From vision to action

87
S E M I N A R Ikatan Mahasiswa Planologi Universitas Tarumanagara (SEMINAR IMAPLANTA) 2012. GREEN DEVELOPMENT NOW Bintang A Nugroho Core Founding Member Deputy for Organization and Event GREEN BUILDING COUNCIL INDONESIA

description

 

Transcript of From vision to action

Page 1: From vision to action

S E M I N A R Ikatan Mahasiswa Planologi Universitas Tarumanagara (SEMINAR – IMAPLANTA) 2012.

GREEN DEVELOPMENT NOW

Bintang A NugrohoCore Founding MemberDeputy for Organization and EventGREEN BUILDING COUNCIL INDONESIA

Page 2: From vision to action

WORLD GREEN BUILDING COUNCIL

Through leadership collaboration the global property industry will transform traditional building practices and fully adopt sustainability as the means by which our environments thrive, economies prosper, and societies grow to ensure the future health of our planet.

Vision

Page 3: From vision to action

Source: Global Footprint Network

Page 4: From vision to action

Source: Global Footprint Network

Page 5: From vision to action
Page 6: From vision to action

• Global Societies spend 90%of time indoors.

• Architectural design and infrastructuredevelopment are considered one of the primary benchmarks for economic and cultural success.

Page 7: From vision to action

GREEN BUILDINGAN IMPORTANT PART OF THE

SOLUTION

Page 8: From vision to action

Swiss TowerLondon, England

ABN-AMRO HQAmsterdam, the Netherlands

Menara MesiniagaSubang Jaya, Malaysia

Genzyme Corp. HQCambridge, Mass. USAEdificio Malecon

Buenos Aires, Argentina

Solar HouseHamberg, Germany

Szencorp BuildingMelbourne, Australia

Green ApartmentsJerusalem, Isreal

Page 9: From vision to action

About the World GBC• An international business-led coalition

• 15 full member nations;

• 12 emerging Councils

• 12 prospective members

• Member nations represent more than

50% of global construction activity

• World GBC mission is to accelerate the transformation of built environment

Page 10: From vision to action

Sustainable building: a way forward

• IPCC identified that available building technologies offer the best opportunity to make significant reductions in Greenhouse emissions

• IPCC estimates that by 2020 CO2 emissions from building energy use can be reduced by 29% at no net cost.

• Built environment should be the top priority for practical action

Page 11: From vision to action

Brazil

United States of America

Mexico

Canada

United Kingdom

Germany

United Arab Emirates

India

Japan

Taiwan

Australia

New Zealand

Poland

Colombia

ArgentinaSouth Africa

Viet Nam

GREEN BUILDING COUNCILS

Council Development of World GBC

Indonesia

Page 12: From vision to action

Asia-Pacific: hyper-urbanisation• Nearly 1 million people per week moving into

urban environments in Asia

• 1.1 billion more people in urban areas of Asia by 2030 – 53% of the world’s urban population

• China has already overtaken the US as the largest source of greenhouse emissions, with buildings the key driver

World Green Building Council

Page 13: From vision to action

Asia-Pacific: hyper-urbanisation

• CO2 emissions from coal-fire electricity in Asia Pacific to double by 2025 if growth continues

• Resource inefficient building stock is the main driver

• Nearly one third of the urban poor have no access to safe water and more than two-thirds do not have access to adequate sanitation

• 2 billion people without access to electricity

• WHO estimates that health costs caused by air pollution amount to about $200 million pa per Asian mega-city

World Green Building Council

Page 14: From vision to action

• EMERGING Member of World GBC

• Active Member of World GBC Asia

Pacific Network

• WHY? Indonesia needs to be part of

the global network to gain access to the

know-how and also become independent

in determining our rating system

Page 15: From vision to action

GBCI’s Mission

“Towards Indonesia’s

Sustainable Future”

