GATEWAY TRANSFORMATION -PHASE 2 VOLUME 2 ... gateway transformation phase 2 2018 gateway...

download GATEWAY TRANSFORMATION -PHASE 2 VOLUME 2 ... gateway transformation phase 2 2018 gateway transformation

If you can't read please download the document

  • date post

    23-Feb-2021
  • Category

    Documents

  • view

    0
  • download

    0

Embed Size (px)

Transcript of GATEWAY TRANSFORMATION -PHASE 2 VOLUME 2 ... gateway transformation phase 2 2018 gateway...

  • DATE

    SHEET TITLE

    SHEET NUMBER

    PROJECT TITLE

    ISSUED FOR DATE

    Copyright Alliiance

    ARCHITECT

    ALLiiANCE

    400 CLIFTON AVENUE SOUTH MINNEAPOLIS, MN 55403 PHONE: 612.874.4100

    CONSTRUCTION MANAGER

    THE CHRISTMAN COMPANY

    634 FRONT AVE NW SUITE 500 GRAND RAPIDS, MI 49504 PHONE: 616-454-4454

    CIVIL ENGINEER

    PREIN&NEWHOF

    3355 EVERGREEN DRIVE NE GRAND RAPIDS, MI 49525 PHONE: 616.364.8491

    MECHANICAL, ELECTRICAL, PLUMBING ENGINEERS

    TOWER PINKSTER

    4 EAST FULTON STREET, SUITE 200 GRAND RAPIDS, MI 49503 PHONE: 616.456.9944

    INFORMATION TECHNOLOGY & SECURITY

    FAITH GROUP, LLC

    3101 S. HANLEY ROAD, SUITE 100 ST. LOUIS, MO 63143 PHONE: 314.991.2228

    SIGNAGE & WAYFINDING

    ENTRO

    33 HARBOUR SQUARE, SUITE 202 TORONTO, CANADA M5J2G2 PHONE: 416.368.6988

    BAGGAGE CONVEYANCE

    SWANSON RINK

    1120 LINCOLN STREET, SUITE 1200 DENVER, CO 80203 PHONE: 303.832.2666

    STRUCTURAL ENGINEER

    JDH ENGINEERING, INC.

    3000 IVANREST AVE SW, SUITE B GRANDVILLE, MI 49418 PHONE: 616.531.6020

    SET REPRESENTS THE FOLLOWING: BID SET ISSUED AUGUST 10, 2018 ADDENDUM 1 ISSUED AUGUST 21, 2018 ADDENDUM 2 ISSUED SEPTEMBER 5, 2018

    CONFORMED SET DECEMBER 01 2018

    DECEMBER 01, 2018

    GERALD R.

