US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14 Planned Dredging and Placement Area Construction Contracts Christopher Frabotta Deputy Chief, Operations Division / Chief, Navigation Branch Southwestern Division - Galveston District November 6, 2012

Transcript of FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial...

Page 1: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Beneficial Use of Dredged Material Workshop

Custodians of the Coast

FY-13 Scheduled & FY-14 Planned Dredging and Placement Area

Construction Contracts Christopher Frabotta Deputy Chief, Operations Division / Chief, Navigation Branch Southwestern Division - Galveston District November 6, 2012

Page 2: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

SWG - Galveston District

OPERATIONS MANAGERS Paula Wise Alicia Rea Tricia Campbell Eddie Irigoyen

Page 3: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Beneficial Use of Dredged Material Workshop

Custodians of the Coast

Corpus Christi Ship Channel Sabine-Neches Waterway Texas City Channel

Paula Rankin Wise

Operations Manager

Navigation Branch

November 6, 2012

Page 4: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Paula Wise Operations Manager

Corpus Christi Ship Channel Sabine-Neches Waterway Texas City Channel Cedar Bayou Trinity River & Tributaries Double Bayou Clear Creek & Clear Lake Dickinson Bayou

Page 5: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contracts Corpus Christi Ship Channel

Page 6: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Corpus Christi Ship Channel PA 1 Levee Raising / DAMP

Type of Work: Levees / Dewatering

Placement Area: PA 1

Type of Equipment: Bull dozers; Excavators, marsh buggies

Est. Start Date: September 2013 Corpus Christi Ship Channel

Ingleside Nueces

Bay

Corpus Christi

Port Aransas

Aransas Pass

BC

N 8

2 2

1

PA 1

Page 7: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Corpus Christi Ship Channel PA 10 /13 Rock Stabilization

Type of Work: Improvements

Placement Area: PA 10; PA 13

Type of Equipment: Bull dozers; Excavators

Est. Start Date: October 2013 Corpus Christi Ship Channel

Ingleside Nueces

Bay

Corpus Christi

Port Aransas

Aransas Pass

BC

N 8

2 2

1

PA 10

PA 13

Page 8: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contracts Corpus Christi Ship Channel

Page 9: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Corpus Christi Ship Channel

Ingleside Nueces

Bay

Corpus Christi

Port Aransas

Aransas Pass

BC

N 8

2 2

1

Project: Corpus Christi Ship Channel Entrance / Jetty Channel

Dredging Quantity: 900,000 cubic yards

Material Type: Silt/Sand

Placement Area: Offshore

Distance to Placement Area: 2.5 Mile Avg.

Type of Equipment: Hopper Dredge

Env. Window: Dec. 1 thru Mar. 31

Reason for Window: Sea Turtles

Award: 2nd Quarter

Page 10: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Corpus Christi Ship Channel Inner Basin to Main Turning

Basin

Dredging Quantity: 2,500,000 cubic yards

Material Type: Silt/Sand

Placement Area: Open Water/Upland

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: Sept. – Mar.

Reason for Window: Turtles and Nesting Birds

Award: 3rd Quarter

Ingleside Nueces Bay

La Quinta Channel

Corpus Christi

Port Aransas

Aransas Pass

11

14-A

14

-B

PA 10 15

-A

15-B

16

-A

16-B

17

-A

17-B

B

CN

82

PA 6

2

PAs 7 & 8

PA 2

Page 11: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contracts Sabine-Neches Waterway

Page 12: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Page 13: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

1

2

3

4

Sabine Project: Sabine-Neches Waterway Outer Bar and Bank

Channel

Dredging Quantity: 2,500,000 cubic yards

Material Type: Silt/Clay

Placement Area: Offshore

Distance to Placement Area: 3 Mile Avg.

Type of Equipment: Hopper Dredge

Env. Window: Dec 1 – Mar 31

Reason for Window: Sea Turtles

Est. Start Date: September 2013

Page 14: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Sabine-Neches Waterway Neches River

Dredging Quantity: 2,500,000 cubic yards

Material Type: Silt/Clay

Placement Area: Various Upland PAs

Type of Equipment: Pipeline Dredge

Est. Start Date: September 2013

Page 15: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contracts Sabine-Neches Waterway

Page 16: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Sabine-Neches Waterway Port Arthur Canal, Turning

Basin, Junction Area and Taylors Bayou

Dredging Quantity: 2,500,000 cubic yards

Material Type: Silt/Clay

Placement Area: PA 8 and PA 9

Distance to Place Area: 1.5 - 2 Miles Avg.

