G2 TAYLOR YARD
RIVER PARK
1
TAYLOR YARD G2 RIVER PARK
COMMUNITY WORKSHOP #3
October 4, 2018
www.lariver.org/G2
www.tayloryardG2.com 1
Pre-Design Update
G2 TAYLOR YARD
RIVER PARK
2
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
Pre-Design Update
G2 TAYLOR YARD
RIVER PARK
3
Project Management Team
Michael Affeldt
Director, LARiverWorks
Arturo Chavez
Senior Advisor
Gary Lee Moore, PE, ENV SP
City Engineer
Deborah Weintraub, AIA, LEEDAP
Chief Deputy City Engineer
Christopher Johnson, PE, GE
Program Manager
Katie Doherty, PE
Project Manager
Pre-Design Update
G2 TAYLOR YARD
RIVER PARK
4
Project Partners
California Departm ent of Toxic
Substances Control
Pre-Design Update
G2 TAYLOR YARD
RIVER PARK
5
PRIME CONSULTANT
Project Managem ent /
Leadership
Arch itectureUrban Design & Landscape
Arch itectureMed iterranean Landscape
Arch itecture
Econom ic
Developm ent
& Financing
Hydrology &
Hydraulics/
Inspect ions
Public
Engagem ent
Water
Quality
Civil Engineering
Botany, Biology &
Natural Habitat
Public
Engagem entPublic
Engagem ent
Environm ental
Docum entat ion
Soil Sam pling
Managem ent
City of Los Angeles
Bureau of Engineering
3
TAYLOR YARDG2 LOCATIONMILE 25 OF THE LARIVER
6
G2 TAYLOR YARD
RIVER PARK
7
G2 TAYLOR YARD
RIVER PARK
8Image of Wetland Habitat Area Required by ARBOR
9
Project Development and
Activities in 2018
9
EXISTING
ARBOR Study
Concept
Jan Public Meetings
Feb Community Survey
Mar Internal Pre-DesignWorkshops
Apr Geophysical Survey,Groundwater Monitoring
May Begin Site Assessments
June Mayor’s Briefing
July Site Assessment Ongoing
Aug Site Assessment Ongoing
9
G2 TAYLOR YARD
RIVER PARK
10
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
G2 TAYLOR YARD
RIVER PARK
11
Community Site Tour and
Workshop January 2018
1111
12
Community Workshop Table Comments
G2 TAYLOR YARD
RIVER PARK
13
Community Survey Results
ARBOR Study
Concept
Over 1300 Respondents!
Key Findings:
• Nature - Respondents have a high interestin natural components; open space; trailsand habitat.
• Recreation - Outdoor recreation includingwalking / jogging and cycling ranked high,both as activities
• LA River - 84% reported having visited theRiver. Strong interest in River interactionand education.
• Consistent Results - Community prioritiesamong the public are largely consistentwith those of the community immediatelysurrounding the G2 parcel.
G2 TAYLOR YARD
RIVER PARK
14
Community Survey Results
Favorite Park Features
Respondents were asked to selecttheir top three:
64% - access to nature
53% - walking and hiking trails
35% - scenic views
G2 TAYLOR YARD
RIVER PARK
15
Preferred Natural Space/Wildlife Habitat Features:
40%- River Access
40% - Trails
33% - Enjoying Nature/Habitat
G2 TAYLOR YARD
RIVER PARK
16
Preferred Activities/Recreational Elements:
60%- Walking/Running/Jogging
40% - Children’sNature/Adventure Play
38% - Meadow andPicnicking
G2 TAYLOR YARD
RIVER PARK
17
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
18
Rail Operations - Equipment
Maintenance and Fueling:
• Early 1900’s – 2006
• Former facilities:-Diesel and machine shop
-Roundhouse, turntables
-Underground and aboveground
storage tanks
-Industrial wastewater treatment
plant
• Materials previously onsite:-Diesel and gasoline fuel
-Various oils, greases, acids, paints
and thinners
-Pesticides and herbicides
-Lead
-Cleaning and chlorinated solvents
Taylor Yard – Site Use and Environmental History
Aerial Photo of Historical Rail Operations (c 1994)
Diesel ShopService Tracks Machine Shop
19
2018 Site Investigation (Began Summer 2018) “What are we investigating?”
G2 TAYLOR YARD
RIVER PARK
20
2018 Site Investigation (Began Summer
2018) “What are we investigating?”
GROUNDWATER SAMPLING:
• 22 samples from 16 monitoring wells
SOIL GAS SAMPLING:
• 228 sample locations
• 452 total samples
SOIL SAMPLING:
• 78 locations
• 645 total samples
EXCAVATION TEST PITS:
• 23 pit and trench excavations
20
Direct Push Equipment
for Soil Sampling
Mobile Laboratory for
Soil Gas Analysis
20
G2 TAYLOR YARD
RIVER PARK
21
Site Assessment: “What Are We Looking For?”
