Ground Floor Plan Roof Plan - live.ipcn.nsw.gov.au · pMrojeactcarthur Memorial Park Varroville...
Transcript of Ground Floor Plan Roof Plan - live.ipcn.nsw.gov.au · pMrojeactcarthur Memorial Park Varroville...
project
Macarthur Memorial Park Varroville Outbuildings166-170 St Andrews Road Varroville Former Coach House -Existing Ground Floor Plan & Roof Plan MD.1011711
www.architecturalprojects.net.auAtel. +61 (0)2 8303 1700
Gary O'Reilly | nominated architect no. 4796
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
drawing plot date revisiondrawing no.Architectural Projects
01W105
FFL + 74.450
GD02
GW02
GW01
GD03
GD01
G02
G03
G01
AD.01 over
123
AD.02 over
MD203
01W105MD203
10m0 1 5
Ground Floor Plan Roof Plan
project
Macarthur Memorial Park Varroville Outbuildings166-170 St Andrews Road Varroville Former Coach House -Existing Elevations MD.1021711
www.architecturalprojects.net.auAtel. +61 (0)2 8303 1700
Gary O'Reilly | nominated architect no. 4796
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
drawing plot date revisiondrawing no.Architectural Projects
RL + 74.26RL + 74.30FFL+ 74.450 RL +74.44
RL + 74.26
AD.01
FFL+ 74.450
RL +74.44 RL +74.45DG02
GD01
FFL+ 74.450 RL + 74.30RL + 74.47
AD.02
FFL+ 74.450
10m0 1 5
South Elevation East Elevation
North Elevation West Elevation
project
Macarthur Memorial Park Varroville Outbuildings166-170 St Andrews Road Varroville Former Coach House-Section 01 MD.1031711
www.architecturalprojects.net.auAtel. +61 (0)2 8303 1700
Gary O'Reilly | nominated architect no. 4796
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
drawing plot date revisiondrawing no.Architectural Projects
10m0 1 5
RL + 74.47
RL + 74.30
AD.01
FFL+ 74.450
Section 01 Former Coach House
project
Macarthur Memorial Park Varroville Outbuildings166-170 St Andrews Road Varroville Cottage -Existing Ground Floor Plan & Roof Plan MD.2011711
www.architecturalprojects.net.auAtel. +61 (0)2 8303 1700
Gary O'Reilly | nominated architect no. 4796
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
drawing plot date revisiondrawing no.Architectural Projects
10m0 1 5
01W206
01W206
MD103
MD103
01W206
01W206
FFL + 74.590
GW03 GW02 GW01
GW04 GW05
GW06
GW
07
GW08
GW09
GW10
G02G01
G03 G04 G05 G06 G09
G08
G07
GD01
GD02
GD03 GD04 GD05
GD
06
GD07
GD08
GD09
GD10
GD11
GW11
GW12
MD103
MD103
Roof PlanCottage -Existing Ground Floor Plan
project
Macarthur Memorial Park Varroville Outbuildings166-170 St Andrews Road Varroville Cottage- Existing Elevations MD.2021711
www.architecturalprojects.net.auAtel. +61 (0)2 8303 1700
Gary O'Reilly | nominated architect no. 4796
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
drawing plot date revisiondrawing no.Architectural Projects
GD09
RL + 73.70RL+ 74.05
FFL + 74.59
GW06
GW04 GW05 GW07GW08
FFL + 74.59RL + 73,70 RL + 73,75
GW09
FFL + 74.59RL + 74,350
GW03GW02GW01 GD01
FFL + 74.59GW10
GW11
10m0 1 5
South Elevation East Elevation
West ElevationNorth Elevation
project
Macarthur Memorial Park Varroville Outbuildings166-170 St Andrews Road Varroville Cottage-Section 01 MD.2031711
www.architecturalprojects.net.auAtel. +61 (0)2 8303 1700
Gary O'Reilly | nominated architect no. 4796
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
drawing plot date revisiondrawing no.Architectural Projects
10m0 1 5
RL + 74.20RL + 74.31FFL + 74.59
Section 01 cottage1:100
0 1 5m2 2.5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
N
issue amendment date
drawing
scale drawn checked
Project No. revision
Electrical
Mechanical
Landscape
Hydraulic
Survey
Structural -
-
-
-
-
-
The contractor shall confirm on site existing dimensions and conditionsbefore commencement of works. All discrepancies should be reportedto the architect for instructions
Reproduction of this drawing is prohibited without the consent ofArchitectural Projects Pty. Ltd.
Architectural Projects does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it maybe based on third party origin information. All information should beverified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
Architectural Projects Pty. Ltd.©
project
Macarthur Memorial ParkVarroville Outbuildings166-170 St Andrews RoadVarroville
Former Coach House Ground Floor Plan
1711
GO
DA.101
plot date
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Gary O'Reilly - Registered Architect No. 4796
Architectural Projects Pty. Ltd.-, ABN 78 003 526 823
tel +61 (02) 8303 1700.-, fax +61(02) 9319 1128.-,
architects@architectural projects.net.au -,www.architectural projects.net.authe Foundry.-, Studio 1 / 181 Lawson St, Darlington.-, NSW Australia 2008
drawing No.
TC1:50 @ A1@ A3-
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Preliminary Issue 01 06 17-
Development Application 25 08 17A
A
01W105
FFL + 74.450
Landing Platform over dotted
GD02
GW02
GW01
GD03
GD01
G02
G03
G01
G04
AD.01 over
1
23
GD04GD05GD06C04
C03 C02 C01
C06 C05
C07C08C09C10C11
AD.02 over
New timber column to support existing double beamover. Footing detail to match column C06
Remove existing temporary steel columns and replacewith new timber column to engineer detail. Carefully cutout section of existing slab for new concrete footing.Finish to top of footing to match existing concrete slab .Provide full depth construction joint between existingslab and new footing
Brick crack repair and brick tie joints to engineersdetails
Remove existing electrical cabinet and conducts andmake good to existing wall
Brick crack repair and brick tiejoints to engineers details
Clean off existing concrete slab
Existing timber beams over (dotted)
New verandah beam over (dotted)
New timber columns to detail
conc-ex
conc-ex
conc-ex
conc-ex
Fall
Fall
NOTES:
1. Conservation Works ScheduleThe conservation works schedule prepared by ArchitecturalProjects should be read in conjunction with these drawings.
2. Existing Concrete SlabsRetain and repair as necessary to match existing slab to G04 -remove all existing soil and organic matter
3. Existing Timber Columns-C 01- C04-Remove lower deteriorated section and scarf newsection to match to existing column-C02- C03- Remove existing non- original column and replace tomatch column C01
4. New Timber Columns-C 05- C06- New to detail-C 07- C11- New timber to detail
5. Existing BrickworkReconstruct existing brickwork where it has collapsed to G01 andG04 (dotted) to match existing using salvaged bricks from site
6. Existing Timber WindowsRetain and protect existing windowsComplete maintenance works as scheduled
7. Existing DoorsRetain and make good existing door frame as scheduledInstall new door as scheduled to detail
8. Roof G04Collect all existing timber shingles that are currently on the groundCollect all loose existing timber shingles and store in palletslocated on site elevated on a temporary brickwork: Install a metalroof over the pallets which is fixed to the top of the pallet forprotection
Complete a photographic record of existing roof framing andconnections to existing roof prior to commencing any work anduse for reference in reconstruction of roofCarefully remove existing timber rafters, which have collapsed.Remove existing attached shingles and store as aboveRemove existing battensAssess each rafter and retain those rafers in suitable conditionRafters not suitable for reuse due to termites or dry rot damageshall be retained for repairs. Store as directed
Reconstruct roof to G04 in accordance with spacing and detail ofexisting roof framing. Timber sizes to match exactly the sizes andprofiles of existing rafters . Timber species to match existingInstall new additional timber rafters to augment the existing roof inaccordance with engineer details.
