HYDRAULICS BRA NCH OFFICIAL FILE COP Y UNITED ST ATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION OFFIC.~ FILE COPY BUREAU OF RECLAMATION HY D RAULIC L ABORATORY HYDRAULIC AND BITUMINOUS STUDIES OF AINSWORTH CANAL DUNE SAND MISSOURI RIVER BASIN PROJECT, NEBRASKA c::a >- - General . Report No. 18 SAME. AS HVD . 3C\3 ENGINEERING LABORATORIES OFFICE OF THE ASSISTANT COMMISSIONER AND CHIEF ENGINEER DENVER , COLORADO November 15, 1954

Transcript of HYDRAULICS BRA NCH OFFICIAL FILE COP Y OFFIC.~ … ·  · 2017-08-31stability against sloughing of...

HYDRAULICS BRANCH OFFICIAL FILE COPY

UNITED ST ATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

OFFIC.~

FILE COPY BUREAU OF RECLAMATION HYDRAULIC LABORATORY

HYDRAULIC AND BITUMINOUS STUDIES

OF AINSWORTH CANAL DUNE SAND

MISSOURI RIVER BASIN PROJECT, NEBRASKA

c::a >--

General.Report No. 18 SAME. AS HVD . 3C\3

ENGINEERING LABORATORIES

OFFICE OF THE ASSISTANT COMMISSIONER AND CHIEF ENGINEER DENVER, COLORADO

November 15, 1954

Missouri River Basin Project AINSWORTH CANAL

HYDRAULIC TEST FL'(JJ\fE WITH DUNE SAND PLACED hydraulic and bituminous studies

frontispiece

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

FOREWORD

Hydraulic and bituminous studies using dune sand

from the Ainsworth Canal site, Missouri River Basin Project,

Nebraska,, were conducted in the Engineering Laboratories of

the Bureau of Reclamation at Denver, Colorado, during 1953

and 1954.

During the studies, the model was frequently

observed by personne1 from Region 7, Niobrara River Area

office, and the Canals Branch of the Bureau of Reclamation.

Meetings were arranged to discuss test results., and the

keen interest of the observers resulted in many helpful

suggestions.

The studies were conducted by J. W. Short, R. A.

Dodge, ~- L. Smith., A. A. Kern and P. "F." Enger under

the supervision of E. J. Carlson· and L. M. Ellsperman •

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

CONTENTS

Summary ... .. . ·~ . . ·-. . . . . .. . . . • _ .. . • · Intr.oduction . . . . . . . . .- ~ : . · .- . .. . -.. . .. Construction and Operation of Equipment. . .• The .Investigations • • • • . • . • • • • . · ..•

. .. . . . . . ' ·• .

. . . . . '•· . . . . . . . . . . . .. Hydraulic Model Tests-, ,-Untreated Dune Sand. . ..•.. .. . ..

Tests to determine limiting tractive forces. • • • Tests to determine the distribution of tractive forces Ground-water tests • • • • • • • • • • • • • • Rapid draw-down tests • • . • • • • . • • • • .

. .

Tests to Determine the Best Bituminous Application. •

Cylinder No. 1 Cylinder No. 2 Cylinder No. 3 Cylinder No. 4 Cylinder No. 5 Cylinder No. 6 Cylinder No. 7 Cylinder No. 8 Cylinder No. 9 Cylinder No. 10

. . . . . . . . . . . . . . . . ·• . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • • • • • • • a • • • • • • • • • •

Hydraulic Model Tests of Bituminous Treated Material . . Freeze-thaw Tests • . • • • • • • • • • • • • • • • •

Results and Conclusions • • • • • • . . . . . . . .

Page

.1 2

. • -3 .. ·4

4

4 5 7 7

7

8 8 8 9 9 9 9 9 9

10

10 12

13

Figure

Location map • • • • • • • • • . • • • • • • • • • • • • • Hydraulic properties Ainsworth Canal • • • • • • • • • • • • Hydraulic model • • • • . • • • • • • • • • • • • • • • • • Pitot tube and cylinder banks • • • • • • • • • • • • • • • • Pitot banks and manometer board • • • • • • • • • • • • • • Freez.e-tha w test trays • • • • • • • • • • • • • • • • • • • Sand gradations • • • • • • • • • • • • • • • • • • • • • • Dyed sand observations • • • • • • • • . • • • • • • • • • Average tractive force vs discharge • • • • • • • . • • • • • Tractive force distribution • • • • • . • • • • • • • • • • • • Sloughing of dune sand caused by ground water (there is no

discharge in the model) • • • • • • • • • • • • • • • • •

i

1 2 3 4 5 6 7 8 9

10

11

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

CONTENTS,.:-Continued

Sloughing of dune sand caused by rapid draw-down • • • . .. Cylinders used in surface-penetration tests . . . • • • . • Applying dilute asphalt emulsions. . • . . • • . • • • • • Asphalt emulsion test sections . • • • • . • • • • • • • • Freeze-thaw trays prior to test • • . . • • • • • • • • • Freeze-thaw trays after removal from freezing r.oom. • • • Trays at completion of freeze-thaw tests . • . • • • • . •

ii

Figure

12· 13 14 15 16 17 18

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION·

Office of the Assistant Commissioner and Chief Engineer

Engineering Laboratories Denver, · Colorado November 15, 1954

*General Report No. 18 Bituminous Laboratory and

Hydraulic Laboratorr. C~mpiled and P. "F. ' Enger

checked by: L. M. Ellsperman Reviewed by: E. J. Carlson

Subject: Hydraulic and bituminous studies of Ainsworth Canal dune sand--Missouri River Basin Project, Nebraska

SUMMARY

Tests were conducted on dune sand, shipped from the fiite of the Ainsworth Canal, Missouri River Basin Project, Nebraska, primarily to determine allowable tractive forces. Hydraulic tests. Figure 9, showed the untreated, unlined dune sand began to move at an average tractive force of approximately O. 004 pound per square foot and was undergoing movement over the entire wetted perimeter at an average tractive force of approximately O. 011 pound per square foot.

In determining the tractive force that would move the dune sand, the distribution of tractive forces around the wetted perimeter was studied. An example of a measured tractive force distribution around the wetted perimeter of a channel, of the shape shown, may be seen in Figure _10. Movement of the ·sand first appeared to start near the bottom of the side slopes, as shown _in Figure 8.

Tests to determine the effects of a high ground-water table and rapid draw-down indicated ~ slope of 4: 1 was necessary for stability against sloughing of the untreated or unlined dune sand. Examples of sloughing which may occur on a 2:1 side slope are shown in Figures 11 and 12.

