TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 0 0 0 0 0 0 0
State (SHF) 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Federal 0 0 0 0 0 0 0
State (SHF) 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 1225.000 0 0 0 0 0 1225.000
State (SHF) 306.000 0 0 0 0 0 306.000
Local 0 0 0 0 0 0 0
Total 1531.000 0 0 0 0 0 1531.000
Federal 0 2396.000 0 0 0 0 2396.000
State (SHF) 0 599.000 0 0 0 0 599.000
Local 0 0 0 0 0 0 0.000
Total 0 2995.000 0 0 0 0 2995.000
Federal 1.000 0 0 0 0 0 1.000
State 0 0 0 0 0 0 0.000
Total 1.000 0 0 0 0 0 1.000
Federal 25.000 0 0 0 0 0 25.000
State 6.000 0 0 0 0 0 6.000
Total 31.000 0 0 0 0 0 31.000
Federal 0 40.000 0 0 0 0 40.000
State 0 10.000 0 0 0 0 10.000
Total 0 50.000 0 0 0 0 50.000
Fed (BR) 3646.000 0 0 0 0 0 3646.000
State (BAM) 912.000 0 0 0 0 0 912.000
Total 4558.000 0 0 0 0 0 4558.000
Fed 0 0 961.000 0 0 0 961.000
State (BAM) 0 0 200.000 0 0 0 200.000
Total 0 0 1161.000 0 0 0 1161.000
PIKES PEAK AREA COUNCIL OF GOVERNMENTS
FY 2017 through FY 2022 Transportation Improvement Program Project Funding Tables (Includes Amendments 1-10 & Admin. Changes 1-6)
Bridges On State Highway System
13-66 SR25216.092
Surface Treatment
of SH 85 from
milepost 128 to 138.
CDOTSurface Treatment of SH 85 from milepost 128 to 138 and
repair of bridges J-18-M, J-18-B, I-17-R and I-17-CO.
13-65-05 SR26710.005 BPM for Project CDOT
2017 BPM project at H-17-BB deck and
joint repair, H-17-CZ Deck repair, H17-DA Deck repair, I-
18-BE deck and joint repair
13-65-04 SR26710.004 BPM for Project CDOT
Rockrimmon Part 2 Deck and Joint RepairFy 2016: I-17-
NG deck and joint repair, 1-17-NJ Deck, I-17-NH Deck , I-
17-NI deck & joint, I-17-NN
deck & joint repair, I-17-NO deck and joint repair
13-64 SR26710.003 BPM for Project CDOT
Rockrimmon Part 1 Bridges Fy 2016: I-17-NK Deck repair, I-
17-NL Deck repair, I-17-NQ deck and joint repair, I-17-NR
deck and joint repair
16-801 SR26710.012 SH 24 MLK Bypass CDOT Bridge I-17-JA
16-800 SR26710.009 I-17-GO SH115 CDOT Bridge I-17-GO
13-65-06 SR26710.006 BPM for Project CDOT
El Paso County: I-17-CD deck and
joint repair, I-17-CE deck and joint repair, I-17-LR
deck and joint repair, I-17-O deck and joint repair,
I-17-OO Deck repair, I-17-OP deck and joint repair
10.59 SPP6516.036
Bridge repair design
& construction for
US 24 bridge over
Rainbow Falls
CDOTFinal design and construction for bridge deck and
structural repairs
16-803-A SR26867.040
I-25/Cimarron
Interchange
Reconstruction
CDOT I-25/Cimarron Interchange Reconstruction
16-802 SR26710.023Elpaso City Bridge
RepairsCDOT Bridge repairs I-17-GR
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Fed 228.800 0 0 0 0 0 228.800
State 57.200 0 0 0 0 0 57.200
Total 286.000 0 0 0 0 0 286.000
Federal 0 0 0 5.297 0 0 5.297
State 0 0 0 1.324 0 0 1.324
Total 0 0 0 6.621 0 0 6.621
Federal 0 0 0 0 433.173 433.173
State 0 0 0 0 108.293 0 108.293
Total 0 0 0 0 541.466 0 541.466
Federal 5125.8 2436.000 961.000 5.297 433.173 0 8961.270
State 1281.2 609.000 200.000 1.324 108.29325 0 2199.818
Total 6407.000 3045.000 1161.000 6.621 541.466 0 11161.088
Federal Funds to PPACG 2416.751 1382.019 1032.026 1052.987 0 0 5883.783
0 401.675 0 1052.987 0 0 1454.662
SPP6449.000 CMAQ Pool
projects to be determined (funding for 16/17/18 totaling
154.343 has been included in the TAP project 13-61
Fontaine Blvd Sidewalks to maintain constraint). Funding
has been included in the FY 16 programming year
Fed (CMAQ)
Preconstruction0 0 0 0 0 0 0
Fed (CMAQ)
Construction1034.875 1034.875 0 1009.722 0 0 0 1009.722
Local 215.125 215.125 0 209.896 0 0 0 209.896
Overmatch 0 0 0 0 0 0 0
Total 1250.000 1250.000 0 1219.618 0 0 0 1219.618
Fed (CMAQ)
Preconstruction0 0 0 0 0 0 0
Fed (CMAQ)
Construction0 927.350 0 0 0 0 0 927
Fed (CMAQ) Rollforward
for Obligation0 0 0 0 0 0 0
Local Rollforward for
Obligation0 192.773 0 0 0 0 0 0
State (FASTER) 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 1120.123 0 0 0 0 0 0
Fed (CMAQ)
Preconstruction0 0 0 0 0 0 0
Fed (CMAQ)
Construction292.452 292.452 0 0 0 0 0 0
Local 60.794 60.794 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 353.246 353.246 0 0 0 0 0 0
Fed (CMAQ)
Preconstruction0 0 0 0 0 0 0
Fed (CMAQ)
Construction0 468.759 0 0 0 0 468.759
Local 0 127.119 0 0 0 0 127.119
17.11 SR26710.036SH 85 & I 25 Bridge
RepairCDOT
Bridge Repair at SH 85 A and I-25 Bridge Repair to I-17-CO.
Funds come from Bridge Asset Management. Project
includes scour rapair and gutter maintenance.
Amend. 7
17.10 SR26710.029 US 24 Bridge Repair CDOT
Bridge Repair at US 24 West of Manitou to West Chipita
Bridge repair to I-17-AE. Funds come from Bridge Asset
Management. Project consists of rail repair.
Amend. 7
17.5 SR27002.044US 24 Constitution to
Garrett CDOT
Resurfacing existing pavement on US 24 from
Constitution to the Garrett Intersection. Work includes
reconfiguration of US 24 and Garrett Intersection into a
Florida T type intersection and replace the signal;
change exsiting side slopes between Garrett and
Constitution from 2:1 side slope to 3:1 min/4:1 max as per
AASHTO Roadside Design Guide to meet clear zone
requirements from this type of facility; reconfigure lane,
shoulder and Z slopes as per widths in CDOT Design
Guide Table 4.1 and Figured 4.1 for Type A. Work also
consissts of scoure repair at Structure I-18-BG on Troy Hill
Road
THIS PROJECT IS ALSO FUNDED IN FASTER AND SURFACE
TREATMENT CATEGORIES
Amend. 4
13-10-02
&
17.016
SPP6649.017Phase 2 Advanced
Traffic Detection
Colorado
SpringsAdmin. 6
10.2
&
17.015
SPP6449.05
Roundabout
Conversion @
Tejon/Cheyenne/C
ascade & Ramona
Colorado
Springs
Convert signalized intersection to a roundabout facility
(Programmed 2011)
Amend. 2
&
Admin. 6
Bridges On System Totals
CMAQ
Unprogrammed Funds
8.23
&
17.014
SPP6449.005Falcon Area Park
and Ride Expansion
El Paso
County
Add 150 parking spaces and improvements to access
and operations of the facility. (programmed 2010)Admin. 6
13-10-03 SPP6649.017Phase 3 Advanced
Traffic Detection
Colorado
Springs
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Overmatch 0 0 0 0 0 0 0
Total 0 595.878 0 0 0 0 595.878
Fed (CMAQ) 0 457.840 0 0 0 0 457.840
0 0 0 0 0 0 0
Local 0 29.229 0 0 0 0 29.229
Overmatch 0 0 0 0 0 0 0
Total 0 487.069 0 0 0 0 487.069
Fed (CMAQ)
Preconstruction0 0 0 0 0
Fed (CMAQ) Construction 631.584 1943.161 0 0 0 0 0 0
Fed (CMAQ) Rollforward
for Obligation0 0 0 0 0 0 0
Local Rollforward for
Obligation131.291 0 0 0 0 0 0
Local 40.321 403.935 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 803.196 2347.096 0 0 0 0 0 0
Fed (CMAQ)
Preconstruction0 53.745 0 0 0 0 53.745
Fed (CMAQ)
Construction0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local (Match) 0 13.436 0 0 0 0 13.436
Total 0 67.181 0 0 0 0 67.181
Fed (CMAQ)
Preconstruction0 0 22.304 0 0 0 22.304
Fed (CMAQ) Construction 0 0 0 0 0 0 0
Local 0 0 5.576 0 0 0 5.576
Overmatch 0 0 0 0 0 0 0
Total 0 0 27.880 0 0 0 27.880
Fed (CMAQ) 457.840
0
Local 29.229
Overmatch 0.000
Total 487.069
1958.911
Federal CMAQ 2416.751 980.344 1032.026 0 0 0 4429.121
Local 345.469 169.784 215.472 0 0 0 730.725
State 0 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 2762.220 1150.128 1247.498 0 0 0 5159.846
13-6
&
17.017
SPP7004.001Traffic System
Upgrades
Colorado
Springs
Upgrades of traffic signal equipment including poles,
signal heads, controllers, enhanced street signs, video
detection devices, fiber optics & radar volume/speed
count devices throughout the city.
ALSO FUNDED IN STP METRO
Amend. 2
&
Admin. 6
16-300 SPP6449.016
Metro Rides
Regional Travel
Demand Mngt.
