWA-WT-V-303:
241-AW-A Valve Pit OPEN
AWA-WT-V-304:
241-AW-A Valve Pit OPEN
AWA-WT-V-301:
241-AW-A Valve Pit CLOSED
AW02A-WT-V-101:
241-AW-02A Central Pump Pit
ROUTE flow from Nozzle J to Nozzle V and BLOCK flow to AW02A-WT-V-102
AW02A-WT-V-102:
241-AW-02A Central Pump Pit CLOSED
AW02A-WT-V-103:
241-AW -02A Central Pump Pit
ROUTE flow from AW02A-WT-V-104 to Nozzle “H” and BLOCK flow to Nozzle “U”.
NOTE - The following Leak Detector/Check Valve Assembly is required for flammable gas controls under AC 5.11 and AC 5.12.
Leak Detector/Check Valve Assembly: 241-AW-801 Service Pit
OVER DRAIN
NOTE - The following six valves at the 241-AW Flush Pit are positioned to protect the Service Water Detection System, which is required to be operable per LCO 3.1.2.
AWFP-RW-V-208:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-204 to DRAIN and BLOCK flow from Valve
AWFP-RW-V-211
AWFP-RW-V-210:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to Valve AWFP-RW-V-213 and BLOCK flow to Nozzle R-17 in the 241-AW-B Valve Pit
AWFP-RW-V-211:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to AWFP-RW-V-214 and BLOCK flow to Nozzle L-17 in the 241-AW-A Valve Pit
AWFP-RW-V-212:
241-AW Flush Pit CLOSED
AWFP-RW-V-213:
241-AW Flush Pit CLOSED
AWFP-RW-V-214:
241-AW Flush Pit CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
78 of 111
Valve Position Checklist
Transfer From 241-AW-105 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep.Verif
Initials/Date
244-BX
NOTE - The following two valves at the 244-BX Flush Pit are positioned to protect the Service Water Detection System, which is required to be operable per LCO 3.1.2.
BX244-RW-V-229 Flush Pit Isolation Valve:
244-BX Flush Pit CLOSED
BX244-WT-V-206 Pump Pit Flush Valve:
244-BX Pump Pit CLOSED
AP FARM
APVP-WT-V-609: 241-AP Valve Pit
OPEN
APVP-WT-V-603: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-601 to
APVP-WT-V-613 and BLOCK flow to APVP-WT-V-619
APVP-WT-V-619:
241-AP Valve Pit CLOSED
APVP-WT-V-610: 241-AP Valve Pit
CLOSED
NOTE - Any positioning of APVP-WT-V-803 must be coordinated through the Shift Manager/OE due to missing valve
positioning funnel. Valve verified to be in a partial OPEN position during a water flush test.
APVP-WT-V-803: 241-AP Valve Pit
OPEN N/A N/A
NOTE - Any positioning of APVP-WT-V-802 must be coordinated through the Shift Manager/OE due to a slight
misalignment causing leak through. Valve verified to be in CLOSED position by water leak check.
APVP-WT-V-802: 241-AP Valve Pit
CLOSED N/A N/A
NOTE - Any positioning of APVP-WT-V-805 must be coordinated through the Shift Manager/OE due to missing valve
positioning funnel. Valve verified by Operations to be in the CLOSED position.
APVP-WT-V-805: 241-AP Valve Pit
CLOSED N/A N/A
APVP-WT-V-801:
241-AP Valve Pit CLOSED
APVP-WT-V-804: 241-AP Valve Pit
OPEN
APVP-WT-V-620:
241-AP Valve Pit OPEN
APVP-WT-V-606: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-620 to APVP-WT-V-608 and BLOCK flow to
APVP-WT-V-616
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
79 of 111
Valve Position Checklist
Transfer From 241-AW-105 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date
Indep.Verif Initials/Date
APVP-WT-V-616:
241-AP Valve Pit CLOSED
APVP-WT-V-608:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-606 to APVP-WT-V-618 and BLOCK flow to APVP-WT-V-607
APVP-WT-V-607:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-617 to APVP-WT-V-615 and BLOCK flow to APVP-WT-V-608
APVP-WT-V-618:
241-AP Valve Pit OPEN
AP08A-WT-V-108:
241-AP-108 Central Pump Pit
ROUTE flow from Nozzle A to Nozzle E and BLOCK flow to pump
APVP-WT-V-132 (AP Valve Pit Floor Drain): 241-AP Valve Pit
Drain Sealed (No orange paint visible on drain handle
NOTE - The following two valves at the 241-AP Flush Pit are positioned to protect the Service Water Detection System, which is required to be operable per LCO 3.1.2.