Promote & Stewards

market transformation

Educate

the industry & public

Forums

for Industry dialog

Builds Community

Provides

tools & expertise

Page 16: From vision to action

PENGGUNA“KAMI SENANG JIKA DAPAT

MENGGUNAKAN BANGUNAN YANG HEMAT

SECARA LINGKUNGANTAPI YANG TERSEDIA

HANYA SEDIKIT SEKALI. “

INVESTOR“KAMI BERSEDIA

MEMBIAYAI BANGUNAN HEMAT

LINGKUNGAN,TAPI PERMINTAAN

PASAR TIDAK NYATA”

PENGEMBANG“KALAU KAMI MINTA KONTRAKTORBANGUNAN HEMAT LINGKUNGAN

PARA INVESTOR TIDAKAKAN MEMBAYAR “

KONTRAKTOR“KAMI BISA SAJA

MEMBANGUN BANGUNANHEMAT LINGKUNGAN

TAPIPARA PENGEMBANG

TIDAK MEMINTABANGUNAN2 SEPERTI ITU.”

‘CIRCLE OF BLAME’

Page 17: From vision to action

PENGGUNA

“KAMI SENANG JIKA DAPATMENGGUNAKAN BANGUNAN

YANG HEMAT SECARA LINGKUNGAN

KARENANYA SEDIAKAN LEBIH BANYAK“

INVESTOR

“KAMI BERSEDIAMEMBIAYAI

BANGUNAN HEMATLINGKUNGAN,

KARENA PERMINTAANAKAN MENINGKAT”

PENGEMBANG

“ ATAS KESEDIAAN INVESTOR KAMI MINTA KONTRAKTOR

UNTUK MEMBANGUNBANGUNAN HEMAT LINGKUNGAN “

KONTRAKTOR

“KAMI PERLU MEMBANGUN BANGUNAN

HEMAT LINGKUNGANMEMENUHI

PERMINTAANPARA PENGEMBANG”

‘CIRCLE OF SUPPORT’

GBCI

Page 18: From vision to action

Key Stakeholders of GBC Indonesia and Hypothetical Relationship Model

Industries

Government

Universities &

Research Inst.

Civil Societies

Individual

Professionals

• Networking & collaborating

• Setting up environment-friendly

standards

• Brand leveraging

• Partnerships

• Endorsing initiatives

• Legal adoption new standards

• Agreed new standards enforcement • Networking & collaboration

• Expertise support

• Develop new environment-friendly

standards

• Networking & collaboration

• Grass-root promoting

• Creating mass movements

• Networking & collaborating

• Knowledge exchange

Local Central

FSIECU

RHC

NGOs Communities

Associations

• FSI: Financial Services Industry

• ECU: Energy & Utilities

• RHC: Real Estate, Hospitality & Constructions

Page 19: From vision to action

Building User Training Program

Automatic HVAC switch off

T5 fluorescent lighting

Detailed Building User’sGuide

Electrical Sub-Metering

External shading shade

Photovoltaic system

Wind turbine

ConstructionWaste recycling

Reuse of furniturefrom previous tenants

Certified or Recyled timber

Grey water treatment system

Small car parking spaces

Laptop provided to Individual workstation

Bicycle Storage, Change Rooms, Shower

Internal Atrium

C O S T

SU

STA

IN

AB

IL

IT

Y

LOW

HIGH

HIGH

Page 20: From vision to action

WO

RL

D G

RE

EN

BU

ILD

ING

C

OU

NC

IL

No Action ActionAction

Potential Results

No Action

What will your world look like?