Program
Colorado
Springs
Provide carpool, vanpool, and schoolpool programs;
2017 and 2018 funds includes inflation
13-10-03 SPP6649.017Phase 3 Advanced
Traffic Detection
Colorado
Springs
16-300 SPP6449.016
Metro Rides
Regional Travel
Demand Mngt.
Program
Colorado
Springs
(FLEXED TO FTA)
Provide carpool, vanpool, and schoolpool programs;
2017 and 2018 funds includes inflation
13-15 SPP6156.030
MMT Route 8
Pedestrian/Transit
Accessibility
Improv.
Colorado
Springs
Complete handicapped accessible ramps, sidewalks,
and driveway and alley crossings, construct concrete
transit waiting pads and enhanced pedestrian crossings
ALSO FUNDED IN STBG
Amend. 2
20-300Route 9, Phase 4
EnhancementsMMT
Construction includes new sidewalks and segments of
curb and gutter where missing; installation of ADA
compliant facilities to provide and improve
handicapped accessiblility to transit stops along the
corridor and improve/replace signage and pavement
markings and marked and signed bicycle lanes through
corridor.
ALSO FUNDED IN STBG
Amend. 2
CMAQ Total Programmed
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal & match funding
levels from CDOT147.150 189.073 137.681 137.688 611.592
Federal funds to PPACG 588.601 756.291 550.724 550.751 629.416 630.036 3705.819
Region 2 TAP 680.000
Fed EPP 186.504
FED EPP Match 46.626 0 0 0 0 0
Unprogrammed Funds 0 205.592 0 126.718 455.557 224.365 920.833
Fed (STBG)
Preconstruction0 374.255 0 0 0 0 374.255
Fed (STBG)
Construction0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local (Match) 0 93.564 0 0 0 0 93.564
Total 0 467.819 0 0 0 0 467.819
Fed (STBG)
Preconstruction0 0 0 424.033 0 424.033
Fed (STBG)
Construction0 0 0 0 0 0 0
Fed (STP) 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local (Match) 0 0 0 106.008 0 0 106.008
Total 0 0 0 530.041 0 0 530.041
Fed (STBG)
Preconstruction0 0 0 0 0 0 0
Fed (STBG) Construction 0 0 0 0 173.859 405.671 579.530
State 0 0 0 0 0 0 0
Local (Match) 0 0 0 0 43.465 101.418 144.883
Total 0 0 0 0 217.324 507.089 724.413
Fed (STBG)
Preconstruction0 0 0 0 0 0 0
Fed (STBG)
Construction0 0 0 0 0 0 0
Local 37.727 0 0 0 0 0 37.727
Overmatch 0 0 0 0 0 0 0
Total 37.727 0 0 0 0 0 37.727
Fed (STBG)
Preconstruction0 0 0 0 0 0 0
Fed (STBG) Construction 0 0 0 0 0 0 0
Federal (metro) 0 0 0 0 0 0 0
FED (CMAQ) 0 0 0 0 0 0 0
Local 0 0 46.000 0 0 0 46.000
Overmatch 0 0 0 0 0 0 0
Total 0 0 46.000 0 0 0 46.000
Fed (STBG)
Preconstruction111.182 0 0 0 0 0 0
Fed (STBG) Construction 0 534.282 0 0 0 0 0 0
Local 27.796 133.571 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 138.978 667.853 0 0 0 0 0 0
22-400Creek Walk Trail -
Ph 3 & 4
Manitou
Sporings
Continuation of the Creekwalk Trail from the completed
phase at schryver park west to the intersection of par
and manitou aves to allow connection to the Ute Pass
trail and Rainbow Falls
(Also funded in STP)
20-300Route 9, Phase 4
EnhancementsMMT
Construction includes new sidewalks and segments of
curb and gutter where missing; installation of ADA
compliant facilities to provide and improve
handicapped accessiblility to transit stops along the
corridor and improve/replace signage and pavement
markings and marked and signed bicycle lanes through
corridor.
ALSO FUNDED IN CMAQ
Amend. 2
Transportation Alternatives/STBGSA
SPP6156Transportation
Alternatives PoolVarious projects to be determined
13-61 SR25079.062Fontaine Blvd.
Sidewalks
El Paso
County
Construct new sidewalks and curb cuts in existing
sidewalks from Easy St. to Kokomo St. ($380K in CDBG
funds in 2016) (2017 Federal TAP funding moved to
CMAQ $154.000)
Amend. 2
13-23 SPP6156.038Downtown
Monument
Sidewalks
MonumentInstallation of about 9600 ft. of 5' wide concrete
sidewalk, curb and gutter in the downtown area
21-100El Paso County
Wetland Bank:
Akers
Design and construction of approximately 20 acres of
mitigation for inclusion in the El Paso Co Wetland
Umbrella Mitigation Bank
13-18
&
17.018
SPP6156.033
MMT Routes 1 & 7
Pedestrian/Transit
Accessibility and
Bicycle Lanes
Colorado
Springs
Complete handicapped accessible ramps, sidewalks,
and driveway and alley crossings, construct concrete
transit waiting pads, enhanced pedestrian crossings and
bicycle lanes.
Admin. 6
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Fed (SBTG)
Preconstruction477.419 0 192.326 0 0 0 192.326
Fed (SBTG) Construction 0 816.505 0 0 0 0 0 0
Local 119.355 204.126 0 48.082 0 0 0 48.082
Overmatch 0 0 0 0 0 0 0
Total 596.774 1020.631 0 240.408 0 0 0 240.408
Fed (STBG)
Preconstruction0 160.453 0 0 0 0 160.453
Fed (STBG) Construction 0 15.991 358.398 0 0 0 374
Local 0 44.111 89.600 0 0 0 133.711
Overmatch 0 0 0 0 0 0 0
Total 0 220.555 447.998 0 0 0 668.553
Fed (STBG)
Preconstruction0 0 0 0 0 0 0
Fed (STBG)
Construction0 593.732 0 0 0 0 0 0
Reg 2 TAP 172.146 0 0 0 0 0 0
Reg 2 local
match0 43.037 0 0 0 0 0 0
Fed EPP 186.504 0 0 0 0 0 0
Local 0 148.433 0 0 0 0 0 0
Local (EPP Match) 46.626 0 0 0 0 0 0
Total 233.130 957.348 0 0 0 0 0 0
Fed (STBG)
Preconstruction0 0 0 0 0 0 0
Fed (STBG)
Construction0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Fed (STBG)
Preconstruction0 0 0 0 0 0 0
Fed (STBG)
Construction0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Fed (STBG)
Preconstruction0 0 0 0 0 0 0
Fed (STBG)
Construction0 613.550 0 0 0 0 0 0
Fed (STBG) Rollforward for
Obligation0
Local Rollforward for
Obligation0
Local 0 153.388 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 766.938 0 0 0 0 0 0
Fed (STBG)
Preconstruction0 0 0 0 0 0 0
Fed (STBG)
Construction0 0 0 0 0 0 0
Fed (STBG) Rollforward for
Obligation
Local Rollforward for
Obligation
Overmatch 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
13-20-02 SPP6156.035
Sand Creek Trail:
North Carefree
Circle to Barnes
Road
Colorado
Springs
Construct 1.2 miles of new 12' wide, concrete trail
between North Carefree Ave. and Tutt Blvd.
13-15
&
17.019
SPP6156.030
MMT Route 8
Pedestrian/Transit
Accessibility
Improv.
Colorado
Springs
Complete handicapped accessible ramps, sidewalks,
and driveway and alley crossings, construct concrete
transit waiting pads and enhanced pedestrian crossings
ALSO FUNDED IN CMAQ
Amend. 2
&
Admin. 6
13-13Hancock
Expressway/Avenu
e Bicycle Lanes
Colorado
Springs
Add 2.1 centerline miles of new bicycle lane from
Hancock Drive to East Bijou Street
10-4 SPP6156.044FMT Pedestrian and
ADA EnhancementsFountain
Construct bus stop pads, seating accomodations, and
ADA sidewalk curb ramps to improve access
13-20-01
&
17.020
SPP6516.034
Sand Creek Trail:
Palmer Park Blvd. to
Constitution Ave.
Colorado
Springs
Construct 1.2 miles of new 12' wide, concrete trail from
Palmer Park Blvd. to Constitution Ave.
Admin. 1
&
Admin. 6
13-21Rainbow Falls
Access
Improvements
El Paso
County
Improve multimodal access to Rainbow Falls, control
erosion from surrounding roads and install bicycle lanes
Manitou Ave and Serpentine Dr.
Amend. 2
13-14
&
17.021
SPP6516.029
Rock Island Trail
Construction: Sand
Creek Trail to
Constitution
Colorado
Springs
Construct 1.77 miles of new 12' wide, concrete trail
between the Sand Creek Trail and Constitution Ave.Admin. 6
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Fed (STBG)
Preconstruction0 0 680.000 0 0 0 680.000
Fed (STBG)
Construction0 0 0 0 0 0 0
Local
Preconstruction0 0 170.000 0 0 0 170.000
Local
Construction0 0 0 0 0 0 0
Total 0 0 850.000 0 0 0 850.000
Fed (STBG) 588.601 550.699 1230.724 424.033 173.859 405.671 2784.986
Reg 2 (TAP) 0 0 0 0 0 0 0
-611.263 Reg 2 local Match 0 0 0 0 0 0 0
Fed EPP 186.504 0 0 0 0 0 0
Local EPP Match 46.626 0 0 0 0 0 0
Federal (CMAQ) 0 0 0 0 0 0 0
Federal (Metro) 0 0 0 0 0 0 0
Local 184.877 137.67475 353.681 106.008 43.465 101.418 742.247
State 0 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 1006.608 688.374 1584.405 530.041 217.324 507.089 3527.233
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal (5304) 0 0 0 0 0 0 0
State (FASTER) 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 0 0 0 0 0 0 0
State 375.000 0 0 0 0 0 375.000
Overmatch 0 0 0 0 0 0 0
Total 375.000 0 0 0 0 0 375.000
Federal 0 0 0 0 0 0 0
State 500.000 0 0 0 0 0 500.000
Local 0 0 0 0 0 0 0
Total 500.000 0 0 0 0 0 500.000
Federal 0 0 0 0 0 0 0
State (Faster) 800.000 0 0 0 0 0 800.000
Local 0 0 0 0 0 0 0
Total 800.000 0 0 0 0 0 800.000
Federal 0 0 0 0 0 0 0
State 1500.000 0 0 0 0 0 1500.000
Local 0 0 0 0 0 0 0
Total 1500.000 0 0 0 0 0 1500.000
17.12 SR25079.083Ute Pass Pedestrian
Project
El Paso
County
This project was awarded TAP funds in region 2 call for
projects. This project is a segment of the ring the peak
trail project.