APFP-RW-V-201:
241-AP Flush Pit CLOSED
APFP-RW-V-202 (DRAIN VALVE): 241-AP Flush Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
80 of 111
Valve Position Checklist
Transfer From 241-AW-106 Annulus to 241-AP-108
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep.Verif Initials/Date
AW FARM
AWB-WT-V-202: 241-AW-B Valve Pit
OPEN
AWB-WT-V-203: 241-AW-B Valve Pit
OPEN
AWB-WT-V-201: 241-AW-B Valve Pit
CLOSED
AW02A-WT-V-101:
241-AW-02A Central Pump Pit
ROUTE flow from Nozzle V to AW02A-WT-V-102 and BLOCK flow to
Nozzle J
AW02A-WT-V-102:
241-AW-02A Central Pump Pit CLOSED
AW02A-WT-V-103:
241-AW -02A Central Pump Pit
ROUTE flow from to Nozzle “H” to Nozzle “U”
and BLOCK flow to AW02A-WT-V-104.
AW02A-WT-V-104:
241-AW-02A Central Pump Pit CLOSED
NOTE - The following Leak Detector/Check Valve Assembly is required for flammable gas controls under AC 5.11 and
AC 5.12.
Leak Detector/Check Valve
Assembly: 241-AW-801 Service Pit OVER DRAIN
NOTE - The following six valves at the 241-AW Flush Pit are positioned to protect the Service Water Detection System,
which is required to be operable per LCO 3.1.2.
AWFP-RW-V-208: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-204 to
DRAIN and BLOCK flow from Valve AWFP-RW-V-211
AWFP-RW-V-210: 241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to Valve AWFP-RW-V-213 and BLOCK flow to Nozzle R-17 in the 241-AW-B Valve Pit
AWFP-RW-V-211:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to AWFP-RW-V-214 and BLOCK flow to Nozzle
L-17 in the 241-AW-A Valve Pit
AWFP-RW-V-212:
241-AW Flush Pit CLOSED
AWFP-RW-V-213:
241-AW Flush Pit CLOSED
AWFP-RW-V-214:
241-AW Flush Pit CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
81 of 111
Valve Position Checklist
Transfer From 241-AW-106 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date Indep.Verif Initials/Date
244-BX
NOTE - The following two valves at the 244-BX Flush Pit are positioned to protect the Service Water Detection System, which is required to be operable per LCO 3.1.2.
BX244-RW-V-229 Flush Pit Isolation Valve:
244-BX Flush Pit
CLOSED
BX244-WT-V-206 Pump Pit Flush
Valve: 244-BX Pump Pit
CLOSED
AP FARM
APVP-WT-V-609:
241-AP Valve Pit CLOSED
APVP-WT-V-619:
241-AP Valve Pit CLOSED
APVP-WT-V-610:
241-AP Valve Pit OPEN
APVP-WT-V-804:
241-AP Valve Pit CLOSED
NOTE - Any positioning of APVP-WT-V-803 must be coordinated through the Shift Manager /OE due to missing valve
positioning funnel. Valve verified to be in a partial OPEN position during a water flush test.
APVP-WT-V-803:
241-AP Valve Pit CLOSED N/A N/A
NOTE - Any positioning of APVP-WT-V-802 must be coordinated through the Shift Manager/OE due to a slight
misalignment causing leak through. Valve verified to be in CLOSED position by water leak check.
APVP-WT-V-802:
241-AP Valve Pit CLOSED N/A N/A
NOTE - Any positioning of APVP-WT-V-805 must be coordinated through the Shift Manager/OE due to missing valve
positioning funnel. Valve verified by Operations to be in the CLOSED position.
APVP-WT-V-805:
241-AP Valve Pit CLOSED N/A N/A
APVP-WT-V-801:
241-AP Valve Pit CLOSED
APVP-WT-V-620:
241-AP Valve Pit OPEN
APVP-WT-V-606: 241-AP Valve Pit
ROUTE flow from APVP-WT-V-620 to
APVP-WT-V-608 and BLOCK flow to APVP-WT-V-616
APVP-WT-V-616: 241-AP Valve Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
82 of 111
Valve Position Checklist
Transfer From 241-AW-106 Annulus to 241-AP-108 (Cont.)
Valve Nomenclature: Location Valve Position Operator
Initials/Date
Indep.Verif Initials/Date
APVP-WT-V-608:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-606 to APVP-WT-V-618 and BLOCK flow to APVP-WT-V-607
APVP-WT-V-607:
241-AP Valve Pit
ROUTE flow from APVP-WT-V-617 to APVP-WT-V-615 and BLOCK flow to
APVP-WT-V-608
APVP-WT-V-618:
241-AP Valve Pit OPEN
AP08A-WT-V-108:
241-AP-108 Central Pump Pit
ROUTE flow from Nozzle A to Nozzle E and BLOCK flow to pump
APVP-WT-V-132 (AP Valve Pit Floor Drain): 241-AP Valve Pit
Drain Sealed (No orange paint visible on drain handle
NOTE - The following two valves at the 241-AP Flush Pit are positioned to protect the Service Water Detection System,
which is required to be operable per LCO 3.1.2.
