How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural...
-
Upload
aria-hannum -
Category
Documents
-
view
225 -
download
0
Transcript of How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural...
![Page 1: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/1.jpg)
How to Build a Better Bus Garage:Mn/DOT’s Facility Guidebook
18th National Conference on Rural Public and Intercity Bus Transportation
Gerry Weiss, State Program Administrator Principal
Minnesota Department of Transportation
![Page 2: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/2.jpg)
Lack of Process to Determine Facility Needs
• Increasing Number of Requests for Facilities
• No Process to Determine Need
• No Process to Determine Facility Size
• No Process to Determine Appropriate Cost
• No Process to Determine Benefit/Cost
• No Process to Rank Facility Requests
![Page 3: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/3.jpg)
Development of Facility Guidebook
• Need to provide a clear, consistent and streamlined process of documenting the need for a facility, and clarify the steps required to submit application for project funding
• Need to establish a uniform process for Mn/DOT to use when evaluating funding requests
![Page 4: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/4.jpg)
Facility Guidebook Overview• Provide a summary of the planning
and application process• More involvement from the
Mn/DOT Transit Project Manager• Clearly define the roles of all
involved parties• Do as much “up front” planning as
possible• Provide guidelines based on other
facilities• Develop a relationship with local
agencies
![Page 5: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/5.jpg)
Facility Guidebook Overview (Continue)
• Provide guidelines based on other facilities
• Develop a relationship with local units of government
• Provide examples
• Describe how projects are evaluated
• Develop application process
![Page 6: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/6.jpg)
Facility Application Process
• Step 1: Project Definition
• Step 2: Project Development
• Step 3: Project Submittal
• Step 4: Application for Funding
• Step 5: Final Design and Construction
![Page 7: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/7.jpg)
Step 1 – Project Definition
• Project Definition is the process that promotes initial discussions between an applicant and local government and documents the need for the project timelines
• Complete Project Need and Justification worksheet to document need
![Page 8: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/8.jpg)
FACILITY DESIGN - WORKSHEET 2Recommended Planning Guidelines
TRANSIT PROVIDER INPUT:
Input your data in the yellow cells only. The remaining data is calculated automatically
Total Annual System Miles (from Transit Report or Projected) - Total Bus Fleet, all classes of buses
1: RECOMMENDED NUMBER OF MAINTENANCE BAYSNumber of Bays based on vehicle miles per year 0Number of Bays based on number of buses 0
The above two numbers are averaged to determine the recommended number of bays:
RECOMMENDED NUMBER OF MAINTENANCE BAYS 0
![Page 9: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/9.jpg)
FACILITY DESIGN - WORKSHEET 2(Continue)
2: RECOMMENDED NUMBER OF WASH BAYS 0 3: APPROXIMATE AREAS FOR MAINTENANCE SERVICES AND TRANSIT GARAGE
3A: Overall Maintenance Bay Area 3B: Parts Room
3C: Maintenance Storage 3D: Tire Storage 3E: Wash Bays
3F: Transportation and Administrative Services
Sum total of individual Maintenance Service Areas, ie the Transit Garage Check: Total Maintenance Service Area based on fleet miles
The above two numbers are averaged to determine the recommended number of bays : RECOMMENDED PRELIMINARY AREA OF TRANSIT GARAGE 4: RECOMMENDED NUMBER OF FUELING STATIONS 0
4A: Automobile Parking Area 4B: Total Area of Building 4C: Total Site Circulation Area 5: SITE AREA
RECOMMENDED MINIUM SITE AREA, IN ACRES 0
![Page 10: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/10.jpg)
Step One Project Definition (Continue)
• Conduct initial meetings with local government
• Review and project approval
![Page 11: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/11.jpg)
Step 2 – Project Development
• Site investigation and selection
• Develop concept layout
• Develop concept cost estimates
• Complete Benefit/Cost analysis
![Page 12: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/12.jpg)
COST/BENEFIT– WORKSHEET 4Costs: (actual costs of the proposed facility per bus per year over the useful life of the facility
Project Cost (new bus garage facility) Number of buses
Cost per Bus Years of benefit Cost per Bus per Year
Benefits (Direct measurable benefits such as service hours savings, eliminating a lease, eliminate cost from private provider)
Service hours saved per bus/year costs per hour of operation total buses
annual savings $ - savings per bus per year
Cost/Benefit Ratio /1.00 << Enter information in yellow cells only
![Page 13: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/13.jpg)
Step 2 – Project Development (Continue)
• Obtain concept approval from local government
• Develop support documentation
• Amend Capital Improvement Plan
• Submittal
![Page 14: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/14.jpg)
Site investigation and Selection• Determine if there are any
environmental issues with the property
• What type and size building is physically possible on the site (s)
• What condition the existing building is in and what potential it has to accommodate the applicant’s need
![Page 15: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/15.jpg)
Concept Site Plan• Site boundary• Lot area• Identification of unusual
conditions (topography, wetlands, parklands, archaeologically, etc.)