Page 21: From vision to action
Page 22: From vision to action

Greenship Associate

Greenship Professional

Greenship

TAGTechnical Advisory Group

Sertifikasi Green Building

Page 23: From vision to action
Page 24: From vision to action

OrganisasiDEWAN PENDIRI

DEWAN PENGARAH

DEWAN PENGURUS

A N G G O T A

Page 25: From vision to action

GBCI Founding Member

•Core Founder

•Corporate Founding Member

•Government Institution:

•Ministry of Environment

•Department of Public Works

•Department of Industry

•Department of Energy and Mineral Resources

•Ministry of State Owned Companies

•Ministry of Public Housing

•Indonesia Research and Science Institute (LIPI)

•Professional association and institutions

•Media

Page 26: From vision to action
Page 27: From vision to action
Page 28: From vision to action
Page 29: From vision to action
Page 30: From vision to action

Green Building Councils & their tools

USA Canada Brazil

Taiwan

India

Japan

AustraliaNew Zealand

South Africa

UK

Mexico EmiratesGermany

No formal rating tool yet

BREEAM

UK

Page 31: From vision to action

Dipresentasikan oleh:Yodi Danusastro, ST, [email protected]

Page 32: From vision to action

Developing Process : GREENSHIP Rating Tools

23 Feb 2012

*Launching NB 1.1

Nov 2011

Rating Committe Input

SocializationInput From GP on Certification Process

Input From GP training

June 20117 Jun 2010

Launching NB 1.0

- Expert Discussion

- TAG Meeting- Nat Consensus

*Dalam acara network

Page 33: From vision to action

GREENSHIP NEW BUILDING VERSION 1.1

Energy Efficiency And Conservation

(7 criterias + 1 bonus, 26 points + 5 bonus points)

25,74%

Water Conservation(8 criterias, 21 points)

20,79%

Indoor Air Healthand Comfort

(8 criterias, 10 points)9,9%

Appropiate Site Development

(8 criterias, 17 points) 16,83 %

Material Resources and Cycle

(7 criterias, 14 points)13,86%

BuildingEnvironment Management

(8 criterias, 13 points)12,87%

TOTAL : 46 CRITERIAS 101 POINTS

Page 34: From vision to action

Peringkat Persentase Nilai minimal

Platinum 73 % 74Gold 57 % 58Silver 46 % 47

Bronze 35 % 35Total 101

Re-certification: 3 Years

Page 35: From vision to action

I Luas bangunan sekurang-kurangnya 2500 m2

II Lokasi tapak bangunan sesuai dengan peruntukanberdasarkan Rencana Tata Ruang Wilayah (RTRW)setempat

III Bersedia menandatangani surat yang berisi persetujuanuntuk memperbolehkan data gedung yang berhubungandengan penerapan green building dipergunakan untukdipelajari dalam studi kasus yang diselenggarakan olehGBC INDONESIA

IV Akan menyertakan salinan dokumen Upaya PengelolaanLingkungan Hidup (UKL) dan Upaya PemantauanLingkungan Hidup (UPL) yang disahkan Bapedal

Page 36: From vision to action

V Bersedia menandatangani surat yang menyatakan bahwa gedung yang bersangkutan akan dibuat tahan gempa

VI Bersedia menandatangani surat yang menyatakan bahwa gedung yang bersangkutan akan memenuhi standar pemakai gedung untuk penyandang cacat

VII Bersedia menandatangani surat yang menyatakan bahwa gedung yang bersangkutan akan memenuhi standar kebakaran dan keselamatan

Page 37: From vision to action

RATING CATEGORY CRITERIA POINTPrerequisite 1 Basic Green Area P

ASD 1 Site Selection 2

ASD 2 Community Accessibility 2

ASD 3 Public Transportation 2

ASD 4 Bicycle 2

ASD 5 Site Landscaping 3

ASD 6 Micro Climate 3

ASD 7 Storm Water Management 3

TOTAL 17

Page 38: From vision to action
Page 39: From vision to action

Appropriate Site Development (Tepat Guna Lahan)

Prasyarat 1 Basic Green Area (Area Dasar Hijau)

ASD 1 Site Selection (Pemilihan lahan) 2 Poin

ASD 2 Community Accessibility (Aksesibilitas Komunitas) 2 Poin

Page 40: From vision to action
Page 41: From vision to action

ASD 3 Public Transportation (Transportasi Umum) 2 Point

ASD 4 Bicycle (Sepeda) 2 Points

ASD 5 Site Landscaping 3 Points

Appropriate Site Development (Tepat Guna Lahan)