Install new timber verandah beam to match existing (fragment)Install new timber columns C07-C11 to detailInstall additional beam at mid spam to augment existing roofframing in accordance with engineer details
Install brass plaque confirming reconstruction to details. Refer toConstruction Works Schedule
LEGEND
CRACK REPAIR ANDREPAIR TO ENGINEER DETAILS
EXISTING REGRADING OFEXISTING GROUND LEVEL ( APPROX.)
RECONSTRUCT EXISTING BRICKWORKTO MATCH EXISTING
AdjustableBathBulkheadBrick PavingBasinBrickworkConcrete BlockworkColour backed glassControl JointCement RenderConcrete Roof TilesConcreteCheck On SiteChrome PlatedCupboardCarpetCeramic TilesDownpipeDamp Proof CourseDishwasherExisting Ceiling LevelExisting Floor LevelExisting Ground LineExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFixed GlazingGel coated Fibre GlassFinished Ground LevelFire HydrantFire Hose ReelFinished Floor LevelFloor WasteFinished Structural LevelGranolithicHot PlateHardwoodHot Water UnitLaminate Finish
lvmdfmmcmrmrfmsmsbopglovpbdpcpconcplyrefRLrwhsscshshrskslrfspssststpvtctdtrttftphtrtrztvurvlwbwcwpmwrwrc
LouvreMed. Density FibreboardMirrorMetal CladdingMoisture ResistantMetal RoofingMild SteelMain SwitchboardOpaque GlazingOvenPlasterboardPolished ChromePolished ConcretePlywoodRefrigeratorReduced LevelRainwater HeadSinkSatin ChromeShadow LineShowerSkirtingSlate RoofingSet PlasterStainless SteelStoneStone PavingTerracottaTimber DeckingTerracotta Roof TilesTimber Strip FloorToilet Paper HolderTowel RailTerrazzoTimber Veneer (MDF)UrinalVinylWeatherboardWater ClosetWaterproofing MembraneWardrobeWestern Red Cedar
abbkhdbkpvbsnbwkcblkcbgcjcrcrtconccoscpcbdcptctdpdpcdwECLEFLEGLejFbwkfcFCLfgfgcFGLfhfhrFFLfwFSLgranohphwdhwulam
LEGEND
N
SCALE 1:50@A1
Ground Floor Plan-
01
0 1 5m2 2.5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
N
issue amendment date
drawing
scale drawn checked
Project No. revision
Electrical
Mechanical
Landscape
Hydraulic
Survey
Structural -
-
-
-
-
-
The contractor shall confirm on site existing dimensions and conditionsbefore commencement of works. All discrepancies should be reportedto the architect for instructions
Reproduction of this drawing is prohibited without the consent ofArchitectural Projects Pty. Ltd.
Architectural Projects does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it maybe based on third party origin information. All information should beverified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
Architectural Projects Pty. Ltd.©
project
Macarthur Memorial ParkVarroville Outbuildings166-170 St Andrews RoadVarroville
Former Coach House Roof Plan
1711
GO
DA.102
plot date
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Gary O'Reilly - Registered Architect No. 4796
Architectural Projects Pty. Ltd.-, ABN 78 003 526 823
tel +61 (02) 8303 1700.-, fax +61(02) 9319 1128.-,
architects@architectural projects.net.au -,www.architectural projects.net.authe Foundry.-, Studio 1 / 181 Lawson St, Darlington.-, NSW Australia 2008
drawing No.
TC1:50 @ A1@ A3-
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Preliminary Issue 01 06 17-
Development Application 25 08 17A
A
01W105
Retain and protect existing corrugated steel roofing asscheduled
Install new galvanised steel ogee gutter and .. downpipesas specified
Replace existing timber barge board and install newedge roll to detailReplace existing ridge capping to detail
Reconstruct timber shingles roof under (dotted) to matchexisting
Retain and protect existing timber shingle roofing asspecifiedInstall new galvanised corrugated steel roof as specified
Reconstruct timber roof framing and timber shingles roofingas specifiedInstall new galvanised corrugated steel roofing as specified
Install new galvanised steel ogee gutter and downpipesas specified
Reconstruct timber shingles roof under (dotted) to matchexisting
Reconstruct timber boards and framing to existing catshead landing
Reconstruct timber shingles roof under( dotted ) tomatch existingRepair/infill corrugated steel roofing to match existing
Reconstruct timber shingles roofunder (dotted) to match existing
Replace existing ridge capping todetail
Replace existing timber barge board and install newedge roll to detailReplace existing ridge capping to detail
mrf
mrf
mrf-ex
mrf-ex
NOTES:
1. Conservation Works ScheduleThe conservation works schedule prepared by ArchitecturalProjects should be read in conjunction with these drawings
2. Existing Roof SheetingGenerally retain and protect existing roof sheeting "in situ" .Carefully inspect the roof space and identify areas required forrepairs. Replace and repair to match existing sheeting to achieve awater proof roofing system as scheduledRemove all modern Tek-screws and washersRetain all existing traditional roof fixings and lead washersRetighten all existing fixings to be retained. Replace wheredamaged. Replace missing and damaged lead washersInstall new roof fixings to match existing where missing or fixingsare to be replaced
3. Existing Timber Shingle Roofing.The original timber shingle roof remains extant under the existingcorrugated steel roofingRetain and protect the existing shingle roofing and prevent anydamage to the extant shinglesInspect the underseal of the shingles form with the roof space fortermites damage and active termites
4. Existing Flashingsinstall new lead soaker flashing for the chimney flueInspect all existing flashings and repair as required to matchexisting
5. GuttersReplace existing gutter with new galvanised ogee gutters. Installnew galvanised ogee gutter to the existing verandah
6. DownpipesInstall new 90mm OD galvanised downpipes as noted
AdjustableBathBulkheadBrick PavingBasinBrickworkConcrete BlockworkColour backed glassControl JointCement RenderConcrete Roof TilesConcreteCheck On SiteChrome PlatedCupboardCarpetCeramic TilesDownpipeDamp Proof CourseDishwasherExisting Ceiling LevelExisting Floor LevelExisting Ground LineExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFixed GlazingGel coated Fibre GlassFinished Ground LevelFire HydrantFire Hose ReelFinished Floor LevelFloor WasteFinished Structural LevelGranolithicHot PlateHardwoodHot Water UnitLaminate Finish
lvmdfmmcmrmrfmsmsbopglovpbdpcpconcplyrefRLrwhsscshshrskslrfspssststpvtctdtrttftphtrtrztvurvlwbwcwpmwrwrc
LouvreMed. Density FibreboardMirrorMetal CladdingMoisture ResistantMetal RoofingMild SteelMain SwitchboardOpaque GlazingOvenPlasterboardPolished ChromePolished ConcretePlywoodRefrigeratorReduced LevelRainwater HeadSinkSatin ChromeShadow LineShowerSkirtingSlate RoofingSet PlasterStainless SteelStoneStone PavingTerracottaTimber DeckingTerracotta Roof TilesTimber Strip FloorToilet Paper HolderTowel RailTerrazzoTimber Veneer (MDF)UrinalVinylWeatherboardWater ClosetWaterproofing MembraneWardrobeWestern Red Cedar
abbkhdbkpvbsnbwkcblkcbgcjcrcrtconccoscpcbdcptctdpdpcdwECLEFLEGLejFbwkfcFCLfgfgcFGLfhfhrFFLfwFSLgranohphwdhwulam
LEGEND
N
SCALE 1:50@A1
Roof Plan-
01
0 1 5m2 2.5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
issue amendment date
drawing
scale drawn checked
Project No. revision
Electrical
Mechanical
Landscape
Hydraulic
Survey
Structural -
-
-
-
-
-
The contractor shall confirm on site existing dimensions and conditionsbefore commencement of works. All discrepancies should be reportedto the architect for instructions
Reproduction of this drawing is prohibited without the consent ofArchitectural Projects Pty. Ltd.
