Transcript of Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening
1
SYDNEY NETWORK
2
PROJECT SCOPE
3
• Reduce congestion
• New entry/exit points - Windsor Road - Macquarie Park
• Upgraded ITS
• Tunnel widening and systems upgrade
• Cashless tolling
HILLS M2 UPGRADE
4
ORIGINAL TUNNEL
5
ORIGINAL TUNNEL Cross Section
ORIGINAL CONDITON
6
7
TUNNEL REQUIREMENTS
Three 3.5m lanes eastbound and westbound
2.5m breakdown lane
0.5m median shoulder and 0.6m protected walkway
New fire safety deluge system and storage tanks
New HV sub station
New Intelligent Transport System
8
CHALLENGES
• Working next to live traffic. • Non continuous work times
(weekends only). • Requirements to return to an
operational motorway at the end of every shift.
• Maintaining the operational capability of the tunnel for motorway operation requirements during construction.
• Close proximity to the community. • Managing environmental
constraints. • Staging and sequencing.
Widening of an existing tunnel while maintaining traffic flow at all times is a first for Australia
AUSTRALIAN FIRST
9
10
TUNNEL WORK PROGRAMME
Service Relocation
Trench and Niche Excavation
Batter Widening
Tunnel Widening
Drainage and Pavement
Finishings
Project Time Chainage
11
NEW SERVICE TRENCH
Multiple detail excavation methods used
NEW NICHES
12
13
M&E STAGE 1
EXCAVATION CUT IN EASTBOUND
14
15
EXCAVATION CUT IN WESTBOUND
16
CONSTRUCTION VENTILATION 2no. 30m³/sec Low Profile Dust Scrubber
ROCKBOLTING, GROUT & SHOTCRETE
17
Type 1 – 2 m grid Type 2 – 1.5 m grid
ROCKBOLTING, GROUT & SHOTCRETE
18
Grid Layout and Staging
ROCKBOLTING, GROUT & SHOTCRETE
19
24 mm DCP from DSI in 45 mm hole 100 mm SFR Shotcrete
SS cap and grout for 100 year design life
60,000 t rock removed 6,000 No 5m rock bolts installed 6070 m2 of shotcrete applied 4,200 m2 of pavement placed
TUNNEL WIDENING- CIVIL
20
Westbound Eastbound
PORTALS
21
• Deluge with 15 zones per tube. Mains supply only.
• Fire wire for detection. • Six pairs of jet fans per tube. • Three cross passages at 120m
spacing • Egress signage • Lane Usage and Tunnel
Message Signs • Counter-beam lighting
FIRE AND LIFE SAFETY ORIGINAL
22
• Redundant water supply using twin 350,000 l tanks. • Automatic Video Incident Detection. • Ventilation fire mode controlled by wind speed and
pressurisation in non-incident tunnel • Lowered floor of cross passages • Running man signage • Radio Rebroadcast • Symmetrical lighting • Tunnel Closure System with VSLS, VMS, Boomgates and
Traffic Signals
FIRE AND LIFE SAFETY UPGRADE
23
FIRE AND LIFE SAFETY UPGRADE
24
• 1,000+ new lights
• 24.5 km of sub-main cabling
• 7.5 km of new deluge pipework
• 4 x diesel fire booster pumps
• Over 6500 small rock anchors to
support suspended installations
• 8 x new Electric niches
• New 11KV HV power supply
TUNNEL WIDENING- M&E
25
CROSS PASSAGES
26
27
TRAFFIC MANAGEMENT
NOVEMBER 2011 – AUGUST 2012
2 x Eastbound and 1 x Westbound 26 weekends from November 2011
Saturday 20:00 to Monday 5:00 (33 hours)
Eastbound excavation : 2 + 1 Contraflow in Westbound Tube
28
TRAFFIC MANAGEMENT
AUGUST 2012 – APRIL 2013
2 x Eastbound and 2 x Westbound between 8pm – 2pm the next day and throughout weekends
3 x Westbound between 2 - 8pm Mon to Fri (2 lanes in Eastbound Tunnel and 1 lane in
Westbound Tunnel)
Westbound excavation : 2 + 2 Contraflow in Eastbound Tube
29
WIDENED TUNNEL
> Click to edit Master text styles − Second level > Third level
30