Page 42: From vision to action
Page 43: From vision to action

ASD 5 Microclimate (Iklim Mikro) 3 Poin

ASD 6 Stormwater Management (Manajemen air limpasan Hujan) 3 Poin

Appropriate Site Development (Tepat Guna Lahan)

Page 44: From vision to action

RATING CATEGORY CRITERIA POINT

Prerequisite 1 Electrical Sub Metering P

Prerequisite 2 OTTV Calculation P

EEC 1 Energy Efficiency Measure 20

EEC 2 Natural Lighting 4

EEC 3 Ventilation 1

EEC 4 Climate Change Impact 1

EEC 5 On Site Renewable Energy 5

TOTAL 26

Page 45: From vision to action
Page 46: From vision to action

Energy Efficiency and Conservation(Konservasi dan Efisiensi Energi)

Prasyarat 1 Electrical Sub Metering (Sub-meter Listrik)

Prasyarat 2 OTTV Calculation (Perhitungan OTTV)

Page 47: From vision to action
Page 48: From vision to action

EEC 1 Energy Efficiency Measures (Perhitungan efisiensi energi) 20 Poin

Block Zone

Air

Tempera

ture (°C) Humidity (%)

Time of

Max

Cooling

Max Op Temp in

Day (°C)

Floor Area

(m2)

Volume

(m3)

Flow/Floor

Area (l/s-m2)

Floor 1 Office2 20 64.3 17:00 25.7 136 475.9 47.58

Floor 1 Lobby 20 62.9 10:00 27.8 26.3 92 48.22

Floor 1 WC - - - 27 8 28.1 0

Floor 1 Office1 21 61.2 14:30 26.1 117.7 412 34.52

Floor2 Office3 20 63.9 15:00 26.2 207.3 725.4 54.9

Floor2 Lobby2 20 64.1 15:00 26.1 70.6 247.2 48.64

Floor2 WC2 - - - 27.7 10.1 35.4 0

Roof 1 Zone 1 - - - 62.2 288 294.1 0

Total Av 20.2 Av 63.28 Av 31.1 576 2310.1 233.86

EEC 2 Natural Lighting (Pencahayaan Alami) 4 Poin

Energy Efficiency and Conservation(Konservasi dan Efisiensi Energi)

Page 49: From vision to action
Page 50: From vision to action

EEC 3 Ventilation (Ventilasi) 1 Poin

EEC 4 Climate Change Impact (Dampak perubahan iklim) 1 Poin

EEC 5 On Site Renewable Energy(Energi terbaharukan dalam tapak)

5 Bonus Points

Page 51: From vision to action

RATING CATEGORY CRITERIA POINT

WAC-Prerequisite 1 Water Metering P

WAC-Prerequisite 2 Water Calculcation P

WAC 1 Water Use Reduction 8

WAC 2 Water Fixtures 3

WAC 3 Water Recycling 3

WAC 4 Alternative Water Resource 2

WAC 5 Rainwater Harvesting 3

WAC 6 Water Efficiency Landscaping 2

TOTAL 21

Page 52: From vision to action
Page 53: From vision to action

Water Conservation (Konservasi Air)

Prasyarat 1 Water Metering (Meteran Air)

WAC 1Water Use Reduction (Penghematan air)

8 Poin

WAC 2 Water Fixtures (Alat keluaran air) 2 Points

Prasyarat 2Water Calculation(Perhitungan air)

Page 54: From vision to action
Page 55: From vision to action

WAC 3 Water Recycling (Daur ulang air) 3 Poin

WAC4 Alternative Water Resource (Sumber air bersih alternatif) 2 Poin

Water Conservation (Konservasi Air)

Page 56: From vision to action
Page 57: From vision to action

WAC 5 Rainwater Harvesting (Pemanenan air hujan) 3 Poin

WAC 6 Water Efficient Landscaping 2 Poin

Water Conservation (Konservasi Air)