Architectural Projects does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it maybe based on third party origin information. All information should beverified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
Architectural Projects Pty. Ltd.©
project
Macarthur Memorial ParkVarroville Outbuildings166-170 St Andrews RoadVarroville
Former Coach House Elevations
1711 DA.103
plot date
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Gary O'Reilly - Registered Architect No. 4796
Architectural Projects Pty. Ltd.-, ABN 78 003 526 823architects@architectural projects.net.au -,www.architectural projects.net.authe Foundry.-, Studio 1 / 181 Lawson St, Darlington.-, NSW Australia 2008
drawing No.
xx1:50 @ A1@ A3-
GO
tel +61 (02) 8303 1700.-, fax +61(02) 9319 1128.-,
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Preliminary Issue 01 06 17-
Development Application 25 08 17A
A
Reconstruct timber beam to head of opening based onextant evidence to existing columns C01, C04Reconstruct 3/no timber louvres over beam based onextant evidence to existing columns C01, C04
Existing timber columns C01, C04 to be replaced asscheduled
Reconstruct the timber boardeddoor as scheduled and to detailDG 04 - DG -06
Reconstruct timber boarded dooras scheduled and to detail
Remove and replace as requiredany existing roof framing to matchexisting
Existing timber columns C02, C03 to be repaired asscheduled to detail
Replace existing gutter and downpipes as scheduled
Remove existing capping to existing barge boardInstall new barge board and galvanised edge roll asspecifiedRemove existing capping to existing barge board
Install new barge board and galvanised edge roll asspecified
Replace existing ridge capping as specified
Repair existing pulley beam . Scarf new section on toexisting beam
Reconstruct existing timber cats head landing to matchexisting
NOTES:
1. Conservation Works ScheduleThe conservation works schedule prepared by ArchitecturalProjects should be read in conjunction with these drawings
2. Existing Roof SheetingGenerally retain and protect existing roof sheeting "in situ" .Carefully inspect the roof space and identify areas required forrepairs. Replace and repair to match existing sheeting to achievea water proof roofing system as scheduledRemove all modern Tek-screws and washersRetain all existing traditional roof fixing and lead washersRetighten all existing fixings to be retained. Replace wheredamaged. Replace missing and damaged lead washersInstall new roof fixings to match existing where missing or fixingsare to be replaced
3. Existing Timber Shingle Roofing to G01-G03The original timber shingle roof remains extant under the existingcorrugated steel roofingRetain and protect the existing shingle roofing and prevent anydamage to the extant shinglesInspect the underside of the shingles from within the roof spacefor termite damage and active termites
8. Roof G04Collect all existing timber shingles that are currently on the groundCollect all loose existing timber shingles and store in palletslocated on site elevated on a temporary brickwork: Install a metalroof over the pallets which is fixed to the top of the pallet forprotection
Complete a photographic record of the existing roof framing andconnections to existing roof prior to commencing any work anduse for reference in reconstruction of roofCarefully remove existing timber rafters, which have collapsed.Remove existing attached shingles and store as aboveRemove existing battensAssess each rafter and retain those rafers in suitable conditionRafters not suitable for reuse due to termites or dry rot damageshall be retained for repairs. Store as directed
Reconstruct roof to G04 in accordance with spacing and detail ofexisting roof framing. Timber sizes to match exactly the sizes andprofiles of existing rafters . Timber species to match existingInstall new additional timber rafters to augment the existing roof inaccordance with engineer details.
Install new timber verandah beam to match existing (fragment)Install new timber columns C07-C11 to detailInstall additional beam at mid spam to augment existing roofframing in accordance with engineer details
Install brass plaque confirming reconstruction to details. Refer toConstruction Works Schedule
DG02DG06DG05DG04 C04C03C02C01
GD01
FFL+ 74.450 EFL
Existing lapped points in corrugated steel roofing to beretained
Cracks repair toexisting render todetail
Reconstruct timber shingles roofunder (dotted) to match existingReconstruct timber shingles roof
under (dotted) to match existingReplace existing timber barge board and install newedge roll to detailReplace existing ridge capping to detail Replace existing timber barge board and install new
edge roll to detailReplace existing ridge capping to detail
cr-ex
mrf-ex
mrf-ex
mrf-ex
dp
Remove existing capping to existing barge boardInstall new barge board and galvanised edge roll asspecified
Remove existing capping to existing barge boardInstall new barge board and galvanised edge roll asspecified
Crack replace to engineer details
Remove existing steel plate and tension bar and makegood to existing wall and render
Replace and clean existing stone foundation asspecified
Repair existing stone sill as specified
Retain and repair existing timber window asscheduled
Remove existing timber door andreconstruct timber window to openingas scheduled
Retain and repair ... reconstruct existingwindow as scheduled
EXISTING BUILDING TO BE DEMOLISHED
REPLACE OR INFILL RENDER TO MATCHEXISTING APPROXIMATE ONLY TO BEDETERMINED ON SITE
CRACK REPAIR TO DETAIL
LEGEND
WG02WG01
AD.02
FFL+ 74.450 EFL
Replace existing timber barge board and install new edge roll to detailReplace existing ridge capping to detail
cr-ex
cr-ex
st-ex
st-ex
st-ex
dpdp
AdjustableBathBulkheadBrick PavingBasinBrickworkConcrete BlockworkColour backed glassControl JointCement RenderConcrete Roof TilesConcreteCheck On SiteChrome PlatedCupboardCarpetCeramic TilesDownpipeDamp Proof CourseDishwasherExisting Ceiling LevelExisting Floor LevelExisting Ground LineExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFixed GlazingGel coated Fibre GlassFinished Ground LevelFire HydrantFire Hose ReelFinished Floor LevelFloor WasteFinished Structural LevelGranolithicHot PlateHardwoodHot Water UnitLaminate Finish
lvmdfmmcmrmrfmsmsbopglovpbdpcpconcplyrefRLrwhsscshshrskslrfspssststpvtctdtrttftphtrtrztvurvlwbwcwpmwrwrc
LouvreMed. Density FibreboardMirrorMetal CladdingMoisture ResistantMetal RoofingMild SteelMain SwitchboardOpaque GlazingOvenPlasterboardPolished ChromePolished ConcretePlywoodRefrigeratorReduced LevelRainwater HeadSinkSatin ChromeShadow LineShowerSkirtingSlate RoofingSet PlasterStainless SteelStoneStone PavingTerracottaTimber DeckingTerracotta Roof TilesTimber Strip FloorToilet Paper HolderTowel RailTerrazzoTimber Veneer (MDF)UrinalVinylWeatherboardWater ClosetWaterproofing MembraneWardrobeWestern Red Cedar
abbkhdbkpvbsnbwkcblkcbgcjcrcrtconccoscpcbdcptctdpdpcdwECLEFLEGLejFbwkfcFCLfgfgcFGLfhfhrFFLfwFSLgranohphwdhwulam
LEGEND
SCALE 1:50@A1
North Elevation-
01
SCALE 1:50@A1
West Elevation-
02
0 1 5m2 2.5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
issue amendment date
drawing
scale drawn checked
Project No. revision
Electrical
Mechanical
Landscape
Hydraulic
Survey
Structural -
-
-
-
-
-
The contractor shall confirm on site existing dimensions and conditionsbefore commencement of works. All discrepancies should be reportedto the architect for instructions
Reproduction of this drawing is prohibited without the consent ofArchitectural Projects Pty. Ltd.
