Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

28
PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. Light Rail Conference 2016 Presenter: Ian Corfield Topic: Global Technology Breakthroughs for Light Rail

Transcript of Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

Page 1: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Light Rail Conference 2016

Presenter: Ian Corfield

Topic: Global Technology

Breakthroughs for

Light Rail

Page 2: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

BOMBARDIER TRANSPORTATION

The broadest portfolio of products & solutions in the rail industry

Fleet

Management

Asset Life

Management

Material

Solutions

Component

re-engineering

and overhaul

Services

Integrated

control

systems

Automatic train

protection and

operation

Interlocking

systems

Wayside

equipment

Services

Rail Control

Solutions

Monorail

systems

APM systems

Light rail

systems

ART systems

Metro Systems

Intercity

Systems

Transit

Security

Transportation

Systems

Traction

converters

Auxiliary

converters

Traction drives

Control and

communication

Propulsion

& Controls

Light rail

vehicles

Metros

Commuter

trains

Regional trains

Intercity trains

High speed

trains

Locomotives

Rail Vehicles

Portfolio to

match entire

range of rail

vehicles

Full scope of

service over

the lifetime

of a bogie

Bogies

2

Page 3: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Bombardier in Australia

Sites

Perth

B Series EMU

A & B Fleet

Maintenance

Sydney (Bid Office)

Dandenong - Melbourne, Head Office

Manufacturing Facility / Refurb & Repairs

West Melbourne, Dynon, Geelong, Ballarat , V/Line Maintenance

1000+ employees

across Australia

Adelaide

PTS Fleet Maintenance (DMU & EMU)

Adelaide LRVs (Supply)

Gold Coast LRT Project + Extension

Maintenance & Services

Milton – Brisbane

Engineering,

Service, Spares

QNGR Project Mgt,

Product Introduction

3

Wulkuraka –

Brisbane

QNGR

Maintenance

Dandenong – RCS

(Rail Control Systems)

Office

Page 4: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Bombardier in Australia

Reference Projects

Perth B Series EMU (JV)

204 cars

Project awarded in May 2002

Extension in 2006, 2011 & 2012

Adelaide LRV

15 LRVs

Project awarded in Oct 2004

Concluded: 2012

Victoria Vlocity DMU

195 cars Project awarded in Nov 2001

Extension in 2002, 2005, 2009 , 2012,

2015

Adelaide A-City EMU

66 cars

Project awarded in Mar 2011

Services commenced Feb 2014

Concluded: 2015

FLEXITY Swift Melbourne

50 + 20 trams Project awarded in

Oct 2010 & Sep 2015

Services commenced Nov 2013

Extension 2015

4

GoldCoast Rapid Transit

14 FLEXITY 2 LRVs & Maintenance

Project awarded in Jun 2010

Services commenced Jul 2014

Extension 4 x LRVs in 2015

Page 5: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Bombardier in Australia

Reference Projects

Queensland NGR

450 cars & Maintenance

Project awarded in Jan 2014

First Train into QLD – Feb 2016

Western Australia

Perth B series EMU OEM

Maintenance

Perth A Series EMU Maintenance

South Australia

DMU Adelaide Fleet Maintenance

3000 Class Refurbishment

Adelaide 25kV EMU Fleet Maintenance

Victoria

V/Line Passenger Fleet Maintenance

Flexity Melbourne Fleet Maintenance

5

Queensland SMU / IMU 160/260 (JV)

192 cars

Project awarded in Nov 2004

Concluded: 2011

Page 6: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

6

Challenges

facing Public

Transport in

Australia?

