Transcript of FoundOcean Company Presentation
-
FoundOcean
Subsea and offshore grouting for the global energy construction
industries
-
FoundOcean is a subsea and offshore grouting specialist for the global energy construction industries.
Our primary business is fixing structures to the sea bed by foundation grouting.
We also provide structural repair services for subsea and offshore structures, as well as pipeline and cable support and protection services.
What Does FoundOcean Do?
-
FoundOcean was founded in 1966 and is headquartered in the UK. We are a privately held company.
Our Heritage
1966 1993Wimpey Laboratories later becomes Wimpey Geotech
1981 - 2006SeaMark Systems acquires the offshore division of Wimpey Geotech in 1993
2006SeaMark Systems changes its name to FoundOcean
-
Engineers and Technicians
Taking a mobilisation briefing
Manufacturing grout cubes for strength testing
Pumping grout onboard a vessel
Undertaking an onshore grout trial
Handling the Source for FMD projects
Maintaining the equipment
-
Plant and EquipmentFoundOcean Fabric formwork
deployment sledFoundOcean RJM
Recirculating Jet Mixer
Female (L) and Male (R) FoundOcean Grout Connectors
FoundOcean horizontal cement silo FoundOcean Pan Mixer
FoundOcean Winch
-
We deliver our promises on time and on budget We solve project critical problems We only use qualified, experienced offshore engineers QHSE is our main priority We provide detailed operation and grouting
procedures and reports as standard We have proven contingency procedures We take part in your planning meetings to
ensure full project participation
Our subsea grouting experience spans 40 years and over 800 projects
We work to minimise our environmental impact
Why Customers Choose FoundOcean
-
Some of FoundOceans Clients
-
Projects in Development
Ormonde Wind Farm: 31 turbine jackets, Irish Sea
Akcakocca: 1 platform jacket, Black Sea
Walney Wind Farm: 1 substation jacket, Irish Sea
Talisman: FMD inspection work, North Sea
Leman AD1: Jacket repair work, North Sea
Valhall: Re-development of jacket, North Sea
-
Excellent Health and Safety Record
YearAverage
# ofPersonnel
Onshore hours
# of Offshore projects
Offshore days
Offshorehours
Total hours
Lost time incidents
2002 19 28,168 12 922 11,064 39,232 0
2003 22 26,783 16 2,171 26,052 52,835 0
2004 24 30,842 22 2,061 24,732 55,574 0
2005 26 33,712 26 2,176 26,112 59,824 1
2006 28 36,392 25 2,327 27,924 64,316 0
2007 25 36,561 22 1,308 15,696 52,257 0
2008 32 37,946 24 2,635 31,620 69,566 1
2009 34 37,128 23 2,525 30,980 68,128 1
-
Industry Firsts from FoundOcean
1973 Invents the Recirculating Jet Mixer (RJM)
1976 Industry First with the Invention of the Repair clamp
1976 Invents the Hardwire Grout Monitoring system. 1984 Replaces HGM with ROV Grout Density Probe
1984 Invents the ScourMat
1985 Invents the MassivMesh concrete mattress
1988 Invents the ROV Grout Connector now industry standard
1994 Industry First with Underbase Grouting for Jacket Suction Foundations
2008 Industry First: Record breaking fabric formworks installation at -1,224m
-
Structural Pile Grouting
Ballasting and Underbase Grouting
Structural Repair and
Strengthening
Pipeline Support and Stabilisation
Hydrascope Flooded Member
Detection
Pipeline and Cable Protection
Grout ConnectorsConsulting
FoundOcean Services
-
How Our Services Fit Together
-
Structural Pile Grouting
-
Ballasting and Underbase Grouting
-
Structural Repair and Strengthening
-
Pipeline and Cable Stabilisation
-
Hydroscope FMD
-
Pipeline and Cable Protection
-
Grout Connectors
-
Putting Things in Perspective...
Pile grouting completed by FoundOcean in 1988
-
Recent Projects
Pentland Firth, UKOne of the best sites anywhere in the world for tidal turbine power generation
Water depth 45mTidal flows up to 4 knotsPile groutingWorking window 45mins every 4 hours
Image courtesy ofTidal Generation Limited
Image courtesy of Subsea7
-
Recent Projects
Walney Offshore Windfarm, UKInstallation grouting of the substation
Water depth ~ 30mGrouting completed in record timeGrouting 4 pile sleevesIrish Sea Image courtesy of DONG Energy
Image courtesy of Subsea7
Image courtesy of DONG Energy
-
Recent Projects
Ormonde Offshore Windfarm, UKGrouting 31 jackets: 30 turbine and 1 substation
Water depths from 17m 21mThe largest multiple jacket installation project for FoundOceanGrouting is expected to take 60 days
Image courtesy of Subsea7
-
The Peregrino Field, Brazil The first phase included two drilling and wellhead platforms
100m of water depth85km offshorePile grouting operation on jacket404 metric tonnes of cement used
Recent Projects
Image courtesy of Statoil
-
Equipment Locations
Louisiana
Livingston
RotterdamOrtona
Jebel Ali
Batam
-
Equipment Locations & 2010 Operations
Louisiana
Livingston
RotterdamOrtona
Jebel Ali
Batam
-
Contact
Head Office99 High StreetMarlowBuckinghamshire SL7 1ABT +44 (0)1628 567 000W www.foundocean.com
Service BaseUnits 3 & 4Telford Square Business ParkTelford SquareHouston Industrial EstateLivingston EH54 5PQ
FoundOceanWhat Does FoundOcean Do?Our HeritageEngineers and TechniciansPlant and EquipmentWhy Customers Choose FoundOceanSome of FoundOceans ClientsProjects in DevelopmentExcellent Health and Safety RecordSlide Number 10FoundOcean ServicesHow Our Services Fit Together Structural Pile GroutingBallasting and Underbase GroutingStructural Repair and StrengtheningPipeline and Cable StabilisationHydroscope FMDPipeline and Cable ProtectionGrout ConnectorsPutting Things in Perspective...Recent ProjectsRecent ProjectsRecent ProjectsRecent ProjectsEquipment LocationsEquipment Locations & 2010 OperationsContact