Architectural Projects does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it maybe based on third party origin information. All information should beverified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
Architectural Projects Pty. Ltd.©
project
Macarthur Memorial ParkVarroville Outbuildings166-170 St Andrews RoadVarroville
Former Coach House Elevations
1711 DA.104
plot date
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Gary O'Reilly - Registered Architect No. 4796
Architectural Projects Pty. Ltd.-, ABN 78 003 526 823architects@architectural projects.net.au -,www.architectural projects.net.authe Foundry.-, Studio 1 / 181 Lawson St, Darlington.-, NSW Australia 2008
drawing No.
xx1:50 @ A1@ A3-
GO
tel +61 (02) 8303 1700.-, fax +61(02) 9319 1128.-,
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Preliminary Issue 01 06 17-
Development Application 25 08 17A
A
Reconstruct existing roof framing of timber shinglesroofing to detailInstall new galvanised steel corrugated roofing
Repair existing pulley beam. Scarf newsection on to existing beam to match
Reconstruct existing timbercats head landing to matchexisting
WG01
C07C08C09C10C11
NOTES:
1. Conservation Works ScheduleThe conservation works schedule prepared by ArchitecturalProjects should be read in conjunction with these drawings
2. Existing Roof SheetingGenerally retain and protect existing roof sheeting "in situ" .Carefully inspect the roof space and identify areas required forrepairs. Replace and repair to match existing sheeting to achievea water proof roofing system as scheduledRemove all modern Tek-screws and washersRetain all existing traditional roof fixing and lead washersRetighten all existing fixings to be retained. Replace wheredamaged. Replace missing and damaged lead washersInstall new roof fixings to match existing where missing or fixingsare to be replaced
3. Existing Timber Shingle Roofing to G01-G03The original timber shingle roof remains extant under the existingcorrugated steel roofingRetain and protect the existing shingle roofing and prevent anydamage to the extant shinglesInspect the underside of the shingles from within the roof spacefor termite damage and active termites
8. Roof G04Collect all existing timber shingles that are currently on the groundCollect all loose existing timber shingles and store in palletslocated on site elevated on a temporary brickwork: Install a metalroof over the pallets which is fixed to the top of the pallet forprotection
Complete a photographic record of the existing roof framing andconnections to existing roof prior to commencing any work anduse for reference in reconstruction of roofCarefully remove existing timber rafters, which have collapsed.Remove existing attached shingles and store as aboveRemove existing battensAssess each rafter and retain those rafers in suitable conditionRafters not suitable for reuse due to termites or dry rot damageshall be retained for repairs. Store as directed
Reconstruct roof to G04 in accordance with spacing and detail ofexisting roof framing. Timber sizes to match exactly the sizes andprofiles of existing rafters . Timber species to match existingInstall new additional timber rafters to augment the existing roof inaccordance with engineer details.
Install new timber verandah beam to match existing (fragment)Install new timber columns C07-C11 to detailInstall additional beam at mid spam to augment existing roofframing in accordance with engineer details
Install brass plaque confirming reconstruction to details. Refer toConstruction Works Schedule
FFL+ 74.450 EFL
Retain and protect existing timber shingle roof asspecified
Lapped joint to new roof sheeting as specified
Reconstruct brick wall to support verandah beam
New timber columns and verandah beam to detail C07-C11
Install new galvanised steel ridge capping
Reconstruct brick wall to supportverandah beam
Install new roof sheeting as specified
Reconstruct timber shingles roof under (dotted) to matchexisting
Reconstruct timber shingles roofunder (dotted) to match existing
mrf
mrf
dp dp
fbk-ex fbk-ex
AD.01
FFL+ 74.450 EFL
Repair existing pulley beam. Scarfnew section on to existing beam tomatch
Reconstruct existingtimber cats headlanding to matchexisting
Reconstruct existingtimber cats head landingto match existing
Crack repair to engineerdetail
Remove existing steel plate and tension barand make good to existing wall and render
Reconstruct timber door reusing salvage timber boards from GW03
cr-ex cr-ex cr-ex
dp
dp
EXISTING BUILDING TO BE DEMOLISHED
REPLACE OR INFILL RENDER TO MATCHEXISTING APPROXIMATE ONLY TO BEDETERMINED ON SITE
CRACK REPAIR TO DETAIL
LEGEND
AdjustableBathBulkheadBrick PavingBasinBrickworkConcrete BlockworkColour backed glassControl JointCement RenderConcrete Roof TilesConcreteCheck On SiteChrome PlatedCupboardCarpetCeramic TilesDownpipeDamp Proof CourseDishwasherExisting Ceiling LevelExisting Floor LevelExisting Ground LineExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFixed GlazingGel coated Fibre GlassFinished Ground LevelFire HydrantFire Hose ReelFinished Floor LevelFloor WasteFinished Structural LevelGranolithicHot PlateHardwoodHot Water UnitLaminate Finish
lvmdfmmcmrmrfmsmsbopglovpbdpcpconcplyrefRLrwhsscshshrskslrfspssststpvtctdtrttftphtrtrztvurvlwbwcwpmwrwrc
LouvreMed. Density FibreboardMirrorMetal CladdingMoisture ResistantMetal RoofingMild SteelMain SwitchboardOpaque GlazingOvenPlasterboardPolished ChromePolished ConcretePlywoodRefrigeratorReduced LevelRainwater HeadSinkSatin ChromeShadow LineShowerSkirtingSlate RoofingSet PlasterStainless SteelStoneStone PavingTerracottaTimber DeckingTerracotta Roof TilesTimber Strip FloorToilet Paper HolderTowel RailTerrazzoTimber Veneer (MDF)UrinalVinylWeatherboardWater ClosetWaterproofing MembraneWardrobeWestern Red Cedar
abbkhdbkpvbsnbwkcblkcbgcjcrcrtconccoscpcbdcptctdpdpcdwECLEFLEGLejFbwkfcFCLfgfgcFGLfhfhrFFLfwFSLgranohphwdhwulam
LEGEND
SCALE 1:50@A1
South Elevation-
01
SCALE 1:50@A1
East Elevation-
02
0 1 5m2 2.5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
N
issue amendment date
drawing
scale drawn checked
Project No. revision
Electrical
Mechanical
Landscape
Hydraulic
Survey
Structural -
-
-
-
-
-
The contractor shall confirm on site existing dimensions and conditionsbefore commencement of works. All discrepancies should be reportedto the architect for instructions
Reproduction of this drawing is prohibited without the consent ofArchitectural Projects Pty. Ltd.
Architectural Projects does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it maybe based on third party origin information. All information should beverified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
Architectural Projects Pty. Ltd.©
project
Macarthur Memorial ParkVarroville Outbuildings166-170 St Andrews RoadVarroville
Cottage - Ground Floor Plan
1711
GO
DA.201
plot date
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Gary O'Reilly - Registered Architect No. 4796
Architectural Projects Pty. Ltd.-, ABN 78 003 526 823
tel +61 (02) 8303 1700.-, fax +61(02) 9319 1128.-,
architects@architectural projects.net.au -,www.architectural projects.net.authe Foundry.-, Studio 1 / 181 Lawson St, Darlington.-, NSW Australia 2008
drawing No.
TC1:50 @ A1@ A3-
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Preliminary Issue 01 06 17-
Development Application 25 08 17A
A
01W206
01W206
FFL + 74.590
Hanging beam 2/no (former tie beams paintedwhite)Remove and store for reinstatement to formerlocation
Demolish existing hot water tank
GW03GW02 GW01
GW04 GW05
GW06
GW
07GW08
GW09
GW10
G02G01
G03 G04 G05G06 G09
G08
G07
GD01
GD02
GD03 GD04 GD05
GD
06
GD07
GD08
GD09
GD10
GD11
NOTES:
1. Conservation Works ScheduleThe conservation works schedule prepared by ArchitecturalProjects should be read in conjunction with these drawings
2. Existing timber toungue and Ground floorRetain and protect existing timber flooring
3. Existing Floor CoveringRemove all existing floor coverings including smooth edge, nails,tracks and adhesive
4. Existing Wall LiningsRemove all existing internal hardboard or sheet linings includingany battens to walls to be retained. Take care not to damageexisting substrate (Plaster or framing)Retain and protect all existing timber board linings to room G04
5. Existing WallsDemolish existing walls noted for demolition. Take care whenremoving walls to not damage adjacent wall finishes.