Amend. 7
13-68 SR26867.029
I-25 and S.
Academy Blvd.
Acceleration Ramp
Improvements
CDOTExtend the north-bound on ramp at I-25 and S. Academy
Blvd.
10-39. SR25216.080Surface Treatment
of SH 16 and SH 21CDOT
Surface treatment of SH 16 and SH 21 from Syracuse St. to
Bradley Rd. (On SH 16 from mile marker 1.34 to 2.80 and
on SH 21 from mile marker 131.81 to 134.55.) (13 TIP, Amd
28 shows '15 funding prgmd including $375K in FASTER:
unsure of funding shown in 2017 in this TIP)
Transportation Alternatives/STBGSA Totals
FASTER
FASTER Safety Pool CDOT projects to be determined
13-43Downtown Transfer
Station Relocation
Study
Colorado
SpringsDowntown Transfer Station Relocation Study
13-70 SR27002.032US 24 at 21st Street
Intersection
Improvements
CDOTAdd left turn storage capacity on west bound US 24 at
21st St.
13-69 SR27002.041Install Wildlife
Fencing on US 24CDOT
Install wildlife fencing on US 24 from milepost 298 to
milepost 300.3.
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Fed 0 0 0 0 0 0 0
State
(FASTER)0 0 0 0 0 0
Local 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Fed 0 0 0 0 0 0 0
State
(FASTER)0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Fed 0 0 0 0 0 0 0
State
(FASTER)0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Fed 0 0 0 0 0 0 0
State (FASTER) 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal
STI REGION 20 0 0 0 0 0 0
FASTER Sfety 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 0 0 0 0 0 0 0
State (FASTER) 80.000 0 0 0 0 0 80.000
Local 20.000 0 0 0 0 0 20.000
Total 100.000 0 0 0 0 0 100.000
Federal 0 0 0 0 0 0 0
State (FASTER) 8.800 0 0 0 0 0 8.800
Local 2.200 0 0 0 0 0 2.200
Total 11.000 0 0 0 0 0 11.000
Federal 0 0 0 0 0 0 0
State (FASTER) 700.000 0 0 0 0 0 700.000
Local 236.054 0 0 0 0 0 236.054
Total 936.054 0 0 0 0 0 936.054
Federal 0 0 0 0 0 0 0
State (FASTER) 124.000 0 0 0 0 0 124.000
Local 31.000 0 0 0 0 0 31.000
Total 155.000 0 0 0 0 0 155.000
16-301
MMT Fixed Rte
Vehicle
Replacement
(FASTER Urbanized
Area Set-asides
MMT Replace upto 3 Fixed Rte vehicles
Admin. 3
&
Admin. 2
16-900Silver Key BOC
Replacement
Silver Key
Senior
Services
Replace 2 Body on Chassis (BOC) Admin. 3
16-900Silver Key Minivan
Replacement
Silver Key
Senior
Services
Replace one minivan Admin. 3
16-302
MMT Vanpool
Replacement
(FASTER Statewide
Competitive Pool)
MMT Replace 4 Vans for vanpool program Admin. 2
Vehicle
ReplacementsCDOT
El Paso Fountain Valley Senior Citizens Program was
awarded extra funding during CDOTs consolidated call
for capital projects. The funding will be used as
matching funds for a 5310 project coming through the
City of Colorado Sprnigs. They will be purchasing 2 ADA
compliant replacement body-on-chassis vehicles.
17.04Vehicle
ReplacementsCDOT
Silver Key Senior Services was awarded extra funding
during CDOTs consolidated call for projects. This money
will be used to purchase 1 replacement ADA compliant
body-on-chassis vehicle and one minivan.
Admin. 3
16-804 NAI-25 widening @ N
of COSCDOT I-25 @ Middle Tributary Creek
Vehicle
ReplacementsCDOT
Disability Services Inc. was awarded extra funding
during CDOTs consolidated call for capital projects. This
funding will be used to purchase 2 replacement ADA
compliant body-on-chassis vehicles
17.03Vehicle
ReplacementsCDOT
Mountain Metro Transit was awarded extra funding
during CDOTs consolidated call for capital projects. This
funding will be used to purchase up to 24 ADA
compliant body-on-chassis vehicles for their paratransit
services.
Admin. 3
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
State 2780.000 0 0 0 0 0 2780.000
Total 2780.000 0 0 0 0 0 2780.000
Federal 0 0 0 0 0 0 0.000
State (FASTER) 80.000 0 0 0 0 0 80.000
Local 20.000 0 0 0 0 0 20.000
Total 100.000 0 0 0 0 0 100.000
Federal 0 0 0 0 0 0 0.000
State (FASTER) 0 700.000 0 0 0 0 700.000
Local 0 175.000 0 0 0 0 175.000
Total 0 875.000 0 0 0 0 875.000
Federal 0 0 0 0 0 0 0.000
State (FASTER) 0 293.744 0 0 0 0 293.744
Local 0 73.436 0 0 0 0 73.436
Total 0 367.180 0 0 0 0 367.180
Federal 0 0 0 0 0 0 0
State (FASTER) 0 112.000 0 0 0 112.000
Local 0 28.000 0 0 0 0 28.000
Total 0 140.000 0 0 0 0 140.000
Federal 0 0 0 0 0 0 0
State (FASTER) 0 112.000 0 0 0 112.000
Local 0 28.000 0 0 0 0 28.000
Total 0 140.000 0 0 0 0 140.000
Federal 0 0 0 0 0 0 0
State (FASTER) 6947.800 1217.744 0 0 0 0 8165.544
Local 309.254 304.436 0 0 0 0 613.690
Overmatch 0 0 0 0 0 0 0
Total 7257.054 1522.180 0 0 0 0 8779.234
Federal 90.000 2322.000 0 0 0 0 2412.000
State 10.000 258.000 0 0 0 0 268.000
Local 0 0 0 0 0 0 0
Total 100.000 2580.000 0 0 0 0 2680.000
17.3 SR27002.044US 24 Constitution to
Garrett CDOT
Resurfacing existing pavement on US 24 from
Constitution to the Garrett Intersection. Work includes
reconfiguration of US 24 and Garrett Intersection into a
Florida T type intersection and replace the signal;
change exsiting side slopes between Garrett and
Constitution from 2:1 side slope to 3:1 min/4:1 max as per
AASHTO Roadside Design Guide to meet clear zone
requirements from this type of facility; reconfigure lane,
shoulder and Z slopes as per widths in CDOT Design
Guide Table 4.1 and Figured 4.1 for Type A. Work also
consissts of scoure repair at Structure I-18-BG on Troy Hill
Road
THIS PROJECT IS ALSO FUNDED IN SURFACE TREATMENT
AND BRIDGE PREVENTATIVE MAINTENEANCE CATEGORIES
Amend. 4
17.20FASTER Urban Area
Set-aside MMT Minivan Vanpool Replacements (11) Amend. 8
17.19FASTER Urban Area
Set-aside MMT Replacement of up to 24 paratransit (Cutaway) Vehicles Amend. 8
13-45
ITS Computer
Hardware
Replacement
Colorado
SpringsReplacement of onboard vehicle equipment Admin. 4
FASTER Totals
Hazard Elimination-Safety
R26644Hazard Elimination
Safety (HES) Pool
Various
entitiesprojects to be determined
17.28
Discover Goodwill
Vehicle
Replacement
Discover
Goodwill of
Southern and
Western
Colorado
Replace two buses for Goodwill's Rehabilitation Program Amend. 10
17.27Amblicab vehicle
replacementAmblicab
Replace two body-on-chassis buses wwith seating for 10
ambulatory passengers and two wheelchairs. Amend. 9
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal (HSIP) 0 0 0 0 0 0 0
Federal (RPP) 0 0 0 0 0 0 0
Federal
(Surf. Treat.)0 0 0 0 0 0 0
State (FASTER) 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 0 405.000 0 0 0 0 405.000
State 0 45.000 0 0 0 0 45.000
Local 0 0 0 0 0 0 0
Total 0 450.000 0 0 0 0 450.000
Federal 90.000 1890.000 0 0 0 0 1980.000
State 10.000 210.000 0 0 0 0 220.000
Local 0 0 0 0 0 0 0
Total 100.000 2100.000 0 0 0 0 2200.000
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 0 432.000 0 0 0 0 432.000
State 0 48.000 0 0 0 0 48.000
Local 0 0 0 0 0 0 0
Total 0 480.000 0 0 0 0 480.000
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal HSIP
(Design)135.000 0 0 0 0 0 135.000
Federal HSIP
(Construction)376.496 1440.000 0 0 0 0 1816.496
State
(Design)15.000 0 0 0 0 0 15.000
State
(Construction)41.832 160.000 0 0 0 0 201.832
Local 0 0 0 0 0 0 0
Total 568.328 1600.000 0 0 0 0 2168.328
Federal (HSIP) 270.000 0 0 0 0 270.000
Local 30.000 0 0 0 0 30.000
Total 0 300.000 0 0 0 0 300.000
16-806 SR26644.067 CDOT US 24 @ 31st Street
16-805 SR26644.066 CDOT SH 21 @ Milton Proby Signal Replacement
13-42 SR26644.052
SH 21 Blvd. Corridor:
Design and
construction of
acceleration and
deceleration lanes
CDOT
Design and construction of acceleration and
deceleration lanes at various locations along the SH 21
Blvd. corridor. Locations include: Dublin, Stetson Hills,
Barnes, North Carefree, South Carefree, Constitution,
Palmer Park, Galley, and Victor.