APFP-RW-V-201:
241-AP Flush Pit CLOSED
APFP-RW-V-202 (DRAIN VALVE): 241-AP Flush Pit
CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
83 of 111
Flush Valve Position Checklists
Valve Position Checklist for Flushing 241-AW-101, 103, and 105
Valve Nomenclature:
Location/Action Valve Position
Operator
Initials
*NOTE: Valve AW801-RW-V-101 must be verified to be OPEN by either;
Verifying a positive raw water pressure indication on raw water pressure gauge PI-101 downstream of AW801-RW-V-103.
OR
Opening valve AW801-RW-V-112 and verifying raw water flow.
271-AW-801 Service Building
AW801-RW-V-101 :
271-AW Service Building OPEN
AW801-RW-V-102 :
271-AW Service Building OPEN
AW801-RW-V-103 :
271-AW Service Building OPEN
AW801-RW-V-104 :
271-AW Service Building CLOSED
AW801-RW-V-105 :
271-AW Service Building OPEN
AW801-RW-V-110 :
271-AW Service Building OPEN
AW801-RW-V-111 :
271-AW Service Building OPEN
AW801-RW-V-112 :
271-AW Service Building CLOSED
AW801-RW-V-113 :
271-AW Service Building CLOSED
AW801-RW-V-114 :
271-AW Service Building CLOSED
AW801-RW-V-115 :
271-AW Service Building OPEN
241-AW Flush Pit
AWFP-RW-V-202:
241-AW Flush Pit CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
84 of 111
Valve Position Checklist for Flushing 241-AW-101, 103, and 105 (Cont.)
Valve Nomenclature:
Location/Action Valve Position
Operator
Initials
AWFP-RW-V-206:
241-AW Flush Pit CLOSED
AWFP-RW-V-207:
241-AW Flush Pit CLOSED
AWFP-RW-V-212:
241-AW Flush Pit CLOSED
AWFP-RW-V-213:
241-AW Flush Pit CLOSED
AWFP-RW-V-214:
241-AW Flush Pit CLOSED
AWFP-RW-V-215:
241-AW Flush Pit CLOSED
AWFP-AS-V-301:
241-AW Flush Pit CLOSED
AWFP-RW-V-208:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-204 to valve AWFP-RW-V-211 and BLOCK flow to drain
AWFP-RW-V-210:
241-AW Flush Pit
ROUTE flow from Nozzle R17 in 241-AW-B Valve Pit to valve AWFP-RW-V-213 and BLOCK flow from valve AWFP-RW-V-208
AWFP-RW-V-211:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to Nozzle L17 in 241-AW-A Valve Pit and BLOCK flow to valve AWFP-RW-V-214
**NOTE: The raw water flex hose (RW-OUT to RW-IN) in the 241-AW Flush Pit is permanently installed.
**AWFP-RW-V-201:
241-AW Flush Pit
ROUTE flow from AW801-RW-V-115 through the raw water flex hose (RW-IN to RW-OUT) to valve AWFP-RW-V-204 and BLOCK flow to
drain
AWFP-RW-V-204:
241-AW Flush Pit OPEN
241-AW-B Valve Pit
AWB-WT-V-201:
241-AW-B Valve Pit CLOSED
END OF FLUSH VALVE LINE UP FOR 241-AW-101, 103, and 105
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
85 of 111
Valve Position Checklist for Flushing 241-AW-102, 104, and 106
Valve Nomenclature:
Location/Action Valve Position
Operator
Initials
*NOTE: Valve AW801-RW-V-101 must be verified to be OPEN by either;
Verifying a positive raw water pressure indication on raw water pressure gauge PI-101 downstream of
AW801-RW-V-103. OR
Opening valve AW801-RW-V-112 and verifying raw water flow.
271-AW-801 Service Building
*AW801-RW-V-101 :
271-AW Service Building OPEN
AW801-RW-V-102 :
271-AW Service Building OPEN
AW801-RW-V-103 :
271-AW Service Building OPEN
AW801-RW-V-104 :
271-AW Service Building CLOSED
AW801-RW-V-105 :
271-AW Service Building OPEN
AW801-RW-V-110 :
271-AW Service Building OPEN
AW801-RW-V-111 :
271-AW Service Building OPEN
AW801-RW-V-112 :
271-AW Service Building CLOSED
AW801-RW-V-113 :
271-AW Service Building CLOSED
AW801-RW-V-114 :
271-AW Service Building CLOSED
AW801-RW-V-115 :
271-AW Service Building OPEN
241-AW Flush Pit
AWFP-RW-V-202:
241-AW Flush Pit CLOSED
AWFP-RW-V-206:
241-AW Flush Pit CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
86 of 111
Valve Position Checklist for Flushing 241-AW-102, 104, and 106 (Cont.)