Tests on bituminous stabilized dune sand and penetrated macadam cover** were conducted. ·The tests showed that the dune sand penetrated with diluted asphalt emulsion was erosion-resistant under maximum tractive forces resulting from the tests, but became soft and lost cohesion under freezing and thawing action. After thawing

•See Laboratory Reports No. Hyd-393 and B-21. **Gravel, smaller than 3/ 8 inch, was penetrated by approxi­

mately 2. 5 gallons per square yard of a rapid-setting emulsion.

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

and redrying, the treated dune sand regained most of its original stability. The penetrated macadam cover withstood high tractive forces and remained stable through the freezing and thawing tests.

INTRODUCTION

As· shown in Figure 1, Ainsworth Canal is to be located in. the Niobrara River Basin in Nebraska and is part of the Missouri River Basin Project. Starting at the Merritt Reservoir, it runs east across wind deposited sand hills for approximately 50 miles and, asgive.n in the recent Definite Plan Report, will carry approximately 620 cfs of irrigation water to the Ainsworth Unit.

A preliminary canal design at the time the tests were made of a typical unlined section based on approximately 980 cfs as shown .in Figure 2, was 8 feet deep with a 40-foot bottom width, and 2 or 2-l/ 2: _1 side slopes. The maximum tractive forces which would occur in a straight section of the preliminary design as computed from the _formula T 0 = wds were found to range from 0. 035 to 0. 045 pounds per square foot.

To determine the limiting tractive force of the dune sand, tests were conducted in the Hydraulic Laboratory. Dune sand was shipped from the site to the Denver laboratories for these tests. The .sand was placed in a test flume at field density, and the tractive forces acting on it were increased by increments. Data were taken to determine the tractive forces at which the sand began to move. ·

Tests involving a ground-water table higher than the invert of the canal, and rapid draw-down, were conducted. Over part of the proposed 50-mile length of canal, the ground-water table is expected to be higher than the bottom of the canal; the ref ore, provisions were made to introduce ground water into the sand, and effects of a high ground-water table on the empty canal were investigated.

Tests were made using dilute asphalt emulsion as a surface treatment to stabilize the dune sand. Preliminary penetration tests were performed to. obtain the most satisfactory dilutions and quantities of asphaltic materials which would provide adequate penetration into the dune,sand and also provideresistancetomoderate tractiveforces. The m9st satisfactory dilutions and quantities were sprayed on the dune sand and, after curing, its resistance to tractive forces was investigated. A penetrated macadam cover (fine gravel penetrated with asphalt emul­sion) was also investigated.

To further _evaluate the two types of bituminous construction, their resistance to alternate cycles of freezing and thawing were determined.

2

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

The freeze-thaw tests were conducted under simulated field conditions by maintaining a ground-water table higher than the invert of the canal which represents the most severe condition expected.

CONSTRUCTION AND OPERATION OF EQUIPMENT

As shown in Figure 3 and in the frontispiece, the arrange-ment for the hydraulic tests of the Ainsworth dune sand consisted of a head box, a baffle for stilling the water. a flume 70 feet long by 8 feet wide by 22-1/ 2 inches deep. a tail box, and a control gate. The flume, head box. and tail box were available in the Hydraulic Laboratory and were utilized for the study. The actual tractive forces to which the dune sand was subjected were measured. To obtain tractive forces comparable to those in the canal. the slope of the model was made steeper than the slope of the canal because of the smaller depths in the model. No model scale was used.

The flume, Figure 3. was prepared for the hydraulic tests as follows: From Station 0+00 tp Station 0+40. 2: 1 side slopes of wood covered with metal lath were placed in the flume. Over the wood and metal lath framework, gravel of 1/ 4 to 3/ 8 inch was placed so that the bottom width of the channel was 2 feet 10 inches and the side slopes wer~ 2:1. From Station 0+30 to Station 0+40. the gravel was held in place by a water-cement mixture. Twenty feet of dune sand test section was constructed to the same contour between Station 0+40 and Station 0+60. From Station 0+60 to Station 0+70, the construction was the same as that between Station 0+00 and Station 0+30. A piping system from a water tank was connected to two 2-inch rock-filled water collectors along the sides of the test section, Figure 3. The water tank was adjustable, and by setting the tank at a given elevation and allowing a garden hose to discharge into the tank so that water just spilled over its edge, various ground-water conditions could be represented in the test section. The dune sand was compacted to the average field density of 102. 5 pounds per cubic foot by personnel from the Earth Materials Laboratory.

Prior to operation, the model was backfilled slowly to the test depth. The discharge was gradually raised in the supply line, and the water surface in the flume was maintained by manipulation of the tail­gate.

The discharge was measured by a laboratory Venturi meter, and the water-surface elevations were determined by point gages. The elevation of the ground water was determined by calibrated tubes connected to the ground-water collectors. Point velocities were read by means of a pitot tube bank, a pitot cylinder bank. and a sloping manometer board, Figures 4 and 5.

3

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

Two types of equipment were used to apply the dilute asphalt emulsion when used in hydraulic tests: (1) Chausee; Standard Model T-200, 220-gallon asphalt distributor with power spray attachment, flexible metallic-hose and hand spray bar; (2) Hudson Sprayer Model 25 3, 1-1/ 2-gallon_ tank. .

For freeze-thaw tests, two sheet-metal containers (Figure 6) measuring 1 foot wide, 5 feet long, and 1 foot deep were placed on four-wheeled wooden platform carts and securely braced. The trays were trapezoidal shaped, which provided for construction of a dune sand section 1 foot wide with 2: 1 side slopes, so that when the test surfaces were· in place the cross section would be similar to that of the proposed canal and the hydraulic test model. The emuision was applied with the Hudson sprayer. After curing, 6 inches of water was maintained over the bottom of the test section for the freeze-thaw test.

THE INVESTIGATIONS

Hydraulic ModelTests--Untreated Dune Sand

Tests to determine limiting tractive forces. The dune sand, on which the tests were .conducted, was fairly unif.orm. As shown in Figure 7, 99 percent passed a U. S. Standard No. 30 sieve and 5 percent passed a U. S. Standard No. 200 sieve (0. 590 to 0. 074mm). The-re was no appreciable cementing material in the sand.

The first tests were conducted to obtain the average tractive force required to move the sand and the area where movement first started. To aid in visual observations, some of the san_d was dyed with methyl violet using the method explained in Civil Engineering, November 1941, pages 668 and 669. As shown in Figure 8a, a strip of dyed sand, 3 inches wide and approximately 1/ 16 inch thick, was, placed at Station 0+46 and Station 0+55. The strips were observed to aid in determining when the dune sand started to move and where movement started.

