Good morning!

10
16 October 2003 DESY Stefan Wilke 1 Introduction Schedule Overview Parameter Machine RF-System Scenarios Conclusion PETRA III at DESY Hamburg/Germany Good morning!

description

PETRA III at DESY Hamburg/Germany. Good morning!. Introduction Schedule Overview Parameter Machine RF-System S cenarios Conclusion. PETRA as a New High Brilliance Synchrotron Radiation Source. - PowerPoint PPT Presentation

Transcript of Good morning!

Page 1: Good morning!

16 October 2003 DESY Stefan Wilke 1

Introduction Schedule Overview Parameter

• Machine

• RF-System

Scenarios Conclusion

PETRA III at DESY Hamburg/GermanyGood morning!

Page 2: Good morning!

16 October 2003 DESY Stefan Wilke 2

DESY plans to convert the PETRA II storage ring, which is now used as a proton/lepton preacceleratorto HERA and as a synchrotron radiation source forHASYLAB, into a new high brilliance third generationsynchrotron radiation source.Make use of existing hardware whenever possibleTo ensure reliable machine operation

New vacuum system (decoupling of chamber and quads)Installation of more correctors and beam position monitorsReplace radiation damaged coils of magnetsNew coupled bunch feedback systemEtc.Modernize rf system

PETRA as a New High Brilliance Synchrotron Radiation Source

Page 3: Good morning!

16 October 2003 DESY Stefan Wilke 3

Schedule

preliminary design study May 2001preliminary design study May 2001

completion of CDR beginning 2004completion of CDR beginning 2004

approval of project in 2004approval of project in 2004

final design of components and final design of components and ordering of hardware in 2005/2006ordering of hardware in 2005/2006

rebuilding of PETRA in 2007rebuilding of PETRA in 2007

start of operation in 2008start of operation in 2008

preliminary design study May 2001preliminary design study May 2001

completion of CDR beginning 2004completion of CDR beginning 2004

approval of project in 2004approval of project in 2004

final design of components and final design of components and ordering of hardware in 2005/2006ordering of hardware in 2005/2006

rebuilding of PETRA in 2007rebuilding of PETRA in 2007

start of operation in 2008start of operation in 2008

Page 4: Good morning!

16 October 2003 DESY Stefan Wilke 4

Futureexperiments

New octant and new

experimentalHall

HERA6336 m

DORIS289 m

PETRA2304 m

TTF

DESY293 m

RF-Halls

LINAC

Page 5: Good morning!

16 October 2003 DESY Stefan Wilke 5

Machine Parameter of PETRA III

Beam Energy:Beam Energy: EE00 = 6 GeV = 6 GeV

Energyloss per Turn:Energyloss per Turn: UU00 = 6590 keV = 6590 keV

Beam Current (e+): Beam Current (e+): II00 = 100 mA (later 200 = 100 mA (later 200

mA)mA)

Beam Charge:Beam Charge: 769 nC (1537 nC)769 nC (1537 nC)

Harmonic Number:Harmonic Number: h = 3840h = 3840

Revolution Frequency:Revolution Frequency: ffrr = 0.130122 MHz = 0.130122 MHz

Momentum Compaction Factor:Momentum Compaction Factor: αα = 1.221* 10 = 1.221* 10-3-3

EmittanceEmittance εε = = 1 nmrad !1 nmrad !

Damping Time (longitudinal)Damping Time (longitudinal) ττ = 6.92 ms = 6.92 ms

UndulatorsUndulators 13 – 1513 – 15

Beam Energy:Beam Energy: EE00 = 6 GeV = 6 GeV

Energyloss per Turn:Energyloss per Turn: UU00 = 6590 keV = 6590 keV

Beam Current (e+): Beam Current (e+): II00 = 100 mA (later 200 = 100 mA (later 200

mA)mA)

Beam Charge:Beam Charge: 769 nC (1537 nC)769 nC (1537 nC)

Harmonic Number:Harmonic Number: h = 3840h = 3840

Revolution Frequency:Revolution Frequency: ffrr = 0.130122 MHz = 0.130122 MHz

Momentum Compaction Factor:Momentum Compaction Factor: αα = 1.221* 10 = 1.221* 10-3-3

EmittanceEmittance εε = = 1 nmrad !1 nmrad !

Damping Time (longitudinal)Damping Time (longitudinal) ττ = 6.92 ms = 6.92 ms

UndulatorsUndulators 13 – 1513 – 15

Page 6: Good morning!

16 October 2003 DESY Stefan Wilke 6

RF – System of PETRA III

Frequency:Frequency: ffRFRF = 499.66 MHz = 499.66 MHz

Synchrotron Frequency:Synchrotron Frequency: ffss = 6.31 kHz = 6.31 kHz

Circumferencial Voltage:Circumferencial Voltage: UUc c = 20 MV= 20 MV

Shunt-Impedance ofShunt-Impedance of

one 7-cell cavity:one 7-cell cavity: RRss = 23 M = 23 MΩΩ

Beam Power:Beam Power: PPbeambeam = 659 kW (1318 kW) = 659 kW (1318 kW)

+ HOM-losses+ HOM-losses

Frequency:Frequency: ffRFRF = 499.66 MHz = 499.66 MHz

Synchrotron Frequency:Synchrotron Frequency: ffss = 6.31 kHz = 6.31 kHz

Circumferencial Voltage:Circumferencial Voltage: UUc c = 20 MV= 20 MV

Shunt-Impedance ofShunt-Impedance of

one 7-cell cavity:one 7-cell cavity: RRss = 23 M = 23 MΩΩ

Beam Power:Beam Power: PPbeambeam = 659 kW (1318 kW) = 659 kW (1318 kW)

+ HOM-losses+ HOM-losses

Page 7: Good morning!

16 October 2003 DESY Stefan Wilke 7

Existing RF-System of PETRA2 * 8 7-cell cavities, normalconductive

Page 8: Good morning!

16 October 2003 DESY Stefan Wilke 8

scenarios

max. 150 kW per couplerNumber of installed 7-Cell Cavities

Coupling Factor for Matching @100mA

Power Transmission per Coupler [kW]

Required Transmitter Power @ 20MV, 100mA [kW]

Max. Beam Current with one Transmitter @1440 kW [mA]

2 x 8 2.4 81 2 x 690 107

2 x 7 2.2 99 2 x 731 97

2 x 6 2.0 124 2 x 786 83

2 x 5 1.9 163 2 x 863 63

2 x 4 1.7 230 2 x 978 31

superconductivesingle-cell cavitiesIOTs

Page 9: Good morning!

16 October 2003 DESY Stefan Wilke 9

Conclusion

IOTs?

Page 10: Good morning!

16 October 2003 DESY Stefan Wilke 10

Thank You!

Questions?