Type of Equipment: Pipeline Dredge

Award: 1st Quarter

9

8

Port Arthur

Port Arthur Turning Basins

Junction Area

Page 17: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

1

2

3

4

Sabine Project: Sabine-Neches Waterway Outer Bar and Bank

Channel

Dredging Quantity: 3,000,000 cubic yards

Material Type: Silt/Clay

Placement Area: Offshore

Distance to Placement Area: 3 Mile Avg.

Type of Equipment: Hopper Dredge

Env. Window: Dec. 1 thru Mar. 31

Reason for Window: Sea Turtles

Award: 3rd Quarter

Page 18: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Sabine-Neches Waterway Sabine Pass Channel

Dredging Quantity: 2,000,000 cubic yards

Material Type: Silt/Sand

Placement Area: PA 5A, 5B and 5C

Distance to Place Area: 3.5 Mile Avg.

Type of Equipment: Pipeline Dredge

Award: 4th Quarter

Sabine

Gulf of Mexico

5 6

Page 19: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contract Texas City Channel

Page 20: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Texas City

Project: Texas City Channel DAMP of Placement Area

5&6

Type of Work: Dewatering

Placement Area: PA 5&6

Type of Equipment: Excavators; Dozers; Marsh Buggy

Est. Start Date: October 2013

Page 21: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contract Texas City Channel

Page 22: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Texas City Channel Main Channel and Turning

Basin

Dredging Quantity: 2,000,000 cubic yards

Material Type: Silt/Sand

Placement Area: PA 5/6; SPPA’s 3, 4, 5

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Award: 4th Quarter

Page 23: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Questions Comments?

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Page 24: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Beneficial Use of Dredged Material Workshop

Custodians of the Coast

Alicia D. Rea

Operation Manager

Navigation Branch

November 6, 2012

Brazos Island Harbor Gulf Intracoastal Waterway, TX Matagorda Ship Channel

Page 25: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Brazos Island Harbor (Brownsville) Gulf Intracoastal Waterway, TX Matagorda Ship Channel Channel to Port Mansfield Channel to Port Isabel Channel to Palacios Channel to Aransas Channel to Harlingen Channel to Port Bolivar

Alicia Rea Operations Manager

Page 26: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contracts Brazos Island Harbor (Brownsville Harbor)

Page 27: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

1 Port Isabel

2 3 4

5

7 8

Port of Brownsville

T E X A S

M E X I C O

Project: Brazos Island Harbor Brownsville Ship Channel

Dredging Quantity: 350,000 cubic yards

Material Type: Silt

Placement Area: Upland

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Est. Start Date: June 2013

Page 28: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

1 Port Isabel

2 3 4

5

7 8

Port of Brownsville

T E X A S

M E X I C O

Project: Brazos Island Harbor Brownsville Jetty Channel

Dredging Quantity: 350,000 cubic yards

Material Type: Sand

Placement Area: Beach/BU

Distance to Place Area: 2 Miles Avg.

Type of Equipment: Hopper/Pipeline Dredge

Env. Window: Oct-Mar

Reason for Window: Turtle/Tourism

Est. Start Date: October 2013

Page 29: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contract Brazos Island Harbor (Brownsville Harbor)

Page 30: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

1 Port Isabel

2 3 4

5

7 8

Port of Brownsville

T E X A S

M E X I C O

Project: Brazos Island Harbor Brownsville Jetty Channel

Dredging Quantity: 350,000 cubic yards

Material Type: Sand

Placement Area: Beach/BU

Distance to Place Area: 2 Miles Avg.

