Guinn Hall Project, Summer 2014 Scope of Project
10
Guinn Hall Project, Summer 2014 Scope of Project • Painting • Flooring • Tub surrounds • Tile in bathrooms • Electrical upgrades • Light fixtures • New doors • Ceilings • 12 th floor lounge • Furniture replacement • Microfridge purchase
description
Guinn Hall Project, Summer 2014 Scope of Project. Painting Flooring T ub surrounds Tile in bathrooms Electrical upgrades L ight fixtures New doors Ceilings 12 th floor lounge Furniture replacement Microfridge purchase. Floor Elevator Atrium Area. After. Before. Hallway. Before. - PowerPoint PPT Presentation
Transcript of Guinn Hall Project, Summer 2014 Scope of Project
Guinn Hall Project, Summer 2014Scope of Project
• Painting• Flooring• Tub surrounds• Tile in bathrooms• Electrical upgrades• Light fixtures• New doors• Ceilings• 12th floor lounge• Furniture replacement• Microfridge purchase
Floor Elevator Atrium Area
Before After
Hallway
Before After
Student Room DoorsBefore After
Student Room Walls
AfterBefore
Bathroom
AfterBefore
Room Desks
Old Built-in Desks & Dressers
New Desks & Bookshelves
Beds and Dressers
New Bed and DresserOld Bed
Amenities
Old Refrigerator New
Microfridge