The average tractive force was computed from .the formula: To= wRs

where

T O = the average tractive force (pounds per square foot)

w = the specific weight of water (62. 4 pounds per cubic foot)

4

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

R = the average hydraulic radius

s = the slope of the hydraulic energy gradient

Water-surface elevations were recorded for each change in discharge, and the hydraulic gradient was computed.

To obtain the limiting tractive forces, the model was started to operate at a low tractive force, and the tractive force was grad-· ually increased until general movement of the sand occurred. Hold­ing a depth of 1. 00 foot at Station 0+60, the discharge was slowly raised to 2. 5 cfs. The resulting average tractive force, as computed from T O = ·wRs, was too small to move the sand. Holding the depth of 1. 00 foot at Station 0+60, the discha·rge was gradually increased. As shown in Figure 9, when the discharge reached 3. 5 cf~, with a corresponding average tractive force of 0. 0041 pound per square foot, the dune sand started to move.. Movement first occurred near. the bottom.of the side slopes, Figure 8b. However, there was little movement at the average tractive force of 0. 0041 pound per square foot. The discharge was increased by small increments, and at 5. 5 cfs, with a resulting tractive force of 0. 0114 pound per square foot, general movement occurred over the entire wetted perimeter, Figure 9.

Although Manning's l!n" value changed throughout the tests, as the test section became rougher due to moving material forming in waves, the average "n" value for the dune sand test section was calculated as 0. 0164.

Tests to determine the distribution of tractive forces. Tests were conducted to determine the distribution of tractive forces around the wetted perimeter. The tests were a continuation of general studies being conducted on tractive forces. The following method was used for calculations.

As shown by H. A. Einstein, in the Soil Conservation Service Technical Bulletin No. 1026, the Von Karman logarithmic velocity distribution law for open channels may be written in the following form:

'Y::t.. ·= 5. 75 log{30. 2 L)

\fl fl

where

Vy = the average point velocity {feet per second) at a distance y from the bed

5

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

T O = the shear at the boundary (tractive force) pounds per square foot

J' = the density of the water in slugs per cubic foot

D,. = the apparent roughness of the surface and contains a corrective parameter

5. 75 = a constant which includes Von Karman's k value (assumed constant and equal to 0. 4)

If the preceding equation is used and the velocity 011) at one point (y 1) is subtracted from the velocity r, 2) of another point (y2) which is at a higher elevation. we obtain:

V2 - V1 = 5. 75 fl ~og JO;yz -log JO-:.Yl] or:

V2 - V1 • 5.75 \[fj. logij

from which:

To=

In the preceding equation. the distances from the boundary should be measured perpendicular to the boundary. and velocities close to the boundary should be used .

If a given distance from the boundary is set for Yl and Y2, the equation will reduce to the following form:

T 0 =C(V2 -V1) 2

where

C • a constant = f

2 [ 5. 75 log;~]

The preceding method depends on accurate determination of the position of the boundary. and as the elevation of the boundary continually changed after the dune sand started to move. some difficulty

6

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

was experienced in obtaining a satisfactory boundary position. By recording the position of the boundary before and after a run and the time at which point velocities were measured, tl:ie approximate position of the boundary at the time point velocities were recorded could be determined. As the dune sand moved in a wave formation, only the approximate position of the boundary was obtained from this method. An example of one group of analyzed, plotted data may be seen in Figure 10. The discharge for the test shown was 6 .• 00 cfs. Figure 9 shows the average tractive force throughout the test sec­tion to be 0. 0137 pound per square foot when the discharge was equal to 6. 00 cfs. The point:..velocity method, Figure 10, shows the average tractive force acting at Station 0+57. 5, which was near the end of the test section, to be 0. 0180 pound per square foot. The average tractive force calculated from the point-velocity method is 31 percent higher than that indicated by Figure 9. The~difference could be due to the increase in roughness of the test section from Station 0+40 to Station 0+60. The increase in roughness would in­crease the hydraulic gradient and, thus, a larger tractive force would act at Station 0+60 than at Station 0+40. In all point-velocity data, for the untreated sand,. which was analyzed, the average tractive force at Station 0+57. 5 was higher than the average trac­tive force shown by Figure 9.

Ground-water tests. Although extensive tests on ground­water conditions were not conducted, a test was performed to determine the effect of a high ground-water table on an empty canal. As shown in Figure 11, sloughing of the side slopes occurred.

In the test performed, the ground water was held 0. 78 foot above the average elevation of the channel bottom. After approxi­mately 10 minutes, water appeared on th'e bottom of the channel, and after approximately 15 minutes, small failures from sloughing began to occur. The sloughing progressed rapidly for approxi­mately 45 minutes. After about 1 hour, the sloughing slowed considerably, Figure 11. The side slopes which resulted from the sloughing were approximately 4: 1. ·

Ra~id draw-down tests. The test section was subjected to rapid draw- own. A discharge of 1. 94 cfs was set in the channel.and an average depth of O. 98 foot was maintained over the test section. The model was operated for 6 hours to saturate the dune sand. After the dune sand was· well saturated, the discharge was turned off and simultaneously the tailgate was dropped. As shown in Figure 12, the side slopes sloughed from approximately 2: 1 to approximately 3. 33: 1.

Tests to Determine the Best Bituminous Application

Prime-membrane type asphaltic canal lining experiments in Region 1 on the Payette Division of the Boise Project, Roza Division

7

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

of the .Yakima Project, and the Pasco Laterals of the Columbia Basin Project have shown that a surface treatment will provide increased stability. provided a proper selection of bituminous materials is correctly applied to. the exposed surface of a sandy soil under . temperature· conditions that will all.ow absorption and penetration of · · the bituminous··materials without excessive run-down. A lower-cost canal lining report, published by Region 1 in January 1949, entitled "Experimental Asphaltic Prime-Membrane Canal Lining?" presents· valuable· data regarding the construction and serviceability of this type of stabilization. The subgrade of the East Turbine Lateral is defined as a fine "blow sand" (Figure 7) which is considered com­parable to the Ainsworth material; therefore, the techniques and materials used on the East Turbine Lateral should be applicable to the Ainsworth area.

Some surface-penetration experiments employing bituminous materials were. performed with the thought of economically providing cohesion in a surface layer of the in-place dune sand. The results of these experiments and the estimated costs of this type of slope stabilization are herein reported.

I

The Ainsworth sand was placed in 3-inch-diameter plastic cylinders fitted with wooden bases at the field in-place density of 102. 5 pounds per cubic foot. The time to obtain a "surface dry condition" (when the bituminous material had been absorbed into the sand) and the depth of penetration of each application was recorded.1 Photographs of ·the test cylinders may be seen in Figure 13.