Valve Nomenclature:
Location/Action Valve Position
Operator
Initials
AWFP-RW-V-207:
241-AW Flush Pit CLOSED
AWFP-RW-V-212:
241-AW Flush Pit CLOSED
AWFP-RW-V-213:
241-AW Flush Pit CLOSED
AWFP-RW-V-214:
241-AW Flush Pit CLOSED
AWFP-RW-V-215:
241-AW Flush Pit CLOSED
AWFP-AS-V-301:
241-AW Flush Pit CLOSED
AWFP-RW-V-208:
241-AW Flush Pit
ROUTE flow from valve AWFP-RW-V-204 to valve AWFP-RW-V-211 and BLOCK flow to drain
AWFP-RW-V-210:
241-AW Flush Pit
ROUTE flow from Nozzle R17 in 241-AW-B Valve Pit to valve AWFP-RW-V-208 and BLOCK flow to valve AWFP-RW-V-213
AWFP-RW-V-211:
241-AW Flush Pit
ROUTE flow from Nozzle L17 in 241-AW-A Valve Pit to valve AWFP-RW-V-214 and BLOCK flow to valve AWFP-RW-V-208
**NOTE: The raw water flex hose (RW-OUT to RW-IN) in the 241-AW Flush Pit is permanently installed.
**AWFP-RW-V-201:
241-AW Flush Pit
ROUTE flow from AW801-RW-V-115 through the raw water flex hose (RW-IN to RW-OUT) to valve AWFP-RW-V-204 and BLOCK flow to drain
AWFP-RW-V-204:
241-AW Flush Pit OPEN
241-AW-A Valve Pit
AWA-WT-V-301:
241-AW-A Valve Pit CLOSED
END OF FLUSH VALVE LINE UP FOR 241-AW-102, 104, and 106
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
87 of 111
241-AW Flush Pit Drain Valving Checklist
Valve Nomenclature:
Location Valve Position
Operator
Initials
AWFP-RW-V-204:
AW Flush Pit CLOSED
AW801-RW-V-115:
271-AW-801 Service Building CLOSED
AWFP-RW-V-208:
AW Flush Pit
ROUTE flow from valve AWFP-RW-V-204 to DRAIN and BLOCK flow to valve AWFP-RW-V-211
AWFP-RW-V-214:
AW Flush Pit
OPEN
(This will drain the transfer line between the 241-AW Flush Pit and the
241-AW-A Valve Pit when AWFP- RW-V-211 is opened)
AWFP-RW-V-211:
AW Flush Pit
ROUTE flow from valve AWFP-RW-V-214 to Nozzle L17 in 241-AW-A Valve Pit and BLOCK flow to valve AWFP-RW-V-208
NOTE - WHEN the flush pit piping has drained approximately 2 minutes, Valve AWFP-RW-V-214 must be closed.
AWFP-RW-V-214:
AW Flush Pit
CLOSED
(After approximately 2 minutes)
AWFP-RW-V-211:
AW Flush Pit
ROUTE flow from valve AWFP-RW-V-208 to valve AWFP-RW-V-214 and BLOCK flow to Nozzle L17 in 241-AW-A Valve Pit
AWFP-RW-V-210:
AW Flush Pit
POSITION valve AWFP-RW-V-210 to ROUTE flow from AWFP-RW-V-208 to valve AWFP-RW-V-213 and BLOCK flow to
241-AW-B Valve Pit
AWFP-RW-V-213:
AW Flush Pit
OPEN
(To drain Flush Pit piping)
NOTE - WHEN the flush pit piping has drained approximately 2 minutes, Valve AWFP-RW-V-213 must be closed.
AWFP-RW-V-213:
AW Flush Pit
CLOSED
(After approximately 2 minutes)
AWFP-RW-V-210:
AW Flush Pit
POSITION valve AWFP-RW-V-210 to ROUTE flow from 241-AW-B Valve Pit to valve AWFP-RW-V-213 and BLOCK flow to AWFP-RW-V-208
AWFP-RW-V-213:
AW Flush Pit
OPEN
(To drain Flush Pit piping)
NOTE - WHEN the flush pit piping has drained approximately 2 minutes, Valve AWFP-RW-V-213 must be closed.
AWFP-RW-V-213:
AW Flush Pit
CLOSED
(After approximately 2 minutes)
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
88 of 111
241-AW Flush Pit Drain Valving Checklist (Cont.)
Valve Nomenclature:
Location Valve Position
Operator
Initials
AWFP-RW-V-202:
AW Flush Pit
OPEN
(To drain Flush Pit piping)
AWFP-RW-V-204:
AW Flush Pit
OPEN
(To drain Flush Pit piping)
AWFP-RW-V-206:
AW Flush Pit
OPEN
(To drain Flush Pit piping)
AWFP-RW-V-201:
AW Flush Pit
POSITION valve AWFP-RW-V-201 to ROUTE the flex hose (RW-OUT) to the DRAIN and BLOCK flow to
AW801-RW-V-115
*NOTE - WHEN approximately one minute has passed, Valve AWFP-RW-V-202, AWFP-RW-V-204, and AWFP-RW-V-206 must be closed.
