HANDS-ON TRAINING SKID BILL DRAPER www.immersiontraining.solutions [email protected] O: 281.420.4300 | C: 832.457.2105 IMMERSION TRAINING GENERAL DESCRIPTION is large-scale, realistic, industrial process system facilitates training and practice in field activities regularly undertaken by process operators within the refining, petrochemical and oil & gas industries. Designed to support process technology (PTEC), process operations programs in US technical college programs, the device can also be applied to similar process operations programs in colleges and universities as well as within industry, directly. Activities focus on common tasks and formal procedures undertaken on a daily basis by operators in many industries. Examples include; chemical injection, product sampling, strainer maintenance, piping line-up changes, taking equipment in and out of service, pump change-over, routine process parameter checks, normal start-up and shutdown. Fabricated to ASME standards, and incorporating durable state-of-the-art industrial components, the system will provide years of trouble-free service, whether installed in the training laboratory or in outdoor environments. With multiple installations completed to date, this proven tool will help make training more memorable, effective, and realistic.

Transcript of HANDS-ON TRAINING SKID

HANDS-ON TR AINING SKID

BILL DRAPERwww.immersiontraining.solutionsbill@immersiontraining.solutions

O: 281.420.4300 | C: 832.457.2105

I M M E R S I O N T R A I N I N G

GENERAL DESCRIPTION

This large-scale, realistic, industrial process system facilitates training and practice in field activities regularly undertaken by process operators within the refining, petrochemical and oil & gas industries.

Designed to support process technology (PTEC), process operations programs in US technical college programs, the device can also be applied to similar process operations programs in colleges and universities as well as within industry, directly.

Activities focus on common tasks and formal procedures undertaken on a daily basis by operators in many industries. Examples include; chemical injection, product sampling, strainer maintenance, piping line-up changes, taking equipment in and out of service, pump change-over, routine process parameter checks, normal start-up and shutdown.

Fabricated to ASME standards, and incorporating durable state-of-the-art industrial components, the system will provide years of trouble-free service, whether installed in the training laboratory or in outdoor environments.

With multiple installations completed to date, this proven tool will help make training more memorable, effective, and realistic.

FEATURES AND SPECIFICATIONS

SERVICE REQUIREMENTSSTANDARD ACCESSORIES

• Overall size of 10’ x 24’ x 7’ 6” H (Requires operating area of 18’ x 30’ x 10’ H)

• Welded, structural steel baseplate assembly with position-ing skids, lifting eyes and industrial grating working surface (Self-draining).

• Welded-steel pump pedestals and tank mounting pads.

• Welded and flanged process piping system fabricated to ANSI standards.

• (3), 1.5 HP primary centrifugal circulation pumps (1 x 1.25 x 5) with flow rates to 25 - 30 gpm.

• Includes spared pumps with both series and parallel piping configurations.

• (1) Simulated chemical injection (diaphragm type), 44 GPD, and quill.

• (1) Shell and tube heat exchanger with removable tube bundle and incorporating piping bypass (allows for flushing and draining).

• (1) Air -cooled, fan-type air-cover with 300,000 BTU/HR capacity (on-off control).

• 1/4-Turn vent and drain valves throughout allowing for decommissioning, winterization where necessary, and

component isolation/removal.

• (1) 300,000 BTU/HR electric heater tank with thermocouple control capability and fail-safe safety trip.

• (3) Primary process tanks; (1) 300 gallon feed tank, (1) 300 gallon product tank and (1) chemical feed tank, 20 gallons (all polyethylene).

• Industrial-quality level gauges, including; (1) gauge column sight glass and (1) magnetic column sight glass.

• Two hard-piped control stations with Fisher diaphragm-type control valves (300 lb) with positioners, as well as valve

by-pass and block valves.

• PLC control system with operator control panel interface (other control systems, including DCS, possible).

• PLC control software package.

• Multiple control loops including temperature control, level control, and multiple flow control loops (allows for cascade control).

• 5 Supplemental local thermowells with local temperature indicators.

• Rosemount brand differential pressure and temperature transmitters throughout.• (2) Duprex pump suction strainers.• (2) Orifice flow assemblies.• Provision for optional DCS control.• (8) Locally-mounted pressure gauges.• System pressure relief valve.• Provision for lock-out / tag-out, at all service connections.

• Includes gate, globe, swing-check, safety relief, and ball check, valves.

• Safety shower and eye-wash station.• System stabilization and preparation specialized carrier.

• Water source, instrument air source, 480 VAC 3-phase 100A, primary service, 240 VAC, 50A, single phase supplies. Alternate voltage requirements can be accommodated. • Use and start-up guide

• Exercise package• Complete engineering and design documentation package• Commissioning and start-up support

HA N D S - ON T R A I N I NG SK I D - C ON T I N U E D

BILL DRAPERwww.immersiontraining.solutionsbill@immersiontraining.solutions

O: 281.420.4300 | C: 832.457.2105

• Product Dimensions: 10ft x 24ft x 7ft 6in / 15,000 lbs