• Building location/layout• Roadway access• Available utilities• Conduct Phase 1
Environmental site review• If necessary conduct Phase 2
EA and drilling investigation
![Page 16: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/16.jpg)
Concept Layout
• Applicant is required to develop a concept layout of the new facility or renovation
• Concept layout includes space needs, circulation and facility components
![Page 17: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/17.jpg)
Concept Cost Estimates
• Capital recovery
• Utility costs
• Labor costs
• Maintenance costs
• Facility support services
![Page 18: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/18.jpg)
Benefit/Cost Analysis
• The purpose of completing a benefit/cost analysis is to determine the advantages of making improvements and their relationship with the resulting costs of improvements
• Complete vehicle operating cost savings worksheet
• Complete benefit/cost analysis worksheet
• Complete buy/lease worksheet
![Page 19: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/19.jpg)
Concept approval• After completing the
benefit/cost analysis worksheet, the applicant has enough information to present to present proposal to local funding agencies to receive comments and concept approval
• This step is necessary to verify that the project can be constructed and determine if there are any conditions that will affect the cost of the project.
![Page 20: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/20.jpg)
Develop Support Documentation
• Useful Life (assure operation of facility for its useful life, normally 20 – 30 years)
• Local Match (applicant has commitment for 20% local match)
• Project Readiness (includes a checklist of steps toward project implementation)
![Page 21: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/21.jpg)
Step 3 – Project Submittal• Applicant submits all
worksheets in Step 2 to Mn/DOT Project Manager for review and forward to Office of Transit
• Office of Transit will review, rank and create a list of priority projects
• Office of Transit will then determine funding source (State General Funds, State Bond Funds, Section 5309)
![Page 22: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/22.jpg)
Step 4 – Application for Funding• Application of approved projects
must include: description of project; document that project has been included in STIP (if Federally funded); CE documentation; description of service area
• Priority projects that have been authorized to proceed now go into the formal grant process
• If project is going to be funded with Federal Funds, CE must be approved by the FTA prior to grant submittal
• Applicant enters into contract agreement with Mn/DOT
![Page 23: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/23.jpg)
Step 5 – Final Design and Construction
• Preparation of contract documents
• Applicant must enter into a contract with a registered architect to prepare final construction documents and be the administrator of the construction contract between owner and contractor
![Page 24: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/24.jpg)
Step 5 – Final Design and ConstructionBidding and Contractor Administration
• Once project has been bid and approved for construction, the actual work of building begins
• Bidding process is influenced by the Federal or State grant requirements
• Architect retained by the applicant will administer the contract per the agreed General Conditions
![Page 25: How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.](https://reader034.fdocuments.net/reader034/viewer/2022051110/5517796a5503460e6e8b523c/html5/thumbnails/25.jpg)
More Information
• Checkout our website at: • www.dot.state.mn.us/transit/grantapplications/C
apital_facility/greatermnappindex.html• Contract Mn/DOT Office of Transit, 395 John
Ireland Boulevard, MS 430, Saint Paul , Minnesota 55155
• Gerry Weiss: 651-366-4183, email: [email protected]