16-809 NASignal
ReplacementCDOT US 24 & Fariview St Signal replacement (Woodland Park)
16-808 NASignal
ReplacementCDOT US 24 & Baldwin St (Woodland Park)
16-807 naSignal
ReplacementCDOT US 24 & West St (Woodland Park)
17.17El Paso County
Local Raod Safety
Plan
El Paso
County
El Paso County will be conducting a road safety audit
on local roads in unincorporated El Paso County to
identify and prioritize safety concerns and develop a
plan of action. EPC was awarded HSIP funding from
CDOT.
Amend. 8
17.011
&
17.2
SR26644.040
&
SR26644.077
SH83 and County
Road 404
(E. Palmer Divide
Avenue)
CDOTThis is a safety project that will build a round-about and
fix the roadway for sight distance.
Admin. 5
&
Amend. 3
16-810 SR26644.073 CDOT US 24 - Cave of the Winds Signal Replacement
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal (HSIP)
Design112.500 0 0 0 0 0 112.500
Federal (HSIP)
Construction0 0 1800.000 0 0 0 1800.000
State Match
Design12.500 0 0 0 0 0 12.500
State Match
Construction0 0 200.000 0 0 0 200.000
Total 125.000 0.000 2000.000 0 0 0 2125.000
Federal (HSIP)
Design at Omaha45.000 0 0 0 0 0 45.000
Federal (HSIP)
Construction at Omaha0 0 661.500 0 0 0 0
State Match at Omaha 5.000 0 73.5000 0 0 0 78.500
Total 50.000 0.000 735.000 0.000 0.000 0.000 785.000
Federal (HSIP)
Design at Ridge Rd. 22.500 0 0 0 0 0 22.500
Federal (HSIP)
Construction at Ridge
Road
0 0 193.500 0 0 0 193.500
State Match 2.500 0 21.500 0 0 0 24.000
Total 25.000 0 215.000 0 0 0 240.000
Federal (HSIP)
Design412.696 0 0 0 0 0 412.696
Federal (HSIP)
Construction121.416 273.798 0 0 0 0 395.214
State Match 59.344 30.422 0 0 0 0 89.766
Total 593.456 304.220 0 0 0 0 897.676
Federal (HSIP) 1405.608 7032.798 2655.000 0 0 0 11093.406
Federal (RPP) 0 0 0 0 0 0 0
State 99.344 591.422 295.000 0 0 0 985.766
Local 0 0 0 0 0 0 0
Total 1504.952 7624.220 2950.000 0 0 0 12079.172
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 2914.000 0 0 0 0 0 2914.000
Federal (BAM) 0 0 0 0 0 0 0
State (BAM) 0 0 0 0 0 0 0
State 605.792 0 0 0 0 0 605.792
Total 3519.792 0 0 0 0 0 3519.792
Federal 1532.415 0 0 0 0 0 1532.415
State 318.585 0 0 0 0 0 318.585
Federal (Bridge) 0 0 0 0 0 0 0
State (Bridge) 0 0 0 0 0 0 0
Total 1851.000 0 0 0 0 0 1851.000
Federal 2831.000 0 0 0 0 0 2831.000
State 589.000 0 0 0 0 0 589.000
Total 3420.000 0 0 0 0 0 3420.000
17.23SR26644.080
Ridge Road (US 24
MP299.5 to 300.0)
Safety Project
CDOT
The addition of this safety project in the PPACG area
consists of design and construction of intersection
reconstruction from full movement to restricted turn
lanes.
Amend. 8
17.22SR26644.078
Omaha (SH 21 MP
142.5 to 143.0) and
Ridge Road (US 24
MP299.5 to 300.0)
Safety Project
CDOT
The addition of this safety project in the PPACG area
consists of design and construction of intersection
reconstruction from full movement to restricted turn
lanes.
Amend. 8
17.21 SR26644.079SH 94 and Peyton
Highway (MP 12.6
to 13.6)
CDOT
This project is to design and construct intersection
improvements at SH94 and the Peyton Highway (MP 12.6
to 13.6). The proposed scope of work is adding east
bound and west bound left turn lanes with sufficient
strage areas. The work will include, but not limited to
minor widening and re-striping of existing roadway to
construct left turn lanes.
Amend. 8
13-73 SR25216.105MLK Bypass
Resurfacing and
Bridge Repair
CDOTResurface MLK Bypass including the ramps and
maintenance of bridges I-17-JA, I-17-JL and I-17-JC
Hazard Elimination-Safety Totals
Maintenance and Operations (Surface Treatment)
16-811 SR25216.104 Manitou Springs CDOT STP - MP 0 to 2.5
17.24
&
17.010
SR26644.069I-25 Median Barrier
(MP 119 to MP 128)CDOT
This scope of work of this project is to place cable
barriers alogn the edge of the asphalt of I-25 both North
and Soutbound from milepost 119 to milepost 128. This is
additional funding for the I-25 median barrier project
due to the project slopes not meeting required
specifiications.
Amend. 8
&
Admin. 5
16-812 SR25216.108 US 24 G CDOT WB only MP 314.5/318.4
13-74 SR25216.107SH 115 Resurfacing
and Bridge RepairCDOT
Resurface SH 115 from south of Cheyenne Rd. to Arvada
St. and repair of bridge I-17-GO (MP 46.1/47.4)
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal 2409.189 0 0 0 0 0 2409.189
State 500.811 0 0 0 0 0 500.811
Total 2910.000 0 0 0 0 0 2910.000
Federal 0 0 0 0 0 0 0
BAM 208.000 0 0 0 0 0 208.000
State BAM 52.000 0 0 0 0 0 52.000
State SUR 0 0 0 0 0 0 0
Total 260.000 0 0 0 0 0 260.000
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
State (STP) 0 0 2108.661 0 0 0 2108.661
Local 0 0 438.339 0 0 0 438.339
Total 0 0 2547.000 0 0 0 2547.000
State (STP) 0 0 2375.245 0 0 0 2375.245
Local 0 0 493.755 0 0 0 493.755
Total 0 0 2869.000 0 0 0 2869.000
State (STP) 0 0 13045.220 0 0 0 13045.220
Local 0 0 2711.780 0 0 0 2711.780
Total 0 0 15757.000 0 0 0 15757.000
State (STP) 0 0 5845.802 0 0 0 5845.802
Local 0 0 1215.198 0 0 0 1215.198
Total 0 0 7061.000 0 0 0 7061.000
State (STP) 303.011 0 0 0 0 0 303.011
Local 62.989 0 0 0 0 0 62.989
Total 366.000 0 0 0 0 0 366.000
Federal 3642.760 910.690 0 0 0 4553.450
State 757.240 189.310 0 0 0 946.550
Total 4400.000 1100.000 0 0 0 5500.000
Federal 0 0 0 4801.820 0 0 4801.820
State 0 0 0 998.180 0 0 998.180
Total 0 0 0 5800.000 0 0 5800.000
Federal 0 0 0 13163.610 13163.610
State 0 0 0 2736.390 0 0 2736.390
Total 0 0 0 15900.000 0 0 15900.000
13-75 SR25216.109 SH 67 Resurfacing CDOTResurface SH 67 north of Woodland Park between
milepost 79.5 and 91.7
16-814 NAI-25 from Garden of
the Gods to
Woodmen Rd
CDOT Concrete preventative maintenance
16-813 SR25216.074 Surface Treatment of SH16CDOT Surface Treatment of SH16 AND SH 21
13-66 SR25216.092Surface Treatment
of SH 85 from
milepost 128 to 138.
CDOT Surface Treatment of SH 85 from milepost 128 to 138.
16-817 NAUS 24 - 8th St to W.
of Manitou SpringsCDOT Mill and Hot Mix Asphalt (HMA) overlay
16-816 NA86 I-25 S. Academy -
southbound onlyCDOT white topping/concrete reconstruction
16-815 NAI-25 Circle Dr N. to
MLK CDOT Mill and SMA Overlay
17.13 SR25216.132
US 24 West of
Manitou to West
Chipita Park
CDOT
US 24 West of Manitou to West Chipita Park. This is a
surface treatment project. This is a 5 mile surface
treatment project. It's getting minor rehab- mill and
overlay.
Amend. 7
17.4 SR27002.044US 24 Constitution to
Garrett CDOT
Resurfacing existing pavement on US 24 from
Constitution to the Garrett Intersection. Work includes
reconfiguration of US 24 and Garrett Intersection into a
Florida T type intersection and replace the signal;
change exsiting side slopes between Garrett and
Constitution from 2:1 side slope to 3:1 min/4:1 max as per
AASHTO Roadside Design Guide to meet clear zone
requirements from this type of facility; reconfigure lane,
shoulder and Z slopes as per widths in CDOT Design
Guide Table 4.1 and Figured 4.1 for Type A. Work also
consissts of scoure repair at Structure I-18-BG on Troy Hill
Road
THIS PROJECT IS ALSO FUNDED IN FASTER AND BRIDGE
PREVENTATIVE MAINTENEANCE CATEGORIES
Amend. 4
16-818 NASH 16 & SH 21
Syracuse to BradleyCDOT Full depth reclamation (FDR) & paving
17.14 SR25216.134
I-25 South
Academy South
Northbound only
CDOT
I-25 South Academy Northbound starts at mile marker
127.4 and ends at 136 almost 8 miles long- major rehab-
going to be redoing concrete
Amend. 7
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal 9686.604 3642.760 910.690 17965.43 0 0 32205.484
Federal (BAM) 208.000 0 0 0 0 0 208.000
State 2014.188 757.240 189.310 3734.570 0 0 6695.308
State (BAM) 52.000 0 0 0 0 0 52.000
State (SUR) 0 0 0 0 0 0 0
Total 11960.792 4400.000 1100.000 21700 0 0 39160.792
Federal and Local Funds To PPACG 9066.130 9264.741 9452.246 9687.125 37470.242
PROGRAMED FEDERAL FUNDS Fed (STP Metro) 8898.450 7947.725 7825.515 8019.971 7318.625 7325.650 47335.936
Unprogrammed
Funds0 277.722 5.727 86.035 4576.987 439.000 11740.251
SPP6726.000 STP-Metro Pool Various
Fed (STP)
Preconstruction0 0 0 0 447.066 0 447.066
Fed (STP)
Construction0 0 0 0 0 1617.484 1617.484
Fed (STP) Rollforward for
Obligation
Local Rollforward for
Obligation
State 0 0 0 0 0 0 0
Local (Match) 0 0 0 0 92.934 336.235 429.169
State 0 0 0 0 540.000 1953.719 2493.719
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction0 0 0 0 0 4000.000 4000.000
State 0 0 0 0 0 0 0
Local (Match) 0 0 0 0 0 831.501 831.501
Total 0 0 0 0 0 4831.501 4831.501
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction0 0 2386.436 4755.452 0 0 7141.888
State 0 0 0 0 0 0 0
Local (Match) 0 0 496.081 988.541 0.000 0 1484.622
Total 0 0 2882.517 5743.993 0.000 0 8626.510
Fed (STP)
Preconstruction0 850.000 0 0 0 0 850.000
Fed (STP)
Construction0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local (Match) 0 176.694 0 0 0 0 176.694
Total 0 1026.694 0 0 0 0 1026.694
Amend. 2
20-100South Academy
Blvd EPC
Expand Academy Blvd from 4 to 6 lanes from Drennan
Rd to I25 Ramps. Design and construct shoulders,
improve sight distance with horizontal and vertical
improvements, address add turn lanes and intersection
improvements where needed. Address drainage and
improve bridge structures. Provide for non-motorized
travel.