6. Existing Ceiling LiningsDemolish all existing horizontal hardboard or similar sheet liningsTake care not to damage or remove existing ceiling roof tie beams(3no) framing to Dwelling 1
7. Ceiling FramingRemove all lower (horizontal) ceiling Joists to G02 & G03.
Remove all lower (horizontal) ceiling Joists to G01, G04, G05 &G06 only as nominated. Protect and retain existing ceiling framingnominated (evidence of white painted timber).
Remove and salvage 2/ no former ceiling framing roof tie beammembers utilised as hanging beams and store for reuse (evidenceof white painted timber)
8. Existing Roof FramingRetain and protect all existing roof framing including collar tiesand framing to roof ventilator
9. Existing Timber Boarded CeilingRetain and protect all existing timber boarded ceiling linings toroof space
10. Existing Timber Boarded WallRetain and protect all existing timber boarded walls includingthose boards to roof space between G02/G03 and G01/G04(above ceiling framing)
11. Roof VentilatorRetain and protect all framing , boarding, linings and louvres.
12. Existing Hot Water TankRemove existing hot water tank platform and all associatedservices from the roof space
13. Existing Water ServicesCarefully remove all internal services, pipes, conduct switch platesand cables equipment without damaging any adjacent finishes offabric or structure.
14. Existing WindowsRetain and protect window GW03 as an original window. andrepair as scheduled.Demolish existing windows GW01 and GW02Existing windows GW04 GW05 GW06 and GW07 to be retainedand repaired as scheduledRetain existing glass to windows sashes
15. Existing DoorsDemolish existing door leaf to GD01Demolish security door to GD01Demolish existing timber door to fireplace in room G01
EXISTING WALLS TOBE DEMOLISHED
EXISTING FLOORSTO BE DEMOLISHED
EXISTING CEILING LININGTO BE DEMOLISHED
LEGEND
GD12
EXISTING TIE BEAMS TO CEILINGSOVER TO BE RETAINED
EXISTING REGRADING OFEXISTING GROUND LEVEL ( APPROX.)
C1 C2 C3 C4 C5 C6
G10
GW11
DWELLING 2 DWELLING 1
Carefully remove existing concrete paving as theremay be evidence of original paving underneathseek instruction regarding paving once concrete pavinghas been removed
Demolish existing temporary timber columns toverandah . Salvage existing tuimber columns (paintedwhite) for reuseTemporary support verandah until column replacements
Demolish existing concrete slab
3/no existing tie beams to be retained inceiling (evidence of white paint)
Carefully remove existing infill boarding and framing toformer opening. Salvage and store safely external timberboards removed for potential maintenance works
New verandah beam over (dotted)
New timber columns to detail
GW12
Fall
Fall
Fall
tf-ex
tf-ex tf-ex
tf-ex
tf-ex
AdjustableBathBulkheadBrick PavingBasinBrickworkConcrete BlockworkColour backed glassControl JointCement RenderConcrete Roof TilesConcreteCheck On SiteChrome PlatedCupboardCarpetCeramic TilesDownpipeDamp Proof CourseDishwasherExisting Ceiling LevelExisting Floor LevelExisting Ground LineExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFixed GlazingGel coated Fibre GlassFinished Ground LevelFire HydrantFire Hose ReelFinished Floor LevelFloor WasteFinished Structural LevelGranolithicHot PlateHardwoodHot Water UnitLaminate Finish
lvmdfmmcmrmrfmsmsbopglovpbdpcpconcplyrefRLrwhsscshshrskslrfspssststpvtctdtrttftphtrtrztvurvlwbwcwpmwrwrc
LouvreMed. Density FibreboardMirrorMetal CladdingMoisture ResistantMetal RoofingMild SteelMain SwitchboardOpaque GlazingOvenPlasterboardPolished ChromePolished ConcretePlywoodRefrigeratorReduced LevelRainwater HeadSinkSatin ChromeShadow LineShowerSkirtingSlate RoofingSet PlasterStainless SteelStoneStone PavingTerracottaTimber DeckingTerracotta Roof TilesTimber Strip FloorToilet Paper HolderTowel RailTerrazzoTimber Veneer (MDF)UrinalVinylWeatherboardWater ClosetWaterproofing MembraneWardrobeWestern Red Cedar
abbkhdbkpvbsnbwkcblkcbgcjcrcrtconccoscpcbdcptctdpdpcdwECLEFLEGLejFbwkfcFCLfgfgcFGLfhfhrFFLfwFSLgranohphwdhwulam
LEGEND
SCALE 1:50@A1
Ground Floor Demolition Plan-
01
0 1 5m2 2.5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
N
issue amendment date
drawing
scale drawn checked
Project No. revision
Electrical
Mechanical
Landscape
Hydraulic
Survey
Structural -
-
-
-
-
-
The contractor shall confirm on site existing dimensions and conditionsbefore commencement of works. All discrepancies should be reportedto the architect for instructions
Reproduction of this drawing is prohibited without the consent ofArchitectural Projects Pty. Ltd.
Architectural Projects does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it maybe based on third party origin information. All information should beverified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
Architectural Projects Pty. Ltd.©
project
Macarthur Memorial ParkVarroville Outbuildings166-170 St Andrews RoadVarroville
Cottage - Roof Plan
1711
GO
W.202
plot date
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Gary O'Reilly - Registered Architect No. 4796
Architectural Projects Pty. Ltd.-, ABN 78 003 526 823
tel +61 (02) 8303 1700.-, fax +61(02) 9319 1128.-,
architects@architectural projects.net.au -,www.architectural projects.net.authe Foundry.-, Studio 1 / 181 Lawson St, Darlington.-, NSW Australia 2008
drawing No.