AWFP-RW-V-202:
AW Flush Pit
CLOSED
(After one minute)
AWFP-RW-V-204:
AW Flush Pit
CLOSED
(After one minute)
AWFP-RW-V-206:
AW Flush Pit
CLOSED
(After one minute)
AW801-RW-V-111:
271-AW-801 Service Building CLOSED
AW801-RW-V-110:
271-AW-801 Service Building CLOSED
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
89 of 111
Post Transfer/Flush Valve Position Checklist
Valve Nomenclature:
Location Valve Position
Operator
Initials
Post Transfer Valving for 241-AP Valve Pit
APVP-WT-V-618 (for 241-AP-108):
241-AP Valve Pit CLOSED
APVP-WT-V-803:
241-AP Valve Pit CLOSED
APVP-WT-V-804:
241-AP Valve Pit CLOSED
APVP-WT-V-620:
241-AP Valve Pit CLOSED
APVP-WT-V-609:
241-AP Valve Pit CLOSED
APVP-WT-V-610:
241-AP Valve Pit CLOSED
AWA-WT-V-304:
241-AW-A Valve Pit CLOSED
AWA-WT-V-303:
241-AW-A Valve Pit CLOSED
AWB-WT-V-202:
241-AW-B Valve Pit CLOSED
AWB-WT-V-203:
241-AW-B Valve Pit CLOSED
AW02A-WT-V-101:
241-AW-02A Central Pump Pit
ROUTE flow from Nozzle “V” to AW02A-WT-V-102 and BLOCK flow to Nozzle “J”
AW02A-WT-V-103:
241-AW-02A Central Pump Pit
ROUTE flow from Nozzle “U” to AW02A-WT-V-104 and BLOCK flow to Nozzle “H”
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
90 of 111
Figure 1 - 241-AW-101 Annulus Transfer Route
L16 241-AW-A VALVE PIT
D
V-303
V-304
V-301
L17
L1
TO TANK 241-AW-102
241-AW-01A
CENTRAL PUMP PIT
241-AW-101
V-601G
A
SN-261
P
PW-471
FROM VALVE
V-211 IN 241-AW
FLUSH PIT
(See Figure 9)
LEGEND
LOCATION
AWA-WT-***
AW01A-WT-***
VALVE LABEL
DESCRIPTION
AWFP-RW-***
*AWFP-AS-***
241-AW
FLUSH PIT
241-AW-A
VALVE PIT
241-AW-01A
CENTRAL
PUMP PIT
SN-267
241-AW-02A
CENTRAL
PUMP PIT
AW02A-WT-***
SN-609
241-AW-02ACENTRAL PUMP PIT
V-1O1
V-401
V-102
V
L
J
NU
V-103
V-104H
V-402
TO NOZZLE 14 IN
241-AP VALVE PIT
(See Figure 7)
SN-610
TO NOZZLE 13 IN
241-AP VALVE PIT
(See Figure 8)
E
FROM 241-AW-B
VALVE PIT
SN-268
CRANE
OPERATED
3-WAY VALVE
ELECTRIC
PUMP
AIR DRIVEN PUMP
P
P
241-AW-01BANNULUSPUMP PIT
E
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
91 of 111
Figure 2 - 241-AW-102 Annulus Transfer Route
R15 241-AW-B VALVE PIT
D
V-202
V-203
V-201R17
R1
TO TANK 241-AW-102
FROM VALVE
V-210 IN 241-AW
FLUSH PIT
(See Figure 9)
LEGEND
LOCATION
AWA-WT-***
VALVE LABEL
DESCRIPTION
AWFP-RW-***
*AWFP-AS-***241-AW
FLUSH PIT241-AW-A
VALVE PIT
SN-609
241-AW-02ACENTRAL PUMP PIT
V-401
V
J
N
SN 268
UV-103
V-104H
V-402
TO NOZZLE 14 IN
241-AP VALVE PIT
(See Figure 7)
SN-610
241-AW-02A
CENTRAL
PUMP PIT
AW02A-WT-***
TO NOZZLE 13 IN
241-AP VALVE PIT
(See Figure 8)
CRANE
OPERATED
3-WAY VALVE
ELECTRIC
PUMP
AIR
DRIVEN
PUMP
P
P
241-AW-02BANNULUSPUMP PIT
241-AW-102
E
FROM 241-AW-A
VALVE PIT
SN-267
PW-472
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
92 of 111
Figure 3 - 241-AW-103 Annulus Transfer Route
L14241-AW-A VALVE PIT
D
V-303
V-304
V-301
L17