Urbanization

Ageing

Network

Infrastructure

Reliability &

Testing

Sustainability

Availability

Investment

Commercialization

Innovation &

Technology

Acceleration

Page 7: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Challenges for Light Rail

Line capacity (thousands)

Com

merc

ial speed (

km

/h)

50

100

7

• Increasing technical and

performance requirements for

Light Rail Vehicles

• Reliability & Availability

• Passenger environment & comfort

• Ability to operate Wire Free

• Security of Operation for

operators, passengers & external

bodies

• Performance “out of the box”

Page 8: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Bombardier’s FLEXITY vehicles

SUSTAINABLE URBAN TRANSPORT SOLUTIONS

• Integrated into urban traffic

• Curve radius between 20m & 25m

• 100 % low-floor & conventional

wheel-set bogies

• Easy access and increased

passenger comfort

• High running stability, noise

reduction

• Ability to use existing

infrastructure

Bombardier has more than 3,500 trams and LRVs in revenue service or on order

8 FLEXITY is a trademark of Bombardier Inc. or its subsidiaries.

Page 9: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Future of Urban Transport

FLEXITY 2 SYSTEM

FLEXITY is a trademark of Bombardier Inc. or its subsidiaries.

Improved technical features

– Better corrosion protection

– Enhanced bogie design

– Latest state-of-the-art cab structure

– 100% low-floor

– Easy access, especially for wheel-

chairs or prams

– High running stability

– Noise reduction

Lower energy consumption

– Bombardier MITRAC propulsion

technology

– Optimized air conditioning system

– PRIMOVE technology

Easy customization

– Composition of trains

– Exterior

– Interior

9

Page 10: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Focus on Passengers

VEHICLE INTERIOR

Maximum use of the space

High flexibility in terms of layout and colouring

High capacity, large number of comfortable

passenger seats

Very low pedestal, no steps obstruct passenger

flow

Aisle width up to 740 mm with

2+2 seating

Optimised cross section and arrangement for

agreeable perception of space

Generously dimensioned articulation portal

gangway

FLEXITY is a trademark of Bombardier Inc. or its subsidiaries.10

Page 11: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

High flexibility and customisation

TAILOR-MADE VEHICLES

Vehicle configuration flexibility

Customers given virtually

unlimited scope in customizing the

exterior design

Interior design is a balanced mix of

simple, standardized solutions and

individual features

– Colours

– Materials

– Seat-cover fabric

– Lighting

– Seats and stanchion arrangement

– Onboard racks for bicycles or

luggage

11

Page 12: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

12 FLEXITY is a trademark of Bombardier Inc. or its subsidiaries.

Flexible vehicle arrangement

CONFIGURATION

5 modules 7 modules

2 motor bogies 3 motor bogies

1 trailer bogies 1 trailer bogies

32m long 43m long

2.30m / 2.40m / 2.65m wide 2.30m / 2.40m / 2.65m wide

CM: cab module

BM: bogie module

SM: saloon module

Page 13: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

• Gold Coast University Hospital to

Broadbeach through Southport and

Surfers Paradise

• Revenue service began July 2014

• 13 km double-track alignment

• 16 stations

• 14 vehicles

• Patronage averaging 21,000 per day

• 100% low floor vehicles

• 99.99% Availability over last 6

months

• Bombardier provides operations and

maintenance services (27 year

contract)

Gold Coast, Australia

FLEXITY 2 LIGHT RAIL TRANSIT SYSTEM

13 FLEXITY is a trademark of Bombardier Inc. or its subsidiaries.

Page 14: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Gold Coast, Australia

FLEXITY 2 LIGHT RAIL TRANSIT SYSTEM

Page 15: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

FLEXITY is a trademark of Bombardier Inc. or its subsidiaries.

Melbourne E-Class, Australia

FLEXITY LIGHT RAIL

FLEXITY Light Rail design

Available on Route 96 & 11.

