    PRESENTATION AGENDA

    C&I Engineering in a snapshot

    Strategies & Initiatives undertaken

    Engineering Process Standardization

    New Practices/ Concepts

    New Technologies

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    3/20

    PRESENTATION AGENDA (Contd.)

    Security of C&I system

    Measures for reducing forced outages

    IPON implementation

    Expectations from site

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    4/20

    ` Packages Owned

    Station C&I

    Instrumentation cable

    R&M packages of C&I systems Training Simulator packages (Stand

    alone/part of main packages) for Thermal,

    Hydro, Gas projects

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    5/20

    ` Contribution to Mechanical Packages SG TG Gas projects

    Material handlingx AHPx CHP

    Water system-x DM/PT/CPU/ETP/AWRS/Desalination

    x CW MUx AC & Ventilation/Fire protection

    Main plant and off site Civil works package Hydro packages

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    6/20

    ` In house engineering

    Station C&I packagex IO list/Drive list

    x Logics

    x

    HMIPIS inputs-(MIMICS, Logs ,Reports, LVS Annunciation, SOEx Marshalling/panel termination assignment for DCS cabinets)

    x Bought out items inputs for

    x Field instrumentation

    x LIE/LIR grouping

    x JB grouping

    x Locations for CCTV,PA system, Master Slave clock

    x DCS System Testingx System Design Features/Simulated and Integrated Testing

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    7/20

    Cable Engineeringx Cable list

    x Cable schedule

    x Interconnection Schedule

    x Control and power cable lists for AC/DC power distribution ,earthing andgrounding requirements.

    Layout Engineeringx Control Rooms layouts, Control equipment rooms, Battery Rooms, UPS

    rooms, SWAS rooms etc

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    8/20

    Projects Being Engineered Concurrently( In-House)

    x New -14

    x R&M -3

    x Diverse DCS Systems -6

    x Functional testing in a year-10-12

    x These figures will increase substantially for projects

    to be engineered in future.

    C&I EnggEngg. Activities a snapshot

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    9/20

    Stringent targetsx C&I Specification preparation time w.r.t zero date has

    come down from 6 months tonow -4 in bulk tendering projects)

    x Documents review & approval time reduced

    x Cost reduction in all packages including C&I

    x

    Minimization of Project to Project Variants ( Eg,C&I Layout)

    x FAT time reduction though scope of testing

    increased

    C&I Engg. ActivitiesC&I Engg. Activities a snapshoa snapshot

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    10/20

    ` Tender Phase Two Stage Bidding ( Specification better tuned to

    contemporary systems)

    Standard Specification Module ( Streamlining the Specs.Preparation process)

    ` Engineering Phase

    Specialization based Dept. Structure ( Detailed focus onspecific area; continuity & consistency in Engg.; single ptinterface to sites)

    Standardization in Engg. Process.

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    11/20

    Pre-engineering of systems UPS, 24V DC charger.

    All logics/ loops tested in laptops with the vendor before

    Integrated test.

    Major Design Features test for DCS before FAT.

    Standardization of Documents (Interconnection Drawing

    etc).

    Standardization of Control Room/ Control Equipment

    rooms layout. Automation in Engg. Process (ICS generation for main

    plant & offsite).

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    12/20

    ` In On-going Projects

    x

    Practice/ Concept

    Uniform Control System for main plant as well as offsite ( DCS Platform)

    for ease of maintenance, uniform HMI, optimized operation.

    Uniform Logics Philosophy/ Tagging for Offsites in line with main plant.

    Facility of remote operation of hydro plant from Corporate Centre.

    Multiplexing of Programmer room hardware for space saving and

    optimized usage.

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    13/20

    ` In On-going Projects

    Practice/ Concept

    Reduction in Control Hardware

    Testing and Commissioning Tool of DDCMIS for site activities

    PADO Results dissemination back to DDCMIS & to any PC on Plant

    Intranet

    Online Control loop tuning software in Station C&I package.

    Contd..

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    14/20

    ` In On-going Projects

    x

    Technology From

    LED instead of UHP lamps for

    LVS

    Bulk Projects

    Modular Chargers Dadri-II

    Field Bus for I/O intensive areas Simhadri-II ( Boiler Metal

    Temperatures)

    Microprocessor based

    Positioners

    Simhadri-II

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    15/20

    Technology

    Online Coal Analyzer

    GIUs for offsite areas for control in place of DCS

    Field Bus for more areas

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    16/20

    Security policies and procedures for DDCMIS included in

    the latest specifications.

    Circulated to all sites as OGN-31.

    Station LAN architecture modification - Recommendedarchitecture.

    Security audit.

    Government Initiative Example

    Training in Network Security - essential (included in latestspecifications for ongoing projects.

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    17/20

    Separate Cables for individual signals for tripping.

    (Furnace Pr. Tx., PA Hdr Pr. Tx.)

    Separate UPS feeder for Flame Scanner and Ignitors.

    Separate JB for 24V DC.

    Triplex type T/C in Turbine Brg. Temp. measurement with

    2/3 on each such point.

    CW logic modification for operating any CW pump from

    any unit. Power supply for offsite area control system modified to

    include 2 charger- 2 battery system.

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    18/20

    Ignitor testing kit/ assembly included in scope.

    Proximity type limit switch for Hot Air Gates of Mill.

  • 8/8/2019 HOD C&I Workshop Nov 2010Final

    19/20

    x

    Performance report of Vendors on continuous basis

    - w.r.t quality of work & support

    - w.r.t their product performance

    Project Completion report with objective feedback about utilization of

    various systems.

    Sharing of new technology adopted, if any at any site (e.g. trial

    installations).

    Similar sharing of best practices.

    Training of site engineers.

  • 8/8/2019 HOD C&I Workshop Nov 2010Final