L1
TO TANK 241-AW-102
241-AW-03A
CENTRAL PUMP PIT
241-AW-103
A
SN-263
P
E
A
PW-473
P
P
CRANE
OPERATED
3-WAY VALVE
ELECTRIC
PUMP
AIR
DRIVEN
PUMP
241-AW-03BANNULUSPUMP PIT
FROM VALVE V-211IN 241-AW FLUSH PIT
(See Figure 9)
LEGEND
LOCATION
AWA-WT-***
AW03A-WT-***
VALVE LABELDESCRIPTION
AWFP-RW-***
*AWFP-AS-***
241-AW
FLUSH PIT
241-AW-A
VALVE PIT
241-AW-03A
CENTRAL
PUMP PIT
241-AW-02A
CENTRAL
PUMP PIT
AW02A-WT-***
SN-609
241-AW-02A
CENTRAL PUMP
PIT
V-1O1
V-401
V-102
V
L
J
NU
V-103
V-104H
V-402
TO NOZZLE 14 IN
241-AP VALVE PIT
(See Figure 7)
SN-610
TO NOZZLE 13 IN
241-AP VALVE PIT
(See Figure 8)
E
FROM 241-AW-B
VALVE PIT
SN-268
SN-267
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
93 of 111
Figure 4 - 241-AW-104 Annulus Transfer Route
R14241-AW-B VALVE PIT
D
V-202
V-203
V-201
R17
R1
SN-268
TO TANK 241-AW-102
241-AW-04A
CENTRAL
PUMP PIT
241-AW-104
V-604
G
A
SN-264
P
CRANE
OPERATED
3-WAY VALVE
ELECTRIC
PUMP
AIR
DRIVEN
PUMP
P
P
241-AW-04BANNULUSPUMP PIT
FROM VALVE
V-210 IN 241-AW
FLUSH PIT
(See Figure 9)
E
PW-474
LEGEND
LOCATION
AWA-WT-***
AW04A-WT-***
VALVE LABEL
DESCRIPTION
AWFP-RW-***
*AWFP-AS-***
241-AW
FLUSH PIT
241-AW-A
VALVE PIT
241-AW-04A
CENTRAL
PUMP PIT
241-AW-02A
CENTRAL
PUMP PIT
AW02A-WT-***
SN-609
241-AW-02A
CENTRAL PUMP
PIT
V-1O1
V-401
V-102
V
L
J
NU
V-103
V-104H
V-402
TO NOZZLE 14 IN
241-AP VALVE PIT
(See Figure 7)
SN-610
TO NOZZLE 13 IN
241-AP VALVE PIT
(See Figure 8)
E
FROM 241-AW-A
VALVE PIT
SN-267
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
94 of 111
Figure 5 - 241-AW-105 Annulus Transfer Route
L15241-AW-A VALVE PIT
D
V-303
V-304
V-301
L17
L1
TO TANK 241-AW-102
241-AW-05A
CENTRAL PUMP PIT
241-AW-105
V-605
G
A
SN-265
P
E
A
PW-475
P
P
CRANE
OPERATED
3-WAY VALVE
ELECTRIC
PUMP
AIR
DRIVEN
PUMP 241-AW-05BANNULUSPUMP PIT
LEGEND
LOCATION
AWA-WT-***
AW05A-WT-***
VALVE LABEL
DESCRIPTION
AWFP-RW-***
*AWFP-AS-***
241-AW
FLUSH PIT
241-AW-A
VALVE PITAW-05A
CENTRAL
PUMP PIT
FROM VALVE V-211 IN
241-AW FLUSH PIT
(See Figure 9)
241-AW-02A
CENTRAL
PUMP PIT
AW02A-WT-***
SN-609
241-AW-02A
CENTRAL PUMP
PIT
V-1O1
V-401
V-102
V
L
J
NU
V-103
V-104H
V-402
TO NOZZLE 14 IN
241-AP VALVE PIT
(See Figure 7)
SN-610
TO NOZZLE 13 IN
241-AP VALVE PIT
(See Figure 8)
E
FROM 241-AW-B
VALVE PIT
SN-268 SN-267
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
95 of 111
Figure 6 - 241-AW-106 Annulus Transfer Route
R15 241-AW-B VALVE PIT
D
V-202
V-203
V-201
R17
R1
TO TANK 241-AW-102
241-AW-06A
CENTRAL
PUMP PIT
241-AW-106
A
SN-266
P
FROM VALVE
V-210 IN 241-AW
FLUSH PIT
(See Figure 9)
E
PW-476
LEGEND
LOCATION
AWA-WT-***
AW06A-WT-***
VALVE LABEL
DESCRIPTION
AWFP-RW-***
*AWFP-AS-***241-AW
FLUSH PIT
241-AW-A
VALVE PIT241-AW-06A
CENTRAL
PUMP PIT
SN 268
241-AW-02A
CENTRAL
PUMP PIT
AW02A-WT-***
SN-609
241-AW-02A
CENTRAL PUMP
PIT
V-1O1
V-401
