New Swimming Pool Homeowner Presentation Fox Point Homeowners Association October 30, 2013

Transcript of Fox Point Homeowners Association October 30, 2013.

Page 1: Fox Point Homeowners Association October 30, 2013.

New Swimming PoolHomeowner Presentation

Fox Point Homeowners AssociationOctober 30, 2013

Page 2: Fox Point Homeowners Association October 30, 2013.

Meeting OverviewWhy a new pool?Williams design planHOA finances – how to pay for the projectProject timetable

Page 3: Fox Point Homeowners Association October 30, 2013.

Pool Studies/Reports2005 PHN Architects Pool Study2006 Committee Report2010 PHN Architects Pool Study2011 Independent Aquatic Engineer Report2011 Systems Assessments -- made it clear

that our pool was at its “end of life” .Deck drainage and piping of entire pool area in

need of total replacement due to failure (broken and clogged).

Dye test revealed leaks in the pool wall, gutter and pit

Page 4: Fox Point Homeowners Association October 30, 2013.

2012 Renovation Application2011 Board engaged architect to explore

renovation versus replacement.

Application to state started at $460-560K plus contingency -- $650K tipping point.

IDPH additional requirements drove cost to $700K for renovation of main pool.

Page 5: Fox Point Homeowners Association October 30, 2013.

Why a New Pool?Renovation $700K+ to meet current codes.

Building a new main pool structure was projected to be $1.0M.

Renovation based on good sound concrete pool shell

Lifespan of renovation 20-30 years vs. new 40-50 years

Diving well not compliant with code and starting block depth shallow by current standards

Page 6: Fox Point Homeowners Association October 30, 2013.

New Pool Architect and Plan SelectionPool Subcommittee formed – Elaine Leighton, Tom

Malia, Doug Zwiener, Keith Gritzek, Lynn Douglas, Geoff Ommen and Seth Gering (pool manager).

Subcommittee interviewed 3 firms in summer 2013 (2 architects, 1 builder)– asked them to present their vision for the pool and a complete project proposal (budget estimate, plans , construction management through project completion)

Subcommittee selected Williams Architects based on their experience, project management abilities with in-house aquatic engineering, and creative vision for pool project.

Page 7: Fox Point Homeowners Association October 30, 2013.

Scope of Work RevisedOriginal $1.0M budget was to replace the L

shaped pool shell and deck, keeping the existing tot pool and mechanical equipment.

Existing mechanicals (filtration) would potentially work with new pool design but require additional components to meet code. New heaters required for main and tot pools. Better to replace all systems for efficiency and lower operational costs.

To repair tot pool deck requires new tot pool (and shed/mechanicals).

Page 8: Fox Point Homeowners Association October 30, 2013.

Fox Point Pool PrioritiesPool subcommittee met with Williams several

times to identify the top user priorities. Competitive swimming with 6 lanesDeep water area for recreation and

diving/water poloDiving boardLap lane available at all timesMaximum usable deck surface areaTot pool

Page 9: Fox Point Homeowners Association October 30, 2013.

Design OptionsSubcommittee and Williams met several times

to discuss design alternatives that would best suit our users.

Exact same “L” shaped layoutRectangle pool with deep water Modified rectangle pool with step-in areaTot pool vs spray padOptional features: drop/flume slides, high

diving board, separate spray pad

Page 10: Fox Point Homeowners Association October 30, 2013.

Pool Design ElementsMain rectangle pool Increases recreational deep water use Diving board easily removedBetter sight lines for staff and parentsEasier to clean and maintain

Step-in areaEasier access for older adults and parents with young

kidsAllows parents with younger and older children in pool

togetherFeature will appeal to adults away from more active play

Tot Pool

Page 11: Fox Point Homeowners Association October 30, 2013.

Williams Pool Design

Page 12: Fox Point Homeowners Association October 30, 2013.

Water Features

Page 13: Fox Point Homeowners Association October 30, 2013.

Initial Cost EstimatesNew main pool* $1.2M - $1.3MStep-in area $106K- $120KShade structures $30K - $40KTot pool/building** $252K - $283KTOTAL $1.6M - $1.7M

*decks/drainage/mechanicals/fencing/lighting/electric/hose hydrants/rework filter room plus architect/legal/construction management

**decks/drainage/mechanicals/fencing/lighting/electric/new equipment shed plus architect/legal/construction management

Page 14: Fox Point Homeowners Association October 30, 2013.

Tot Pool Estimate1000 sq. foot pool $120,000New mechanical shed 20,000Decks/fencing 30,000

Lighting/power 11,000Demo/earthwork 14,000

Utilities allowances 15,000Design fees/contingencies 34,000

Sprays/bubblers 8,000TOTAL $252,000

Page 15: Fox Point Homeowners Association October 30, 2013.

How Does Pool Impact Reserves?Starting Balance 1,829,0002014 Dues Allocation 170,000 Potential Capital Expenditures-Non-Pool (75,000)2015 Dues Allocation 170,000 Potential Capital Expenditures-Non-Pool (75,000) Sub-total 2,019,000 Estimated Pool Expenditure (1,700,000) Remaining Post-Pool Reserves 319,000

Projected Reserve’s ReplenishmentAnnual Dues Allocation 170,000Average Non-Pool/Non-Lake Capital Expenditures (53,000)Annual Addition to Reserves: 117,000

Page 16: Fox Point Homeowners Association October 30, 2013.

Project TimetableOct-Dec 2013 – Design

Development/Construction DocumentsJan-Mar 2014 – Submit application to

IDPH/Obtain permitApr-Jun 2014 – Bid and award construction

contractLate August 2014 – Construction beginsMay 2015 – New pool opens