RECREATING COMMUNITY by maximizing connectivity PRESENTED BY Aan Garrett-Coleman Coleman and Associates Ricardo Zamarripa LJA Engineering

Transcript of Hillway Final Presentation for the Green Mobility Challenge

Page 1: Hillway Final Presentation for the Green Mobility Challenge

RECREATING COMMUNITY by maximizing connectivityPRESENTED BY

Aan Garrett-ColemanColeman and Associates

Ricardo ZamarripaLJA Engineering

Page 2: Hillway Final Presentation for the Green Mobility Challenge

GOALSTHE OAK HILLWAY

RECREATECommunity by Maximizing Mobility

RECONNECTGateways, Multi-use Trails, and New Parkway

RESTOREWilliamson Creek and create New Open Space

RALLY

Public Support

Page 3: Hillway Final Presentation for the Green Mobility Challenge

OAK HILL HISTORYTHE PAST

Page 4: Hillway Final Presentation for the Green Mobility Challenge

THE GATEWAYSCONNECTING THE COMMUNITY “AT GRADE”

OAK HILL SPRINGS (1876) at Scenic Brook

OATMANVILLEat FM 1826

CONVICT HILLat Convict Hill Road

THE “Y”at 290 and 71

SHILOHat William Cannon

WILLIAMSON CREEKat Patton Ranch Road

Naming each Gateway reinforces Oak Hill’s historic past, provides sub-neighborhood identity, and provides sense of place.

Page 5: Hillway Final Presentation for the Green Mobility Challenge

USE UNDERPASSES AS GATEWAYSRECONNECTING TO THE HEART OF OAK HILL

Page 6: Hillway Final Presentation for the Green Mobility Challenge

OAK HILL PARKWAYCONNECTING 290 TO 71

SETON HOSPITAL

NEW OPENSPACE

OAK HILL NEIGHBORHOODS

OAK HILL NEIGHBORHOODS

FREESCALEOAK HILL

PLAZA

ACC

WEST PARKPUD

Page 7: Hillway Final Presentation for the Green Mobility Challenge

OAK HILL PARKWAYRECONNECTING THE HEART OF OAK HILL

Page 8: Hillway Final Presentation for the Green Mobility Challenge

OAK HILL PARKWAYCONNECTING 290 TO 71

SETON HOSPITAL

NEW OPENSPACE

OAK HILL NEIGHBORHOODS

OAK HILL NEIGHBORHOODS

FREESCALE

OAK HILL PLAZA

ACC

WEST PARKPUD

Page 9: Hillway Final Presentation for the Green Mobility Challenge

Recreate a strong urban core in Oak Hill.

OAK HILL TOWN CENTERRECREATING THE HEART OF OAK HILL

Page 10: Hillway Final Presentation for the Green Mobility Challenge

ENGINEERINGHIGHLIGHTS OF THE OAK HILLWAY

•WATER QUALITY & QUANTITY

•WILLIAMSON CREEK RELOCATION

•LED LIGHTING

Page 11: Hillway Final Presentation for the Green Mobility Challenge

WATER QUALITY & QUANTITYRELOCATE | RESTORE | REVITALIZE

PFC•INCREASED VISIBILITY DURING RAIN EVENTS

•INCREASED SKID RESISITANCE

•NOISE REDUCTION

VEGETATIVE FILTER STRIPS

GRASSY SWALE LINEAR DETENTION

TSS REMOVALREQUIRED – 80%

ACTUAL – 87%

BIOFILTRATION

•REDUCES CONSTRUCTION & MAINTENANCE COSTS

Page 12: Hillway Final Presentation for the Green Mobility Challenge

WATER QUANTITYCURRENT SCHEMATIC VS. OAK HILLWAY

EXISTING CONDITION

CURRENT SCHEMATIC

OAK HILLWAY

0

100

200

400

300

600

500

600 700 800 900

PRE-EXISTING CONDITION

TIME (S)

FLO

W (

CF

S)

Page 13: Hillway Final Presentation for the Green Mobility Challenge

WILLIAMSON CREEKRELOCATE | RESTORE | REVITALIZE

CURRENT SCHEMATIC

•LEAVES CREEK IN PLACE

•PORTIONS IN PERMANENT SHADE

OAK HILLWAY

•RELOCATES CREEK

•FLEXIBILITY IN DESIGN & REDUCES COST

Page 14: Hillway Final Presentation for the Green Mobility Challenge

•MEANDERING CREEK

•NATIVE VEGETATION & LIMESTONE

•RECREATIONAL OPPORTUNITIES

WILLIAMSON CREEKRELOCATE | RESTORE | REVITALIZE

FROM THIS

TO THIS

WILLIAMSON CREEK TODAY

EXAMPLE OF RESTORED CREEK IN AUSTIN AREA

Page 15: Hillway Final Presentation for the Green Mobility Challenge

WILLIAMSON CREEKRELOCATE | RESTORE | REVITALIZE

ADDITIONAL STORAGE

100-YEAR FLOW

Page 16: Hillway Final Presentation for the Green Mobility Challenge

ENERGY REDUCTIONTHE OAK HILLWAY

OPERATIONS• UP TO 80% ENERGY SAVINGS OVER

CONVENTIONAL LIGHTING

MAINTENANCE• LED LASTS 15 – 20 YEARS

• CONVENTIONAL REPLACED EVERY TWO YEARS

LED LIGHTING

Page 17: Hillway Final Presentation for the Green Mobility Challenge

COST EFFECTIVETHE OAK HILLWAY

COST EFFECTIVENESS SAVINGS

CHANNEL REALIGNMENT $6,000,000

WATER QUALITY IMPROVEMENTS $350,000

SUBTOTAL: $6,350,000

LED LIGHTING $650,000

WATER QUALITY IMPROVEMENTS $1,000,000

SUBTOTAL: $1,650,000

TOTAL COST SAVINGS (over 10 years): $8,000,000

CONSTRUCTION COSTS

OPERATION & MAINTENANCE (10 YEARS)

Page 18: Hillway Final Presentation for the Green Mobility Challenge

CLOSINGHIGHLIGHTS OF THE OAK HILLWAY

RECREATE and RECONNECT The Oak Hill Community.

RESTORE Williamson Creek.

RALLYPublic Support.