POLITEKNIK TUANKU SULTANAH BAHIYAH INDUSTRIAL BUILDING SYSTEM (IBS)

LAPORAN LAWATAN INDUSTRI KE GLOBAL PREFAB SYSTEM SDN BHD

Name: mohamad alif bin akasah Matric no: 16dka10f1115 Class: dka2c Lect name: pn rossitah binti selamat

PENGHARGAANSegala puji bagi allah swt yang telah membawa sinar kesejahteraan kepada seluruh alam. Alhamdulillah bersyukur ke hadrat ilahi di atas rahmat dan limpah kurnianya dapat menjayakan program lawatan sambil belajar ke kilang IBS (GLOBAL PREFAB SYSTEM SDN BHD ) ini seadanya.walaupun pelbagai rintangan dan cabaran dating menimpa namum berkat kesabaran dan sokongan sesetengah pihak, apat juga akhirnya penulisan ini di jayakan.

Ucapan terima kasih kepada En.Sabri Abdul Ghani selaku wakil daripada syarikat kilang IBS yang telah member tunjuk ajar dan dorongan dalam usaha menjayakan lawatan sambil belajar ini.

Penghargaan juga khas untuk pensyarah kami Pn.Rossitah Binti Selamat kerana member peluang untuk menjalankan program ini dan member galakan terutama dalam aspek pengurusan masa sepanjang program ini dijalankan.tanpa sokongan dan dorongan beliau agak sukar bagi saya untuk menjalankan program lawatan ini.

OBJEKTIF LAWATANAntara objektif lawatan ini diadakan ialah:

Untuk menjalin hubungan yang lebih intim antara pelajar dan pensyarah. Untuk mengetahui konsep IBS dengan lebih teperinci dan lebih mendalam. Untuk mengetahui kaedah-kaedah yang terdapat didalam system IBS.

HASIL LAWATAN Mendedahkan system IBS kepada pelajar Member peluang kepada pelajar untuk melihat sendiri hasil binaan yang menggunakan system IBS Mendedahkan kepada pelajar kelebihan dan kekurangan IBS. Dapat mengenal pasti kaedah pembuatan struktur IBS. Dapat memberi penerangan tentang cara-cara pemasangan struktur IBS. Dapat melahirkan generasi yang celik dalam bidang IBS. Dapat membezakan cara pembinaan IBS dengan kaedah konvensional. Dapat menganggarkan kos pembinaan,tempoh pembinaan yang tepat dan betul. Mendedahkan pelajar kepada konsep pembelajaran diluar bilik darjah.

LAPORANPada hari khamis 14 januari 2011,seramai 38 orang pelajar dan 2 orang pensyarah politeknik tuanku sultanah bahiyah telah mengadakan lawatan industri ke kilang IBS cyberjaya.disana semua pelajar diberi penerangan olah wakil kilang tersebut untuk mengetahui lebih mendalam tentang IBS. Serba serbi maklumat telah diperolehi dan dapat difahami tentang pembangunan yang menggunakan kaedah IBS. Selepas penerangan tersebut,semua pelajar dibawa untuk melihat tapak bina untuk melakukan struktur bangunan tersebut. Dengan penerangan dan lawatan ke tapak tersebut telah memberikan pengetahuan yang lebih mendalam mengenai kaedah IBS.

KESIMPULANSelepas membuat lawatan ke kilang IBS kami dapat mengetahui tentang system IBS. Kami juga dapat mengetahui kelebihan gan kekurangan dalam system ini. Kami juga dapat mengetahui tentang kaedah membuat struktur binaan dan juga dapat mengetahui kos serta tempoh pembinaan dengan lebih tepat. Selain itu kami juga dapat melahirkn generasi yang celik untuk system ini di masa akan dating dengan lebih meluas dan moden.

DEFINISIIBS bermaksud satu system atau kaedah pembinaan yang mana komponennya dihasilkan di dalam keadaan terkawal (di kilang atau tapak bina) , diangkut dan dipasang dalam kerja pembinaan dengan menggunakan pekerja yang minimum di tapak.

ADVANTAGE ON IBSDapat mengurangkan pekerja am. Dapat memendekkan masa pembinaan. Kualiti kerja terjamin dan dapat ditingkatkan. Dapat menjaga alam sekitar.

DISADVANTAGE ON IBS Kos pembinaan yang tinggi Tidak mempunyai pekerja mahir yang cukup. Bangunan yang siap tidak boleh diubah suai. Perancangan yang lemah akan membawa kegagalan.

