Integrating Blackwater & South Blackwater Mines
David RuddellFebruary 2003
NSW Coal Prep Society Presentation – Feb 2003
Blackwater / South Blackwater Integration
• Blackwater Overview• Safety• Coal Processing Integration
• Organisation• Processing• Quality • Mine – Port Modelling
• Key Milestones
NSW Coal Prep Society Presentation – Feb 2003
Capella
Dysart
BlackwaterEMERALD
MACKAY
Clermont
GLADSTONE
PEAK DOWNS
NORWICH PARK
BLACKWATER
GREGORY
SOUTH WALKER CREEK
SARAJI
CRINUM
RIVERSIDE
GOONYELLA
Date 18.10.2002
NSW Coal Prep Society Presentation – Feb 2003
ML70167
ML1767
ML1829
ML1860 ML1907 ML
70139
ML70091
ML1771
ML1772
ML 1800
ML 70104ML 1760
ML 1759
ML 1762
ML 70103
ML1812
ML1792
ML1773
ML70091
CAPRICORNHIGHWAY
Mining Lease
Mineral Development Licence
Mined area
Future mining
COOK CPP
BLACKWATER MINE
COOKTown of Blackwater
MDL155
MDL
1 89
MDL155
South CPP(SCPP)
North CPP(NCPP)
Thermal Coal Plant (TCP)
Industrial Facility
NSW Coal Prep Society Presentation – Feb 2003
BLACKWATER
SOUTH BLACKWATERMining Lease
Mined Area
Future Mining
NSW Coal Prep Society Presentation – Feb 2003
Blackwater Project Overview
• BHP Blackwater - 36 years old ~8mtpa YEJ00
• South Blackwater - 31 years old ~4.5mtpa YEJ00
• Integration project objective - join Blackwater & South Blackwater mines to produce at 13.5Mtpa sustained rate from 31 Dec’01
• Capital expenditure - $115m on infrastructure, land & mining equipment
• Operating Contracts – $53m Pre-strip, pit development• Equipment relocations to Blackwater site• Closure of underground mines – Laleham & Kenmare
NSW Coal Prep Society Presentation – Feb 2003
Safety
• Integration of Blackwater & South Blackwater systems• Traffic Rules• Emergency Response Systems• Hazardous Work , Working @ Heights• Fitness for Work• Black Coal Competencies
• Standard Operating Procedures (SOP’s) Implementation
• Management of contractors – mining / construction
• Critical risk assessments• Construction• Operational
NSW Coal Prep Society Presentation – Feb 2003
Project Management
NSW Coal Prep Society Presentation – Feb 2003
CHPP Organisation
Laboratory
Ops / Maint
TCP Ops
Shift Coordinators
Senior ProcessingCoordinator
BW
Laboratory
Operators / Maint7 days
Ops / Maint5 days
Shift Coordinators
Senior ProcessingCoordinator
SBW
MaintenancePlanners
Day MaintenanceCrews
Maintenance CoordinatorElect Eng Mgr - CPP's
Senior MaintenanceCoordinator
Coal QualityOfficer
Coal QualityCoordinator
PlantMetallurgist
Senior ProcessEngineer
CPP Manager
NSW Coal Prep Society Presentation – Feb 2003
NCPP Configuration
NSW Coal Prep Society Presentation – Feb 2003
SCPP Configuration
NSW Coal Prep Society Presentation – Feb 2003
Processing
• Trial washing – Blackwater coals in SCPP
• SCPP Plant modifications – input / output product handling
• ROM upgrades – blasted vs non blasted coal
• Metallurgical Plan• Consumable reduction – magnetite, floc, etc• Processing circuit improvements• Fine coal recovery – BW CPP• Fines Circuit – SBW CPP• Bypass optimisation
• Laboratory Reviews
• Operating Practices - alignment
NSW Coal Prep Society Presentation – Feb 2003
Quality Management
• Multiple products – vary specifications
• Developed integrated mine plan
• Managing quality across mine / port
• Implementing Quality Management System @ SBW to obtain ISO 9001 accreditation
• Modelling tools• BHP Transport – mine / rail / port modelling• Integrated mine plans• Managing coal quality / inventory
NSW Coal Prep Society Presentation – Feb 2003
NSW Coal Prep Society Presentation – Feb 2003
NSW Coal Prep Society Presentation – Feb 2003
CHPP Integration
• Combined railings contract
• Blending at Port – stockpile management
• Integrated Coal Sales
• Product Rationalisation
• Reporting & Management Systems• Production / Costs / Quality
NSW Coal Prep Society Presentation – Feb 2003
Integration Project – Key Milestones
• Commenced Integration Nov ‘00• Close Laleham Mine Feb ‘01• Commission 4100 XPB shovel May ’01• Relocate Dragline 39 to Blackwater Aug ’01• Commissioning of 930E Trucks Sep ‘01• Enterprise Bargain Agreement Certified Sep ’01• One Mine Created Sep ‘01• Commission 315 tonne truck fleet Oct ’01• Complete haul road link Dec ’01• Kenmare Operation ceased mining Apr 02• Ramp 8 industrial facility Apr ’02• Commissioning of RH200 Shovel Sept 02• Kress Haulers start commissioning Oct 02
NSW Coal Prep Society Presentation – Feb 2003
Kress HaulersKress Haulers-- first one to be commissioned Oct02first one to be commissioned Oct02
NSW Coal Prep Society Presentation – Feb 2003
Questions?