TC1:50 @ A1@ A3-
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Preliminary Issue 01 06 17-
Development Application 25 08 17A
A
01W206
01W206
Trim off folded roof flush with barge board and installnew galvanised edge roll to trim roofing
NOTES:
1. Conservation Works ScheduleThe conservation works schedule prepared by ArchitecturalProjects should be read in conjunction with these drawings
2. Existing Roof SheetingGenerally retain and protect existing roof sheeting "in situ" .Carefully inspect the roof space and identify areas required forrepairs. Replace and repair to match existing sheeting to achieve awater proof roofing system as scheduledRemove all modern Tek-screws and washersRetain all existing traditional roof fixings and lead washersRetighten all existing fixings to be retained. Replace wheredamaged. Replace missing and damaged lead washersInstall new roof fixings to match existing where missing or fixingsare to be replaced
3. Existing Timber Shingle RoofingThe original timber shingle roof remains extant under the existingcorrugated steel roofingRetain and protect the existing shingle roofing and prevent anydamage to the extant shinglesInspect the underside of the shingles from within the roof space fordry, rot, termite damage and active termites
4. Existing Flashingsinstall new lead soaker flashing for the chimney flueInspect all existing flashings and repair as required to matchexisting
5. GuttersReplace existing gutter with new galvanised ogee gutters. Installnew galvanised ogee gutter to the existing verandah
6. DownpipesInstall new 90mm OD galvanised downpipes as noted
7. Existing Fascias and Barge BoardsRemove and replace existing timber fascia and barge boardswith new barge boards as specified
8. Existing Roof VentilatorRemove corrugated roof sheeting to the vertical faces and salvagefor reuseRepair and make good to existing framing, cladding and louvres asrequired.Install new timber shingle roof to match existingInstall bronze insect mesh to the inside frame of the louvresReinstate corrugated steel roofing and capping: over timber shingleroofing
9. Existing Masonry WallsInstall a new damp proof course to the full depth of the brick wall toall masonry walls as specified. Damp proofing course to be installedimmediately above the timber flooring
DEMOLISH EXISTING ROOF
REMOVE EXISTING ROOF SHEETING AND SALVAGE
AREA OF SPECIFIC REPAIRS TO EXISTING ROOF SHEETING
LEGEND
EXISTING BUILDING DEMOLISHED
Install new galvanised ogee gutter as specified toexisting verandah
Install new lead soaker flashing to existing chimney flue
Remove existing ridge capping and replace to matchexisting
Remove existing edge cappingInstall new galvanised edge roll to trim existing roofing
Remove and replace existing gutter with new galvanisedogee gutter as specified
Replace existing timber fascia as specified
Remove existing roofing and capping and salvage forre-installationInstall new timber shingle roof to match existingRe install existing corrugated sheet roofing and cappingto match existing prior to removal
Remove existing edge cappingInstall new galvanised edge roll to trim existing roofing
Replace existing barge boards as specified
Existing lapped joints in corrugated steel roofing to beretained
Install new timberbarge boards asspecified . Installnew existing edgeroll to trim existingroofing
Replace existing timber barge boards as specifiedand install new edge rolls as specified
mrf-ex
mrf-ex
mrf-ex
mrf-ex
mrf-ex
mrf-ex
AdjustableBathBulkheadBrick PavingBasinBrickworkConcrete BlockworkColour backed glassControl JointCement RenderConcrete Roof TilesConcreteCheck On SiteChrome PlatedCupboardCarpetCeramic TilesDownpipeDamp Proof CourseDishwasherExisting Ceiling LevelExisting Floor LevelExisting Ground LineExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFixed GlazingGel coated Fibre GlassFinished Ground LevelFire HydrantFire Hose ReelFinished Floor LevelFloor WasteFinished Structural LevelGranolithicHot PlateHardwoodHot Water UnitLaminate Finish
lvmdfmmcmrmrfmsmsbopglovpbdpcpconcplyrefRLrwhsscshshrskslrfspssststpvtctdtrttftphtrtrztvurvlwbwcwpmwrwrc
LouvreMed. Density FibreboardMirrorMetal CladdingMoisture ResistantMetal RoofingMild SteelMain SwitchboardOpaque GlazingOvenPlasterboardPolished ChromePolished ConcretePlywoodRefrigeratorReduced LevelRainwater HeadSinkSatin ChromeShadow LineShowerSkirtingSlate RoofingSet PlasterStainless SteelStoneStone PavingTerracottaTimber DeckingTerracotta Roof TilesTimber Strip FloorToilet Paper HolderTowel RailTerrazzoTimber Veneer (MDF)UrinalVinylWeatherboardWater ClosetWaterproofing MembraneWardrobeWestern Red Cedar
abbkhdbkpvbsnbwkcblkcbgcjcrcrtconccoscpcbdcptctdpdpcdwECLEFLEGLejFbwkfcFCLfgfgcFGLfhfhrFFLfwFSLgranohphwdhwulam
LEGEND
SCALE 1:50@A1
Roof Plan-
01
LEGEND
0 1 5m2 2.5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
issue amendment date
drawing
scale drawn checked
Project No. revision
Electrical
Mechanical
Landscape
Hydraulic
Survey
Structural -
-
-
-
-
-
The contractor shall confirm on site existing dimensions and conditionsbefore commencement of works. All discrepancies should be reportedto the architect for instructions
Reproduction of this drawing is prohibited without the consent ofArchitectural Projects Pty. Ltd.
Architectural Projects does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it maybe based on third party origin information. All information should beverified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
Architectural Projects Pty. Ltd.©
project
Macarthur Memorial ParkVarroville Outbuildings166-170 St Andrews RoadVarroville
Cottage - Elevations
1711 W.203
plot date
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Gary O'Reilly - Registered Architect No. 4796
Architectural Projects Pty. Ltd.-, ABN 78 003 526 823architects@architectural projects.net.au -,www.architectural projects.net.authe Foundry.-, Studio 1 / 181 Lawson St, Darlington.-, NSW Australia 2008
drawing No.
xx1:50 @ A1@ A3-
GO
tel +61 (02) 8303 1700.-, fax +61(02) 9319 1128.-,
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Preliminary Issue 01 06 17-
Development Application 25 08 17A
A
Remove existing temporary columnRetain existing timber column scarf a newlower section to the column (to match theexisting ) with new concealed galvanisedstirrup to detail (typical)
Retain existing timber boardingto roof ventilator
Remove existing capping to existing barge boardInstall new barge board and galvanised edge rollas specified
mrf-ex
FFL + 74.59 EFL
Infill render to detail Crack repair to existingrender to engineer detail
Demolish existing electricalcabinet and condiuitsMake good to existing render
Existing ground line (dotted) New ground line
Remove existing roofing and capping and salvage forre-installationInstall new timber shingles roofing to match existing .Re-install existing corrugated steel roof and capping tomatch existing prior to removal
Demolish existing buildings
New timber boards to match existing toverandah ends
Repair /replace existing timbercolumns as specified
cf-ex
cf-ex
cf-ex
cf-ex
wb-ex
wb
dp
Fall
Fall
dp
RL + 74.59
Remove existing corrugated steel cladding to roofSalvage for future use
Demolish existing metal panelbox
Remove any existing door andinstall new door to detail
Remove existing sheet nailedto verandah beam and makegood
New lead soaker flashing tochimney flue
Carefully remove existing infillboard and framing to formopening Install new timberdoor to detail
Regrade existing ground levelto be a minimum of 200 mmbelow existing floor level withfalls away from the building
existing ground line (dotted)
New ground line
Demolish existing non- original addition to chimney flueSupply and install a lead capping to the fireplace flue
New lead capping to existingchimney flue
NOTES:1. Conservation Works ScheduleThe conservation works schedule prepared by ArchitecturalProjects should be read in conjunction with these drawings
2. Existing servicesRemove all existing services to exterior of the building and makegood.
3. Roof VentilatorRemove corrugated roof sheeting to the vertical faces and salvagefor reuseRepair and make good to existing framing, cladding and louvresas required.Install new timber shingle roof to match existingInstall bronze insect mesh to the inside frame of the louvresReinstate corrugated steel roofing and capping: over timbershingle roofing
4. Existing Roof SheetingGenerally retain and protect existing roof sheeting "in situ" .Carefully inspect the roof space and identify areas required forrepairs. Replace and repair to match existing sheeting to achievea water proof roofing system as scheduledRemove all modern Tek-screws and washersRetain all existing traditional roof fixings and lead washersRetighten all existing fixings to be retained. Replace wheredamaged. Replace missing and damaged lead washersInstall new roof fixings to match existing where missing or fixingsare to be replaced
5. Existing Timber Shingle RoofingThe original timber shingle roof remains extant under the existingcorrugated steel roofingRetain and protect the existing shingle roofing and prevent anydamage to the extant shinglesInspect the underside of the shingles from within the roof spacefor dry, rot, termite damage and active termites
6. Existing External RenderExisting building has been cement renderedHack off existing loose and rummy render. Clean down whererender has been removed or is missing to remove any dust looseor organic materialInstall new render to match the existing render materialcomposition, strength, texture and finish
7. Existing External Timber WeatherboardsGenerally repair all existing external timber weatherboardsWhere possible retain and repair with splice joints or similarmethods with new sections to match.Where replacement is required replace to match existing timberspecies or as approvedReplace profile with a profile that is similar but distinguishablefrom the original (to approved detail) on close inspectionGroup together existing and new boards . New boards should belocated in a group at the bottom of the wall where possible orexcept as noted.