V-102
V
L
J
NU
V-103
V-104H
V-402
TO NOZZLE 14 IN
241-AP VALVE PIT
(See Figure 7)
SN-610
TO NOZZLE 13 IN
241-AP VALVE PIT
(See Figure 8)
E
FROM 241-AW-A
VALVE PIT
SN-267
CRANE
OPERATED
3-WAY VALVE
ELECTRIC
PUMP
AIR
DRIVEN
PUMP
P
P
241-AW-06BANNULUSPUMP PIT
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
96 of 111
Figure 7 - 241-AW -101, 102, 103, and 105 to 241-AP-108 Transfer Route
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
97 of 111
QUICKDISCONNECT
RW INLET
HOSE CONNECTIONHOLDER
DRAIN
VALVE
V-202
SEAL LOOP
DR-713
AP FLUSH PIT
V-615
24
V-617
V-618
V-616
232221201918172530
V-612V-614
V-611
V-613V-801V-805
V-601V-603
V-803
HM
P V-619
V-606 V-608
V-602
V-802
DRAIN
14
V-609
O
N
V-804
O
D
H
V-402
V-610
V-403
H
DV-620
13 C
TK-103-AP
D
K
V-607
241-AP VALVE PIT
KEYVALVE*V-133
V-201
L
J
PS-205
TANK 241-AP-108
08A PIT
P
A
E
V-108
SN-618
FROM 241-AW-02ACENTRAL PUMP PIT(See Figures 1, 2, 3, and 5)
SN-609
FROM 241-AW-02ACENTRAL PUMP PIT(See Figures 4, and 6) SN-610
FROM AP FARMSERVICE BUILDING
241-AP VALVE LINE UP FOR PUMPING THEANNULUS OF 241-AW-101, 102, 103, and 105
LEGEND
LOCATION VALVE LABEL DESCRIPTION
241-AP VALVE PIT
AP-01A PUMP PIT
APVP-WT-V-***
AP01A-WT-V-***
APFP-RW-V-***AP FLUSH PIT
AP-08A PUMP PIT AP08A-WT-V-***
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
98 of 111
Figure 8 - 241-AW -104 and 106 to 241-AP-108 Transfer Route
QUICKDISCONNECT
RW INLET
HOSE CONNECTION
HOLDER
DRAIN
VALVE
V-202
SEAL LOOP
DR-713
AP FLUSH PIT
V-615
24
V-617
V-618
V-616
232221201918172530
V-612V-614
V-611
V-613V-801V-805
V-601V-603
V-803
HM
P V-619
V-606 V-608
V-602
V-802
DRAIN
14
V-609
O
N
V-804
O
D
H
V-402
V-610
V-403
H
D
V-620
13 C
TK-103-AP
D
K
V-607
241-AP VALVE PIT
KEYVALVE*V-133
V-201
L
J
PS-205
TANK 241-AP-108
08A PIT
P
A
E
V-108
SN-618
FROM 241-AW-02ACENTRAL PUMP PIT(See Figures 1, 2, 3, and 5)
SN-609
FROM 241-AW-02ACENTRAL PUMP PIT(See Figures 4, and 6) SN-610
FROM AP FARMSERVICE BUILDING
241-AP VALVE LINE UP FOR PUMPINGTHE ANNULUS OF 241-AW-104 and 106
LEGEND
LOCATION VALVE LABEL DESCRIPTION
241-AP VALVE PIT
AP-01A PUMP PIT
APVP-WT-V-***
AP01A-WT-V-***
APFP-RW-V-***AP FLUSH PIT
AP-08A PUMP PIT AP08A-WT-V-***
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
99 of 111
Figure 9 - 241-AW Flush Pit Valving
DR
DRHC
STEAMDR
V-206
V-202
V-204
V-212
*V-301
V-208
V-207
V-210
V-213
PS-220
DRV-211
PS-221
DR
V-201
V-214
V-215
PS-222
HC
RW-OUTRW-IN
HC
DR-362
DR-362
241-AW FLUSH PIT
LOCATIONVALVE LABEL
DESCRIPTION
241-AW
FLUSH PIT
AWFP-RW-V-***
*AWFP-AS-V-***
TO 241-AW-A Valve Pit(See Figures 1, 3, and 5)
LEGEND
TO 241-AW-B Valve Pit(See Figures 2, 4, and 6)
NOTE: VALVE V-213 IS POSITIONED TO PROVIDE FLOW TO 241-AW-B VALVE PIT AND V-211 IS POSITIONED TO BLOCK FLOW TO 241-AW-A VALVE PIT WHEN FLUSHUNG 241-AW-102, 104, OR 106.
