Griha avoided post construction landfill
15
AVOIDED POST CONSTRUCTION LANDFILL Multi-coloured dustbins/different garbage chut have been provided to building occupants to ensure segregation of waste at source. Dedicated, segregated and hygienic storage space in the project site to store different w before treatment /recycling. Contractual tie-ups with waste recyclers for saf recycling for recyclable wastes like metal, paper, plastic, glass etc. GRIHA criteria : 22 DEEPIKA VERMA (15001506003) M. Arch. (2015-17), 2nd Sem, Department of Architechture, Deenbandhu ChhotuRam University of
-
Upload
deepika-verma -
Category
Design
-
view
134 -
download
0
Transcript of Griha avoided post construction landfill
AVOIDED POST CONSTRUCTION LANDFILLMulti-coloured dustbins/different garbage chutes have been provided to building occupants to ensure segregation of waste at source.Dedicated, segregated and hygienic storage spaces in the project site to store different wastes before treatment /recycling.Contractual tie-ups with waste recyclers for safe recycling for recyclable wastes like metal, paper, plastic, glass etc.
GRIHA
criteria : 22
DEEPIKA VERMA (15001506003) M. Arch. (2015-17), 2nd Sem, Department of Architechture, Deenbandhu ChhotuRam University of Science & Technology, Murthal