Type of Equipment: Hopper/Pipeline Dredge

Env. Window: Oct-Mar

Reason for Window: Turtle/Tourism

Award: 4th Quarter

Page 31: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contracts Gulf Intracoastal Waterway, TX

Page 32: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Aransas Bay

Project: Gulf Intracoastal Waterway Construct Beneficial Use

(BU) Site at Aransas National Wildlife Refuge

Type of Work: BU Site

Material Type: Silt/Clay

Type of Equipment: Marsh Buggy

Est. Start Date: April 2013

Page 33: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Provide a map of that shows the work package. Add as many maps as you need

Port O’Connor

117

117-a

118

118

119

119

120

120 121

121-A 122

1 2

123

Project: Gulf Intracoastal Waterway Port O’Connor to San

Antonio Bay

Dredging Quantity: 750,000 cubic yards

Material Type: Sand/Silt

Placement Area: Upland/Open Water/BU

Distance to Place Area: 1.0 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: April thru October

Reason for Window: Nesting Bird

Est. Start Date: May 2013

Page 34: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Provide a map of that shows the work package. Add as many maps as you need

Project: Gulf Intracoastal Waterway Main Channel Across

Aransas Bay

Dredging Quantity: 600,000 cubic yards

Material Type: Sand/Silt

Placement Area: Open / BU

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: April thru Oct

Reason for Window: Whooping Crane/Nesting Birds

Est. Start Date: July 2013

Page 35: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Rollover Pass

28 29 30 31

32 33 34 35

36

Beach Nourishment Area

37 38

39 40

41

42

Bolivar Marsh 43

Bolivar Ferry Port Bolivar

Smith Point

Project: Gulf Intracoastal Waterway High Island to Bolivar, Channel to

Port Bolivar, and Across Galveston Bay

Dredging Quantity: 400,000 cubic yards

Material Type: Fine Sand/Silt

Placement Area: Open / Upland Confined/BU

Distance to Place Area: 2 Miles Avg.

Type of Equipment: Pipeline Dredge

Env. Window: Oct-Mar

Reason for Window: Nesting Turtles

Est. Start Date: October 2013

Page 36: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contracts Gulf Intracoastal Waterway, TX

Page 37: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Gulf Intracoastal Waterway Corpus Christi to Port Isabel

Dredging Quantity: 2,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/BU Sites

Distance to Placement Area: 3 Miles Avg.

Type of Equipment: Pipeline Dredge

Env. Window: Oct. – Mar.

Reason for Window: Seagrass

Award: 1st Quarter

Arroyo Colorado 227 226

225 224

223

222

221

Port Mansfield

229 230

231 232

233

234

235 236

Port Isabel

Rio Hondo

228-A 228-B

237 239 240 241

3

Arroyo City

208

208-B

207-B

208-A 208

208

209

210

211

220 / 7

212

213

214

215

216

217

218 219

221

Port Mansfield

Page 38: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

99

100

101-A 101 Boggy Bayou

104-A

103 104-B

104

105

106

106

108 108-A

109

Baxter Island

3

Colorado River Locks

Project: Gulf Intracoastal Waterway Boggy Bayou to Colorado

River

Dredging Quantity: 1,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/Upland Confined

Distance to Placement Area: 1 Miles Avg.

Type of Equipment: Pipeline Dredge

Award: 1st Quarter

Page 39: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Gulf Intracoastal Waterway Freeport to Brazos River

Crossing

Dredging Quantity: 1,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/Upland Confined/BU Sites

Distance to Placement Area: 2 Miles Avg.

Type of Equipment: Pipeline Dredge

Award: 2nd Quarter

Page 40: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Gulf Intracoastal Waterway Turnstake to Live Oak

Dredging Quantity: 1,200,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/BU Sites

Distance to Placement Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: Apr. – Oct.

Reason for Window: Whooping Cranes

Award: 3rd Quarter

Beneficial Use Site ‘B’

Beneficial Use Site ‘A’

1 2

Page 41: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Gulf Intracoastal Waterway Colorado River to Upper

Matagorda Bay

Dredging Quantity: 2,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/Upland Confined

Distance to Placement Area: 1 Miles Avg.

Type of Equipment: Pipeline Dredge

Award: 4th Quarter

106

108 108-A

109

Baxter Island 3

Colorado River Locks

110

111

112-A

112-A 112-B

112-C 113 114

115 116

Page 42: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Gulf Intracoastal Waterway High Island to Port Bolivar

Dredging Quantity: 1,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/Upland Confined/BU

Distance to Placement Area: 2 Miles Avg.