From271-AW-801Service Building(See Figure 10)
TO 02E Pit
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
100 of 111
Figure 10 - 271-AW-801 Service Building
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
101 of 111
BUILDING VALVE LABEL DESCRIPTION
LEGEND
FT
PI
101
TEST
V-101
V-102
V-104
V-103
V-105
V-110
V-112
V-111
V-113
V-114 V-115
271-AW-801 SERVICE BUILDING
TO 241-AW FLUSH PIT
(See Figure 9)
*
LDE-801
271-AW-801 BLDG AW801-RW-V-***
PI102
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
102 of 111
Figure 11 - 241-AW-101 to 241-AP-108 Excavation Walkdown
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
103 of 111
SN-267
SN-609
N
75'
104'
13'
10' 10'
94'
94'
84'
6'
6'
84'
88'
49'
9'
12'31'
20'14'
9'
241-AW-102241-AW-101
12' 42'
5'
30'
SN-261
Reference Drawings
H-2-70397 70398 70399 70400 90544 90547 90548
241-AW-01A
CENTRAL PUMP PIT241-AW-02A
CENTRAL PUMP PIT
241-AW-A
VALVE PIT
241-AW-01BANNULUSPUMP PIT
30'
7'
241-AP
VALVE PIT
241-AP-08ACENTRAL PUMP PIT
20'
53'
11'
72'
65'
91'
68'
73'
'
241-AP-108
SN-618
PW-471
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
104 of 111
Figure 12 - 241-AW-102 to 241-AP-108 Excavation Walkdown
N
SN-609
75'
104'
13'10'
10'94'
94'
84'
6'
6'
84'
88'
49'
241-AW-102
Reference Drawings
H-2-70397 70398 70399 70400 90544 90547 90548
5'
30'
241-AW-02B
ANNULUS
PUMP PIT
241-AP-08ACENTRAL PUMP PIT
20'
53'
11'
72'
65'
91'
68'
73'
4'
'
241-AW-02A
CENTRAL PUMP PIT 7'
241-AP
VALVE PIT
241-AP-108
SN-618
PW-472
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
105 of 111
Figure 13 - 241-AW-103 to 241-AP-108 Excavation Walkdown
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
106 of 111
241-AW-02A
Central Pump Pit
241-AW-102
241-AW-03A
Central Pump Pit
Reference Drawings
H-2-70397
70398
70399
70400
90544
90547
90548241-AW-103
241-AW-08B
Annulus Pump Pit
241-AW-A
Valve Pit
241-AP
Valve Pit
241-AP-08A
Central Pump Pit241-AP-108
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
107 of 111
Figure 14 - 241-AW-104 to 241-AP-108 Excavation Walkdown
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
108 of 111
N
SN-610
104'
13'
10' 10'
94'
94'
76'
6'
6'
84'
88'
49'
241-AW-102
241-AW-02ACENTRAL PUMP PIT
Reference Drawings
H-2-70397
70398
70399
70400
90544
90547
90548
241-AW-04A
CENTRAL PUMP PIT
12'18'
21'23'
6'
4'
26'
24'
12'
5'SN-268
SN-264
6'
20' 8'
14'
41'
6'
7'
30'
241-AP-08A
CENTRAL PUMP PIT
20'
53'
11'
72'
65'
91'68'
73'4'
241-AP-108
241-AW-B
VALVE PIT
PW-474
241-AW-104
241-AP
VALVE PIT
SN-618
241-AW-04BANNULUSPUMP PIT
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
109 of 111
Figure 15 - 241-AW-105 to 241-AP-108 Excavation Walkdown
N
SN-609
75'
104'
13' 10'
10'94'
94'
84'
6'
6'
84'
88'
49'
241-AW-102
Reference Drawings
5'
241-AP-08A
CENTRAL PUMP PIT
20'
53'
11'
72'
65'
91'68'
73'
4'
'
241-AW-02ACENTRAL PUMP PIT
SN-267 9'
12'31'
20'14'
9'
241-AW-105
241-AW-03A
CENTRAL PUMP PIT
241-AW-A
VALVE PIT
241-AW-05B
ANNULUS PUMP PIT
30'
7'
PW-475
241-AP-108
241-AP
VALVE PIT
SN-618
12'
28'
H-2-70397
70398
70399
70400
90544
90547
90548
7'
SN-265
16'
COB AW-9
241-AW-05A
CENTRAL PUMP PIT
241-AW-10393'
5'
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
110 of 111
Figure 16 - 241-AW-106 to 241-AP-108 Excavation Walkdown
TSR Compliance
Emergency Annulus Pumping Procedure for AW-Farm
Type
CONTINUOUS Document No.
TO-001-283 Rev/Mod
X-0 Release Date
mm/dd/yy Page
111 of 111
N
SN-610
104'
13'
10' 10'
94'
94'
76'
6'
6'
84'
88'
49'
241-AW-102
241-AW-02A
CENTRAL PUMP PIT
Reference Drawings
H-2-70397
70398
70399
70400
90544
90547
90548
241-AW-104
241-AW-04A
CENTRAL PUMP PIT
26'
24'
12'
5'SN-268
6'
20' 8'
14'
41'
6'
7'
30'
241-AP-08A
CENTRAL PUMP PIT
20'
53'
11'
72'
65'
91'68'
73'4'
241-AP-108
241-AW-B
VALVE PIT
23'
10'5'
SN-266
241-AW-106
241-AW-06A
CENTRAL PUMP PIT
10'19'
117'COB
AW-10
PW-476
241-AW-06B
ANNULUS
PUMP PIT
SN-618241-AP
VALVE PIT