HR Connect Industry Day January 20, 2011

Transcript of HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background...

Page 1: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

HR Connect Industry DayJanuary 20, 2011

Page 2: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

Agenda

• Welcome/introductions/ground rules• Background• Acquisition strategy/timeline• HR Connect concept of operations• Wrap-up

2

Page 3: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

Agenda

• Welcome/introductions/ground rules• Background• Acquisition strategy/timeline• HR Connect concept of operations• Wrap-up

3

Page 4: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• No handouts will be provided• Focus for today

– Provide background information to vendors

• Intention– Increase competition

• Any question/any time

4

Ground Rules

Page 5: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• The remarks today by the HR Connect Program Office are not a guarantee of the Treasury’s course of action in proceeding with this procurement.

• The information shared today represents current HR Connect program status and may change based on internal and external circumstances.

• The formal solicitations, when issued, are the only documents that should be relied upon in determining the Treasury’s official requirements.

5

The “Fine Print”

Page 6: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Mitigate project risk by removing as much ambiguity as possible; develop realistic expectations for HR Connect and industry, before release of RFP

– Inform industry of current acquisition status/seek industry’s feedback on approach, viability and risks as they relate to industry’s ability to meet Treasury’s HR IT requirements

– Encourage industry to gain better insight into current HR Connect capabilities, Treasury customer requirements, and IT management processes/ mitigate risks

6

Today’s Objectives

Page 7: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

Agenda

• Welcome/introductions/ground rules• Background• Acquisition strategy/timeline• HR Connect concept of operations• Wrap-up

7

Page 8: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

● Designated HR LOB since 2005● Strength and relevance through HR/IT collaboration ● Dedicated and service-oriented● Outward-looking● Established in 2000/Serving 150,000● Major customers:

– All Treasury Bureaus– GAO– HUD– Alcohol, Tobacco, & Firearms (Justice)– U.S. Secret Service (Homeland Security)

● Aligns with human capital mission

8

What is HR Connect?

Page 9: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

● Integrated platform: information/processes/tools

● Supported by a hybrid of products – customized COTS, SaaS applications and other federal applications

• PeopleSoft HRMS 9.0 and PeopleTools

– New user interface

– Expanded functionality

• EODS

• Workforce Analytics/MD 715 compliant

• Other considerations: Monster Government Solutions, Plateau LMS, NFC payroll integration, eOPF etc.

9

Today’s HR Connect

Page 10: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• System of Record – complete by 9/2011• Enhanced EODS (incl. provisioning/pre-hire) –

complete by 9/2011• Integrated Talent Management application

– Competency management– Performance management– Workforce planning– Career development

• Building identity management (PDS)– Employees– Contractors– Service-oriented architecture (SOA)

• Upgraded LMS to Plateau 6.2• Portal: employees and managers

10

Recent / Current Projects

Page 11: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

Agenda

• Welcome/introductions/ground rules• Background• Acquisition strategy/timeline• HR Connect concept of operations• Wrap-up

11

Page 12: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Two contract vehicles:– Operations, maintenance and improvement (firm

fixed price contract via TIPSS-4)– New projects (firm fixed price and time and

materials BPA via GSA, Schedule 70)• Goals:

– Maintain effective and efficient operation– Maximize flexibility and innovation: customers gain

more value for their money

12

Current Thinking – Acquisition Strategy

Page 13: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Manages relationships

• Sets the vision

• Works with non-Treasury customers and Treasury Bureaus

• Works with contractor partners through hands-on engagement, and on-site

13

HR Connect Government Team

Page 14: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Management• Technical Architecture (System

Administration, Database Administration, Network Administration)

• Development (Functional Requirements, Design, Development, and Deployment)

• Deployments for New Customers• Configuration Management• Functional Enhancements• System Problem Reports• Pay Adjustments• Interfaces• Tier 3 Support• Includes optional CLINS, e.g. O&M of new

customers• Software patches and upgrades• Usability Improvements and Web Design

• Deployments for new customers• Emerging Technologies• New Projects• Usability Improvements and Web Design

One vendor for Operations/MaintenancePerformance Work Statement/Firm, Fixed Price

Multiple Vendors for New Work (Blanket Purchase Agreement/Firm, Fixed Price and

Time and Materials)

14

Contract Components

Page 15: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Treasury Enterprise HR IT Capability (with an interface to the National Finance Center) that meets Federal HR Business Requirements

• Entry on Duty, Workforce Analytics, Employee, Manager, and HR Self Service for Employees, Managers, and Human Resources Practitioners, ePerformance

• Information security• Technical architecture• Functional requirements• Software development• Test and evaluation• Deployment• Production operations• Maintenance and improvement• Integration to software as a service product suite includes eOPF,

CareerConnector, Treasury Learning Management System, Timekeeping, Integrated Talent Management, and Bureau unique systems

15

Optional CLINs, primarily for acceptance of products from the BPA – examples: two new customer deployments per year ; two new projects per year; one usability improvement project insertion per year

Operations and Maintenance Contract

Page 16: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Deployments for new customers Phase I (Fit-Gap Review) Phase II (Deployment) Cost to transition to O&M will be part of deployment price, if appropriate

16

BPA Workstreams

Page 17: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• New Technologies– Phase I: technology assessment– Phase II: prototype (proof of concept)– Phase III: verification (capability built to HR