Maintenance & Operations Totals (Surface Treatment)
STP-Metro
22-200
Hancock-Academy
Multimodal
Improvements PH 1
COS
This project will implement first phase improvements
identifed by the PPACG funded Academy Boulevard/
Hancock Expressway PEL study. The improvements will
be multi-modal in nature and improve the southern part
of the Hancock and Academy Boulevard intersection.
Activities and improvements include the removal of the
existing obsolete ramp in the SW quadarant of the
intersection, improved transit access and circulation
with the addition of a new full-movement traffic signal
south of Hancock Expressway, removal of a roadway
bottleneck by widening Academy Boulevard to 6 lanes
to match the section south of Proby Parkway and north
of Hancock Expressway, and installation of curb, gutter,
sidewalks, trails and median improvements.
22-401
Ruxton Ave
Pedestrian &
Drainage Corridor
PH 1
Manitou
Springs
This phase of the Ruxton Avenue Pedestrian and
Drainage Improvement project is design only. The design
for this project will consist of new and repaired
sidewalks, curb/gutter, crosswalks, storm drainage
improvements, street lighting, landscaping
improvements and undergrounding of electricity,
telephone and cable line on Ruxton Avenue from
Manitou Avenue roundabout to the Brook Street
intersection, resulting in 1,668 linear feet of total
improvements.
21-200
30th Street
Roadway & Safety
Improvements
COS
Construct roadway and safety improvements for 30th
Street from Fontanero Street to Mesa Road. The project
includes the construction of multi-purpose shoulders,
drainage/stormwater improvements, resolving slope
erosion and sight line/radius safety issues and
intersection improvements.
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Fed (STP)
Preconstruction0 0 0 0 480.053 0 480.053
Fed (STP)
Construction0 0 0 0 0 1119.947 1119.947
State 0 0 0 0 0 0 0
Local (Match) 0 0 0 0 99.791 232.809 332.601
Total 0 0 0 0 579.844 1352.756 1932.601
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction0 0 0 19.947 837.300 0 857.247
State 0 0 0 0 0 0 0
Local (Match) 0 0 0 4.146 174.054 0 178.201
Total 0 0 0 24.093 1011.354 0 1035.448
Fed (STP)
Preconstruction1366.035 1468.465 0 1718.950 0 0 4553.450
Fed (STP)
Construction0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local (Match) 283.965 305.258 0 357.327 0 0 946.550
Total 1650.000 1773.723 0 2076.277 0 0 5500.000
Fed (STP)
Preconstruction0 0 0 1000.000 0 0 1000.000
Fed (STP)
Construction0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local (Match) 0 0 0 0 0 0 0
Total 0 0 0 1000.000 0 0 1000.000
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction0 0 0 0 828.000 0 828.000
State 0 0 0 0 0 0 0
Local (Match) 0 0 0 0 172.121 0 172.121
Total 0 0 0 0 1000.121 0 1000.121
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction800.000 0 0 0 0 0 800.000
Fed (TE) 0 0 0 0 0 0 0
Local 166.300 0 0 0 0 0 166.300
Overmatch 24.233 0 0 0 0 0 24.233
Total 990.533 0 0 0 0 0 990.533
144.883
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction48.133 144.883 0 0 0 0 0 0
Fed (STP) Rollforward for
Obligation0
Local Rollforward for
Obligation0
Fed (BR-OS) 0 412.560 0 0 0 0 0 0
Local 10 30.118 0 0 0 0 0 0
103.140 0
Total 58.139 587.561 0 0 0 0 0 0
Fed (STP)
Preconstruction415.224 415.224 631.584 0 0 0 0 631.584
Fed (STP) Construction 0 0 0 0 0 0 0
Local 86.315 86.315 131.291 0 0 0 0 131.291
Overmatch 0 0 0 0 0 0 0.000
Total 501.539 501.539 762.875 0 0 0 0 762.875
Fed (STP)
Preconstruction0 0 2690.190 0 2690.190
Fed (STP) Construction 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
22-500Jackson Creek
Pkwy Expansion Monument
Jackson Creek Parkway (JCP) is a major north south
road from Baptist Road to Highway 105. The project is
intended to increase the 2 lane segment to 4 lanes to
insure safety and capacity. The portion of JCP south of
Higby Road is in the jurisdiction of Triview Metropolitan
District. North of Higby Road is the jurisdiction of the Town
of Monument. The scope of work for this portion of the
project consists of preconstruction and mitigation phases
only. Additionally, the preconstruction and construction
phases of a bicycle/pedestrian facility will be
completed.
Statewide
Household Travel
Survey
PPACG
Conduct PPACG's portion of the statewide household
travel survey. Local match will come from partners
(CDOT) in the project.
17.01Charter Oak Ranch
RoadEPC
Reconstruct the unimproved 2 lane road to collector
standards from Highway 85/87 to Gate 19 at Fort Carson
NOTE: In the process of rescoping the work for this
project
Admin. 1
Creek Walk TrailManitou
Springs
Continuation of the Creekwalk Trail from the completed
phase at schryver park west to the intersection of par
and manitou aves to allow connection to the Ute Pass
trail and Rainbow Falls
(Also funded in STBG)
10.5
&
17.022
NAGolden Lane Road
Bridge
Replacement
El Paso
County
Replace the bridge (NBI # 2196-00.00) On Golden Lane
Rd.over Fountain Creek. Bridge is 0.1 mi east of 31st Street
(Programmed for 2013) (Add $144,843 Fed/$30,117 Local)
Amend. 2
&
Admin. 6
8.38 SPP6156.018Canon Ave & Park
Ave Bridge repairs
Manitou
Springs
Reconstruct pier & spandrel wall, repair cracks,
repointing of stone masonry, replace bench & cap
stones, scour repair & construction of bridge saddle
(Programmed 2010) (Add $800K Fed/$200K Local)
Admin. 3
20-101 Ute Pass Trail El Paso Co Design and ROW improvements for Ute Pass Trail
13-23 SPP7006.999
SH 21 Widening (SH
21
Intersection/Interch
ange
Improvements)
CDOT
Widen SH 21 to six lanes from Platte Ave. to Fountain
Blvd. with a noisewall and added lanes east and west of
SH 21 at Airport Rd.
Amend. 2
13-6
&
17.023
SPP7004.001Traffic System
Upgrades
Colorado
Springs
Upgrades of traffic signal equipment including poles,
signal heads, controllers, enhanced street signs, video
detection devices, fiber optics & radar volume/speed
count devices throughout the city.
ALSO FUNDED IN CMAQ
Amend. 2
&
Admin. 6
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Overmatch 0 0 0 0 0 0 0
Total 0 0 2690.190 0 0 0 2690.190
1179.519
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 292.455 1179.519 468.759 0 0 0 0 468.759
Local 60.794 245.193 97.443 0 0 0 0 97.443
Overmatch 0 0 0 0 0 0 0
Total 353.249 1424.712 566.202 0 0 0 0 566.202
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 1555.116 3275.250 0 0 0 0 0 0
Local 323.270 680.844 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 1878.386 3956.094 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 0 77.666 0 0 0 0 0 0
Local 0 16.145 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 93.811 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 0 4235.490 0 0 0 0 0 0
Fed (STP) Rollforward for
Obligation0
Local Rollforward for
Obligation0
Local 0 880.454 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 5115.944 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 0 33.116 0 0 0 0 0 0
Local 0 6.884 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 40.000 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 0 280.000 0 0 0 0 0 0
Local 0 58.205 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 338.205 0 0 0 0 0 0
13-10
&
17.024
SPP6449.017Advanced Traffic
Detection
Colorado
Springs
Install advanced traffic detection system at about 77
intersections on Woodmen, Rockrimmon, Centennial,
Murray, Chelton, Palmer Park, Uintah, Fillmore and
Fontanero.
Amend. 2
&
Admin. 6
13-23 SPP7006.999
SH 21 Widening (SH
21
Intersection/Interch
ange
Improvements)
CDOT
Widen SH 21 to six lanes from Platte Ave. to Fountain
Blvd. with a noisewall and added lanes east and west of
SH 21 at Airport Rd.
Amend. 2
13-34
&
17.027
SPP6726.021Walker Rd.(SH 105)
Corridor
Improvements
El Paso
County
Widen to four lanes, add sidewalk, curb/gutter and turn
lanes from Woodmoor Dr. to Lake Woodmoor Dr.
Amend. 2
&
Admin. 6
13-31
&
17.026
SPP6726.018
MMT Route 12
Pedestrian/Transit
Accessibility
Improv.: Phase 3
Colorado
Springs
Complete handicapped accessible ramps and
sidewalks, construct concrete transit waiting pads and
enhanced crossings.