· -Cylinder No. 1. A canal limng emulsion with the catalyt­ically blown asphalt cement as the base was added to the damp sur­f ace of the .soil at a rate of 1. 0 gallon per square yard. The asphalt fraction separated from the water in the emulsion or "broke" in 7 minutes forming a surface membrane. The penetration did not exceed 1/ 16 inch. After curing in an oven at 140° F for 18 hours, no additional penetration was observed.

Cylinder No. 2. One-half gallon per square yard of HRM or mixing-grade emulsion was added to the damp sand as above. The asphalt emulsion broke in 16 minutes forming a membrane. The asphalt penetrated 3/ 16 inch into the sand. Oven curing for 18 hours increased the depth of penetration 1 / 8 inch.

. Cilinder No. 3. Using a blend of 1 part of "cat" emulsion (Cylinder o. 1 )to 1 part of water at a rate of 1. 0 gallon per square yard, the material broke in 25 minutes forming a surface membrane. The maximum penetration observed was 3/ 16 inch.

8

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

C~linder No. 4. Diesel fuel, at a quantity of 1 gallon per square yar , was absorbed rapidly by the dry sand (7 seconds to a surface dry condition). The penetration was 3/ 8 inch. One and one­half hours later, SC-1 was added at a quantity of 1. 0 gallon per square yard. A surface dry condition was observed in 28 minutes at which time the SC-1 had penetrated 7/16 inch and the diesel fuela total of 1-3/ 8 inches. The following day, RC-0 was added to the surface in two equal applications of O. 25 gallon per square yard. The cylinder was cured in the 140° F oven overnight and then placed under an infrared lamp for 20 minutes. A layer, rich in asphalt, with a relatively stable crust, was formed by the above treatment.

Cylinder No. 5. Same as Cylinder No. 4, except the SC-1 was warmed to isoo F and applied in two equal applications of O. 5 gallon per square yard. A surface dry condition was observed in 3. 5 minutes. As shown in Figure 13, the asphalt penetrated approxi­mately 2-1/ 2 inches. The same firm surface as noted on Cylinder No. 4 was observed on Cylinder No. 5.

Cyl~nder No. 6. A preprime of 0. 5 gallon per square yard of diesel fuel was applied to the dry sand followed by two applications of 0. 5 gallon per square yard each of a blend consisting of 50 percent diesel fuel and 50 percent SC-1. The RC-0 was added as in Cylinder No. 4. The materials were absorbed readily. The depth of penetraton was 1-1/2 inches, as shown in Figure 13.

Cylinder No. 7. To the dry surface, without a preprime, O. 5 gallon per square yard of the same blend as used in Cylinder No. 6 provided a penetration of approximately 5/ 16 inches. A second sim­ilar application failed to increase the penetration significantly leaving an asphalt rich crust on the surface.

C~linder No. 8. Four- equal applications of o. 5 gallon per square yar of a blend of 1 part HRM (mixing grade) emulsion to 4 parts of water were applied to the surface of the damp sand. The material was absorbed rapidly. The depth of penetration was not clearly defined. The emulsion produced a fairly firm surface over a stratified layer about 1-3/ 8 inches thick. The final application, applied the following day, consisted of 0. 5 gallon per square yard of a blend of 1 part HRM to 2 parts of water. This material was not absorbed too readily since it required 18 minutes to become surface dry. Total penetration was 1-3/ 4 inches.

Cylinder No. 9. Same as Cylinder No. 8, except the sample was placed under the infrared lamp for 30 minutes prior to the final application. This treatment retarded the absorption. It required 40 minutes for the surface to become dry .

9

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

Cylinder No. 10. Using dry sand, eight applications of O. 5 gallon per square yard of a blend composed of 1 part HRM emulsion and 9 parts water were made in quick succession. The observed penetration was approximately 2-1/ 4 inches. Since the emulsion was very dilute, the deep penetration was accomplished rapidly (3 inches in 40 minutes). One-half gallon per square yard of a 1:2 blend was applied to the surface and the cylinder placed under the infrared lamp• for curing. The sand was firm after the curing period.

The estimated cost of materials for the preceding applica­tions are:

Diesel fuel, per gallon . . • . . SC-1, per gallon. . • . . • • • RC-0, per gallon. . . • . •

8. 33 cents 5. 0 cents 6. 25 cents

The preceding are quoted fob Casper, Wyoming, in tank transport lots (approximately 5, 500 gallons}.

Asphalt emulsion, per gallon:

fob Kansas City. Missouri . . . 10. 0 cents fob Laurel, Montana • • • • • . 8. 33 cents

In transport lots

It is estimated that for volumes in the order of 100, 000 gallons, the cost of application would be about 6 cents per gallon.

Hydraulic Model Tests of Bituminous Treated Material

The hydraulic test section was reshaped with dune sand placed at the field in-place density, and a slow setting asphalt emulsion, con­forming to Federal Specification SS-A-6 74b, Type SS-1, was mixed with water and sprayed on the dune sand. Some difficulties were en­countered in controlling the discharge of emulsion and application pressures when using the hand spray bar and the asphalt distributor. As shown in Figure 14a, considerable sloughing of the dune sand occurred due to oversaturation. Figure 14b shows that the Hudson sprayer produced satisfactory results.

The spraying operation was continuous. The following table shows the dilution and rate of application:

10

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

1 u 10n ar s

A lication Parts water emulsion

Prime 100 0 2.5 0.14

Penetration 8 1 85.0 4.88

Surface 1. 75 1 10.8 0.62

A total of 13. 3 gallons of asphalt emulsion was used in t~e stabilization treatment of 1 7. 4 square yards of dune sand surface at 0. 764 gallon per square yard. After first applying a water prime, approximately 70 percent of the asphalt emulsion was applied in the 8: 1 dilution to obtain maximum penetration into the sand. The final surface treatment consisted of a 1. 75:1 dilution.

Curing was accomplished by using a battery of infrared lamps. As shown in Figure 15a, some circular areas about 6 inches in diameter in which the cohesion of the asphalt was destroyed resulted from localized overheating. The burned areas would not occur in a properly ·sun-cured section in the field. With the excep­tion of the burned areas, the section satisfactorily withstood over 200 hours of operation with the average tractive force varying from O. 015 to O. 055 pound per square foot. Except for the burned areas, the section appeared as though it would withstand higher tractive forces than those resulting from the tests.

A short section of penetrated macadam was constructed by applying approximately 2. 5 gallons per square yard of a rapid-setting emulsion to the surface of the 1/ 4- to 3/ 8-inch gravel in the approach to the hydraulic test section of dune sand, Figure 3. Figure 15b shows the penetrated macadam and a battery of infrared lamps used in the curing process. The emulsion used for the penetrated macadam conformed with Federal Specification SS-A-674b, Type RS-1. To pre­vent excessive run-off on the side slopes, the emulsion was applied in two applications. The first application of approximately 1. 5 gallons per square yard was followed by a second application of 1. 0 gallon per square yard.

