HxGN SMART Build - Leica Geosystems

42
HxGN SMART Build

Transcript of HxGN SMART Build - Leica Geosystems

Page 1: HxGN SMART Build - Leica Geosystems

HxGN SMART Build

Page 2: HxGN SMART Build - Leica Geosystems

HxGN SMART Build2

HxGN SMART Buildis pioneering a simple yet powerful

platform that will improve profit margins

and drive completion of projects safely,

on time and on budget.

Page 3: HxGN SMART Build - Leica Geosystems

HxGN SMART Build3

No go-to solution:

Existing tools are inadequate and complex

Starting off on the wrong foot:Base planning is model flawed / inaccurate

Missing the big picture:Limited / no coordination during pre- construction phase

No instruction manual:Inefficiencies from poor work package / planning

No feedback loop:

Lack of timely feedback from the field

Recipe for finger pointing:

Little or no accountability/responsibility

Challenges of Building SMART

Page 4: HxGN SMART Build - Leica Geosystems

HxGN SMART Build4

Isolated Silos of Information

Page 5: HxGN SMART Build - Leica Geosystems

HxGN SMART Build5

Coordination during construction 0

0 is a huge and costly challenge for the

General Contractor 0

Page 6: HxGN SMART Build - Leica Geosystems

HxGN SMART Build6

0and cost and time overruns expose the owner to risk.

Page 7: HxGN SMART Build - Leica Geosystems

HxGN SMART Build7

ClarityComprehensive role-based

access to the entire project

ConnectivityCentralised information sharing via

cloud-enabled private portal

SimplicityEase of use and automation

replace complexity

HxGN SMART Build

From the ground up

Page 8: HxGN SMART Build - Leica Geosystems

HxGN SMART Build8

HxGN SMART Build: A Construction Enterprise Solution

Construction Site Construction Office Owner

Page 9: HxGN SMART Build - Leica Geosystems

HxGN SMART Build9

CONSTRUCT

Your project at a glance

Pre-Construction Construction Final Asset Delivery

PACKAGE WORKPLANNING

CAD

PLAN

DESIGN

OPERATE

Progressive Reality Capture

Full transparency throughout life of project

Project Control & Management

Page 10: HxGN SMART Build - Leica Geosystems

HxGN SMART Build10

HxGN SMART Build Hub: Common Data Environment — the Walls Disappear

Page 11: HxGN SMART Build - Leica Geosystems

HxGN SMART Build11

Project Control and Management : HUB

Planning and Scheduling Continuously optimise plans

Construction Material Management

Project Cost Control

Construction

Handover

PACKAGE WORKPLANDESIGN CONSTRUCT

• Aggregate models

• 2D/3D redlining

• Drawing/document repository

• Create initial work packs

• Identify crews/workforce

• Detail & finalise work packs

• Share performance information

• Proactive decisions based on common, accurate data

Page 12: HxGN SMART Build - Leica Geosystems

HxGN SMART Build12

Project Management. From the Ground Up.