Admin. 6
13-36
&
17.025
SPP6726.023
Manitou Avenue
West End
Pedestrian and
Drainage
Improvements
Manitou
Springs
construct sidewalks & ramps, curb & gutter, repave
vehicle lanes, on-street parking, enhanced crosswalks,
improve storm drainage, new street lighting &
landscaping, round-a-bout at Manitou Ave. &
Serpentine Dr.
Admin. 6
13-83
&
17.029
SPP6516.042Monument
Front/1st/Lincoln
Sidewalks
Monument
Install of 1,800 ft. of 5' sidewalk, curb, gutter &handicap
ramps east side of Front Street (2nd Street to Lincoln Ave)
& 1,050 feet, north side of Lincoln Avenue (Front Street to
Washington St); 350 feet along north & south sides of 1st
Street (Front St)
Admin. 6
13-85
&
17.028
SPP6156.043Beacon Rd.
SidewalksMonument
Construct 1,700 feet of sidewalk on Beacon Lite Rd. from
SH 105 north.Admin. 6
13-84 SPP6516.041Douglas Ave.
ReconstructionPalmer Lake
Reconstruct approximately 3,400 lineal feet of Douglas
Ave. and other gravel roads that tie into Douglas.
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 3199.924 4255.279 2399.489 0 0 0 0 2399.489
Local (PPRTA) 665.185 884.568 498.795 0 0 0 0 498.795
PPRTA Overmatch Match 799.981 799.981 4870.345 0 0 0 0 4870.345
Total 4665.090 5939.828 7768.629 0 0 0 0 7768.629
Fed (STP)
Preconstruction0 0 1083.022 0 0 0 1083.022
Fed (STP) Construction 0 0 0 0 0 0 0
Local 0 0 225.134 0 0 0 225.134
Overmatch 0 0 0 0 0 0 0
Total 0 0 1308.156 0 0 0 1308.156
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction0 0 0 0 0 0 0
State (RAMP) 0 0 0 0 0 0 0
State (FASTER) 0 0 0 0 0 0 0
State - 7th Pot 0 0 0 0 0 0 0
State (RPP) 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 0 0 783.000 0 0 0 783
State (RPP) 0 0 0 0 0 0 0
Local (CoS/El Paso Co) 0 0 0 0 0 0 0
Total 0 0 783.000 0 0 0 783
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 0 179.099 631.930 0 0 0 0 631.930
Local 0 37.230 131.363 0 0 0 0 131.363
Overmatch 0 44.701 0 0 0 0 44.701
Total 0 216.329 807.994 0 0 0 0 807.994
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 0 393.813 0 0 0 0 0 393.813
Local 0 81.864 0 0 0 0 0 81.864
Overmatch 0 0 0 0 0 0 0
Total 0 475.677 0 0 0 0 0 475.677
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 947.376 1017.593 947.376 0 0 0 0 947.376
Local 196.936 211.532 196.936 0 0 0 0 196.936
Overmatch 0 0 0 0 0 0 0
Total 1144.312 1229.125 1144.312 0 0 0 0 1144.312
Fed (STP)
Preconstruction0 86.656 210.000 0 0 0 0 210.000
Fed (STP) Construction 0 0 0 0 0 0 0
Local 0 18.014 43.654 0 0 0 0 43.654
Overmatch 0 0 10.497 0 0 0 10.497
Total 0 104.670 253.654 10.497 0 0 0 264.151
13-62 SR26867.050SH 21/Old Ranch
Road Interchange
Completion
CDOT
SH 21/Old Ranch Road Interchange Completion. Admin.
Change #13 moved $125,000 from 2015 to 2014 to fund
necessary utility work. Amd. #17 adds $8.6 million of
FASTER Safety in 2015; $33,208 of FASTER Safety in 2014;
$241,792 of Strategic funds in 2014.
16-819 SPP6726.029Baptist Rd./I-25
Interchange Debt
Repayment
CDOT
partial payment of CDOT's committmemt to repay BRRTA
revenue bond for Baptist Road Bridge Interchange
$1083.22, approved by the PPACG board on 05/13/15.
CDOT is working on identifying non-federal funding
source to for repayment
Amend. 2
13-32
&
17.030
SPP6726.019Platte Avenue
Bridge
Replacements
Colorado
SpringsReplace bridges at Platte Ave. and Sand Creek. Admin. 6
13-4
&
17.032
SPP7003.004Black Forest Road
Culvert
Replacements
El Paso
County
Replace two culverts on Black Forest Road 0.6 mi north
of Shoup Road,Admin. 6
13-3
&
17.031
SPP7003.003Arnold Ave. Bridge
Replacement
El Paso
County
Replace the bridge on Arnold Ave. 0.2 miles west of
Mitchell Avenue.Admin. 6
16-803-B SR26867.040
I-25/Cimarron
Interchange
Reconstruction
CDOT I-25/Cimarron Interchange Reconstruction
13-5
&
17.034
SPP7003.005Elbert Road Bridge
Rehabilitaion
El Paso
County
Replace decking and surface of bridge over Black
Squirrel Creek 0.4 miles north of Latigo Drive.Admin. 6
13-1
&
17.033
SPP7003.001Cheyenne Canon
Road Bridge
Replacements
Colorado
Springs
Plan, design and replace the three existing bridges over
North Cheyenne Creek beginning 1.1 miles west of Evans
Ave..
Admin. 6
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Fed (STP)
Preconstruction40.000 62.400 77.140 149.219 149.219 149.219 627.197
Fed (STP)
Construction0 0 0 0 0 0 0
Local 8.315 12.971 16.036 0 0 0 37.322
Total 48.315 75.371 93.176 31.019 31.019 31.019 309.919
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP) Construction 0 167.994 0 0 0 0 0 0
Local 0 34.922 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 202.916 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction0 800.000 0 0 0 0 0 0
Local 0 166.300 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Totals 0 966.300 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction0 411.124 0 0 0 0 0 0
Local 0 85.463 0 0 0 0 0 0
Total 0 496.587 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 800.000 0 0 0 800.000
Fed (STP)
Construction0 0 0 0 0 0 0
Local 0 0 166.300 0 0 0 166.300
Total 0 0 966.300 0 0 0 966.300
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction0 81.929 0 0 0 0 0 0
Local 0 17.031 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 98.960 0 0 0 0 0 0
Fed (STP)
Preconstruction0 0 0 0 0 0 0
Fed (STP)
Construction0 545.726 0 0 0 0 0 0
Fed (STP) Rollforward for
Obligation0 0 0 0 0 0 0
Local Rollforward for
Obligation0 0 0 0 0 0 0
Local 0 113.443 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 659.169 0 0 0 0 0 0
Fed (STP)
Construction0 267.047 0 0 0 0 0 0
Fed (STP) Rollforward for
Obligation0 0 0 0 0 0 0
Local Rollforward for
Obligation0 0 0 0 0 0 0
Local 0 55.512 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 0 322.559 0 0 0 0 0 0
13-39 SPP6726.002
Transit Planning
Studies Colorado
Springs
(FLEXED TO FTA)
Description to be added
16-200
&
17.037
SPP6516.027Pikes Peak
GreenwayCOS
Reconstruct a one mile segment from I-25/Nevada north
to the Cottonwood Creek bridge. Improvements will
enhance safety.
Admin. 6
13-30
&
17.036
SPP6726.024Indiana Ave/BNSF
Xing ImprovementFountain
Construct 4-laneroad from US 86 to Race St. & a 3-lane
road from Race to S. Main St.; close RR Xing on Illinois
Ave
Admin. 6
13-30
&
17.035
SPP6726.017 MMT Rt 6 MMT
MMT Route 6 Pedestrian/Transit Accessibility Improv.
Operate route 6 on Fillmore Street. This route would
improve on-time performance and system reliability,
directly serve numerous ridership generators and
provide increased access to numerous employment
opportunities along the Fillmore corridor. New
pedestrian accessibility improvements would be made
to allow the new route to function.
Amend. 1
&
Admin. 6
13-2
&
17.039
Paseo Road Bridge
Replacement
Colorado
Springs
Plan, design and replace the box culvert over a Shooks
Run tributary south of Jefferson St
Amend. 2
&
Admin. 6
13-25
17.038
31St Street Bridge
Over Camp Creek
Replacement
Colorado
Springs
Design and environmental clearances for bridge
extending from Fountain Creek just north of US 24 to Echo
Lane
Amend. 2
&
Admin. 6
10.13 SPP0543Woodmen Rd:
Stinson to SH 21:
Phase 2
Colorado
Springs
Design & row acquisition to support Woodmen Rd.
Improvement project from Stinson to SH 21Amend. 2
13-26
&
17.040
SPP6726.013
Academy
Boulevard
Improvements:
Airport to Academy
Loop
Colorado
Springs
Analysis to develop conceptual design for
reconstruction of the Academy Blvd./Hancock Expwy.
Intersection as a "complete streets" intermodal at-grade
intersection
Admin. 6
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Fed (STP) 234.190 0 0 0 0 0 234.190
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
Total 234.190 0 0 0 0 0 234.190
Fed (CMAQ)
Preconstruction0 0 0 0 0 0 0
Fed (CMAQ)
Construction0.000 0 0.000 290.368 0 0 290.368
Local 0.000 0 0.000 60.360 0 0 60.360
Overmatch 0 0 0.000 0 0 0 0
Total 0.000 0 0.000 351 0 0 350.728
Federal (Metro) 8898.453 7670.003 7819.788 7933.936 2741.638 6886.650 35595.685
Federal (BR OS) 0 0 0 0 0 0 0
Federal (TE) 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local 1801.087 1594.405 903.551 1350.015 538.900 1400.546 7588.503
Overmatch 0 44.701 10.497 0 0 0 55.198
Total 10699.540 9309.109 8733.836 9283.951 3280.538 8287.196 49594.169
Fed (5303) 930.318 940.496 950.775 0 0 0 2821.589
Local 193.390 195.506 197.643 0 0 0 586.539
Total 1123.708 1136.002 1148.418 0 0 0 3408.128
Planning Totals
Federal 930.318 940.496 950.775 0 0 0 2821.589
Local 193.390 195.506 197.643 0 0 0 586.539
Total 1123.708 1136.002 1148.418 0 0 0 3408.128
Federal (STP-Metro) 0 0 0 0 0 0 0
State (RAMP) 7931.138 0 0 0 0 0 7931.138
State (FASTER Safety) 0 0 0 0 0 0 0
State (Highway Safety IP) 0 0 0 0 0 0 0
State (from SUR TRTMT) 2860.000 0 0 0 0 0 2860.000
State (Bridge) 8293.123 0 0 0 0 0 8293.123
State (RAMP Asset Mngt) 0 0 0 0 0 0 0
State (RPP) 0 0 0 0 0 0 0
State (Project Savings) 0 0 0 0 0 0 0
Local (COS/El Paso Co) 3050.000 2000.000 0 0 0 0 5050.000
Total 22134.261 2000.000 0 0 0 0 24134.261
Fed (STP-Metro) 0 0 0 0 0 0 0
State (RAMP) 0 0 0 0 0 0 0
State (RPP) 0 0 0 0 0 0 0
Local (PPRTA) 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
8.23 SPP6449.005Falcon Area Park
and Ride Expansion
El Paso
County
Add 150 parking spaces and improvements to access
and operations of the facility. (programmed 2010)
17.6Regional Data
Collection SummitPPACG
PPACG is coordinating a regional data summit among its
member entities. The summit will be a collaborative
effort to coordinate regional data collection include:
pavement condition, traffic counts, crashes, congestion,
other factors that affect the region.
