Grosskraftwerk Mannheim AG Bilfinger Capital Markets Day 2013

Transcript of Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction...

Page 1: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Grosskraftwerk Mannheim AG

Bilfinger Capital Markets Day 2013

Page 2: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Topics

GKM – Energy for the regionSecuring a reliable power supply

GKM

Our projects for the future

Bilfinger Capital Markets Day | 1

Page 3: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

50 Hz three-phase

alternating current

RWE Generation SE (40 %)

EnBW Erneuerbare und Konventionelle

Erzeugung AG (32 %)

MVV RHE GmbH (28 %)

16.7 Hz single-phase

alternating current

DB Energie GmbH

District heat

MVV RHE GmbH

Reliable, cost-effective and environmentally sound energy for

shareholders and German Rail

Bilfinger Capital Markets Day

Efficient generation of electricity and district heat

GKM generates electricity for over 1.5 million people, trade, industry and railway as well as

heat for about 120,000 households in Mannheim and the region.

| 2| 2

Page 4: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

| 3

Business Figures at a Glance

2012

Previous

year

Total Turnover Million € 459 515

Electricity Million € 420 469

District Heating Million € 39 42

Investments Million € 236 319

Balance Million € 1,434 1,243

Assets in Equipment Million € 1,312 1,112

Equity Million € 114 114

Loans Million € 1,320 1,129

Cashflow Million € 89 84

Profit Million € 6.6 6.6

Employees on 31.12. number 608 610

Apprentices number 80 73

Bilfinger Capital Markets Day

Page 5: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Werkübersicht mit Block 9

Installed gross capacity at present: 1,675 MW (of which 220 MW reserve)

from 2015: 2,146 MW

Overview

2015

FW-Speicher

250 MWth

1500 MWhth

Nachschaltturbinen

Ferndampf

Das GKM erzeugt heute Strom für über 1,5 Millionen Menschen und Wärme für rund

120.000 Haushalte, Gewerbe und Industrie in Mannheim und der Region.

Bilfinger Capital Markets Day | 4

Page 6: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Mannheim

Philippsburg

RDK Karlsruhe

Rheinkraftwerke

Hochrheinkraftwerke

1,675 MW

1,468 MW

Nuclear power plants alreadydeactivated

Obrigheim: 375 MWPhilippsburg 1: 926 MWNeckarwestheim 1: 840 MW

915 MW

Significance of GKM in BW

• largest power plant site

• highest CHP extraction

• 75% of electricity is fed indecentralised

• produces about 10% of German railway electricity

940 MW

1,400 MW

391 MW

395 MW

1,270 MW

294 MW

60 MW

164 MW

32 MW

Illerkraftwerke

398 MW

470 MW + 910 MW PSW

100 MW

90 MW PSW

71 MW

360 MW PSW

What we achieve

| 5Bilfinger Capital Markets Day

Page 7: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Impact of power transition on GKM

Mittwoch, 28.03.2012

Wednesday, 21.03.2007MW

Operation earlier … … and today Planned and actual data

| 6

Saturday, 16.04.2011

Output GKM Planned output GKM

Wednesday, 28.03.2012MW

Today’s requirements mean significantly higher demands on equipment and personnel.

Bilfinger Capital Markets Day

Page 8: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Grid load Germany

70.300 MW

GKM

1.400 MW

5 – Unit operation on 13th February 2012 between 7 am and 8 am

950 MW

Wind / Photovoltaic InstalledcapacityGermany

53.900 MW*

~ 2 %950 MW

of which

available

* Status 2011

GKM – The backbone of power supply

Bilfinger Capital Markets Day | 7

Page 9: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

5 – Unit Operation in February 2012

0

10.000

20.000

30.000

40.000

50.000

60.000

70.000

80.000

08.02. 09.02. 10.02. 11.02.

53,900 MW installed wind/PV capacity

17,400 MWMaximum

12.02. 13.02. 14.02.

Grid load Germany

850 MW Minimum

available wind/PV capacity

MW

Bilfinger Capital Markets Day | 8

Page 10: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

5 – Unit Operation in February 2012

08.02. 09.02. 10.02. 11.02.

53,900 MW installed wind/PV capacity

17,400 MWMaximum

12.02. 13.02. 14.02.

Grid load Germany

850 MW Minimum

available wind/PV capacity

Pumped storage Germany6,500 MW, 40,000 MWh, i.e. 5.7 h

MW

Bilfinger Capital Markets Day | 9

Page 11: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

10 104

19 18

14

11 8 8 8 5 3

24 26

23

21

14 10 87 7

22 22

17

13

1312 12

96

5 4

3

2

22

4 4

5

5

55

5

66

11 12

13

15

1617

18

1920

8

1927 31 33

38 42

0

20

40

60

80

100

120

2011 2015 2020 2025 2030 2035 2040 2045 2050

Fehlende Leistung

Erneuerbare

Speicher

Erdöl

Erdgas

Steinkohle

Braunkohle

Kernkraft

Jahreshöchstlastinkl. 10 % Sicherheit

in GW

lack of supply

renewable

storage

oil

natural gas

hard coal

lignite

nuclear energy

maximum load incl.