GW01 GW02 GW03
GD12
GW03GW02GW01 GD01
FFL + 74.59 EFL
Remove existing roofing and capping and salvage forre-installationInstall new timber shingles roofing to match existing .Re-install existing corrugated steel roof and capping tomatch existing prior to removal
Remove and replace existing ridge capping with newgalvanised capping as specified
Infill render to be detailed
Infill render to detail
mrf-ex
cr-ex
cr-exwb-ex wb-ex wb-ex
mrf-ex
mrf-ex
mrf-ex
cr-ex
GW10
GW11
dp
wb-exwb-ex
wb-ex
AdjustableBathBulkheadBrick PavingBasinBrickworkConcrete BlockworkColour backed glassControl JointCement RenderConcrete Roof TilesConcreteCheck On SiteChrome PlatedCupboardCarpetCeramic TilesDownpipeDamp Proof CourseDishwasherExisting Ceiling LevelExisting Floor LevelExisting Ground LineExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFixed GlazingGel coated Fibre GlassFinished Ground LevelFire HydrantFire Hose ReelFinished Floor LevelFloor WasteFinished Structural LevelGranolithicHot PlateHardwoodHot Water UnitLaminate Finish
lvmdfmmcmrmrfmsmsbopglovpbdpcpconcplyrefRLrwhsscshshrskslrfspssststpvtctdtrttftphtrtrztvurvlwbwcwpmwrwrc
LouvreMed. Density FibreboardMirrorMetal CladdingMoisture ResistantMetal RoofingMild SteelMain SwitchboardOpaque GlazingOvenPlasterboardPolished ChromePolished ConcretePlywoodRefrigeratorReduced LevelRainwater HeadSinkSatin ChromeShadow LineShowerSkirtingSlate RoofingSet PlasterStainless SteelStoneStone PavingTerracottaTimber DeckingTerracotta Roof TilesTimber Strip FloorToilet Paper HolderTowel RailTerrazzoTimber Veneer (MDF)UrinalVinylWeatherboardWater ClosetWaterproofing MembraneWardrobeWestern Red Cedar
abbkhdbkpvbsnbwkcblkcbgcjcrcrtconccoscpcbdcptctdpdpcdwECLEFLEGLejFbwkfcFCLfgfgcFGLfhfhrFFLfwFSLgranohphwdhwulam
LEGEND
EXISTING BUILDING TO BE DEMOLISHED
REPLACE OR INFILL RENDER TO MATCHEXISTING APPROXIMATE ONLY TO BEDETERMINED ON SITE
CRACK REPAIR TO DETAIL
LEGEND
SCALE 1:50@A1
West Elevation-
01
SCALE 1:50@A1
North Elevation-
01
0 1 5m2 2.5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
issue amendment date
drawing
scale drawn checked
Project No. revision
Electrical
Mechanical
Landscape
Hydraulic
Survey
Structural -
-
-
-
-
-
The contractor shall confirm on site existing dimensions and conditionsbefore commencement of works. All discrepancies should be reportedto the architect for instructions
Reproduction of this drawing is prohibited without the consent ofArchitectural Projects Pty. Ltd.
Architectural Projects does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it maybe based on third party origin information. All information should beverified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
Architectural Projects Pty. Ltd.©
project
Macarthur Memorial ParkVarroville Outbuildings166-170 St Andrews RoadVarroville
Cottage - Elevations
1711 W.204
plot date
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Gary O'Reilly - Registered Architect No. 4796
Architectural Projects Pty. Ltd.-, ABN 78 003 526 823architects@architectural projects.net.au -,www.architectural projects.net.authe Foundry.-, Studio 1 / 181 Lawson St, Darlington.-, NSW Australia 2008
drawing No.
xx1:50 @ A1@ A3-
GO
tel +61 (02) 8303 1700.-, fax +61(02) 9319 1128.-,
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Preliminary Issue 01 06 17-
Development Application 25 08 17A
A
GD09
RL + 74.320
Remove and replace existing ridge capping as specified
New lead soaker flashing to chimney flue
Demolish existing non- original addition to chimney flueSupply and install a lead capping to the chimney flue
Remove existing corrugated steel cladding to roofventilatorSalvage for future use
Retain and protect existing corrugated steel roofing
Install new lead capping to chimney flue
Demolish existing additions (dotted)
NOTES:
1. Conservation Works ScheduleThe conservation works schedule prepared by ArchitecturalProjects should be read in conjunction with these drawings
2. Existing ServicesRemove all existing services to exterior of the building and makegood.
3. Existing Roof VentilatorRemove corrugated roof sheeting to the vertical faces and salvagefor reuseRepair and make good to existing framing, cladding and louvresas required.Install new timber shingle roof to match existingInstall bronze insect mesh to the inside frame of the louvresReinstate corrugated steel roofing and capping: over timbershingle roofing
4. Existing Roof SheetingGenerally retain and protect existing roof sheeting "in situ" .Carefully inspect the roof space and identify areas required forrepairs. Replace and repair to match existing sheeting to achievea water proof roofing system.Remove all modern Tek-screws and washersRetain all existing traditional roof fixings and lead washersRetighten all existing fixing to be retained. Replace wheredamaged. Replace missing and damaged lead washersInstall new roof fixings to match existing where missing or fixingsare to be replaced
5. Existing Timber Shingle Roofing.The original timber shingle roof remains extant under the existingcorrugated steel roofingRetain and protect the existing shingle roofing and prevent anydamage to the extant shinglesInspect the underside of the shingles form with the roof space fordry, rot, termites damage and active termites
6. Existing External RenderExisting building has been cement rendered removedHack off existing loose and rummy render. Clean down whererender has been removed or is missing to remove any dust looseor organic materialInstall new render to match the existing render materialcomposition, strength, texture and finish
7. Existing External Timber WeatherboardsGenerally repair all existing external timber weatherboardsWhere possible retain and repair with splice joints or similarmethods with new sections to match.Where replacement is required replace to match existing timberspecies or as approvedReplace profile with a profile that is similar but distinguishablefrom the original (to approved detail) on close inspectionGroup together existing and new boards . New boards should belocated in a group at the bottom of the wall where possible orexcept as noted.
FFL + 74.59EFL
GW06
Remove sections of deteriorated external timberboarding . Remove sections of loose white boarding .Re-fix loose boardingInstall new timber boarding to match existing
Vertical joint between new and existing timber boards
Reconstruct timber framing to match existingInstall new external timber boarding to match existing
Demolish existing hot water tank platform and makegood
Remove existing roofing and capping and savage forre-installationInstall new timber shingles roofing to match existing .Re-install existing corrugated steel roof and capping tomatch existing prior to removalRepair existing framing , weatherboards and louvres for
ventilation as specified
Replace....
Demolish existing additions (dotted)
New infill framing ... weatherboards to match existing
New ground line
Demolish existingconcrete slab
Existing ground line
wb-ex
cr-ex
GW04
cr-ex
GW05 GW07
GD08
GW08
wb-ex wb wb
mrf-ex
mrf-ex
cr-ex
cr-ex
Remove existing capping to existing barge boardInstall new barge board and galvanised edge roll asspecified
Demolish existing non- original addition to chimney flueSupply and install a led capping to the fireplace flue
Remove existing corrugated steel cladding to roofSalvage for future use
Remove existing temporarycolumnRetain existing timber columnand scarf a new lower sectionto the column (to the column(to match the existing ) withnew concealed galvanisedstirrup to detail (typical)
EFLFFL + 74.59
Demolish existing additions(dotted)
New galvanised ogee gutter as specified
Infill render to detail
Crack repair to detail
New galvanised ogeegutter as specified
Remove existing roofing and capping and salvage forre-installationInstall new timber shingles roofing to match existing .Re-install existing corrugated steel roof and capping tomatch existing prior to removal
Repair existing framing , weatherboards and louvres forventilation as specified
cr-ex
cr-ex
GW09
wb-ex
cr-ex cr-ex
AdjustableBathBulkheadBrick PavingBasinBrickworkConcrete BlockworkColour backed glassControl JointCement RenderConcrete Roof TilesConcreteCheck On SiteChrome PlatedCupboardCarpetCeramic TilesDownpipeDamp Proof CourseDishwasherExisting Ceiling LevelExisting Floor LevelExisting Ground LineExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFixed GlazingGel coated Fibre GlassFinished Ground LevelFire HydrantFire Hose ReelFinished Floor LevelFloor WasteFinished Structural LevelGranolithicHot PlateHardwoodHot Water UnitLaminate Finish
lvmdfmmcmrmrfmsmsbopglovpbdpcpconcplyrefRLrwhsscshshrskslrfspssststpvtctdtrttftphtrtrztvurvlwbwcwpmwrwrc
LouvreMed. Density FibreboardMirrorMetal CladdingMoisture ResistantMetal RoofingMild SteelMain SwitchboardOpaque GlazingOvenPlasterboardPolished ChromePolished ConcretePlywoodRefrigeratorReduced LevelRainwater HeadSinkSatin ChromeShadow LineShowerSkirtingSlate RoofingSet PlasterStainless SteelStoneStone PavingTerracottaTimber DeckingTerracotta Roof TilesTimber Strip FloorToilet Paper HolderTowel RailTerrazzoTimber Veneer (MDF)UrinalVinylWeatherboardWater ClosetWaterproofing MembraneWardrobeWestern Red Cedar
abbkhdbkpvbsnbwkcblkcbgcjcrcrtconccoscpcbdcptctdpdpcdwECLEFLEGLejFbwkfcFCLfgfgcFGLfhfhrFFLfwFSLgranohphwdhwulam
LEGEND
EXISTING BUILDING TO BE DEMOLISHED
REPLACE OR INFILL RENDER TO MATCHEXISTING APPROXIMATE ONLY TO BEDETERMINED ON SITE
CRACK REPAIR TO DETAIL
LEGEND
SCALE 1:50@A1
South Elevation-
01
SCALE 1:50@A1
East Elevation-
01
0 1 5m2 2.5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
issue amendment date
drawing
scale drawn checked
Project No. revision
Electrical
Mechanical
Landscape
Hydraulic
Survey
Structural -
-
-
-
-
-
The contractor shall confirm on site existing dimensions and conditionsbefore commencement of works. All discrepancies should be reportedto the architect for instructions
Reproduction of this drawing is prohibited without the consent ofArchitectural Projects Pty. Ltd.