Amend. 4
13-60 SSP4227
I-25/Fillmore
Diverging Diamond
Interchange
Construction
CDOTI-25/Fillmore Diverging Diamond Interchange
Construction
RAMP
13-59 SR26867.040I-25/Cimarron
Interchange
Reconstruction
CDOT I-25/Cimarron Interchange Reconstruction
STP-Metro Totals
Transportation Planning
16-1000 SST5274.004
23 U.S.C. Section
104 and Section
5303 Metropolitan
Planning
PPACG PPACG regional transportation planning
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
RAMP Totals Fed (STP-Metro) 0 0 0 0 0 0 0
State (RAMP) 7931.138 0 0 0 0 0 7931.138
State (FASTER Safety) 0 0 0 0 0 0 0
State (HSIP) 0 0 0 0 0 0 0
State (SUR TRTMT) 2860.000 0 0 0 0 0 2860.000
State (Bridge) 8293.123 0 0 0 0 0 8293.123
State (RAMP Asset Mgmt) 0 0 0 0 0 0 0
State (RPP) 0 0 0 0 0 0 0
Local 3050.000 2000.000 0 0 0 0 5050.000
Total 22134.261 2000.000 0 0 0 0 24134.261
Fed (Metro) 3646.000 0 0 0 0 0 3646.000
State 912.000 0 0 0 0 0 912.000
Local - City of Col. Spr. 0 0 0 0 0 0 0
Total 4558.000 0 0 0 0 0 4558.000
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 1324.640 0 0 0 0 0 1324.640
State 275.360 0 0 0 0 0 275.360
Local 0 0 0 0 0 0 0
Total 1600.000 0 0 0 0 0 1600.000
Federal 0 0 0 165.580 0 0 165.580
State 0 0 0 34.420 0 0 34.420
Local 0 0 0 0 0 0 0
Total 0 0 0 200.000 0 0 200.000
Federal 0 0 0 165.580 0 0 165.580
State 0 0 0 34.420 0 0 34.420
Local 0 0 0 0 0 0 0
Total 0 0 0 200.000 0 0 200.000
Federal 3312.000 0 0 0 0 0 3312.000
State 688.000 0 0 0 0 0 688.000
Local 0 0 0 0 0 0 0
Total 4000.000 0 0 0 0 0 4000.000
Federal 0 783.000 0 0 0 783.000
State 0 0 0 0 0 0.000
Local 0 0 0 0 0 0 0
Total 0 0 783.000 0 0 0 783.000
109 SPP6337SH 21: Purchase
Right-of-WayCDOT
purchase right-of-way for SH 21 Boulevard between mile
markers 131.5 to 139.5 and 141.5 to 154.1. This is roughly
from SH 83 south to I-25.
13-68 SR26867.029
I-25 and S.
Academy Blvd.
Acceleration Ramp
Improvements
CDOTExtend the north-bound on ramp at I-25 and S. Academy
Blvd.
Regional Priorities
7 SSP4227I-25: SH 16 to
Douglas Co.LineCDOT I-25/Cimarron Interchange Reconstruction
13-71 SR26867.070US 24 at 31st Street
Intersection
Improvements
CDOTminor widening of east bound auxiliary lane on US24 at
31st St.Amend. 3
13-70 SR27002.032US 24 at 21st Street
Intersection
Improvements
CDOTAdd left turn storage capacity on west bound US 24 at
21st St. Amend. 3
13-72 SPP7006SH 21 Right of Way
PreservationCDOT
Preservation of right of way along Central SH 21 from SH
16 to Woodmen Road with potentially one parcel from
SH 83 to I-25 (13 TIP Amd 26 - programmed in 17 1374.640
fed/275.360 state)
16-821 SPP7007US 24 West
ImprovementsCDOT Design work for W. US 24 Improvements Amend. 2
16-820 SR26867.025US 24 West Corridor
in Pikes Peak TPRCDOT
Construction of safety improvements from 8th St. to the E.
US 24/Manitou Ave. interchange (Programmed in 13 TIP:
2016 -8279.000 Fed & 1721.000 State & 2017 - 2483.700 Fed
& 516.300 State = 13000)
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal 0 0 0 827.900 0 0 827.900
State 0 0 0 0 0 0 0
Local 0 0 0 172.100 0 0 172.100
Total 0 0 0 1000.000 0 0 1000.000
Federal 0 0 0 827.900 0 0 827.900
State 0 0 0 0.000 0 0 0.000
Local 0 0 0 172.100 0 0 172.100
Total 0 0 0 1000.000 0 0 1000.000
Federal 0 0 0 413.950 0 0 413.950
State 0 0 0 0 0 0 0
Local 0 0 0 86.050 0 0 86.050
Total 0 0 0 500.000 0 0 500.000
Federal 0 0 0 82.790 0 0 82.790
State 0 0 0 17.210 0 0 17.210
Local 0 0 0 0 0 0 0
Total 0 0 0 100.000 0 0 100.000
Federal 0 0 0 0 1241.850 0 1241.850
State 0 0 0 0 258.150 0 258.150
Total 0 0 0 0 1500.0000 0 1500.000
Federal 8282.640 0.000 783.000 2483.700 1241.85 0 12791.190
State 1875.360 0 0 86.050 258.150 0 2219.560
Local 0 0 0 430.250 0 0 430.250
Total 10158.000 0 783.000 3000.000 1500 0 15441.000
Fed 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Fed Rollforward for
Obligation
Local Rollforward for
Obligation
Total 0 0 0 0 0 0 0
Fed Preconstruction
(STP Metro)0 0 0 0 0 0 0
Fed Construction
(STP Metro)0 159.950 0 0 0 0 0 0
Fed Rollforward for
Obligation0 0 0 0 0 0 0
Local Match 33.250 0
Local Rollforward for
obligation0 0 0 0 0 0 0
Total 0 193.200 0 0 0 0 0 0
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Safety Enhancement Totals
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
SR26868.057
US 24G East
Planning and
Environmental
Linkages Study
CDOT
US 24 G East Planning and Environmetnal Linkages Study.
Provides a 50% contribution to the project originally
funded in the Central Front Range in 2016.
SPP7007.999Rainbow Falls
Aesthetic
Enhancement
CDOTConstruct aesthetic treatments on the Rainbow Fals
Aesthetic Enhancement Bridge Amend. 3
SPP7006SH 21 Corridor
DesignSH 21 Corridor Design
SR26867.072
I-25 Planning and
Environmental
Linkages (PEL) Study
from Monument to
Castle Rock.
Planning and Environmental Linkages (PEL) Study from
Monument to Castle Rock
Amend. 2
10.46
&
17.041
NAPrinters Prkway and
Prkside Dr Round-a-
about
Colorado
Springs
Design and Construct Round-a-bout (Programmed 2013)
(Add $160 k Fed/$0k Local)Admin. 6
Regional Priorities Totals
Hazard Elimination Safety Enhancements
10.47 SR26644.049Int. Improvements @
Platte & TejonCOS Construct left turn lanes, shift parking
17.15 SR26867.076I-25 Corridor
Management-
Design
CDOT
I-25 from Circle to Fountain. Corridor Management. This
funding provides funding for design of the I-25 Corridor.
The design is for widening I-25 from 4 to 6 lanes.
Amend. 7
Safety Enhancements
Safety
Enhancements Poolprojects to be determined
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal HOT SPOT 260.000 0 0 0 0 0 260.000
HSIP 600.000 0 0 0 0 0 600.000
Total 860.000 0 0 0 0 0 860.000
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal Hot Spot 368.415 0 0 0 0 0 368.415
Match Hot Spot 76.584 0 0 0 0 0 76.584
HSIP 0 0 0 0 0 0 0
Region 2 Funds 62.092 0 0 0 0 0 62.092
Match Region 2 12.907 0 0 0 0 0 12.907
Access Permit Fee 26.648 0 0 0 0 0 26.648
Total 546.646 0 0 0 0 0 546.646
Safety Hot Spot Totals
Federal HOT SPOT 628.415 0 0 0 0 0 628.415
HSIP 600.000 0 0 0 0 0 600.000
State 0 0 0 0 0 0 0
Total 1228.415 0 0 0 0 0 1228.415
Fed (SRTS) 0 195.519 0 0 0 0 0 0
Local 0 48.880 0 0 0 0 0 0
Fed (SRTS) Rollforward for
Obligation0
Local Rollforward for
Obligation0
Total 0 244.399 0 0 0 0 0 0
Safe Routes to Schools Totals
Federal 0 0 0 0 0 0 0
State 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
Federal 0 0 0 0 0 0 0
State - 7th Pot 14253.123 0 0 0 0 0 14253.123
State - RAMP 8000.000 0 0 0 0 0 8000.000
STP-Metro (PPACG) 0 0 0 0 0 0 0
Overmatch 0 0 0 0 0 0 0
Total 22253.123 0 0 0 0 0 22253.123
16-823 NA Install HAWK System CDOTUS 24A @ Center St. (Woodland Park) Install HAWK
System
Safety Hot Spot
16-822 NASH 21 Signal and
Turn Lane at 2
locations
CDOT
Design and Construction of two projects 1) New Signal @
SH 21 & Bradley Rd. 2) New left turn lane @ SH 16 &
Mesa Ridge Rd.
