1 File Name
GAS WELL DELIQUIFICATIONUSING
JET PUMP TECHNOLOGYBy; Sacha Sarshar, Caltec
• BACK GROUND• PRINCIPLE OF JET PUMP OPERATION• SOME SOLUTIONS• FIELD EXPERIENC SO FAR• CONCLUDING REMARKS
2 File Name
CAUSES OF LIQUID LOADING
• WELL FLOWING BELOW ANNULAR MIST REGIME• GAS VELOCITY BELOW A MINIMUM
(5m/s at wellhead)• POOR WELL DRAW DOWN
SIGNS OF LIQUID LOADING• FLUCTUATING THP• WELLHEAD FLOW VELOCITY BELOW MINIMUM• DECREASING LIQUID/GAS RATIO
3 File Name
REMEDIAL ACTIONS
• MAINTAIN RESERVOIR PRESSURE/FLOW• IMPROVE WELL FLOW AT PERFORATION
ZONE• CHANGE TUBING ( increase velocity)• ARTIFICIAL LIFT (VARIOUS METHODS)• WATER SHUT OFF• REDUCE THP, USING A PRESSURE
BOOSTING SYSTEM( jet pump application)
4 File Name
IMPORTANT FACTORS TO CONSIDER
• THE SEVERITY OF THE PROBLEM CAUSED BY DELAYS IN TAKING REMEDIAL ACTION
• EARLY REMEDIAL ACTION AVOIDS OR DEFERS COSTLY SOLUTIONS
• NOT ALL CASES NEED GAS-LIQUID SEPARATION
• DEFERRING COSTLY SOLUTIONS IS STILL COST EFFECTIVE ,AS LOWER COST SOLUTIONS HAVE A SHORT PAY BACK PERIOD
5 File Name
JET PUMP-PRINCIPLE OF OPERATION
NOZZLEMIXINGTUBE DIFFUSER
HP FLOW
LP FLOW
DISCHARGEFLOW
NOZZLEMIXINGTUBE DIFFUSER
HP FLOW
LP FLOW
DISCHARGEFLOW
6 File Name
APPLICATIONS OF JET PUMPS IN OIL&GAS PRODUCTION
• WELL KICK-OFF/DELIQUIFICATION• BOOST PRODUCTION OF INDIVIDUAL WELLS
(oil or gas)• BOOST PRODUCTION OF MANIFOLDED
WELLS (oil or gas)• BOOST PRESSURE OF LP GAS• PREVENT FLARING LLP GAS • DE-BOTTLENECK COMPRESSORS• DOWN HOLE, GAS MOTIVE FLOW
8 File Name
KEY FACTORS AFFECTING PERFORMANCE
• HP/LP PRESSURE RATIO• LP/HP FLOW RATIO• DISCHARGE/LP PRESSURE RATIO
OTHER FACTORS;
• TEMPERATURE,Z FACTOR, Cp/Cv ratio etc.
10 File Name
SOURCES OF MOTIVE (HP) GAS
• HP WELLS/ HP GAS LINE• LIFT GAS• COMPRESSOR OUTLET GAS• HP LIQUID (LIMITED)
13 File Name
BP AMETHYST, UKProblem
WEAK WELLS WERE LOADED AND HAD RESTRICTED PRODUCTION UNDER PREVAILING THP
To
Dow
nstr
eam
Proc
ess/
Pipe
lines
High Pressure Wells
Low Pressure Wells(initially backedout)
Gas Eductor on Platform
14 File Name
G EM IN IS ub sea M anifo ld
ExportSales
40M M S C FDCom pressor
7.4 M M S CFD850 psig
R ecycle
400 ps ig
200 ps ig
1250 psigP rocess
E jector
G EM IN IS ub sea M anifo ld
ExportSales
40M M S C FDCom pressor
7.4 M M S CFD850 psig
R ecycle
400 ps ig
200 ps ig
1250 psigP rocess
E jector
CHEVRON, USA : GEMINI PROJECT (GOM
16 File Name
USE OF TEST SEPARATOR IN WELL REVIVAL
Test Separator
Production Header
Test Header
Booster Pump
Jet Pum
p
HP gas
Well
Test Separator
Production Header
Test Header
Booster Pump
Jet Pum
p
HP gas
Well
17 File Name
ANGSI FIELD WELL REVIVAL OPTION
HI-SEP
TEST HEADER MAIN PRODUCTION HEADER
TO METERING SYSTEM
HP HEADER
P
P
T P
P
JET PUMP
P
TO EXPORT LINE
COMMINGLER
ALTERNATIVE PATH FOR LIQUIDS
BOOSTER PUMP
P
WELLCOM BOOST
SDV
M
EXISTING WELL TESTING METERS
A-1030
MA-1031 HI-SEP
LIFT GAS LINE
P P
WELL REVIVAL WELLCOM BOOST
18 File Name
Table X3: MALAYSIA: Platform C: Gas Jet Pump Application for Well- Kickoff with Backpressure Reduction
4654.4 MMscfd & 100 bbl/d
240(initial 465)
One or two LP wells
8.3 MMscfd and 230 bbl/d
(1/3rd flow)
3100C73.3
4652 MMscfd & 200 bbl/d
165(initial 465)
C38.3 MMscfd and 230 bbl/d
(1/3rd flow)
3100C73.2
4652 MMscfd & 200 bbl/d
Well kick off
100(initial 465)
C325 MMscfd and 688 bbl/d
3100C73.1
Predicted(psia)
Fluid FlowrateMMscfd & bbl/d
Pressure(psia)
Well Name
Fluid Flowrate
MMscfd & bbl/d
Pressure(psia )
WELL
Discharge Pressure
Estimated Low PressureHigh PressureCase
17/5/07
21 File Name
INDE PLATFORM S.NORTH SEA, UK
Low Pressure Gas Wells
Jet PumpCompressor
Export
Kilo
Juliet
Subsea Line
Davy Line
Bessemer Line
Dp
Separator
22 File Name
WELLCOM BOOST SYSTEM
COMMINGLER
LOW PRESSURE OIL WELLS
JET PUMP
TO PIPELINE
GAS
LIQUID
I-SEP
BOOSTER PUMPCOMMINGLER
LIQUID
HIGH PRESSURE GAS GAS
LIQUID
28 File Name
CONCLUDING REMARKS
• THERE ARE NUMEROUS SOLUTIONS FOR DELIQUIFICATION OF GAS WELLS
• THE APPROPRIATE SOLUTION DEPENDS MAINLY ON WELL FEATURES,RESERVOIR CONDITIONS,AND THE EXTENT OF LOADING
• JET PUMPS ARE HIGHLY COST EFFECTIVE TO OFFLOAD WELLS PROVIDED A MOTIVE HP SOURCE IS AVAILABLE AND THE WELL STATUS IS NOT BEYOND THE ABILITY OF THIS SOLUTION
• JET PUMPS CAN BE USED AS ADDITIONAL HELP TO OTHER SOLUTIONS TO INCREASE PRODUCTION