EVOLUTION OF IBS Dari kesan daripada globalisasi, kaedah yang lebih cekap telah diperkenalkan dalam system industry. IBS merupakan salah satu teknik pembinaan moden dimana komponen struktur dihasilkan dikilang, dlam atau luar tapak , diposisikan menjadi struktur dengan minimum tambahan kerja tapak. IBS jauh lebih berkembang dari pembinaan konvensional atau kaedah pracetak serta memerlukan pembaikan utama dari amalan industry saat ini.

PRINCIPLE OF IBS SCOREThe IBS Scoring System emphasis on the following attributes: -

1. The use of prefabricated and precast components

2. Off-site production of components

3. The use standardised components

4. Repeatability

5. Design building component based on Malaysian Standard Guide to Modular Coordination in Building, MS 1064.

About IBSIndustrialised Building System (IBS) is a technique of construction whereby components are manufactured in a controlled environment, either at site or off site, and transported, positioned and assembled into construction works. There are five main IBS groups identified in Malaysia, there are :

1) Pre-cast Concrete Framing, Panel and Box Systems pre-cast columns, beams, slabs, 3-D components (balconies, staircases,toilets, etc), etc; 2) Formwork Systems tunnel forms, EPS-based forms, beams and columns moulding forms, permanent steel formworks, etc; 3) Steel Framing Systems steel beams and columns, portal frames, roof trusses, etc; 4) Prefabricated Timber Framing Systems timber frames, roof trusses, etc; 5) Block Work Systems interlocking concrete masonry units (CMU), lightweight concrete blocks, etc.

With the advancement of technology and innovation, besides the five main types, various pre-fabricated materials have entered the market. It includes gypsum, wood wool, polymer, fiber glass, glass and aluminium based IBS components. For more information on IBS, you may browse to our FAQs.

IBS Components Used in Buildings in Malaysia1. Custom, Immigration & Quarantine Complex, Johor Bahru

Function of Building

Custom, Immigration and Quarantine Complex and Government Offices.

Location

Johor Bahru Precast concrete beams, columns and hollow core slabs Public Works Department, Malaysia.

IBS System

Owner

2. Open University formerly known as JPA, Kuala Lumpur

Function of Building Location

Campus Building

Kuala Lumpur Precast concrete beams, columns and hollow core slabs Public Service Department, Malaysia (JPA)

IBS System

Owner

3. Projek Perumahan Rakyat, Telipok, Sabah

Function of Building

Residential

Location

Telipok, Kota Kinabalu, Sabah

IBS System

Steel formwork system

Owner

Jabatan Perumahan Negara

4. Apartment for Government Staff, Putrajaya

Function of Building

Apartment

Location

Parcel 8, Precinct 9, Putrajaya

IBS System

Precast concrete walls

Owner

Putrajaya Holding Sdn. Bhd.

5. Telekom Tower, Kuala Lumpur

Function of Building

Office

Location

Jalan Pantai Baru, Kuala Lumpur.

IBS System

Steel structure for the sky garden and top part of the building

Owner

Telekom Malaysia Bhd.

6. Water Sports Complex, Putrajaya

Function of Building

Water Sport Complex

Location

Precinct 6 Promenade, Putrajaya.

IBS System

Tubular steel, steel decking for the floor system

Owner

Perbadanan Putrajaya.

7. Kuala Lumpur International Airport (KLIA), Sepang

Function of Building

Airport Terminal Building

Location

Sepang, Selangor.

IBS System

Steel roof structure

Owner

Malaysia Airport Berhad.

8. KL Sentral Station, Kuala Lumpur

Function of Building

Railway station, Commuter station, LRT station, KL Sentral KLIA Airport Rail Station, Shopping Complex, Monorail Station

Location

Brickfields, Kuala Lumpur

IBS System

Steel roof structure, precast hollow core slabs.

Owner

Kuala Lumpur Sentral Sdn. Bhd.

9. Serdang Hospital

Function of Building

Administration Building, Hospital

Location

Serdang, Selangor

IBS System

Steel beams and columns, precast concrete half slabs

Owner

Ministry of Health, Malaysia

10. Government School

Function of Building

School Building

Location

Taman Mutiara Rini, Johor Bahru

IBS System

Steel beams and columns

Owner

Ministry of Education, Malaysia

Melalui klasifikasi berasaskan struktur, terdapat lima kumpulan IBS utama yang dikenapasti digunakan secara meluas di Malaysia iaitu: 1. Sistem kerangka, Panel dan kekotak konkrit pratuang. 2. Sistem Kerangka Keluli 3. Sistem Acuan. 4. Sistem Kerangka Kayu. 5. Sistem Blok.