The penetrated macadam cover was unaffacted after over 200 hours' operation with average tractive forces varying from O. 015 to O. 055 pound per square foot, and it appeared as though it would withstand much higher tractive forces •

11

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

Freeze-thaw Tests

To further evaluate the penetrated dune sand and penetrated macadarn: ~ove~, · their resistance to alternate cycles of freezing and thawing was investigated. The freeze-thaw tests were conducted under simulated field conditions with a high water table by maintaining 6 inches of water over the bottom of the test section during the freeze­thaw test period.

In order to correlate the hydraulic tests with the accelerated freezing ~11d thawing tests, the test specimens, in the two metal con­tainers (Figure 6), were prepared as nearly identical with the sections in the. model as possible. A slightly finer gravel was used for the penetrated macadam cover in freeze-thaw tests than was used· in the hydraulic tests. However, there was no significant difference in the penetration characteristics of this finer material as compared with the test section constructed in the hydraulic model.

The following types of asphalt emulsion stabilization linings were prepared and tested:

a. Dune sand at the undisturbed field density penetrated with diluted asphalt emulsion (Tray 1, Section A, and Tray 2, Section D).

b. Same as a •• above, with a penetrated macadam cover (Tray 1; Section B):-

c. Dune sand at the undisturbed field density (untreated) with a penetrated macadam cover (Tray 2, Section C)~

Figure 16 shows these test sections prior to testing.

The entire surface of Tray 1 and Section D of Tray 2 ·were prepared by penetrating the dune sand with asphalt emulsion (Federal Specification SS-A-674b, Type SS-1) at O. 764 gallon per square yard. Approximately 70 percent of the emulsion was diluted with 8 parts of water (8:1 mix) and applied to the exposed sand surface as a spray using the tank-type Hudson sprayer. The remaining 30 percent emulsion was then applied by the same method after diluting by adding 1. 75 parts of water to 1 part of asphalt emulsion.

The penetrated macadam cover (Tray 1, Section B, and Tray 2, Section C) consisted of a 2-inch layer of fine gravel treated with standard rapid-setting asphalt emulsion (Federal Specification SS-A-6 74b, Type RS-1) at 2. 5 gallons pe:r square yard. The gravel was composed of 50 percent of 3/ 8-inch to No. 4 mesh material, mixed with 50 percent

12

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

coarse sand passing the No. 4 sieve and retained on the No. 8 sieve. The emulsion was applied with the Hudson sprayer. Approximately 1. 5 gallons per square yard was sprayed over the surface of the gravel. The asphalt emulsion rapidly penetrated into the voids of the gravel layer. A second application of 1. 0 gallon per square yard was applied immediately. Some run-off of asphalt material was noted at the toe of the slope.

The test sections were wheeled into the freezing room and held at approximately minus 10° F overnight. Examination showed the entire mass to be completely frozen after the 16-hour freezing period. The test sections were allowed to thaw at room tempera­ture before repeating the freezing process.

Thirty cycles of freezing and thawing were completed under this test program.

Figure 1 7 shows the test sections while frozen, and Figure 18 shows the condition of the test sections after removing the water at the completion of the test.

After 30 cycles of freezing and thawing. the following results were ·observed:

Tray 1, Section A. --Above the water line the asphalt emulsion-stabilized dune sand remained relatively firm, but several irregular cracks from 1/ 8 to 1/ 4 inch wide developed. Below the water line, uncoated sand particles were noted with an accompanying loss in stability as evidenced by a slight slough­ing on the side slope which produced a bulge at the toe of the slope. On thawing and redrying, the dune sand appeared to regain some of its original stability.

Tray 1, Section B. --There was no apparent effect on the stability of the asphalt emulsion-penetrated macadam cover due to the freeze-thaw test. Any movement or sloughing in the under­lying stabilized dune sand was not transferred to the macadam cover.

Tray 2, Section D. --Same as Tray 1, Section A.

Tray 2, Section C. --Unaffected. Resistant to 30 cycles of freezing and thawing.

RESULTS AND CONCLUSIONS

As shown in Figure 9. the untreated dune sand placed at ffeld density started to move at an average tractive force of approximately

13

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

O. 00.41 pound per square foot and was., in general movement, qv.er the entire wetted perimeter, at an average tractive force of approxizp.ately O. 0114 pound per square foot. The tractive forces at which the .dune sand mov_ed indicated that an unprotected or untreated dune sand canal would lose its shape when an average tractive force of approximately o. 0041 pound- per square foot was maintained.

The point-velocity method of determining the tractive-force distribution_ at the wetted perimeter of an open channel appears fea­sible •. Caution must be exercised in determining the position of the . boundary1 and velocities measured near the boundary should be used. The method giyes better results with a fixed boundary than with a. varying boundary.

-:- •. -A grqund-water table above the invert of an unlined., untreated Ainsworth dune sand canal would cause sloughing of 2: 1 side slopes if.' -the canal were empty. To prevent sloughing from a high ground water table a, 4:1 side slope would be required. A 4:1 side slope would also be adequate in preventing sloughing from rapid draw-down in an unlined, untreated Ainsworth dune sand canal.

The asphalt- emulsion stabilized dune sand withstood tractive forces up to O. 055 pound per square foot and appeared as though it would withstand much higher tractive forces, but became soft and lost its cohesion during freezing and thawing action. The test results in­dicate that the following minimum quantities should provide adequate stability for· the high tractive force.

a. (1) o. 5 gallon per square yard diesel fuel

(2) 1. 5-2. 0 gallons per square yard of blended diesel fuel and SC-1 or MC-1

(3) O. 5-1. 0 gallon per square yard RC-0

b. (1) HRM (mixing grade) emulsion diluted with water to provide at least 1. 0 gallon of emulsion per square yard. The dilution should be determined in the field. Lab­oratory tests indicate that successive applications of emulsion must follow closely to prevent the emulsion breaking and the asphalt fraction filling the voids in the sand, preventing further penetration

(2) Final application of O. 5 gallon per square yard of 1 part HRM to 2 parts of water

14

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

Penetrated macadam cover, consisting of fine gravel penetrated with a rapid-setting emulsion, withstood high tractive forces and was unaffected by freezing and thawing action.

