    Mengapa Proyek Gagal? Kurang jelasnya apa yang diinginkan

    Problems avoided, covered up, or minimized

    Inadequate planning (the devil is in the details)

    Ineffective process to deal with changes or problems Lack of willingness or discipline to monitor progress

    Unresolved conflicts

    Lack of committed, dedicated resources

    Lack of understanding of project management

    2

  • 8/10/2019 Project Scope - Project Management

    3/23

  • 8/10/2019 Project Scope - Project Management

    4/23

    Jody

    Tassno

    Proj Charter: daftar peserta

    4

    Isabelle de Zegher [email protected] +41 61 3242592

    Charlie Mead [email protected]

    Georges De Moor [email protected]

    Eric Morincomme [email protected] +32 3 444 7512

    Christel Daniel [email protected] +33 660 484133

    Philippe Lambin [email protected] Zahlmann [email protected] +49 9131 84 7944

    Ulrike Schwarz-Boeger [email protected] +49 89 4140 2409

    Piere-Yves Lastic [email protected] +33 145 362591

    Suzanne Markel-Fox [email protected] +1 610 787 3862

    Sarah Payne [email protected] +44 7896 568458

    Isabelle de Zegher [email protected] +41 79 8241110

    Johan van der Lei [email protected] +31 10 408 7050Marc Peeters [email protected] +41 79 788 65 92

    Rob Thwaites [email protected] +44 208 966 4816

    Michael Thick [email protected]

  • 8/10/2019 Project Scope - Project Management

    5/23

    Jody

    Tassno

    Statement Of Work (SOW)

    Uraian resmi tertulis berisi

    permintaan minimum yang

    harus dilakukan kontraktor.

    5

  • 8/10/2019 Project Scope - Project Management

    6/23

    Jody

    Tassno

    Isian SOW1. Establish a preliminary scope statement ( i.e., the purpose or

    objective of your procurement)

    2. List the tasks to be performed ( i.e., All performancerequirements you intend the contractor to satisfy, allrequirements that the contractor must comply with during

    contract performance )3. Group similar and related tasks.

    4. Organize the tasks in logical sequence

    5. Identify the input ( Required resources to perform the tasks)

    6. Identify the output ( Required results or deliverables )

    7. Identify the timeline or frequency of the deliverables (output)8. Develop the parameters for acceptable quality and performance

    9. Determine how you will monitor the deliverables

    6

  • 8/10/2019 Project Scope - Project Management

    7/23

    Jody

    Tassno

    Project Scope Management

    Scopeadalah seluruh pekerjaanyang diperlukan untuk

    mendapatkan hasil proyek serta proses yang digunakannya

    Deliverableadalah produk/jasa/sistem yang dihasilkan dalam

    bagian proyek, seperti hardware atau software, dokumen

    perencanaan, risalah rapat

    Project scope management termasuk proses2 dalam

    menentukan dan mengendalikan apa yang termasuk dan tidak-

    termasuk dalam proyek.

    7

  • 8/10/2019 Project Scope - Project Management

    8/23

    Jody

    Tassno

    Proses Pengelolaan Scope Proyek Scope planning:menetapkan bagaimana scope akan ditentukan,

    diperiksa, dan dikendalikan

    Scope definition: meninjau pernyataan proyek dan pernyataan scope

    awal dan menambahkan informasi yang dibutuhkan agar dapat

    disepakati

    Membuat WBS: memilah-milah proyek menjadi bagian yang lebih kecil

    dalam bentuk yang manageable

    Scope verification: penerimaan formal terhadap scope proyek

    Scope control: mengendalikan perubahan dalam scope proyek.

    8

  • 8/10/2019 Project Scope - Project Management

    9/23

    Jody

    TassnoScope Planning and the

    Scope Management Plan

    Scope management plan adalah suatu dokumen yang

    didalamnya termasuk bagaimana team menyiapkan

    project scope statement, membuat WBS, memeriksahasil proyek, dan mengendalikan perubahan dalam

    scope

    Asupannya mencakupproject charter,preliminary scope

    statement, danproject management plan.

    9

  • 8/10/2019 Project Scope - Project Management

    10/23

    Jody

    Tassno

    Project Scope Statement

    Scope statement awal, project charter,

    organizational process, dan approved change

    requestssebagai bahan utama membuat

    project scope statement

    Dengan berjalannya waktu scope proyek akan

    semakin jelas dan spesifik.

    10

  • 8/10/2019 Project Scope - Project Management

    11/23

    Jody

    Tassno

    Work Breakdown Structure

    WBS adalah pengelompokan pekerjaan berdasarkan

    produk(deliverable) yang mendefinisikan scope proyek.

    WBS merupakan dokumen dasar yang merupakan landasan bagi

    perencanaan jadwal, biaya, sumberdaya dan perubahan.

    Penguraian(decomposition) adalah memilah hasil proyek menjadi

    bagian lebih kecil.

