Guillemont - Hart District...255 Site Reference SHL100 Site Name Sun Park, Guillemont Park North...
Transcript of Guillemont - Hart District...255 Site Reference SHL100 Site Name Sun Park, Guillemont Park North...
-
253
Guillemont
Site Ref
Site Name
SHL100
Sun Park, Guillemont Park North
-
254
-
255
Site Reference SHL100
Site Name Sun Park, Guillemont Park North
Site Address Minley Road, Blackwater, Camberley, Surrey, GU17 9DG
Parish Blackwater and Hawley
Source of Site 1 (Sites submitted to the Council by developers/ land owners/ agents)
Site Size (ha) 12
Estimate of potential
housing capacity
313
(outstanding undecided planning application 17/00771/FUL)
Current Land Uses 3 self-contained office HQ buildings comprising approximately
30,000sqm with ancillary car parking and landscaping. The site has been
vacant since 2011.
Suitability Policy Constraints
The site is situated within the Guillemont Barracks settlement boundary
as shown in the adopted Local Plan (Replacement) 1996-2006.
Physical
The northern part of the site is in flood zones 2 and 3. There are small
areas within the site that are indicated to be at risk from surface water
flooding. Approximately 40% of the site is at risk of reservoir flooding.
Approximately 70% of the site has potential for groundwater flooding
at the surface and the remaining areas has potential for groundwater
flooding to basement properties.
Landscape, nature and heritage
There are no listed buildings, Conservation Areas, Scheduled
Monuments, Historic Parks and Gardens, National Nature Reserves,
Local Nature Reserves, ancient woodland, Tree Preservation Orders or
Public Rights of Way in the vicinity of the site or close enough to be
affected by the development of the site;
The northern part of the site is within 400m of the SPA.
The site is adjacent to a Site of Nature Conservation (SINC) and there
are SSSIs in the vicinity.
Environmental/amenity impacts
n/a
Recommendations for
overcoming
constraints
The northern part of the site that is within 400m of the SPA should not
be built upon. A contribution towards SPA mitigation would be required.
Any development should be steered towards flood zone 1. Mitigation
relating to groundwater and surface water flooding may be advisable.
Adverse impacts on the nearby SSSIs and SINCs should be avoided.
Availability Land Ownership: It has been confirmed that the land is available for
development (September 2017).
-
256
Achievability No significant market, cost or delivery factors have been identified,
development at this site is considered to be economically viable,
therefore site considered to be achievable.
Deliverability Deliverable (within 5 years) X
Developable (within 6-15 years)
Not currently developable
-
257
-
258