15 Interior • Reclamation • l)enver, Colo.

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

0 r ,, ... {

-~-~·

I'! \ (

1: 1:

~ I t

I

:r ; H

i-I ..

t I

L

.... , ..... ..., ' I

I 1111 " ii I

l t I I

i "' I

~ a ,,.., r I t -<-·11•,f, Cl

l! i :i:c I . , r l . ' - ,

<:,, . ' -,:t Ji 1 • -- ~l"'I I ~ ! j i - :-i

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

510

Cr> Ar>- er>-~------------ 10·-o" --- --- -- ---- ------------- ------- - --- - ------ ----- ------ --- --------- - - -- - --- - ------ -- -----> :' ' I I I Q

I ~ ' I iTo TAIL BOX AND

-+--,f--7--\ TAIL GATE !-,.------WATERTIGHT BULKHEAD --1- ------------}------------~ I I

I I I'',

I : T I I

' I I

6 I

~ ,-.

I \{

9

,: I

I I I I I

7:" :::· :I

- S'~ ~ co ('I.I--

'

I I I I I

i

L

D.D02 SLOPE

t..,_ __ //

I

I

3-2"X 4" BEAMS FOR POINT GAGES® 10'-40' AND 60" FROM HEAD BOX

' ,--- BAFFLE __ ,,

FLOW <-----

I I \ ~------ - ---10·-o·- - - - - -----1 --,: - - -- -- 10!..o" - - - - -- - ->i-:- -- --- -Ii-I- -- IO'O"

1 I \ AL I L I ' ;:,.-

----- I _'"r' ___ - --- -I -- --- --

1

I el>-

30'-o" --- --------- --- ---- -----------r--------- 10·-o· --->

1 C :>- I ,,_ 4•• WELLS FOR HOOK GAGE

i2: ii! I ~I

t;1 61 .; : .; I tn: tn1

I I

.i;-----,- - ,--1

' I ' ' I I ._,..

gj I

' I ' L __ _

I I

USE f GRAVEL WITH f SCREEN OVER DRAIN BACKED WITH WINDOW SCREEN

...... }\: .· ' ,·

' ' ',

. ·u-,_ .+I

', __ [coM PAC TED \DUNE SAND

+I ol ,i I \;;I

I I I

PLAN

SCALE IN FEET

c~-----:~~~~-:~: _ :~~- ----:~~~:~~~~-~ -----1

I Wlll,!DOW SCREEN BACKED WITH i ' I ,,--4"• WELL FOR

t SCREEN SPACED WITH : / HOOK GAGE WOOD SPACERS ALL ->j2'*"'· ,,

SCREEN GALVANIZED--- : ~ I ',

/,---- FLEXIBLE HOSE

' ', ___ ALL PIPE i"+ AND SLOPED

FOR DRAINAGE

10

ADJUSTABLE CONSTANT HEAD TANK APPROXIMATELY 12", 12'~ 18"

TEST SECTION A-A, S S 2d

SECTIONS-SCALE IN FEET

MISSOURI RIVER BASIN PROJECT

AINSWORTH

HYDRAULIC CANAL

MODEL

4

HYDRAULIC AND BITUMINUS STUDIES

1 I

ol :;:1 01 «1 ... , en,

I

----- -4·-o· ----- _____ I /-METAL LATHE 1

I k:----f-5"'---1

I I

gs ... 1 01 .;, :,;1

I

'----ALL GRAVEL IN LEADING ANO TRAILING SECTIONS NOT GREATER THAN f' NOT LESS THAN ·f

SECTION B-B AND C-C, SS 2•1

()

-----~

'=-, .. "' "'

-- _ _i

I ~ 6

/., z :::i >-...J Q. Q. :::, (J)

a: w I-<t 3·

FIGURE 3 REPORT HYO. 393

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

510

/

.:1,...

i:i-------f-11 '---t--

j:j I ---- ----¼I--v7 I .:.,,,

MOVABLE ATTACHMENl',, ~ ..

--,,,,'SEE

-r--------~f~] I ~!Ii I ~ I --1 I I I I I I I I I I I I I I

:CHANNEL,,,

I ' I I

I ) I I

ri

I~ I I I I l I I I I I I I I ! I

SECTION OF CLIPS

Le------ 2 ¼'' ------1 I •.. : l.---, .. -- : l~.1-•:; I I' • ' ->,.---===

=I :,,,l• le--J" 'I T-

:..i ..

