Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

30
1 SYDNEY NETWORK

description

Garret O’Connor, Project Director, Transurban delivered this presentation at the 2013 Australian Tunnelling conference. The two day conference is supported by the Australasian Tunnelling Society and brings together tunnelling leaders, engineers and industry experts to share best practice in tunnelling design, construction, safety and maintenance. The 2012 program focussed on updates from Australasia’s current and future projects, plus case studies from leading International projects - sharing best practice and lessons learnt from the forefront of the latest tunnelling projects. For more information about the event, please visit the conference website: http://www.informa.com.au/tunnellingconference

Transcript of Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

Page 1: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

1

SYDNEY NETWORK

Page 2: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

2

PROJECT SCOPE

Page 3: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

3

•  Reduce congestion

•  New entry/exit points - Windsor Road - Macquarie Park

•  Upgraded ITS

•  Tunnel widening and systems upgrade

•  Cashless tolling

HILLS M2 UPGRADE

Page 4: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

4

ORIGINAL TUNNEL

Page 5: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

5

ORIGINAL TUNNEL Cross Section

Page 6: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

ORIGINAL CONDITON

6

Page 7: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

7

TUNNEL REQUIREMENTS

Three 3.5m lanes eastbound and westbound

2.5m breakdown lane

0.5m median shoulder and 0.6m protected walkway

New fire safety deluge system and storage tanks

New HV sub station

New Intelligent Transport System

Page 8: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

8

CHALLENGES

• Working next to live traffic. •  Non continuous work times

(weekends only). •  Requirements to return to an

operational motorway at the end of every shift.

• Maintaining the operational capability of the tunnel for motorway operation requirements during construction.

•  Close proximity to the community. • Managing environmental

constraints. •  Staging and sequencing.

Page 9: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

Widening of an existing tunnel while maintaining traffic flow at all times is a first for Australia

AUSTRALIAN FIRST

9

Page 10: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

10

TUNNEL WORK PROGRAMME

Service Relocation

Trench and Niche Excavation

Batter Widening

Tunnel Widening

Drainage and Pavement

Finishings

Project Time Chainage

Page 11: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

11

NEW SERVICE TRENCH

Page 12: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

Multiple detail excavation methods used

NEW NICHES

12

Page 13: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

13

M&E STAGE 1

Page 14: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

EXCAVATION CUT IN EASTBOUND

14

Page 15: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

15

EXCAVATION CUT IN WESTBOUND

Page 16: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

16

CONSTRUCTION VENTILATION 2no. 30m³/sec Low Profile Dust Scrubber

Page 17: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

ROCKBOLTING, GROUT & SHOTCRETE

17

Type 1 – 2 m grid Type 2 – 1.5 m grid

Page 18: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

ROCKBOLTING, GROUT & SHOTCRETE

18

Grid Layout and Staging

Page 19: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

ROCKBOLTING, GROUT & SHOTCRETE

19

24 mm DCP from DSI in 45 mm hole 100 mm SFR Shotcrete

SS cap and grout for 100 year design life

Page 20: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

60,000 t rock removed 6,000 No 5m rock bolts installed 6070 m2 of shotcrete applied 4,200 m2 of pavement placed

TUNNEL WIDENING- CIVIL

20

Westbound Eastbound

Page 21: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

PORTALS

21

Page 22: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

•  Deluge with 15 zones per tube. Mains supply only.

•  Fire wire for detection. •  Six pairs of jet fans per tube. •  Three cross passages at 120m

spacing •  Egress signage •  Lane Usage and Tunnel

Message Signs •  Counter-beam lighting

FIRE AND LIFE SAFETY ORIGINAL

22

Page 23: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

•  Redundant water supply using twin 350,000 l tanks. •  Automatic Video Incident Detection. •  Ventilation fire mode controlled by wind speed and

pressurisation in non-incident tunnel •  Lowered floor of cross passages •  Running man signage •  Radio Rebroadcast •  Symmetrical lighting •  Tunnel Closure System with VSLS, VMS, Boomgates and

Traffic Signals

FIRE AND LIFE SAFETY UPGRADE

23

Page 24: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

FIRE AND LIFE SAFETY UPGRADE

24

Page 25: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

• 1,000+ new lights

•  24.5 km of sub-main cabling

•  7.5 km of new deluge pipework

•  4 x diesel fire booster pumps

•  Over 6500 small rock anchors to

support suspended installations

•  8 x new Electric niches

•  New 11KV HV power supply

TUNNEL WIDENING- M&E

25

Page 26: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

CROSS PASSAGES

26

Page 27: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

27

TRAFFIC MANAGEMENT

NOVEMBER 2011 – AUGUST 2012

2 x Eastbound and 1 x Westbound 26 weekends from November 2011

Saturday 20:00 to Monday 5:00 (33 hours)

Eastbound excavation : 2 + 1 Contraflow in Westbound Tube

Page 28: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

28

TRAFFIC MANAGEMENT

AUGUST 2012 – APRIL 2013

2 x Eastbound and 2 x Westbound between 8pm – 2pm the next day and throughout weekends

3 x Westbound between 2 - 8pm Mon to Fri (2 lanes in Eastbound Tunnel and 1 lane in

Westbound Tunnel)

Westbound excavation : 2 + 2 Contraflow in Eastbound Tube

Page 29: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

29

WIDENED TUNNEL

Page 30: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening

>  Click to edit Master text styles −  Second level > Third level

30