Type of Equipment: Pipeline Dredge

Env. Window: Oct. – Mar.

Reason for Window: Nesting Turtles

Award: 4th Quarter

Page 43: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contract Matagorda Ship Channel

Page 44: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

1 2

3

4

5

6

7 8 9 10

11

12

13 14

Port O’Connor

Point Comfort

Port Lavaca

Lavaca Bay

Palacios

Keller Bay

5

6 7 8

9

10

11 12

14 15

16 17 18 19

1

Carancahua Bay

20 21

22 23

117-a

Lavaca Bay

Red Bluff

Harbor Of Refuge

115 114 113 112-C

112-B 112-A

116

Project: Matagorda Ship Channel Matagorda Peninsula to

Point Comfort

Dredging Quantity: 1,100,000 cubic yards

Material Type: Sand/Silt

Placement Area: BU/Open Water

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Est. Start Date: November 2012

Page 45: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contract Matagorda Ship Channel

Page 46: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

1 2

3

4

5

6

7 8 9 10

11

12

13 14

Port O’Connor

Point Comfort

Port Lavaca

Lavaca Bay

Palacios

Keller Bay

5

6 7 8

9

10

11 12

14 15

16 17 18 19

1

Carancahua Bay

20 21

22 23

117-a

Lavaca Bay

Red Bluff

Harbor Of Refuge

115 114 113 112-C

112-B 112-A

116

Project: Matagorda Ship Channel Peninsula to Point Comfort

Dredging Quantity: 1,200,000 cubic yards

Material Type: Sand/Silt

Placement Area: BU/Open Water

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Award: 4th Quarter

Page 47: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Matagorda Ship Channel – Construct Beneficial Use

Site

Type of Work: BU Site

Material Type: Silt/Clay

Type of Equipment: Marsh Buggy

Award: 2nd Quarter

1 2

3

4

5

6

7 8 9 10

11

12

13 14

Port O’Connor

Point Comfort

Port Lavaca

Lavaca Bay

Palacios

Keller Bay

5

6 7 8

9

10

11 12

14 15

16 17 18 19

1

Carancahua Bay

20 21

22 23

117-a

Lavaca Bay

Red Bluff

Harbor Of Refuge

115 114 113 112-C

112-B 112-A

116

Page 48: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Questions Comments?

For more information, contact:

Alicia Rea Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3995

[email protected]

Page 49: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Beneficial Use of Dredged Material Workshop

Custodians of the Coast

Galveston Harbor & Houston Ship Channel - Barbours Cut - Bayport Ship Channel - Greens Bayou

Tricia Campbell, P.E.

Operations Manager

Navigation Branch

November 6, 2012

Page 50: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Tricia Campbell Operations Manager

Galveston Harbor Houston Ship Channel - Bayport Ship Channel - Barbour's Terminal Channel - Green's Bayou Channel

Page 51: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contracts Galveston Harbor

Page 52: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Pelican Island San Jacinto

San Jacinto PA DAMP

Project: Galveston Harbor & Channel - San Jacinto PA

Disposal Area Management Plan (DAMP)

Type of Work: Dewatering

Material Type: Silt/Clay

Placement Area: San Jacinto

Type of Equipment: Marsh Buggy

Est. Start Date: December 2012

Page 53: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Galveston Harbor & Channel - Galveston Entrance, Outer and Inner Bar – (w/option for HSC

South of Redfish High Shoal Reach

Dredging Quantity: 3,500,000 cubic yards

Material Type: Silt/Sand

Placement Area: Offshore/BU

Distance to Place Area: 4 Mile Avg.

Type of Equipment: Hopper Dredge

Est. Start Date: June 2013

Page 54: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contract Galveston Harbor

Page 55: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Galveston Harbor & Channel - Galveston Entrance, Outer and

Inner Bar

Dredging Quantity: 1,500,000 cubic yards

Material Type: Silt/Sand

Placement Area: Offshore/BU

Distance to Place Area: 4 Mile Avg.