' --j----fN

j -I" -

I

--I------

-r--, I I I ,,

B r>-k--- -------- -- - 4'-2 ''------- - ----- _ _.,.: I I

I : I I I I I I I • I : t2·~ I<-- ,. I I' I ,-l;r

IN

,-PAINT WHITE AND

i -,! :: i (b - _Ii g/ CALIBRATE

_L _____ 1__ +, _[ _______________ _,_

~ 111111

,--BALL AND SOCKET ,-- _t_

~.-o,.~---------~-4---J-'!!~~

----SEE DETAIL B t .A. I I u l

i I DETAIL A _L_ __ ~ AL _LI MANOMETER BOARD

0 I 2 3 L -- 7

SCALE OF FEET ;;,... B o

, -y

. -, PLAN

4 • SCALE OF FEET

I

7

~

b

b

p

p __ STA. VARIABLE

'\J

b

p _j.A

. 7

.:i-, .. J __ -!:::_-_: i..+·:..; ..L."-----~ lj' r------- 2 ,., .. -----..i

I ----232 I

1.-------- 4'-6"--------l I n I

,----ALL TUBING HOUSED IN CONDUIT

I I I

l -----r ------ I

I I I I I I I I

:.1 .. ... I I I I I I I I

~~~~--- 2¼" ------SECTION OF CLIPS

FOUR REQUIRED

. " /--2-32 • BRASS TUBES ,/

.,.,.,,.,.,.----~·. ,/

BRASS TU BE

----TACK TUBES AT INTERVALS

1

,-/- WITH SOLDER

...... a,

I I I I I I I I I

-f------

,,,.~,,.,. ---,

1 I I I I I

'fi' BRASS WEB----------------- :

---------1 ,"S I y I

,{ 1'

I

__ EXISTING PITOT

/' I

STATIC TUBE :------... ---: ', 1, a, \

I I I

I I

II

I I

. -l" 7

3 DEBURRED I ~ , ' I \ I I I ~-•HOLES ------~-Jl--

SEE DETAIL A-------

I I

ELEV. APPROX. 7" ---- -- - j II ::::---. ~ i -:=11 1 I ~ I

ABOVE BED r: -,, - I I ~ ,I I I

I.:'. ::, ::. IT ,t N

~--10"--..J

~ /

:,---t=======I .. ELEVATION B-B SECTION A-A

--- 2 .. ___ ..,

~ l ~ C : I I I

' I I

I L-ji-f-_J I ii 11 I I 11 11 I L---ti--_r---r::~-A"X 4"

I I '--1 I ---1 I

-- ,'." CLEARANCE

I I

.Jl.:' k--- 2" -12 j t L • 111•1 r -

'----- 2" ---l7~ 11 r~----1 l :: :

i."PIN-J__ I 1t I 4 I ...... I 11 I

~---1t ... ~>,1l,Jh,J, 7 vJA~J:l:.771A --._,.,,.,.,,.

2"x 4"----

Uc ½" PLATE SECTION C-C

DETAIL B 0 4

---¾"THREADED ROD

____ 2"x 2"X t" PLATE

----2" X 4"

_l ______ _l~ ' \ . >} / :..._ ____________ s.L" ---------+l ·<::,--.._l..."+ BEVEL

', <'1 's• - .... I ~--". '1, ~ .-1 -I \ f ' '----' I - • • µ:.a-::::,..,--

SCALE IN INCHES MISSOURI RIVER BASIN PROJECT

AINSWORTH CANAL I' I I II -

r--------------6~~" ---------->j

PITOT TUBES

SCALE IN INCHES

1 I I __ 1. ____ t__

PITOT CYLINDERS

7 • •

PITOT TUBE AND CYLINDER BANKS HYDRAULIC AND BITUMINUS STUDIES

FIGURE 4 RE PORT HYO. 393

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

,..-As directed / II II • I

1-<-A->-t 1,.. --Where e 1s less than 25.~ _ :_ --1- \ upper berm may be omitted -~ Canal

' s=.04 ' - -.;_ ,. ( ' Wh d 71 ' -<- -- - - --i , - _ N 6 : 0.0' Mox. , ,---16.0 en use / ,~ - ---=-s=- /~ 4 o' Min ,i f as roadway ,' Q) - {._l. . . ~.r t ' , ' -- 4 o' M. , I I t<-12.Q ~ _ \ ..._ -- • In.-.\ : :--10.0->t I I I I -C\J \ J CO I I --slope as / ~ l ~ : 1 J ( ---k--------' s=.f:_4: ,r-Not steeper directed--" .i.______ A,. ----_-_-_y-~__., i N.w.s:----,~ ----{ :/ ___ ~ than 2: 1

SECTION

C - w z ...J - z => C - w z - ....J z => C

I 16.o' When used /

OS roodWOY-------/ ~

-o r- - - - ~ .-.-~,.,.,_,.,,.... -:r ·,.r,;;·'"·~~ N ~ k--h--- - b -r - - -- ---->1 ··· ,' --rc·~T-:~:~ .G.s. ! -------Grovel blanket rt:qui red TYPICAL UNLINED SECTION where ground water is ,

I encountered and on curves---

SOIL GROUND SIDE WATER SLOPES

0 Z::r: <l en NO 2 f: I g 0~ >

WC zz NO 2:, => ct Oen

AINSWORTH CANAL HYDRAULIC PROPERTIES

PRELIMINARY DESIGN

A V Q b

480.0 1.83 876 40.0

504.0 1.84 928 43.0

. 528.0 1.86 982 46.0

424.0 2.08 881 37.0

448.0 2.10 939 40.0

464.0 2.1 I 980 42.0

d

8.0

8.0

8.0

8.0

8.0

8.0

r n tf s

5.78 .0225 .035 .00007

5.85 .0225 .035 .00007

5,93 .0225 .035 .00007

5.83 .0225 .045 .00009

5.91 .0225 .045 .00009

5.97 .0225 .045 .00009 ;o ,,, 'Tl

480.0 1.83 876 40.0 8.0 5.78 .0225 .035 .00007 w LLIC - z zz YES 2 ~: I 504.0 1.84 928 43.0 8.0 5.85 .0225 .035 .00007 - ....J => ct z C U"J 528.0 1.86 982 46.0 8.0 5.93 .0225 .035 .00007 =>

~-

510 "'Gl

--1 C :I: ::u -<m p t,j N) <D (I.I

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

(a) Traversing pitot tube and pitot cylinder· banks mounted on level channel iron

(b) Sloping manometer board-- connected with pitot banks

Missouri River Basin Project AINSWORTH CANAL

PITOT BANKS AND MANOMETER BOARD hydraulic and bituminous studies

Figure 5

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

510

No. I

SECTION A

Water level for freeze-thaw

tests-. I

I" Pipe, cappe~ / und perforated~

," Plastic standpipe , ., ,

SECTION

Asphalt emulsion penetrated

I I I I

: I

B

FIGURE 6 REPORT HYC>. 393

I I ~-- - -- - - --2'-- ---- ---~- - -- 1'---t~- - - - - ----2~-- - --->I l I \ I r< - - - - - - - - - - - - - - - - - - - - 5 - - - - -, - - - - - - - - - - - - - - ->;

'~Dune sand ,.asphalt emulsion. Stabilized.,,

No.2 SECTION C SECTION

,,Asphalt emulsion / penetrated macadam

16 GA.WELDED-BLACK IRON SHEET METAL

0

MISSOURI RIVER BASIN PROJECT

AINSWORTH CANAL FREEZE-THAW TEST TRAYS

HYDRAULIC AND BITUMINOUS STUDIES

\ I I I I I I

I I I

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

... ii C :u Ill

z p

11RAM1N av _______ CHECKED 9Y, _______ DAT£ _____ _

HYDROMETER ANALYSIS I SIEVE ANALYSIS ~ TIME READINGS U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS "U "Tl

·~ •40

·-~ ·~ ~_!fl ·i f t · f r __,___.__, ~ ~ ~~~~7~~~ ,001 I 60 MIN. 19 MIN. 4MIN. IMIN. •200 •IOO

_,... ~

I ii

901 I . I I --~ 1 I · I I ti f+ I I f I · I I . . I I .· I I I I '0

I I I

801 I I I I I I I ! t l I . I . 1· I I I . • I I I · I I 120 11:'AeT "1'111na1._IP "'" AlfJC: ~-___i_nl(tJ.~ ~ Al•1""'

I

ro • ; ~ .,. I

I I 1 I I , 0