    Paket kerja adalah tugas terbawah dalam tingkatan WBS.

    11

  • 8/10/2019 Project Scope - Project Management

    12/23

    Jody

    Tassno

    Penguraian WBS

    12

    Mission

    Project Goal

    Statement

    Objective

    Major Step

    Activity

    Task Task Task Task Task Task Task TaskTask Task

    Objective

    Major Step

    Objective

    Major Step

    Activity Activity Activity Activity

    Level 1

    Level 2

    Level 3

  • 8/10/2019 Project Scope - Project Management

    13/23

    Jody

    Tassno

    WBS Proyek Intranet

    13

  • 8/10/2019 Project Scope - Project Management

    14/23

    Jody

    Tassno

    WBS Intranet Tabular

    14

    1.0 Concept

    1.1 Evaluate current systems

    1.2 Define Requirements

    1.2.1 Define user requirements

    1.2.2 Define content requirements

    1.2.3 Define system requirements

    1.2.4 Define server owner requirements

    1.3 Define specific functionality

    1.4 Define risks and risk management approach

    1.5 Develop project plan

    1.6 Brief Web development team2.0 Web Site Design

    3.0 Web Site Development

    4.0 Roll Out

    5.0 Support

  • 8/10/2019 Project Scope - Project Management

    15/23

    Jody

    Tassno

    Membuat WBS Dengan petunjuk: ada organisasi yang memiliki, seperti DOD

    Cara analogi: dari proyek yang sejenis, sesuaikan dengan proyek

    kita

    Cara top-down: mulai dengan bagian yang terbesar dan uraikan ke

    bawah

    Cara bottom-up : mulai dengan kegiatan khusus, naikan ke atas

    (role-up)

    Caramind mapping suatu teknik seperti pencabangan dari suatu

    gagasan inti.

    15

  • 8/10/2019 Project Scope - Project Management

    16/23

    Jody

    Tassno

    Kamus WBS dan Dasar Cakupan

    Beberapa kegiatan WBS agak kurang jelas sehingga perlu

    diterangkan sehingga dapat diperkirakan waktu dan biaya

    untuk mengerjakannya

    KamusWBS adalah dokumen yang menjelaskan secara rinci

    tentang setiap bagian WBS

    Pernyataanproject scopedengan WBS dan kamus WBS-nya

    membentuk scope baseline, yang digunakan untuk

    mengukur kinerja pencapaian proyek.

    16

  • 8/10/2019 Project Scope - Project Management

    17/23

    Jody

    Tassno

    Paket Kerja Bagian terbawah WBS yang disepakati sebagai alat pengelolaan,

    dengan maksud

    Pendelegasian tanggungjawab dan wewenang

    Pertanggungjawaban pekerjaan

    Merupakan building blockbagi Project Baseline Plan

    Memberikan dasar umum untuk

    Memprakirakan Scope, Waktu, Sumberdaya, dan Resiko

    Memperbandingkan antara rencana dengan aktual.

    17

  • 8/10/2019 Project Scope - Project Management

    18/23

    Jody

    Tassno

    Tabel Penanggungjawab

    18

    Project Name Date

    Task Smith Johnson Tully Hughs Person n Hours

    1.1 6 R 1 1 2 2 12

    1.2 3 3 R 2 3 3 14

    1.3 1 2 3 6 6 R 181.4 2 1 2 R 2 4 11

    1.5 4 1 1 3 R 5 14

    1.6 3 2 2 R 2 2 11

    1.7 2 1 2 5 R 3 13

    m-th task

    Total hours 21 11 13 23 25 93

    R - Resposible engineer, in-charge

  • 8/10/2019 Project Scope - Project Management

    19/23

    Jody

    Tassno

    Memadukan WBS

    19

  • 8/10/2019 Project Scope - Project Management

    20/23

    Jody

    Tassno

    Scope Verification

    Tidak mudah membuat scope statementdan WBS untuk

    proyek

    Demikian juga untuk memeriksa dan mengujinya, terutamaagar tidak banyak perubahan

    Scope verification harus dapat diterima oleh pemangku-

    kepentingan

    Penerimaan biasanya dengan pemeriksaan oleh

    pelanggan.

    20

  • 8/10/2019 Project Scope - Project Management

    21/23

    Jody

    Tassno

    Scope Control

    Scope controlmencakup pengendalian perubahan2nya

    Sasaran scope control untuk:

    Mengetahui penyebab2 perubahan

    Menjamin bahwa perubahan bagian pengendalian perubahan yang

    terpadu

    Mengelola perubahan pada saat terjadinya

    Varianceadalah perbedaan antara kinerja yang direncanakan

    dengan realisasinya.

    21

  • 8/10/2019 Project Scope - Project Management

    22/23

    Jody

    TassnoMengurangi Permasalahan

    dalam Scope

    1. Realistik

    2. Libatkan pengguna

    3. Gunakan perangkat dan piranti

    4. Ikuti proses manajemen proyek.