Page 58: From vision to action

RATING CATEGORY CRITERIA POINT

Prerequisite 1 Fundamental Refrigerant P

MRC 1 Building and Material Reuse 2

MRC 2 Environmentally Processed Product 3

MRC 3 Non ODS Usage 2

MRC 4 Certified Wood 2

MRC 5 Prefab Material 3

MRC 6 Regional Material 2

TOTAL 14

Page 59: From vision to action
Page 60: From vision to action

Prasyarat 1 Fundamental Refrigerant (refrigeran mendasar)

MRC 1Building & Material Reuse(Penggunaan ulang bangunan dan material bekas)

2 Poin

MRC 2Environmentally Friendly Process Product (Produk terproses ramah lingkungan)

3 Poin

Material Resources and Cycle (Daur dan siklus material)

Page 61: From vision to action
Page 62: From vision to action

MRC 3 Non ODS Usage (Penggunaan material tidak merusak ozon) 2 Poin

MRC 5Prefab Material(Material prafabrikasi)

3Poin

MRC 4Certified Wood (Kayu Bersertifikat)

2 Poin

MRC 6Regional Material (Material regional)

2Poin

1000 km

Material Resources and Cycle (Daur dan siklus material)

Page 63: From vision to action

RATING CATEGORY CRITERIA POINTPrerequisite 1 Outdoor Air Introduction P

IHC 1 CO2 Monitoring 1

IHC 2 Environmental Tobacco Smoke 2

IHC 3 Chemical Pollutant 3

IHC 4 Outside View 1

IHC 5 Visual Comfort 1

IHC 6 Thermal Comfort 1

IHC 7 Acoustic Level 1

TOTAL 10

Page 64: From vision to action
Page 65: From vision to action

Prasyarat 1 Outdoor Air Introduction (Introduksi udara luar)

IHC1 CO2 Monitoring (Monitoring CO2) 2 Points

IHC 2 Environmental Tobacco Smoke Control 2 Points

Indoor Health and Comfort (Kesehatan dan Kenyamanan dalam Ruang)

Page 66: From vision to action
Page 67: From vision to action

IHC 3 Chemical Pollutants (Polutan Kimiawi) 3 Poin

IHC 4 Outside View (Pandangan ke luar) 1 Poin

IHC 5 Visual Comfort (Kenyamanan Visual) 1 Poin

Page 68: From vision to action

IHC 7 Acoustic Level (Kenyamanan Akustik) 1 Poin

IHC 6 Thermal Comfort (Kenyamanan Termal) 1 Poin

Indoor Health and Comfort(Kesehatan dan Kenyamanan dalam Ruang)

Page 69: From vision to action

RATING CATEGORY CRITERIA POINTPrerequisite 1 Basic Waste Facility P

BEM 1 GP as a Member of The Project Team 1

BEM 2 Pollution of Construction Activity 2

BEM 3 Advance Waste Management 2BEM 4 Proper Commissioning 3

BEM 5Submission Implementation Green Building

Data for Database2

BEM 6 Fit Out Guide 1BEM 7 Occupant Survey 2

TOTAL 13

Page 70: From vision to action
Page 71: From vision to action

Prasyarat 1 Basic Waste Facility (Fasilitas sampah mendasar)

BEM 1GP as a member of design team (GP sebagai anggota tim desain)

1Poin

BEM 2Pollution Construction Activity (Pengendalian polusi tahap konstruksi)

2 Poin

Building Environment Management (Manajemen Lingkungan Bangunan)

Page 72: From vision to action
Page 73: From vision to action

BEM 3 Advance Waste Management (Manajemen Sampah tingkat lanjut) 2 Poin

BEM 4 Proper Comissioning 3 Poin

Building Environment Management (Manajemen Lingkungan Bangunan)

Page 74: From vision to action
Page 75: From vision to action

BEM 5Submission Green Building Implementation Data for Data Base (Pemberian data implementasi Green Building untuk datase)