Type of Equipment: Hopper Dredge

Award: 3rd Quarter

Page 56: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contracts Houston Ship Channel

- Barbours Terminal - Bayport Ship Channel - Greens Bayou

Page 57: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Page 58: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

15

14

Atkinson Is. La Porte

Spilman Is.

16

Project: Bayport Ship Channel Bayport Channel and

Turning Basin

Dredging Quantity: 500,000 cubic yards

Material Type: Silt

Placement Area: PA15

Distance to Place Area: 4 Mile Avg.

Type of Equipment: Pipeline Dredge

Est. Start Date: December 2012

Page 59: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Barbours Terminal Main Channel and Turning

Basin & Houston Ship Channel Morgan’s Point to SH-146

Dredging Quantity: 1,200,000 cubic yards

Material Type: Silt

Placement Area: Spilman

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Est. Start Date: April 2013 15

14

Atkinson Is. La Porte

Spilman Is.

16

Page 60: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Morgan’s Point Project: Houston Ship Channel South of Redfish High Shoal Reach (Option on Galveston Entrance Channel Contract)

Dredging Quantity: 1,000,000 cubic yards

Material Type: Sand

Placement Area: Offshore

Type of Equipment: Hopper Dredge

Est. Start Date: June 2013

Page 61: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Alexander Island PA DAMP Spilman

Island

Peggy Lake

Alexander Island

Atkinson Is.

16

14

15

La Porte

Project: Houston Ship Channel Alexander Island PA

Disposal Area Management Plan (DAMP)

Type of Work: Dewatering

Material Type: Silt/Clay

Placement Area: Alexander Island

Type of Equipment: Marsh Buggy

Est. Start Date: August 2013

Page 62: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Houston Ship Channel Mid-Bay PA - Disposal Area

Management Plan

Type of Work: Dewatering

Material Type: Silt

Placement Area: Midbay

Type of Equipment: Marsh Buggy

Env. Window: August-March

Reason for Window: Nesting birds

Est. Start Date: September 2013

Morgan’s Point

Page 63: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Houston Ship Channel Carpenters Bayou to Greens Bayou; with Greens Bayou

Dredging Quantity: 900,000 cubic yards

Material Type: Silt

Placement Area: Lost Lake & Clinton PA

Distance to Place Area: 2.5 Mile Avg.

Type of Equipment: Pipeline Dredge

Est. Start Date: September 2013

Lost Lake

Peggy Lake

West & East Jones

Green’s Bayou PA

Alexander Island PA

Goat Island

Page 64: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Houston Ship Channel Peggy Lake Improvements

Type of Work: Levee raising

Material Type: Silt/Clay

Placement Area: Peggy Lake PA

Type of Equipment: Dragline, dozers

Est. Start Date: September 2013

Lost Lake

West & East Jones

Green’s Bayou PA

Alexander Island PA

Goat Island

Peggy Lake Peggy Lake Improvements

Page 65: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contracts Houston Ship Channel

- Barbours Terminal - Bayport Ship Channel - Greens Bayou

Page 66: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

15

14

Atkinson Is. La Porte

Spilman Is.

16

Project: Houston Ship Channel Bayport Flare and Bayport

to Morgan’s Point

Dredging Quantity: 1,500,000 cubic yards

Material Type: Silt

Placement Area: Atkinson Cells M 6,7,8,9

Distance to Place Area: 4 Mile Avg.

Type of Equipment: Pipeline Dredge

Award: 1st Quarter

Page 67: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Houston Ship Channel Sims Bayou to Turning

Basin

Dredging Quantity: 1,000,000 cubic yards

Material Type: Silt

Placement Area: Clinton (west cell)

Distance to Place Area: 3 Miles Avg.

Type of Equipment: Pipeline Dredge

Award: 1st Quarter

Page 68: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Alexander Island PA Levee Raise Spilman

Island

Peggy Lake

Alexander Island

Atkinson Is.