~ 60 • : . 40~ 0 . i I 4 UI I I I-Cl ' ' l&I IL • I • 500:: ~ I I

lE . ' ~ l&I I I l&,I () I () :!;40 II : 60:!j CL • ' I • I a.. I

201 I I I 7 I f,T I/ I I I I IT I I I I I 11 100

ol I I I I I ,zf ~1 I I I I i I I I I I I i I 190 ~

0 0 "! ij fl') ,t II') 40 r- CD5!?:0

~ cs, ~~8.8.cs.& IN q q I~ ~ ~~~~~ "! r ~b Ir? r "":«!G?~

N I

2.0 "' .. an co,._ mcno ,- 12 ~ ,~ ~ i ~j2g~

.002 .005 .009 .019· .037 .074 .149 .297 .590 1.19 2.38 4.76 9.52 19.I 38.1 76.2 127 152 DIAMETER OF PARTICLE IN MILLIMETERS

CLAY (PLASTIC) TO SILT (NON-PLASTIC) I SAND . I -- -GRAVEL I

FINE f _ __MEDIUM I COARSE. FINE I COARSE COBBLES

~100

NOTES: G'RAD.ATION TEST

MISSOURI RIVER BASIN PROJECT

5iO

AINSWORTH DUNE SAND -NEAR HACKBERRY LAKE NEBRASKA TYPICAL OF MATERIAL ON PROPOSED ROUTE OF AINSWORTH CANAL

EAST TURBINE LATERAL SAND- SUBGRADE, 1.4B 1 ROZA DIVISION YAKIMA PROJECT

LABORA,:oRY ·SAMPLE Na. FIELD DESIGNATION

AINSWORTH CANAL SAND GRADATIONS

HYDRAULIC AND BITUMINOUS STUDIES

EXCAVATION No. DEPT T.

,Ii

::c 111 -< P--.i (II

IO (II

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

(a) Dyed sand strips before test (b) Movement of dyed sand has started. Average tractive force is O. 0041 lbs

· per square foot. Note that near the bottom of the side slopes maximum movement has occurred.

Missouri River Basin Project AINSWORTH CANAL

DYED SAND OBSERVATIONS

hydraulic and bituminous studies

l%j .... OQ

~ l'D 0:,

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

30

20

10

9 ff U B

IAJ 7

i er • :c ~ 11 0 II. 4 0

3

2

510

,-1.Y ' ' J-e-------2'-rd'-----~ CHANNEL SHAPE

AVERAGE DEPTH= 1.00 FT. W=62.4 LBS. PER CUBIC FOOT R= HYDRAULIC RADIUS S=HYDRAULIC GRAIDIENT

Jom2,54 X 10-+Q 2•28l I ..JIii' I

/

I

~

L.- I'""

~

~

-~ ~

I'"" I -~ ......

~ I _,......... I I

I I bENERAL MOVEMENT

I ttOVER ENTIRE WETTED

I PERIMETER

k"MOVEMENT lSTARTS

X 10~ it lll-2 4 5 6 7 8 9 10 2 3

1c;= TRACTIVE FORCE•WRS (LBS PER SQUARE FOOTI

MISSOURI RIVER BASIN PROJECT

AINSWORTH CANAL

AVERAGE TRACTIVE FORCE vs DISCHARGE

HYDRAULIC AND BITUMINOUS STUDIES

4

.JIii'

5

FIGURE 9 REPORT HYO. 393

/ ..,...

6 7 8 9 10

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

RELATIVE "' ELEVATIONS-FT.

b "' "

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

(a) Forty five minutes after ground water was introduced

(b) Seven and one half hours after ground water was introduced

Missouri River Basin Project AINSWORTH CANAL

SLOUGHING OF DUNE SAND CAUSED BY GROUND WATER (THERE IS NO DISCHARGE IN THE MODEL)

hydraulic and bituminous studies

Figure 11

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

i-: 6.0 II. I •

.J l&J

l&J > I- 5.0 Cl .J l&J a:

i-: 6.0 II. I

...i l&J

l&J > I-

5.0

Cl .J l&J a:

i-: 6.0 II. I

.J l&J

l&J > I- 5.0 Cl .J l&J a:

510

3 2

DISTANCE IN FEET LEFT OF C£

L R :>

0 2

FIGURE 12 REPORT HYO. 393

3

DISTANCE IN FEET RIGHT OF C£

STATION 0+45

3

-CONTOUR AFTER RAPID DRAW-DOWN

2 0

CONTOUR BEFORE RAPID DRAW-DOWN SIDI;: SLQPE 2• I --

2 3

DISTANCE IN FEET LEFT OF 'E. DISTANCE IN FEET RIGHT OF t STATION 0+50

L R

3 2 0 2 3

DISTANCE IN FEET LEFT OF(£ DISTANCE IN FEET RIGHT OF '£

STATION O+ 58

AVERAGE SIDE SLOPE AFTER RAPID DRAW-DOWN =APPROXIMATELY 3.33•1 FLOW INTO PAPER

MISSOURI RIVER BASIN PROJECT

AINSWORTH CAN AL SLOUGHING OF DUNE SAND

CAUSED BY RAPII) DRAW-DOWN HYDRAULIC AND Bl TUM I NOUS STUDIES

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

(a) Test cylinders 1 through 5

(b) Test cylinders 6, 8, 9, and 10

Missouri River Basin Project AINSWORTH CANAL

CYLINDERS USED IN SURFACE-PENETRATION TESTS hydraulic and bituminous studies

Figure 13

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

(a) Hand spraybar and Chausee, standard model T-200, asphalt distributor

(b) Tank-type Hudson sprayer, model 253

Missouri River Basin Project AINSWORTH CANAL

APPLYING DILUTE ASPHALT EMULSIONS hydraulic and bituminous studies

Figure 14

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

(a) Asphalt emulsion stabilized dune sand showing erosion in burned areas which were produced during curing

(b) Penetrated macadam cover consisting of asphalt emulsion and pea gravel. Note infra-red lamps used for curing

Missouri River Basin Project AINSWORTH CANAL

ASPHALT EMULSION TEST SECTIONS hydraulic and bituminous studies

Figure 15

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

(a) Tray 1. Dune sand penetrated with diluted asphalt emulsion. Section B shows the 2-inch thick asphalt emulsion penetrated macadam cover.

(b) Tray 2. Section C- dune sand at field "in place" density. A 2-inch thick asphalt emulsion penetrated· macadam cover · was placed over section C. Section D- dune sand penetrated with diluted asphalt emulsion.. ·

Missouri River Basin Project AINSWORTH CANAL

FREEZE-THAW TRAYS PRIOR TO TEST hydraulic and bituminous studies

Figure 16

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng

(a) Tray 1

Missouri River Basin Project AINSWORTH CANAL

(b) Tray 2

FREEZE-THAW TRAYS AFTER REMOVAL FROM FREEZING ROOM hydraulic and bituminous studies

ltj .... IJQ

ij ID

'""' -.:i

(a) Tray 1. Note: Section A, firm but cracked above waterline, uncoated sand and some sloughing below waterline. Section B was uneffected. Discoloration on gravel is due to rust deposit.

(b) Tray 2. Section C (at right) unaffected. Section D (at left) same as Section A.

Missouri River Basin Project AINSWORTH CANAL

TRAYS AT COMPLETION OF FREEZE-THAW TESTS hydraulic and bituminous studies

Figure 18

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng