Booster Synchrotron Cavities: An Overview in the Context of PIP Mohamed Hassan, Timergali Khabiboulline, Vyacheslav Yakovlev 07/03/2013.
The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Update of Control System Plans for the TPS C. Y. Wu, C.H. Kuo, Jenny Chen,
The IR lattice design and optimization of the dynamic aperture for the ring Yiwei Wang, Huiping Geng, Yuan Zhang, Sha Bai, Dou Wang, Tianjian, Jie Gao.
1 The LHC Accelerator Complex Jörg Wenninger CERN Accelerators and Beams Department Operations group Hadron Collider Summer School - June 2007 Part 1:
GSI - 20.08.04P. Lenisa - Univ. Ferrara and INFN 1 PAX Polarized Antiproton Experiment PAX Collaboration Spokespersons: Paolo.
Clinical Neutron Therapy Center Donna Kubik Spring, 2005.
03.11.2011 LHC status and outlook - CMS Workshop - Madrid 1 LHC status and perspectives for 2012 J. Wenninger CERN Beams Department Operation group / LHC.
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
LHC@ATLAS Status and Recent Results Ljiljana Simic Institute of Physics, Belgrade Gravity: New ideas for unsolved problems Divcibare, 2011 In honour of.
LHC Upgrade Part 4: RF systems for the LHC upgrade
Bunch Numbering
UK FFAG Plans Introduction to FFAGs Scaling vs non-scaling Non-scaling FFAGs Non-scaling POP Why the interest? UK plans.