2 Poin

BEM 6Fit out Agreement(Kesepakatan fit out penyewa)

1 Poin

BEM 7Building User Survey(Survey Pengguna Gedung)

3 Poin

Building Environment Management (Manajemen Lingkungan Bangunan)

Page 76: From vision to action

Perubahan versi 1.0 ke 1.1

http://www.gbcindonesia.org/downloads/Greenship/GREENSHIPNB1-1Revision-draft.pdf

Page 77: From vision to action

• 77 prospective projects

• 23 on going projects

• 2 certified projects: Dahana Building & BCA Tower

• 3 projects on Design Recognition Stage:

• Gedung Utama Kementerian PU

• Institut Teknologi Science Bandung

• Rasuna Tower

• 6 projects on Final Assessment Stage:

• 2 projects for EB : Sampurna, German Center

• 3 projects for NB : Lemigas, Austrian Embassy, CiputraLand

Certification Development

Page 78: From vision to action

250210

174.4

0

50

100

150

200

250

300

Average Office

Before After

EEI (KWH/m2.yr)

78

Existing Building – BCA Tower

Saving as Ave : 30,24 %

GREENSHIP EB – Platinum Certified

Saving as Previ : 18,6 %

Page 79: From vision to action

Gedung Bersertifikat GREENSHIP

PLATINUMGREENSHIP Existing BuildingTertanggal: 21 Desember 2011

PLATINUMGREENSHIP New BuildingLulus Assesment: 20 Desember 2011

Page 80: From vision to action

• Air Conditioning and Ventilation Building

Management System,

• Temperature Control,

• Environmentally-friendly chillers and

refrigerant

GREENSHIP NB – Platinum Certified

Saving 42%

New Building – PT Dahana Building

Page 81: From vision to action

Gedung Bersertifikat GREENSHIP

PLATINUMDesign Recognition AwardGREENSHIP New BuildingTertanggal: 20 September 2011

GOLDDesign Recognition AwardGREENSHIP New BuildingTertanggal: 1 Desember 2011

Page 82: From vision to action

DEPARTEMEN PEKERJAAN UMUM

SEKRETARIAT JENDERALSNVT PENGEMBANGAN, PENGENDALIAN

DAN PELAKSANAAN PEKERJAAN STRATEGIS BIDANG PU LAINNYA

PEMBERI TUGAS

Public Works Ministry

Office

New Building – Ministry of Public Work

Design Recognition – Platinum

Saving 38%

Page 83: From vision to action

Design Recognition – Gold

Saving 20%

New Building – ITSB Building

Page 84: From vision to action

• Usage : Office

• Luasan Lahan : 87000 m²

• NLA : 114000 m²

• Tinggi : 286 meter

• Developer : PT. Wahana Nusantara

• Alamat : Jl. HR Rasuna Said Kav. C – 23,

• Kuningan, Jakarta

• Target penilaian : Gold

• Tahapan Sertifikasi : Design Recognition

New Building – Rasuna Tower

Design Recognition – Gold

Page 85: From vision to action

Photovoltaic

Sun shading

Day lighting

Radiant Cooling

Air tight and high thermal insulation building envelopes

250

720503,97

145

0100200300400500600700800

EEI (KWH/m2.yr)

Saving 42%

Austrian Embassy Jakarta

85

New Building

Page 86: From vision to action

• Air Conditioning and Ventilation Building Management System, Temperature Control, Environmentally-friendly chillers and refrigerant

• Lighting T5 and LED lightbulbs, control system, maximise the use of natural lighting

• Water Water recycling from AC condensate and STP, water-efficient fittings

• Materials environmentally friendly materials for ceiling and plasterboards, use of low VOC paints

GEDUNG CIPUTRA WORLD JAKARTA

Saving 40%

250 205121

0100200300

Average Office

G. Ciputra World

(Baseline)

G. Ciputra World

(Desain)

EEI (KWH/m2.yr)

New Building

Page 87: From vision to action

T e r i m a k a s i h