    FORD

    INTERNATIONAL

    AIRPORT

    GRAND RAPIDS, MI

    COVER SHEET

    VOLUME 2

    12-171.45

    G0.00v2

    GATEWAY

    TRANSFORMATION

    PHASE 2

    2018

    GATEWAY TRANSFORMATION - PHASE 2

    GRR PROJECT NUMBER C-290

    4 EAST FULTON STREET, SUITE 200

    GRAND RAPIDS, MI 49503

    PHONE: 616.456.9944

    FAX: 616.456.5936

    ARCHITECTURAL DESIGNER 400 CLIFTON AVENUE

    MINNEAPOLIS, MN 55403-3299

    PHONE: 612.874.4100

    CIVIL ENGINEER 3355 EVERGREEN DRIVE NE

    GRAND RAPIDS, MI 49525

    PHONE: 616.364.8491

    INFORMATION TECHNOLOGY 3101 S. HANLEY ROAD, SUITE 100

    ST. LOUIS, MO 63143

    PHONE: 314.991.2228

    FAX: 314.991.2268

    BAGGAGE CONVEYANCE 1120 LINCOLN STREET, SUITE 1200

    DENVER, CO 80203

    PHONE: 303.832.2666

    STRUCTURAL ENGINEER 3000 IVANREST AVE SW, SUITE B

    GRANDVILLE, MI 49418

    PHONE: 616.531.6020

    FAX: 616.531.8637

    CONSTRUCTION MANAGER

    634 FRONT AVE NW SUITE 500

    GRAND RAPIDS, MI 49504

    PHONE: 616-454-4454

    MEP ENGINEER

    DESIGN TEAM

    VOLUME 2

    5500 4TH STREET SE, GRAND RAPIDS, MI 49512

    ARCHITECTURAL ALLIANCE

    SIGNAGE 33 HARBOUR SQUARE, SUITE 202

    TORONTO, CANADA M5J2G2

    PHONE: 416.368.6988

    FAX: 416.368.5616

    BID SET AUGUST 10, 2018

  • DATE

    SHEET TITLE

    SHEET NUMBER

    PROJECT TITLE

    ISSUED FOR DATE

    Copyright Alliiance

    ARCHITECT

    ALLiiANCE

    400 CLIFTON AVENUE SOUTH MINNEAPOLIS, MN 55403 PHONE: 612.874.4100

    CONSTRUCTION MANAGER

    THE CHRISTMAN COMPANY

    634 FRONT AVE NW SUITE 500 GRAND RAPIDS, MI 49504 PHONE: 616-454-4454

    CIVIL ENGINEER

    PREIN&NEWHOF

    3355 EVERGREEN DRIVE NE GRAND RAPIDS, MI 49525 PHONE: 616.364.8491

    MECHANICAL, ELECTRICAL, PLUMBING ENGINEERS

    TOWER PINKSTER

    4 EAST FULTON STREET, SUITE 200 GRAND RAPIDS, MI 49503 PHONE: 616.456.9944

    INFORMATION TECHNOLOGY & SECURITY

    FAITH GROUP, LLC

    3101 S. HANLEY ROAD, SUITE 100 ST. LOUIS, MO 63143 PHONE: 314.991.2228

    SIGNAGE & WAYFINDING

    ENTRO

    33 HARBOUR SQUARE, SUITE 202 TORONTO, CANADA M5J2G2 PHONE: 416.368.6988

    BAGGAGE CONVEYANCE

    SWANSON RINK

    1120 LINCOLN STREET, SUITE 1200 DENVER, CO 80203 PHONE: 303.832.2666

    STRUCTURAL ENGINEER

    JDH ENGINEERING, INC.

    3000 IVANREST AVE SW, SUITE B GRANDVILLE, MI 49418 PHONE: 616.531.6020

    SET REPRESENTS THE FOLLOWING: BID SET ISSUED AUGUST 10, 2018 ADDENDUM 1 ISSUED AUGUST 21, 2018 ADDENDUM 2 ISSUED SEPTEMBER 5, 2018

    CONFORMED SET DECEMBER 01 2018

    DECEMBER 01, 2018

    GERALD R.

    FORD

    INTERNATIONAL

    AIRPORT

    GRAND RAPIDS, MI

    DRAWING INDEX

    12-171.45

    G0.01

    GATEWAY

    TRANSFORMATION

    PHASE 2

    2018

    DRAWING INDEX ARCHITECTURAL

    A0.01 GENERAL INFORMATION

    AD1.00 FRONT HALL FIRST FLOOR DEMOLITION FLOOR PLAN OVERALL

    AD1.01A1 FRONT HALL FIRST FLOOR DEMOLITION FLOOR PLAN - AREA A1

    AD1.01A3 FRONT HALL FIRST FLOOR DEMOLITION FLOOR PLAN - AREA A3

    AD1.01B1 FRONT HALL FIRST FLOOR DEMOLITION FLOOR PLAN - AREA B1

    AD1.01B2 FRONT HALL FIRST FLOOR DEMOLITION FLOOR PLAN - AREA B2

    AD1.01C1 FRONT HALL FIRST FLOOR DEMOLITION FLOOR PLAN - AREA C1

    AD1.01D1 FRONT HALL FIRST FLOOR DEMOLITION FLOOR PLAN - AREA D1

    AD2.01 FRONT HALL FIRST FLOOR DEMOLITION RCP - OVERALL

    AD2.01A1 FRONT HALL FIRST FLOOR DEMOLITION RCP - AREA A1

    AD2.01A3 FRONT HALL FIRST FLOOR DEMOLITION RCP - AREA A3

    AD2.01B1 FRONT HALL FIRST FLOOR DEMOLITION RCP - AREA B1

    AD2.01C1 FRONT HALL FIRST FLOOR DEMOLITION RCP - AREA C1

    AD2.01D1 FRONT HALL FIRST FLOOR DEMOLITION RCP - AREA D1

    AD3.00 OVERALL EXTERIOR DEMOLITION AXON

    AD3.01 OVERALL DEMOLITION EXTERIOR ELEVATIONS

    AD4.10 DEMOLITION WALL SECTIONS AND INTERIOR ELEVATIONS

    A1.01 MAIN LEVEL OVERALL FLOOR PLAN

    A1.01A1 FRONT HALL MAIN LEVEL FLOOR PLAN - AREA A1

    A1.01A3 FRONT HALL MAIN LEVEL FLOOR PLAN - AREA A3

    A1.01B1 FRONT HALL MAIN LEVEL FLOOR PLAN - AREA B1

    A1.01B2 TERMINAL MAIN LEVEL FLOOR PLAN - AREA B2

    A1.01C1 FRONT HALL MAIN LEVEL FLOOR PLAN - AREA C1

    A1.01D1 FRONT HALL MAIN LEVEL FLOOR PLAN - AREA D1

    A1.02 OVERALL ROOF PLAN

    A1.02A3 FRONT HALL ROOF PLAN - AREA A3

    A1.02B1 FRONT HALL ROOF PLAN - AREA B1

    A1.02C1 FRONT HALL ROOF PLAN - AREA C1

    A2.01 FRONT HALL MAIN LEVEL REFLECTED CEILING PLAN - OVERALL

    A2.01A1 FRONT HALL MAIN LEVEL REFLECTED CEILING PLAN - AREA A1

    A2.01A3 FRONT HALL MAIN LEVEL REFLECTED CEILING PLAN - AREA A3

    A2.01B1 FRONT HALL MAIN LEVEL REFLECTED CEILING PLAN - AREA B1

    A2.01C1 FRONT HALL MAIN LEVEL REFLECTED CEILING PLAN - AREA C1

    A2.01D1 FRONT HALL MAIN LEVEL REFLECTED CEILING PLAN - AREA D1

    A3.00 OVERALL EXTERIOR AXON

    A3.01 OVERALL EXTERIOR ELEVATIONS

    A3.02 ENLARGED EXTERIOR ELEVATIONS

    A3.03 ENLARGED EXTERIOR ELEVATIONS

    A4.01 OVERALL BUILDING SECTIONS

    A4.02 OVERALL BUILDING SECTIONS

    A4.10 WALL SECTIONS

    A5.01 COLUMN WRAP ENLARGED PLAN DETAILS

    A5.10 ENLARGED PLANS AND ELEVATIONS - WOMEN'S RESTROOM

    A5.11 ENLARGED PLANS AND ELEVATIONS - MEN'S RESTROOM

    A5.12 ENLARGED PLANS AND ELEVATIONS - FAMILY RESTROOM

