(PROJECT-ENGG C&I)
NTPC LTD
C&I HOD WORK SHOP AT PMI-NOIDA
(9TH-11TH NOV-10)
10-NOV-2010
TRENDSIN
CONTROL & INSTRUMENTATION
-
8/8/2019 HOD C&I Workshop Nov 2010Final
2/20
PRESENTATION AGENDA
C&I Engineering in a snapshot
Strategies & Initiatives undertaken
Engineering Process Standardization
New Practices/ Concepts
New Technologies
-
8/8/2019 HOD C&I Workshop Nov 2010Final
3/20
PRESENTATION AGENDA (Contd.)
Security of C&I system
Measures for reducing forced outages
IPON implementation
Expectations from site
-
8/8/2019 HOD C&I Workshop Nov 2010Final
4/20
` Packages Owned
Station C&I
Instrumentation cable
R&M packages of C&I systems Training Simulator packages (Stand
alone/part of main packages) for Thermal,
Hydro, Gas projects
-
8/8/2019 HOD C&I Workshop Nov 2010Final
5/20
` Contribution to Mechanical Packages SG TG Gas projects
Material handlingx AHPx CHP
Water system-x DM/PT/CPU/ETP/AWRS/Desalination
x CW MUx AC & Ventilation/Fire protection
Main plant and off site Civil works package Hydro packages
-
8/8/2019 HOD C&I Workshop Nov 2010Final
6/20
` In house engineering
Station C&I packagex IO list/Drive list
x Logics
x
HMIPIS inputs-(MIMICS, Logs ,Reports, LVS Annunciation, SOEx Marshalling/panel termination assignment for DCS cabinets)
x Bought out items inputs for
x Field instrumentation
x LIE/LIR grouping
x JB grouping
x Locations for CCTV,PA system, Master Slave clock
x DCS System Testingx System Design Features/Simulated and Integrated Testing
-
8/8/2019 HOD C&I Workshop Nov 2010Final
7/20
Cable Engineeringx Cable list
x Cable schedule
x Interconnection Schedule
x Control and power cable lists for AC/DC power distribution ,earthing andgrounding requirements.
Layout Engineeringx Control Rooms layouts, Control equipment rooms, Battery Rooms, UPS
rooms, SWAS rooms etc
-
8/8/2019 HOD C&I Workshop Nov 2010Final
8/20
Projects Being Engineered Concurrently( In-House)
x New -14
x R&M -3
x Diverse DCS Systems -6
x Functional testing in a year-10-12
x These figures will increase substantially for projects
to be engineered in future.
C&I EnggEngg. Activities a snapshot
-
8/8/2019 HOD C&I Workshop Nov 2010Final
9/20
Stringent targetsx C&I Specification preparation time w.r.t zero date has
come down from 6 months tonow -4 in bulk tendering projects)
x Documents review & approval time reduced
x Cost reduction in all packages including C&I
x
Minimization of Project to Project Variants ( Eg,C&I Layout)
x FAT time reduction though scope of testing
increased
C&I Engg. ActivitiesC&I Engg. Activities a snapshoa snapshot
-
8/8/2019 HOD C&I Workshop Nov 2010Final
10/20
` Tender Phase Two Stage Bidding ( Specification better tuned to
contemporary systems)
Standard Specification Module ( Streamlining the Specs.Preparation process)
` Engineering Phase
Specialization based Dept. Structure ( Detailed focus onspecific area; continuity & consistency in Engg.; single ptinterface to sites)
Standardization in Engg. Process.
-
8/8/2019 HOD C&I Workshop Nov 2010Final
11/20
Pre-engineering of systems UPS, 24V DC charger.
All logics/ loops tested in laptops with the vendor before
Integrated test.
Major Design Features test for DCS before FAT.
Standardization of Documents (Interconnection Drawing
etc).
Standardization of Control Room/ Control Equipment
rooms layout. Automation in Engg. Process (ICS generation for main
plant & offsite).
-
8/8/2019 HOD C&I Workshop Nov 2010Final
12/20
` In On-going Projects
x
Practice/ Concept
Uniform Control System for main plant as well as offsite ( DCS Platform)
for ease of maintenance, uniform HMI, optimized operation.
Uniform Logics Philosophy/ Tagging for Offsites in line with main plant.
Facility of remote operation of hydro plant from Corporate Centre.
Multiplexing of Programmer room hardware for space saving and
optimized usage.
-
8/8/2019 HOD C&I Workshop Nov 2010Final
13/20
` In On-going Projects
Practice/ Concept
Reduction in Control Hardware
Testing and Commissioning Tool of DDCMIS for site activities
PADO Results dissemination back to DDCMIS & to any PC on Plant
Intranet
Online Control loop tuning software in Station C&I package.
Contd..
-
8/8/2019 HOD C&I Workshop Nov 2010Final
14/20
` In On-going Projects
x
Technology From
LED instead of UHP lamps for
LVS
Bulk Projects
Modular Chargers Dadri-II
Field Bus for I/O intensive areas Simhadri-II ( Boiler Metal
Temperatures)
Microprocessor based
Positioners
Simhadri-II
-
8/8/2019 HOD C&I Workshop Nov 2010Final
15/20
Technology
Online Coal Analyzer
GIUs for offsite areas for control in place of DCS
Field Bus for more areas
-
8/8/2019 HOD C&I Workshop Nov 2010Final
16/20
Security policies and procedures for DDCMIS included in
the latest specifications.
Circulated to all sites as OGN-31.
Station LAN architecture modification - Recommendedarchitecture.
Security audit.
Government Initiative Example
Training in Network Security - essential (included in latestspecifications for ongoing projects.
-
8/8/2019 HOD C&I Workshop Nov 2010Final
17/20
Separate Cables for individual signals for tripping.
(Furnace Pr. Tx., PA Hdr Pr. Tx.)
Separate UPS feeder for Flame Scanner and Ignitors.
Separate JB for 24V DC.
Triplex type T/C in Turbine Brg. Temp. measurement with
2/3 on each such point.
CW logic modification for operating any CW pump from
any unit. Power supply for offsite area control system modified to
include 2 charger- 2 battery system.
-
8/8/2019 HOD C&I Workshop Nov 2010Final
18/20
Ignitor testing kit/ assembly included in scope.
Proximity type limit switch for Hot Air Gates of Mill.
-
8/8/2019 HOD C&I Workshop Nov 2010Final
19/20
x
Performance report of Vendors on continuous basis
- w.r.t quality of work & support
- w.r.t their product performance
Project Completion report with objective feedback about utilization of
various systems.
Sharing of new technology adopted, if any at any site (e.g. trial
installations).
Similar sharing of best practices.
Training of site engineers.
-