ICIT Rm. Valcea1. G. Ana, I. Spiridon, Association Days, 26.11.2009Institute for Cryogenics and Isotopes Technologies Rm. ValceaFuel Cycle and TRI-TOFFY training networks- Preparing the ITER Fuel Cycle -- Tritium Technologies for the Fusion Fuel Cycle -ing. George ANA, ing. Ionut SPIRIDONAssociation Days, 26.11.2009
-
Goals: to provide the optimum design, together with a profound basis of experience for safe operation; to provide the skilled professional staff required for the realization and operation of the ITER Deuterium Tritium Fuel Cycle and for the tritium handling in ITER; to defend and further strengthen the leading European position in the field. Association Euratom - MEdC2. G. Ana, I. Spiridon, Association Days, 26.11.2009
-
ICIT Rm. Valcea3. G. Ana, I. Spiridon, Association Days, 26.11.2009Preparing the ITER Fuel CycleNetwork
-
Parties and funds:Association Euratom - MEdCGermany Forschungszentrum Kalrsruhe Tritium Laboratory (coordinator)France CEA CadaracheItaly ENEA FrascatiHungary MTA Atomki DebrecenRomania ICIT Rm. Valcea4. G. Ana, I. Spiridon, Association Days, 26.11.2009Preparing the ITER Fuel Cycle-2006 2010-
-
- 3 year training project: Feb. 2007 Jan. 2010Association Euratom - MEdC5. G. Ana, I. Spiridon, Association Days, 26.11.2009Preparing the ITER Fuel Cycle
Chart1
23
12
1
Distribution of work to different research institutes
ICSI Feb. 2009 - Jan. 201012 months
JET, May 20081 month
FZK-TLK Feb. 2007 - Jan. 200923 months
Foaie1
Germany8,0563,4528,05611,508115,081.00 146,153
France8,5533,6658,55312,218122,183.00 155,172
Italy8,5803,6778,58012,257122,571.00 155,665
Hungary8,2253,5258,22511,750117,501.00 149,226
Romania7,9633,4137,96311,375113,755.00 144,469
750,685
FZK-TLK, Feb. 2007 - Jan. 200923
ICSI, Feb. 2009 - Jan. 201012
JET, May 20081
Foaie1
0
0
0
0
0
Community 100% contribution for the benefit of the project
Foaie2
0
0
0
Distribution of work to different research institutes
FZK-TLK Feb. 2007 - Jan. 200923 months
JET, May 20081 month
ICSI Feb. 2009 - Jan. 201012 months
Foaie3
Nr. Crt.Numecod Swagelokbuc
1Valva cu diafragma cu conexiuni male de 1/4"6LVV-DPVR4-P-C12
2Conexiune "micro - T"6LV-6MMW-311
3Cot6LV-6MMW-92
4Fiting sudura (gland)6LV-4-VCR-3-6MTB724
5Garnitura metailca cu sistem de fixareSS-4-VCR-2-GR-VS24
6FemaleSS-4-VCR-124
Nr. Crt.Numecod Swagelokbuc
1Valva automata, normal inchisa, cu diafragma cu conexiuni male de in.6LVV-DPVR4-P-C12
2Conexiune "micro - T", OD 6 mm6LV-6MMW-311
3Cot, OD 6 mm6LV-6MMW-92
4Fiting sudura (gland), in. VCR x 6 x 1 mm6LV-4-VCR-3-6MTB724
5Garnitura metalica cu sistem de fixare, inSS-4-VCR-2-GR-VS24
6Female nut, SS-4-VCR-124
-
Association Euratom - MEdC6. G. Ana, I. Spiridon, Association Days, 26.11.2009Preparing the ITER Fuel CycleMeasures and ActivitiesTritium Laboratory Karlsruhe & ICIT Rm. Valcea Cryogenic distillation process Isotopic Separation process Material properties testing standsJET Culham Combination of lectures, tours and practical activities Technical and complementary skills courses CATIA V5 (beginners and advanced); Swagelok fittings course; IPR and Contract Management; Fundamentals of Project Management, etc.
-
Outcomes - 3 ISI articles published ( 2 as main author and 1 as co-author); 2 ISI articles submitted for publishing (as main author and co-author); contacts in all participating institutes (Forschungszentrum Kalrsruhe, CEA Cadarache, ENEA Frascati, MTA Atomki Debrecen, JET Culham) for further colaborations; experience gain for further involvement in projects like ITER WDS-ISS SystemsAssociation Euratom - MEdCPreparing the ITER Fuel Cycle7. G. Ana, I. Spiridon, Association Days, 26.11.2009
-
ICIT Rm. Valcea8. G. Ana, I. Spiridon, Association Days, 26.11.2009Tritium Technologies for the Fusion Fuel Cycle TRI TOFFY
-
PARTIES & COSTS FZK (Coordinator) - Germany; CEA - France; ENEA - Italy;
9. G. Ana, I. Spiridon, Association Days, 26.11.2009Association Euratom - MEdC MTA ATOMKI - Hungary; UKAEA (CCFE) United Kindom; ICIT Ramnicu Valcea RomaniaTRI TOFFY - 2008 2012
-
MEdC/ICIT Trainee - Work package No. 5, such planned:
Introductory/accompanying training at ICIT (duration: 5 months in total)Research training at ICIT (duration: 17 months)Research training at FZK (duration: 12 months)Introductory training at JET Facilities (duration: 2 months)
TOTAL: 36 monthsAssociation Euratom - MEdC10. G. Ana, I. Spiridon, Association Days, 26.11.2009TRI TOFFY- 3 year training project: Jan. 2009 Jan. 2012
Chart1
5
17
12
2
Sales
Periods of training (months)
ICIT 5 months
ICIT17 months
FZK 12 months
JET2 months
Sheet1
Sales
ICIT5
ICIT17
FZK12
JET2
To resize chart data range, drag lower right corner of range.
-
Association Euratom - MEdC11. G. Ana, I. Spiridon, Association Days, 26.11.2009Measures and ActivitiesICIT Rm. Valcea & Tritium Laboratory Karlsruhe Cryogenic distillation process; Isotopic Separation process; Material properties testing stands.JET Culham Combination of lectures, tours and practical activities to become acquainted with the various working fields in JET. TRI TOFFY
-
Association Euratom - MEdC12. G. Ana, I. Spiridon, Association Days, 26.11.2009Completed objectives: Introductory study consisting of an introduction to the institutional technologies and equipments; Courses: CATIA V5 (beginners); Swagelok fittings course; IPR and Contract Management course; 3rd Karlsruhe International School on Fusion Technologies Design of an experimental setup for tritium extraction from the CD column; 1 ISI article published (as co-author).
Future activities: participation to a series of technical and complementary skills courses; further involvement in the development of the detritiation systems (ICIT and TLK): design and experimental activities; Participation in different operational procedures and become acquainted with the various working fields at JET.TRI TOFFY
-
ICIT Rm. ValceaAssociation Euratom - MEdCThank you for your attention !13. G. Ana, I. Spiridon, Association Days, 26.11.2009
*