Safe Routes to School
13-55
&
17.042
SR26868.022
Van Buren Street
Walk and Bike to
School Access
Project
Colorado
SpringsVan Buren Street Walk and Bike to School Access Project
17.012
&
16-822
SR26644.076
SH 21 (Powers Blvd)
and Mesa Ridge
Pkwy
CDOTThis project consists of the construction of intersection
traffic control signals and lighting at the intersection. Admin. 5
16-824 NAInstall Flashing
BeaconCDOT US 24 @ Morning Sun Install flashing Beacon
Strategic Projects
7 SSP4227I-25: SH 16 to
Douglas County
Line
CDOT
Supplemental funding for utility work at SH 21 Boulevard
and I-25 to include: fencing, final stabilization, and post-
acceptance erosion damage repairs.
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Fed
(STP-Metro PPACG)0 0 0 0 0 0 0
State - 7th Pot 14253.123 0 0 0 0 0 14253.123
State - RAMP 8000.000 0 0 0 0 0 8000.000
Overmatch 0 0 0 0 0 0 0
Total 22253.123 0 0 0 0 0 22253.123
Federal
(TIGER VI)0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
State RPP 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0
State RPP 2750.000 0 0 0 0 0 2750.000
Local 160.000 0 0 0 0 0 160.000
Total 2910.000 0 0 0 0 0 2910.000
State SB228 3000.000 0 0 0 0 0 3000.000
Total 3000.000 0 0 0 0 0 3000.000
Fed (Design) 53.094 0 0 0 0 0 53.094
Local (Design) 11.036 0 0 0 0 0 11.036
Fed (Construction) 442.451 0 0 0 0 0 442.451
Local (Construction) 91.974 0 0 0 0 0 91.974
Total 598.555 0 0 0 0 0 598.555
Federal 2072.600
0 0 0 0 0 2072.600
State
0 0 0 0 0 0
Local
0 0 0 0 0 0
Total
2072.600 0 0 0 0 0 2072.600
Federal 501.575
0 0 0 0 0 501.575
State
0 0 0 0 0 0
Local
0 0 0 0 0 0
Total
501.575 0 0 0 0 0 501.575
Water Quality Mitigation RPP
16-101 NAStruther Water
Mitigation (I-25 @
North Gate)
El Paso Water Quality Mitigation @ I-25 & North Gate Admin. 1
Strategic Projects Totals
TIGER VI GRANT
16-100 NACharter Oak Ranch
Road El Paso
Design repaving and upgrade Charter Ranch Rd from Ft.
Carson Gate 19 to I-25 Interchange
Amend. 3
Emergency Relief Funds
17.02
Judge Orr
Concrete Box
Culvert Project
El Paso
Project is located on Judge Orr Road at Bennet Channel
(0.38 miles west of Judge Orr/US 24 Instersection) Project
consists of: install sheetpile on downstream side of
roadway to act as headwall for culverts.; install riprap
around sheetpile and riprarp for plunge pool; concrete
headwall to prevent plunge pool from washing out;
install about 150 linear feet of right-of-way fence; seed
blanket disturbed areas to re-establish soil stabilization
and prevent scour
Admin. 2
SB228 Funds
17.1 CDOT
Funding is for a right-of-way phase to begin looking at
options for a replacement sight for the Woodmen Park-
And-Ride location
17.7 US 24 PWQ PondColorado
Springs
This project consists of design and construction of an
extended detention basin (EDB) located between the
South Bank of Fountain Creek and US 24 west of Ridge
Road in Colorado Springs. The EDB will collect water
from drainages to the south via two proposed 36”
culverts aligned under US 24 on the west side of the
Ridge Road Intersection. Water will discharge from the
EDB into Fountain Creek through an outlet structure, and
in high flow events, through an overflow weir located on
the north side of the EDB.
Amend. 5
17.06Drainage Structure
RepairCDOT
Design concrete box culvert that drains into Douglas
Creek under I-25 at mile marker 144 and 145. Admin. 4
17.05 Wing Wall Project CDOTRepair drainage structures in El Paso County on I-25 at at
mile marker 145.12Admin. 4
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal (5307) 6966.704 7106.038 7248.159 7393.122 7540.985 7691.804 43946.812
Local (5307) 2090.333 2348.949 2191.616 2542.155 2293.281 2289.427 13755.761
Total 9057.037 9454.987 9439.775 9935.277 9834.266 9981.231 57702.573
Federal (5339) 691.158 704.981 719.081 733.463 748.132 763.094 4359.909
Local (5339) 296.211 302.135 308.178 314.341 320.628 327.040 1868.533
Total 987.369 1007.116 1027.259 1047.804 1068.760 1090.134 6228.442
Federal (5310) 51.200 0 0 0 0 0 51.200
Local (5310) 12.800 0 0 0 0 0 12.800
Total 64.000 0 0 0 0 0 64.000
Federal (5310) 34.658 0 0 0 0 0 34.658
Local (5310) 8.665 0 0 0 0 0 8.665
Total 43.323 0 0 0 0 0 43.323
New Freedom 40.000 0 0 0 0 0 40.000
Local 10.000 0 0 0 0 0 10.000
Total 50.000 0 0 0 0 0 50.000
Federal (5310) 411.077 0 0 0 0 0 411.077
Local (5310)73.994 0 0 0 0 0 73.994
Total 485.071 0 0 0 0 0 485.071
Transit TotalsFederal
(Strategic Proj.)0
Federal
(5307)6966.704 7106.038 7248.159 7393.122 7540.985 7691.804 68150.957
Local
(5307)2090.333 2348.949 2191.616 2542.155 2293.281 2289.427 19827.905
Federal
(5310)496.935 0 0 0 0 0 496.935
Local
(5310)95.459 0 0 0 0 0 95.459
Federal (5339) 691.158 704.981 719.081 733.463 748.132 763.094 5761.179
Loal (5339) 296.211 302.135 308.178 314.341 320.628 327.040 2469.078
New Freedom 40.000 0 0 0 0 0 40.000
Federal
(FTA Planning)0 0 0 0 0 0 0
FASTER 0 0 0 0 0 0 0
PPRTA 0 0 0 0 0 0 0
Local 0 0 0 0 0 0 0
Total 10676.800 10462.103 10467.034 10983.081 10903.026 11071.365 96841.513
Private
(Preconstruction)1617.000 0 0 0 0 0 1617.000
Private
(Construction) 0 35000.000 0 0 0 0 35000.000
Total 1617.000 35000.000 0 0 0 0 36617.000
Private Fund Totals
Private 1617.000 35000.000 0 0 0 0 36617.000
Total 1617.000 35000.000 0 0 0 0 36617.000
Transit
17.8 MMTOperating, Maintenance, Planning and Capital projects
to be selected
17.08MMT Barrier
Removal Phase IIIMMT MMT Barrier Removal Phase III Admin. 4
17.07MMT Barrier
Removal Phase IIMMT MMT Barrier Removal Phase II Admin. 4
Amend. 6
17.9 MMT Fixed-route vehicle purcahse Amend. 6
Private Funds
17.16North Powers
Boulevard Phase I
Project
Copper Ridge
Metropolitan
District
The Copper Ridge Metro District will be designing and
constructing phase I of North Powers Boulevard located
between I-25 and Voyager Parkway in COS. Phase I
consists of the I-25/North Gate/North Powers interchange
complex on the west end of the connection and a
signalized intersection at I-25/Voyager on the east end.
This segment of Powers Boulevard will be constructed
with two lanes in each direction.
17.18 FTA Program 5310 MMT
Projects to improve mobility for seniors and individuals
with disabilities by removing barriers to transportation
service and expanding transportation mobility options.
Projects to be selected.
Amend. 8
17.09MMT Barrier
Removal Phase IVMMT MMT Barrier Removal Phase IV Admin. 4
Amend. 8
TIP # STIP # Project TitleProject
SponsorDescription
Amendment/Adm
inistrative ChangeFunding Source 2017
2017
(Roll Forward)2018 2019 2020 2021 2022 Total
Federal 1700.000 0 0 0 0 0 1700.000
Local 0 0 0 0 0 0 0
Total 1700.000 0 0 0 0 0 1700.000
Federal 1700.000 0 0 0 0 0 1700.000
Local 0 0 0 0 0 0 0
Total 1700.000 0 0 0 0 0 1700.000
Contingency Fund Totals
Federal 3400.000 0 0 0 0 0 3400.000
Local 0 0 0 0 0 0 0
Total 3400.000 0 0 0 0 0 3400.000
Federal 0 0 0 0 0 0 0
State 200.000 0 0 0 0 0 200.000
Local 0 0 0 0 0 0 0
Total 200.000 0 0 0 0 0 200.000
Culvert Program Fund Totals
Federal 0 0 0 0 0 0 0
State 200.000 0 0 0 0 0 200.000
Local 0 0 0 0 0 0 0
Total 200.000 0 0 0 0 0 200.000
Federal 53582.211 31064.119 24310.243 36938.981 12879.637 15747.219 174522.410
State 59557.276 3175.406 684.310 3821.944 366.443 0 67605.380
Total 113139.487 34239.525 24994.553 40760.925 13246.080 15747.219 242127.790
Admin. 6
Grand Total
Critical Culvert Program
17.013 SR 26710.045Design of critical
culvert repairs in
the PPACG area
CDOT
Design repairs for culverts needing attention in the
PPACG area. Repairs could include the lining of the
structure, structural repairs of concrete box culverts,
cleaning and removal of silt, and design of outlet splash
pads.
17.26SH 21 and Research
Parkway
Interchange
CDOT This project consists of design Amend. 8
CDOT Transportation Contingency Fund
17.25I-25 Academy to
Circle WideningCDOT This project consists of design Amend. 8