16

14

15

La Porte

Project: Houston Ship Channel Alexander Island PA Levee

Raise

Type of Work: Levee raising

Material Type: Silt/Clay

Placement Area: Alexander Island

Type of Equipment: Dragline, dozers

Award: 2nd Quarter

Page 69: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Lost Lake

Peggy Lake

Alexander Island

Goat Island

Spilman Island

Project: Houston Ship Channel Spilman Island PA Disposal

Area Management Plan (DAMP)

Type of Work: Dewatering

Material Type: Silt/Clay

Placement Area: Spilman Island

Type of Equipment: Marsh Buggy

Award: 4th Quarter

Page 70: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Glendale

House-Stimson Tracts Filter-Bed

Project: Houston Ship Channel House Tract & Glendale

Levee Raise

Type of Work: Levee raising

Material Type: Silt/Clay

Placement Area: House Tract & Glendale

Type of Equipment: Dragline, dozers

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

Page 71: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Questions Comments?

For more information, contact:

Tricia Campbell Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3153

[email protected]

Page 72: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Beneficial Use of Dredged Material Workshop

Custodians of the Coast

Freeport Harbor Channel to Victoria Chocolate Bayou

Eddie Irigoyen

Operations Manager

Navigation Branch

November 6, 2012

Page 73: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Freeport Harbor Channel to Victoria Chocolate Bayou

Eddie Irigoyen Operations Manager

Page 74: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contracts Freeport Harbor

Page 75: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Freeport Harbor Inside Channel

Dredging Quantity: 400,000 cubic yards

Material Type: Sand/Silt

Placement Area: PA 1

Distance to Place Area: 2.5 Mile Avg.

Type of Equipment: Pipeline Dredge

Est. Start Date: June 2013

Page 76: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

1 Quintana

Surfside

85

7

Brazosport Turning Basin

Brazos Harbor Turning Basin and Channel

Upper Turning Basin

1-A

88

Stauffer Channel (De-Authorized)

Buffer Zone

Limits of Discharge

Project: Freeport Harbor Entrance Channel

Dredging Quantity: 1,000,000 cubic yards

Material Type: Sand/Silt

Placement Area: Offshore

Distance to Place Area: 2.5 Mile Avg.

Type of Equipment: Hopper Dredge

Est. Start Date: July 2013

Page 77: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contract Freeport Harbor

Page 78: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

1 Quintana

Surfside

85

7

Brazosport Turning Basin

Brazos Harbor Turning Basin and Channel

Upper Turning Basin

1-A

88

Stauffer Channel (De-Authorized)

Buffer Zone

Limits of Discharge

Project: Freeport Harbor Entrance Channel

Dredging Quantity: 1,500,000 cubic yards

Material Type: Sand/Silt

Placement Area: Offshore

Distance to Place Area: 2.5 Mile Avg.

Type of Equipment: Hopper Dredge

Award: 4th Quarter

Page 79: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2013 Contract Channel to Victoria

Page 80: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Channel to Victoria Raise Levee PA 2

Type of Work: Levee raising

Material Type: Cohesive material (silt & clay)

Placement Area: PA 2

Type of Equipment: Dragline, dozers

Est. Start Date: June 2013

Channel to Seadrift

PA 2

1

Raise Levees

Page 81: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contract Channel to Victoria

Page 82: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

9

10 & 11

13

Turning Basin

8-C

8-B

12

7 6-A

Green Lake 8-A

Project: Channel to Victoria Upper Reach

Dredging Quantity: 500,000 cubic yards

Material Type: Silt/Sand

Placement Area: Upland Confined

Distance to Placement Area: 2.5 Mile Avg.

Type of Equipment: Pipeline Dredge

Award: 3rd Quarter

Page 83: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

FY 2014 Contract Chocolate Bayou

Page 84: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

Project: Chocolate Bayou

Dredging Depth: 14 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 800,000 cubic yards

Material Type: Silt/Sand

Placement Area: BU / Upland Confined

Distance to Placement Area: 1.5 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

70

65 66

67

68

69

Page 85: FY-13 Scheduled & FY-14 Planned Dredging and Placement ......Galveston District – 2012 Beneficial Use of Dredged Material Workshop Custodians of the Coast FY-13 Scheduled & FY-14

BUILDING STRONG®

Galveston District – 2012 BUDM Workshop Custodians of the Coast

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Questions Comments?

For more information, contact:

Eddie Irigoyen Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3130