Dynamically react to

issues & deviations and

manage change

Accurately reflect ‘real’project status against

budget, forecast &

performance

Project Control and Budget Tracking with No Surprises

Understand and

manage schedule and

cost impacts of

deviations

Page 13: HxGN SMART Build - Leica Geosystems

HxGN SMART Build13

Phase 1: Pre-Construction

Page 14: HxGN SMART Build - Leica Geosystems

HxGN SMART Build14

Phase 1: Pre-Construction

Pre-Construction Construction Final Asset Delivery

Project Control & Management

PACKAGE WORKPLANNING

CAD

PLAN

DESIGN

OPERATE

Receive Designs & Detailed Plans

Early Estimates and Schedules

Better Communication to Site

CONSTRUCT

Progressive Reality Capture

Page 15: HxGN SMART Build - Leica Geosystems

HxGN SMART Build15

Pre-Construction Planning

Receive designs and

project documentation

1

Establish estimates

and budgets

2

Procure, create

detailed plans and

work instructions

3

Communicate plans,

instructions and

information

4

Page 16: HxGN SMART Build - Leica Geosystems

HxGN SMART Build16

HxGN SMART Build

3D BIM

Project & Model Mgmt

Planning & Scheduling

Project Cost Controls

Construction

SMART Build: Project & Model Management

2D Plans Office Docs Tasks & RFIsEnterprise-Level Capability

Single, Complete Project Information Model

Revit 3D BIM Model

IFC Interchangeable Model Construction Applications

Sensors & Devices

Intergraph 3D Models

Page 17: HxGN SMART Build - Leica Geosystems

HxGN SMART Build17

SMART Build: Planning & Scheduling

Project & Model Mgmt

Planning & Scheduling

Project Cost Controls

Construction

Quantities and Hierarchy extracted

Work breakdown structures

Estimate andbudget

$ $ $ $ $ $ $ $

Labor & material requirements

Page 18: HxGN SMART Build - Leica Geosystems

HxGN SMART Build18

Increased end-user adoption

One common, mobile-enabled data

environment for all

Single archive for drawings,

contracts, models, etc.