10% security

1 considering actually operating thermic power stations, increase of renewable energy and storage.Source: Prognos AG

| 10

Difference of secured net generated output /

annual peak load up to 2050

Bilfinger Capital Markets Day

Page 12: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Bilfinger Capital Markets Day | 11

GKM – Energy for the region

Securing a reliable power supply

GKM

Our projects for the future

Topics

Page 13: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Bilfinger Capital Markets Day | 12

Unit 9

Energy for Mannheim

and the region

Page 14: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Bilfinger Capital Markets Day | 13

Unit 9

Facts and Figures

Planned commissioning 2015

Gross output 911 MWel

Electrical efficiency 46.4 %

District heating with CHP max. 500 MWth

Fuel utilisation with CHP max. 70 %

Railway electricity approx.100 MW

Page 15: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

• Civil works – ARGE (Bilfinger Construction, Züblin, Diringer & Scheidel, Heberger)

• Steam generator – Alstom Power Systems

• Turbine – Alstom Power Systems

• Flue-gas cleaning – Fisia Babcock Environment

• High-pressure pipework – Bilfinger Power Systems / Kraftanlagen München

• Process-control technology and transformers – Siemens

• Frequency converter – ABB

• Feed-water pumps – Sulzer

Unit 9 – Main suppliers

Auftragsvergabe an führende Anlagenbauer mit weltweiten Referenzen.

| 14Bilfinger Capital Markets Day

Page 16: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Block 9 – Modernste Technik

Net efficiency coal-fired power stations

30 %

35 %

38 %

46.4 %

up to 70 %

Efficiency worldwide

Efficiency Europe

Efficiency Germany

Efficiency Unit 9

Fuel-utilisation efficiency

Unit 9 with CHP

Bilfinger Capital Markets Day | 15

Unit 9 – Advanced technology

Page 17: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Block 9 – Unser Beitrag zum Klimaschutz

Comparing CO2 emissions of old and new coal-fired power stations

with equal power generation

Unit 9 contributes

its share to climate

protection by reduced

CO2 emissions

Bilfinger Capital Markets Day | 16

Unit 9 – Our contribution to climate protection

Reduction1.3m t CO2

old

coal-fired

power

stations

Germany

Unit 9Unit 9

with CHP

Reduction1m t CO2

Page 18: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Amazing facts:

300,000 m3 excavated soil

Bilfinger Capital Markets Day | 17

Page 19: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Amazing facts:

160,000 m3 concrete

| 18Bilfinger Capital Markets Day

Page 20: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

| 19

Amazing facts:

160,000 m3 concrete

Bilfinger Capital Markets Day

Page 21: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

| 20Bilfinger Capital Markets Day

Amazing facts:

60,000 t steel construction and reinforcing steel

Page 22: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

District-heat storage module

Dimensioning

Pressureless flat-bottom tank

Effective volume 43,000 m3

Storage temperature 98 °C

Diameter 40 m

Height 36 m

Output 250 MWth

Capacity approx. 1,500 MWhth

Mass flow 6,200 t/h

Main pipes DN 900

Bilfinger Capital Markets Day | 21

Page 23: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

District-heat storage module

Unser Beitrag zur Energiewende: Mehr Flexibilität und höhere Versorgungssicherheit.

• Enables us to react flexibly to volatile infeeds of renewable energy into the

grid and provide security of supplies at the same time.

• Our facility is the most powerful one in Germany.

• The district-heat storage is operated on behalf of MVV Energie.

• The investment of 27m € is made by MVV Energie.

Bilfinger Capital Markets Day | 22

Page 24: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Auxiliary steam generator

GKM’s new starter

Auxiliary steam generators for process steam

to start units

• Consists of 3 steam generators

(powered by natural gas or heating oil)

• Output 49 MW

(steam generation approx. 65 t/h)

• Feeds steam into our own pipeline

system and provides it that way to

every unit

Bilfinger Capital Markets Day | 23

Page 25: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Replacement of switchgears and transformers

Adjusting technology to Unit 9’s output

Bilfinger Capital Markets Day | 24

Page 26: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Gruppe

Schweißtechnische

Lehr- und Versuchsanstalt

Mannheim GmbH

RWE

EnBW

Vattenfall

Evonik

E.ON

CEZ

GDF SUEZ

Research project 725 °C

Bilfinger Capital Markets Day | 25

Page 27: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Bilfinger Capital Markets Day | 26

What we stand for

Efficiency GKM operates one of the most efficient coal-fired power stations in Europe

Backbone of the energy supplyGKM will be the backbone of a reliable long-term energy supply

Protection of environment and climateGKM produces district heat exclusively by combined heat and power generation (CHP)

Investment for the futureGKM is building one of the most sophisticated coal-fired units worldwide

Responsibility beyond the regionGKM takes responsibility and provides the so-called “cold reserve” according to the

request of the State Government of Baden-Württemberg and the Federal Network Agency

High acceptance in the regionGKM stands for an honest and transparent communication policy

Page 28: Grosskraftwerk Mannheim AG - Bilfinger · • largest power plant site • highest CHP extraction • 75% of electricity is fed in decentralised • produces about 10% of German railway

Grosskraftwerk Mannheim AGThank you for your attention and have nice stay!