Connect standards)– Phase IV: validation (capability meets validated

functional requirements) – Cost to transition to O&M part of new technology

implementation project, if appropriate

17

BPA Workstreams

Page 18: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• New Projects– Phase I: requirements– Phase II: design – Phase III: development and unit test– Phase IV: acceptance– Cost to transition to O&M will be part of the new

project cost, if appropriate

18

BPA Workstreams

Page 19: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Usability improvements, web design, and deployment– Phase I: technology assessment– Phase II: prototype (proof of concept)– Phase III: verification– Phase IV: validation – Cost to transition to O&M part of usability

improvement project cost, if appropriate

19

BPA Workstreams

Page 20: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Government Responsibilities:– Technical authority and final authority for portfolio

of capabilities – Requirements Management– Test and Evaluation– Final authority on design– Contract Management and oversight of all

activities

20

BPA Workstream Transition to Operations and Maintenance

Page 21: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• BPA vendor responsibilities:– Plan and develop new capabilities– Transition the new capabilities to O&M based on

established criteria:• Developed in accordance with standards to ease

transition to O&M• Pass government user acceptance testing • Provide consulting support after production go-live for

period of time, depending on complexity (Government’s option)

21

BPA Workstream Transition to Operations and Maintenance

Page 22: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• O&M vendor responsibilities:– Responsibility for operations, maintenance, and

improvement– Plan for acceptance of new capabilities (both

technologies and new projects) developed under the BPA

– Ensure that new capabilities can be maintained– Accept responsibility to maintain new capabilities

upon government approval

22

BPA Workstream Transition to Operations and Maintenance

Page 23: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Request for proposal– end of second quarter, FY 2011

• Contracts awarded– end of fourth quarter, FY 2011

• Period of Performance:– O&M (TIPSS - 4), base + 5 option years– BPA (GSA Schedule 70), base + 5 option years

23

Acquisition Timeline Goals / Assumptions

Page 24: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

Agenda

• Welcome/introductions/ground rules• Background• Acquisition strategy/timeline• HR Connect concept of operations• Wrap-up

24

Page 25: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Available - 99.0%• Usable - 90% customer satisfaction level• Continuously improved - 100% of deployment milestones

achieved• NIST Security Categorization –

– HR Connect categorized as a High System per NIST guidelines– EODS categorized as a Moderate System per NIST guidelines

• Interoperable - 100% interface accuracy with downstream systems

• Compliant - Meets OPM HR LOB HR and payroll requirements

25

Key Performance Parameters

Page 26: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• Five O&M Managed HR Connect Data Centers1. IRS Detroit Computing Center (DCC)

• HR Connect Production, Development & Test• EODS Development & Test

2. USDA National Information Technology Center (NITC)• HR Connect DR site

3. OPM Macon, GA• Public Internet facing EODS PeopleSoft Portal application• Production and UAT

• www.workplace.gov/DO/• test.workplace.gov/DO/ • OPM manages physical hardware, network and O/S• HRCPO O&M vendor manages applications and portal databases.

4. OPM Boyers, PA• EODS DR site

5. HR Connect Program Office, Washington, DC• Business Intelligence (BI) Reporting servers• HRCPO Network hardware

26

Infrastructure

Data Center Footprint

Page 27: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

Infrastructure (cont’d)

27

O&M WAN & LAN Information

• Treasury network – TNET– Wide Area Nework (WAN) provider is AT&T– Managed under the Networx Universal contract– Maintains “treasury.gov” network

• HR Connect Virtual Lans (VLAN)– Managed by HRCPO O&M vendor– Two domains– Remote system administration to all HRCPO managed data

centers.• Utilize secure SSH, SFTP & Terminal Server access.

– In-house Certificate Authority (CA) for non-production applications and servers.

Page 28: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

O&M Vendor Managed Infrastructure Software• Sun Solaris 10 Operating System• Windows 2003 Operating System• Cisco Network hardware• Fujitsu, Netapp & DataDomain Storage• Symantec NetBackup• Veritas Cluster Server, File System and Volume manager software• HR Connect HCM application

– Oracle 10gR2– Peopletools 8.49.16– Integration Broker

• EODS Peoplesoft Portal application– Oracle 11gR1– Oracle Advance Security Option – Transparent Data Encryption– Peopletools 8.50.03– Integration Broker

• PIV Data Synchronization (PDS) application– Oracle 11gR1 SOA repository– Oracle Fusion Middleware 11.1.1.3.0 – Weblogic 10.3.3– Jdeveloper Studio 11.1.1.3.0

28

Infrastructure (cont’d)

Page 29: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

29

O&M Vendor Managed Infrastructure Hardware

Infrastructure (cont’d)

Data Center Unix Servers

Windows Servers

Enterprise SAN/NAS

Network firewalls, routers,

and switches

DCC Data Center 20 5 2 6

NITC DR Data Center 6 1 1 4

OPM Data Center (Macon, GA)*All hardware and O/S managed by OPM staff via HRCPO and OPM data center SLA

9 0 0 3

OPM DR Data Center (Boyers, PA)*All hardware and O/S managed by OPM staff via HRCPO and OPM data center SLA

4 0 0 2

HR Connect (Washington, DC) 2 19 1 5

Page 30: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.

• HR Connect has configurable functionality for customer needs

• One business unit with 17 unique SETIDs• Approximately 20,000 customizations (objects

touched)– External Objects as of 10/27/10 ~ 1,000– PeopleSoft Objects as of 10/27/10 ~ 19,000

• Job scheduling: Control-M• Configuration Management Tools: Rational Unified

Productivity Package (RUP)• WAN provider: AT&T

30

Infrastructure (cont’d)

Page 31: HR Connect Industry Day January 20, 2011. Agenda Welcome/introductions/ground rules Background Acquisition strategy/timeline HR Connect concept of operations.