• Petroleum hydrocarbons(TPH)
• Metals
• Volatile Organic Compounds(VOCs)
• Semi-volatile organiccompounds (SVOCs)
• Pesticides/herbicides
• Polychlorinated Biphenyls(PCBs)
Split Spoon
Sampler
Showing TPH
Contamination
Field
Notebooks
Split Spoon Sampler
Showing Soil
Stratification
21
22
Solution may include a combination of
alternatives to achieve appropriate
residential/ecological standards:
• Risk assessment for groundwater, soil and soilgas
• Groundwater: extraction/in-situ treatment intargeted areas
• Soil: excavation; engineered cap/paving(temporary or permanent)
• Soil gas: extraction/venting; vapor mitigationsystem
• Phytoremediation
Site Design Implications: “What Is The Remedy?”
G2 TAYLOR YARD
RIVER PARK
23
2018:
October – Lab results complete
November – Lab results summary report submitted to DTSC
November and December - DTSC review
December – Remedial actions considered to address sitecontamination
2019:
February – Recommended Remedial Action Plan submittedto DTSC
April – DTSC approval of Remedial Action Plan
Remedial Action Plan Milestones
G2 TAYLOR YARD
RIVER PARK
24
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
G2 TAYLOR YARD
RIVER PARK
25
Water Quality Improvement Opportunities
• Regulatory Framework
• Tributary Watersheds
• Treatment Alternatives
• Infiltration
• Conclusion
26
Watersheds
Draining Near
Taylor Yard G2
Parcel
Totalapproximatetributarywatershed of4,263 acres
26
EXISTING
ARBOR Study
Concept
26
G2 TAYLOR YARD
RIVER PARK
27
Stormwater Quality Treatment StrategyHydrodynamic
Trash Removal
Unit
Sedimentation
Pond
Treatment
Stream*
Trash √ √
Ammonia √
Copper √ √
Toxicity √ √
Indicator
Bacteria
√
Nutrients (Algae) √
*Treatment Stream: Swales, Dry Creek, Bioretention, Wetlands
28
Proposed Stormwater Treatment System
2828
29
EXISTING
ARBOR Study
Concept
Onsite + Eagle Rock
Onsite + UPRC
Wet Weather
(85th Percentile)
+
Eagle Rock Wet
Weather (85th
Percentile)
Stormwater
management
system utilizes ~41
of the 42 acre site.
Treatment Area
Exhibit for Wet
Weather Flows
29
G2 TAYLOR YARD
RIVER PARK
30
Water Management - Conclusions
• G2 site provides significant space for multiple benefitsincluding: river access, stormwater management, habitatrestoration, active and passive recreation.
• All onsite stormwater is managed.
• Significant offsite dry weather runoff is also managed.
• Managing significant amounts of offsite wet weatherstormwater reduces use of G2 site for other uses.
G2 TAYLOR YARD
RIVER PARK
31
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
G2 TAYLOR YARD
RIVER PARK
32
G2 TAYLOR YARD
RIVER PARK
Preliminary SiteConcepts Soft Edge
• Project Goals
• Public Input
• Community Survey
• Technical ConstraintsIsland
Three Islands
32
3333
3434
3535
3636
3737
G2 TAYLOR YARD
RIVER PARK
38
Next Steps
November 2018: Site Assessment Report of Findings
December 2018: Begin Pre-Design Report; Prepare Soil Quality Report
and Soil Response Plan
Q1 2019: Public Meeting to Review Recommended Alternative;
Finalize Predesign Report
2019: Environmental Review
2019-2020: Detailed design for interim uses
2019-2021: Potential Programming
2020-2021: Construction (possibly phased) for interim uses
39
2017 2018 2019 2020 2021
Meetings
Project Kick-off
Quarterly TASC and CLC Meetings
Public Meetings
Work Plan (Authorized)
Develop Preliminary Design Concepts
Refine Design Concept
Prepare Implementation Plan
Soil Quality Analysis
Develop Soil Sampling Work Plans
Soil Sampling
Prepare Soil Quality Report
Prepare Soil Response Plan
Next Tasks (Pending)
Environmental Review
Detailed Design - Interim Uses
Construction (Possibly Phased) - Interim
Uses
Potential Programming
As needed1 2 3 4 5
TAYLOR YARD G2 RIVER PARK - Project Schedule
Meeting
Number
Meeting Topics
1 Kick-off and background
2Design concept alternatives and Preliminary assessment
results
3 Recommended alternative
4 & 5 Project status updates
40
INCLUSIVE
INSPIRATIONAL
RESILIENT
UNIQUELY LOS ANGELES
PEOPLE
WATER
HABITAT
CONNECTIVI TY
SOIL
HISTORY
AN OPPORTUNITY FOR INNOVATIVE
OPEN SPACE DESIGN