Contract Awarded: Sep 2010

Revenue Service: Nov 2013

50 E-Class + additional 20 Options

100% low floor vehicles

90%+ Availability last 6 months

Seats 214: 64 seated, 150 standing

Bombardier provides design,

manufacture and maintenance for

15 years

Page 16: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Melbourne E-Class, Australia

FLEXITY LIGHT RAIL

Page 17: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Adelaide Light Rail, Australia

FLEXITY Classic

FLEXITY Classic

Contract Awarded: 2005

Revenue Service: Jan 2006

15 FLEXITY Classic trams delivered

by Bombardier

Based on robust Eastern European

design

70% low floor vehicles

Seats 70 + expanded standing

Page 18: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

The BT PRIMOVE tram; wire free operation

Effective solution for changing urban transport

18

Aesthetic solution

Elimination of wires and poles that

clears the cityscape and allows for tram

operation in previously unsuitable areas

Minimal equipment and infrastructure

Less land surface compared with catenary

systems and little impact on civil engineering

No compromise on performance

Same great performance as catenary

systems and reliable under all

environmental conditions

Page 19: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

19

BT Primove: Wire Free Considerations

• Safety

- Passengers, Staff and Public

• Vehicle performance

- Operating speed & acceleration

- Heating, Ventilation and Air-Conditioning

• Reliability

• Operational Flexibility

Page 20: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

20

• The wire free technology is Lithium Ion batteries for

on board energy storage

• This system is operational on LRVs in Nanjing and

Germany, and on a number of bus networks in

Germany

BT Primove technology

Page 21: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

21

What is Lithium lon LRV Technology?

• Large multi-cell battery

- 533V DC, 24.5kWHr

• Multiple batteries for redundancy

- 98kWHr total

• Integral safety and monitoring

systems

• Integral cooling system

• Standard chopper – 533V to 750V

• Heavy duty pantograph

Page 22: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

22

BT Wire Free Technology Development

• 12 years ongoing development

- Dedicated “Primove Team”

• German safety case achieved

• Li-Ion Deployed on buses 2013

• Li-Ion Deployed on LRVs 2014

• World record 41.6km using Li-Ion battery powered LRV 2015

• 12 month failure free Nanjing operation

Page 23: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

The BT Optical Driver Assistance System (DAS)

• Optical system to automatically identify potential hazards in the sweep path of the vehicle as early as possible.

• Warns the driver via acoustic and/or visual warnings

Advantages

Safe detection of objects in sweep path of tram

Infrastructure

Other LRVs and rail vehicles

Motor vehicles

Cyclists

Pedestrians

No undesired increase in the field of vision

Stereo Camera System with 3 cameras

De-central system with standalone control unit

Possibility to capture 3D infrastructure clearance profile

23

Page 24: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

The BT optical Driver Assistance System (DAS)

• DAS is based on picture dependent sensor technology using three cameras

and the associated evaluation unit and software

• The wide angle aperture of the camera lenses give the system a large field of

vision allowing use on tight curves and identification of objects close to the

vehicle

• The heart of the system is the stereo picture processing algorithm jointly

developed with the Austrian Institute of Technology

• The algorithm continuously analyses the pictures from the two camera pairs

and derives the exact position of the rails and the position and size of the swept

envelope for the vehicle path

• The algorithm detects objects such as people or vehicles within the swept path

and derives their distance, size and direction of movement

• Then after considering the trams own speed if a potential collision is identified

then DAS automatically warns the driver via an audio or visual warning

24

Page 25: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

25

The BT Optical Driver Assistance System (DAS)

Page 26: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Light Rail - Part of the Solution!

• Approx. 5,000 Bombardier trams and LRVs in passenger service or on order in Europe, Asia, Australia and North America.

• Bombardier has sold over 1,500 FLEXITY 100% low-floor trams to date

26

Sustainable Urban Transport

Solution

Energy Efficient

Flexible & Customizable

Configurable

Efficient & Competitive

Lower infrastructure costs

Advanced Communications

System

Driver Assist

WIFI availability

Catenary Free options

Page 27: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.

Q&A?

27

Page 28: Ian Corfield - Bombardier - Global Technology Breakthroughs for Light Rail

PR

IVA

TE

AN

D C

ON

FID

EN

TIA

L

© B

om

bard

ier

Inc. or

its s

ubsid

iarie

s. A

ll rig

hts

reserv

ed.