    A5.20 ENLARGED SCREENING ROOM PLANS

    A5.21 ENLARGED PLANS AT ASO's WEST

    A5.22 ENLARGED PLANS AT ASO's EAST

    A5.23 ENLARGED PLANS AT BSO's & VALET

    A5.30 INTERIOR ELEVATIONS - TICKETING

    A5.31 INTERIOR ELEVATIONS - TICKETING

    A5.32 INTERIOR ELEVATIONS - VESTIBULES

    A5.33 INTERIOR ELEVATIONS - RAMPS

    A7.01 WINDOW TYPES, CURTAIN WALL ELEVATIONS

    A7.02 WINDOW TYPES, CURTAIN WALL ELEVATIONS

    A7.03 EXTERIOR DETAILS

    A7.04 EXTERIOR DETAILS

    A7.05 ROOF DETAILS

    A8.01 PARTITION TYPES, INTERIOR DETAILS

    A8.02 INTERIOR DETAILS

    A8.10 DOOR AND FRAME SCHEDULES, TYPES AND DETAILS

    A8.20 FLOOR DETAILS

    A8.30 RESTROOM DETAILS

    A8.31 INTERIOR DETAILS

    A8.40 CEILING DETAILS

    A8.41 CEILING DETAILS

    A8.50 TICKET COUNTERS

    A8.51 BSO AND VALET COUNTERS

    A8.52 TICKET & BSO COUNTER INSERTS

    A8.53 TICKET COUNTER MILLWORK DETAILS

    A8.57 KITCHENETTE DETAILS

    i9.01 MAIN LEVEL OVERALL TERRAZZO PLAN

    i9.01A1 FRONT HALL MAIN LEVEL TERRAZZO PLAN - AREA A1

    i9.01A1a FRONT HALL MAIN LEVEL TERRAZZO JOINT PLAN - AREA A1

    i9.01A3 FRONT HALL MAIN LEVEL TERRAZZO PLAN - AREA A3

    i9.01A3a FRONT HALL MAIN LEVEL TERRAZZO JOINT PLAN - AREA A3

    i9.01B1 FRONT HALL MAIN LEVEL TERRAZZO PLAN - AREA B1

    i9.01B1a FRONT HALL MAIN LEVEL TERRAZZO JOINT PLAN - AREA B1

    i9.01B2 TERMINAL MAIN LEVEL TERRAZZO PLAN - AREA B2

    i9.01C1 FRONT HALL MAIN LEVEL TERRAZZO PLAN - AREA C1

    i9.01C1a FRONT HALL MAIN LEVEL TERRAZZO JOINT PLAN - AREA C1

    i9.01D1 FRONT HALL MAIN LEVEL TERRAZZO PLAN - AREA D1

    i9.01D1a FRONT HALL MAIN LEVEL TERRAZZO JOINT PLAN - AREA D1

    i9.02A1 FRONT HALL MAIN LEVEL FINISH PLAN - AREA A1

    i9.02A3 FRONT HALL MAIN LEVEL FINISH PLAN - AREA A3

    i9.02B1 FRONT HALL MAIN LEVEL FINISH PLAN - AREA B1

    i9.02C1 FRONT HALL MAIN LEVEL FINISH PLAN - AREA C1

    i9.02D1 FRONT HALL MAIN LEVEL FINISH PLAN - AREA D1

    i9.03A ENLARGED FINISH PLANS - RESTROOMS

    STRUCTURAL

    S0.00 STRUCTURAL NOTES

    S1.01 FOUNDATION PLAN OVERALL

    S1.01-A3 FOUNDATION PLAN AREA A3

    S1.01-B1 FOUNDATION PLAN AREA B1

    S1.01-C1 FOUNDATION PLAN AREA C1

    S1.02 OVERALL ROOF FRAMING PLAN

    S1.02-A1 ROOF FRAMING PLAN AREA A1

    S1.02-A3 ROOF FRAMING PLAN AREA A3

    S1.02-B1 ROOF FRAMING PLAN AREA B1

    S1.02-C1 ROOF FRAMING PLAN AREA C1

    S2.00 FOUNDATION DETAILS

    S2.01 FOUNDATION DETAILS

    S3.00 FRAMING DETAILS

    TECHNOLOGY

    T0.01 TECHNOLOGY SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

    TD1.01-A1 FRONT HALL MAIN LEVEL TECHNOLOGY AND SECURITY D