Clear, timely communication –

no redundancies

Templated solution configuration reduces

effort/cost to initiate new projects

Centralised Data Hub And Archive

Page 19: HxGN SMART Build - Leica Geosystems

HxGN SMART Build19

Remove silos to improve accuracy

between field and office

Access all data without expensive

software or plug-ins

Improve execution with dynamic flow

between people, processes and sensors

Use of existing office and mobile devices

reduces overhead

Collaborative ecosystem compresses

schedules and reduces delays

Collaboration & CoordinationEfficient and Accessible

Page 20: HxGN SMART Build - Leica Geosystems

HxGN SMART Build20

Model integration correlates work

breakdown structure across

application modules

Data-driven takeoff of construction

quantities streamlines estimates

Collaboration capabilities facilitate

rapid creation of schedules

Quickly communicate construction

sequencing via 4D & 5D animations

Pre-Construction — PlanningDynamic and Proactive

Page 21: HxGN SMART Build - Leica Geosystems

HxGN SMART Build21

Increase predictability / lower risk

by managing:• Critical quantities• Costs• Performance and forecast

Capture field issues to manage / control

scope change

Keep apprised with visual reporting of

project status to key stakeholders

Clarify accountability and responsibility

with control over costs, progress and

earned value metrics

Project Control

Page 22: HxGN SMART Build - Leica Geosystems

HxGN SMART Build22

PHASE 2: Construction Execution

Page 23: HxGN SMART Build - Leica Geosystems

HxGN SMART Build23

CONSTRUCT

Phase 2: Construction

Pre-Construction Construction Final Asset Delivery

Project Control & Management

PACKAGE WORKPLANNING

CAD

PLAN

DESIGN

Progressive Reality Capture

Execute Plans Capture/Report Progress

Establish and Report Accountability

Manage Earned Value & Performance

Page 24: HxGN SMART Build - Leica Geosystems

HxGN SMART Build24

Execute plans and

instructions and

increase degree of

automation

Capture/report

progress

and deviations

Capture & analyse

earned value

Establish and

report

accountability

An Execution Plan that is Clear and Connected

Page 25: HxGN SMART Build - Leica Geosystems

HxGN SMART Build25

In Practice

Page 26: HxGN SMART Build - Leica Geosystems

HxGN SMART Build26

Total Station Integration

HxGN SMART Build

Add points

Prepare & sync

Layout

As-built check

Sync as-built points

Round-trip points

Issue management

No expensive BIM authoring tools

Office to Field – Field to Office: Total Station

Page 27: HxGN SMART Build - Leica Geosystems

HxGN SMART Build27

SMART Build: Project Cost Controls

Project & Model Management

Planning & Scheduling

Project Cost Controls

Construction

Integrated Earned Value

Contracts Management

Cost Change Management

Consolidated Performance Reporting

Page 28: HxGN SMART Build - Leica Geosystems

HxGN SMART Build28

SMART Build: Construction

Project & Model Management

Planning & Scheduling

Project Cost Controls

Construction

WORK Package

Progress

Page 29: HxGN SMART Build - Leica Geosystems

HxGN SMART Build29

Track progress with real-time

dashboards and 3D visual reporting

Identify issues quickly with dashboard

‘pictures’ that mitigate impact

Increase efficiency, delivering the

exact data the user needs

Project Dashboards

Page 30: HxGN SMART Build - Leica Geosystems

HxGN SMART Build30

Actual field events immediately reported

and updated

Right data, right now with on-demand

reports captured on mobile devices in

the field

Powerful reporting expedites accurate

decision making

Mitigate risk / augment predictability of

success with Project Controls

Real-Time Reporting

Page 31: HxGN SMART Build - Leica Geosystems

HxGN SMART Build31

More speed and accuracy with total

stations, connecting models and smart

BIM layout points

Quick problem resolution with as-built

single points, then round trip back into

collaborative model

Smarter Job Site: Office to Field

Page 32: HxGN SMART Build - Leica Geosystems

HxGN SMART Build32

Progressively scan during construction

Reduce rework by comparing with

models for deviation detection

Provide a virtual job site for safety

inspections

‘Project milestone scans’ capture

behind walls, under floors and

above ceilings

Smarter Job Site: Field to Office

Page 33: HxGN SMART Build - Leica Geosystems

HxGN SMART Build33

PHASE 3: Final Asset Delivery

Page 34: HxGN SMART Build - Leica Geosystems

HxGN SMART Build34

CONSTRUCT

Phase 3: Final Asset Delivery

Pre-Construction Construction Final Asset Delivery

Project Control & Management

PACKAGE WORKPLANNING

CAD

PLAN

DESIGN

OPERATE

Progressive Reality Capture

Digital as-built asset

Page 35: HxGN SMART Build - Leica Geosystems

HxGN SMART Build35

Single, secure source for all project

information for operation and

maintenance

Easily accessible via web browser from

all devices – easy to navigate

• Access to accurate data

• Maintenance repairs

• Planning future renovations

• Retrofit

Operate / MaintainAs-Delivered Asset

Page 36: HxGN SMART Build - Leica Geosystems

HxGN SMART Build36

In Summary

Page 37: HxGN SMART Build - Leica Geosystems

HxGN SMART Build37

HxGN SMART Build for the Life Cycle of Your Project

Capture

as-built

Receive

designs

Project cost

control

Planning &

scheduling

Capture & analyse

earned value

Manage schedule

and cost deviation

Increased

automated plans and instruction

Establish and report

accountability

Continuously

optimiseplans

Progress/deviation

reporting

Page 38: HxGN SMART Build - Leica Geosystems

HxGN SMART Build38

Planning & Pre-Construction

Enhanced collaboration & communication

Higher quality of estimates & budgets

Real-time feedback from site to continuously

optimise planning

Benefits of Building SMART

Page 39: HxGN SMART Build - Leica Geosystems

HxGN SMART Build39

Project Execution

Automation of manual tasks during project execution

Real-time access to detailed work instructions

& packages

Access to up-to-date project information

Real-time deviation reporting back to the office

Measures progress, cost, variances and earned value

Accountability through improved real-time reporting

Benefits of Building SMART

Page 40: HxGN SMART Build - Leica Geosystems

HxGN SMART Build40

Project Completion

Automatic creation of accurate as-built

digital asset throughout project life cycle,

ready for handover

Benefits of Building SMART

Page 41: HxGN SMART Build - Leica Geosystems

HxGN SMART Build41

ClarityComprehensive role-based

access to the entire project

ConnectivityCentralised information sharing

via cloud-enabled private portal

SimplicityEase-of-use and automation

replace complexity

HxGN SMART Build

From the ground up

Page 42: HxGN SMART Build - Leica Geosystems

Thank You

hexagon.com/hxgnsmartbuild