Architectural Projects does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it maybe based on third party origin information. All information should beverified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
Architectural Projects Pty. Ltd.©
project
Macarthur Memorial ParkVarroville Outbuildings166-170 St Andrews RoadVarroville
Cottage - Section 2
1711 W.205
plot date
25/8/17
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Gary O'Reilly - Registered Architect No. 4796
Architectural Projects Pty. Ltd.-, ABN 78 003 526 823architects@architectural projects.net.au -,www.architectural projects.net.authe Foundry.-, Studio 1 / 181 Lawson St, Darlington.-, NSW Australia 2008
drawing No.
xx1:20,1:50 @ A1
@ A3-GO
tel +61 (02) 8303 1700.-, fax +61(02) 9319 1128.-,
File Path -/Volumes/Server Files/04. CAD/Current projects/1711 166-170 St Andrews Road Varoville/Client/166- 170 St Andrews Road Varoville MD B Action Conservation.pln
Preliminary Issue 01 06 17-
Development Application 25 08 17A
A
Retain and repair as required existing roof ventilatorframing, cladding and louvres as scheduled
Retain and repair as required any existing roof framingto match existing
Demolish existing walls and roof
Remove existing corrugated sheeting roof lanternsalvage for future use
Infill timber ceiling boards around existing tiebeamReinstate 2/no tie beams where missing tomatch the existing
Retain and protect existing roof sheeting and timbershingle roofing under rafter
Existing ground level
Regrade existingground level hereaway from thebuilding
Remove existing walllinings
Retain and protectexisting 3/no roof tiebeams install 2/no ofsalvage tie beamsand infill ceilinglining boards aroundbeam ends
Demolish existingfalse ceiling andframing
Remove all cementrender and replasterwall with lime renderas specified
Existing liningdemolished Installnew timber liningboard as specifiedInstall wall insulationprior to lining wall
New removable hatch to ceiling as specifiedNew trim to existing opening to ceiling / ventilator
Re instate existing timber lining boards loose inceiling frame to former location
Carefully remove 2/ no former roof tie beams andreinstate to former location to detail confirm onsite
Repair timber verandah framing as specified
New ogee gutter as specified
Existing ground level
Retain and protect existing timber lining boards to faceceiling
New timber column as scheduled
Regrade existingground level hereaway from thebuilding
tf-ex tf-ex
wb-ex
NOTES:
1. Conservation Works ScheduleThe conservation works schedule prepared by ArchitecturalProjects should be read in conjunction with these drawings
2. Existing Roof SheetingGenerally retain and protect existing roof sheeting "in situ" .Carefully inspect the roof space and identify areas required forrepairs. Replace and repair to match existing sheeting to achievea water proof roofing system.Remove all modern Tek-screws and washersRetain all existing traditional roof fixing screws and lead washersRetighten all existing fixing to be retained. Replace wheredamaged. Replace missing and damaged lead washersInstall new roof fixings to match existing where missing or fixingsare to be replaced
3. Existing Timber Shingle Roofing.The original timber shingle roof remains extant under the existingcorrugated steel roofingRetain and protect the existing shingle roofing and prevent anydamage to the extant shinglesInspect the underside of the shingles form with the roof space fordry, rot, termites damage and active termitesSeek instructions from heritage architect if damage found as towork required
4. Existing Roof VentilatorRemove corrugated roof sheeting to the vertical faces and salvagefor reuseRepair and make good to existing framing, cladding and louvresas required.Install new timber shingle roof to match existingInstall bronze insect mesh to the inside frame of the louvresReinstate corrugated steel roofing and capping: over timbershingle roofing
5. Existing servicesRemove all existing services to exterior architrave of the buildingand make good.
DGD02
G01
EFL
Remove existing wall linings and make good to existingframing as specified
Infill missing timber boarding to match existing fromloose boards in ceiling with new boards as required
Infill timber ceiling boards around existing andreinstate the beams where missing to matchthe existing
Remove existing roofing and capping and salvage forre-installationInstall new timber shingle roof to match existingReinstall existing corrugated sheet roofing and cappingto match existing prior to removal
Lower existing groundlevel below timberfloor/ framing wherepossible to improveclearence andsubfloor ventilation
Demolish existing wall
Replace DG02 andframe as scheduled
wb-ex
tb-ex tb-ex
tb-ex tb-ex
tb-ex
tb-ex
AdjustableBathBulkheadBrick PavingBasinBrickworkConcrete BlockworkColour backed glassControl JointCement RenderConcrete Roof TilesConcreteCheck On SiteChrome PlatedCupboardCarpetCeramic TilesDownpipeDamp Proof CourseDishwasherExisting Ceiling LevelExisting Floor LevelExisting Ground LineExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFixed GlazingGel coated Fibre GlassFinished Ground LevelFire HydrantFire Hose ReelFinished Floor LevelFloor WasteFinished Structural LevelGranolithicHot PlateHardwoodHot Water UnitLaminate Finish
lvmdfmmcmrmrfmsmsbopglovpbdpcpconcplyrefRLrwhsscshshrskslrfspssststpvtctdtrttftphtrtrztvurvlwbwcwpmwrwrc
LouvreMed. Density FibreboardMirrorMetal CladdingMoisture ResistantMetal RoofingMild SteelMain SwitchboardOpaque GlazingOvenPlasterboardPolished ChromePolished ConcretePlywoodRefrigeratorReduced LevelRainwater HeadSinkSatin ChromeShadow LineShowerSkirtingSlate RoofingSet PlasterStainless SteelStoneStone PavingTerracottaTimber DeckingTerracotta Roof TilesTimber Strip FloorToilet Paper HolderTowel RailTerrazzoTimber Veneer (MDF)UrinalVinylWeatherboardWater ClosetWaterproofing MembraneWardrobeWestern Red Cedar
abbkhdbkpvbsnbwkcblkcbgcjcrcrtconccoscpcbdcptctdpdpcdwECLEFLEGLejFbwkfcFCLfgfgcFGLfhfhrFFLfwFSLgranohphwdhwulam
LEGEND
SCALE 1:20@A1
SectionW20101