FOR OFFICE USE ONLY Date Received: 2010 Application for ...
Transcript of FOR OFFICE USE ONLY Date Received: 2010 Application for ...
2010 Application for Multimodal Transportation Concurrency*
*All Applicants Please Note:
1.) Projects affecting arterials or intersections with low level of service (LOS) or that produce 50+ peak hour trips will also be required to complete a full traffic study as per Section 11, Public Works Development Guidelines, available on the Public Works web site.
2.) Projects abutting public right-of-way will be required to construct standard street improvements. 3.) Projects will be required to pay Transportation Impact Fees (TIF) at building permit issuance.
PROJECT INFORMATION
Project Name: _____________________________________ ____________________________________
Project Address: __________________________________ _____________________________________
Assessor’s Parcel Number(s): ______________________ ______________________________________
Concurrency Service Area (CSA) Number (See Map on p age 3): ____________
PROPOSED PROJECT DESCRIPTION Office ___ Retail ___ Industrial/Manufacturing ___ Institutional ___ Mixed Use ___ Other ___
Gross square footage of non-residential building _____________
Single family residential _______ Multi-family residential _______ Total number of units _______
Expected Date of Completion/Occupancy: ____________ _____
APPLICANT INFORMATION Name___________________________________ Company ________________________________
Mailing Address ____________________________________________________________________
Phone ___________________ Fax___________________ Email _____________________________
PROPERTY OWNER INFORMATION (If different from above)
Name___________________________________ Company ________________________________
Mailing Address ____________________________________________________________________
Phone ___________________ Fax___________________ Email _____________________________
As the project applicant listed below, I hereby ack nowledge I have read this permit application and st ate that the information is correct, and agree to comply with all City ordinanc es and State laws regulating activities covered by this permit application.
Applicant Name: ______________________________ Sig nature: ______________________________ Date: ____________
FOR OFFICE USE ONLY
Date Received: ___________________________
Tidemark Case Number: CON________________
Land Use(s) and Trip Generation
Land Use Description
ITE
Land
Use
Code 1
ITE
Trip
Generation
Rate1
Residential
Units
Commercial or Industrial
Gross Square Feet
Total New Trips
(PW Staff Only)
Prop osed Land Uses
Existing Land Uses
Net New Vehicle Trips
(PW Staff Only)
1Note: According to most current edition of Institute of Transportation Engineers (ITE) Trip Generation Manual
ADDITIONAL MULTIMODAL INFORMATION
Distance from project to nearest existing WTA transit route:
_____ abutting project _____ < ¼ mile _____ ¼ mile to ½ mile _____ > ½ mile
Distance from project to nearest existing bicy cle lanes:
_____ abutting project _____ < ¼ mile _____ ¼ mile to ½ mile _____ > ½ mile
Distance from project to nearest existing ADA- compatible sidewalk:
_____ abutting project _____ < ¼ mile _____ ¼ mile to ½ mile _____ > ½ mile
PROPOSED TRIP GENERATION REDUCTIONS FOR PROJECT
_____ locate in mixed use/multimodal-orie nted area, such as an Urban Village
_____ contract with WTA to fund and provi de annual bus passes to residents and/or employees
_____ reduce on-site parking spaces and/o r _____ shared parking spaces
_____ fund and install bicycle parking ra ck(s) for residents and/or employees
_____ fund and install transit shelter in WTA-approved location
_____ contract with car-share agency to p rovide annual membership to residents and/or employ ees
_____ car-share vehicle available on-site to residents and/or employees
G4
CSA Deecripton
1. Edgemooo-S<luth
2. SannhHnl
'3. Fairhaven Vilage
4. South-lfil~Val.,,
s. WWU - SehOMe Arboretum.
8. -rfr-Diatricl 7. Dowo1town-Sarie.~ountam
8. Pugo~-Fallo
9. Bin:h~Cohnbia
10.
11. Baddey Vil._ 12.. Rooaevea-Cha.nder
13. Atabema-SiW..-Beac:h
14. Gordata f'UD.Guido Mericf'on
16- King Moootain
16. 1 ..... p. lnduotrial
Legend Transportation Concurrency
SH~=:~::) Type •
Type II
1.JG.a. H:-at. ..
..__ City of Bellinghan1 G.· ~ _ Transportation Concurrency
~
~ ~
1
Roadway Functional Classificat.ion ,..,, Frindpal Rou:e
~ s.coooa<y """'' /".,/ CO:iett.of Root:
~ lr!3'S!ate S
Service Areas (CSA)
...... Prclp06ed R'lrx:!p.3"
.;•,,,.# R'Op06eC Sieooodary
, .... ,, ?rop06Ed COl:Jecl«
2010
Development Review Elements
Transportation Concurrency is only one piece of the development review puzzle
City of Bellingham Resources
The transportation planning documents listed below are available on the City of Bellingham web site:
www.cob.org/services/neighborhoods/community-planning/transportation/index.aspx
Transportation Report on Annual Concurrency (TRAC)
Multimodal Transportation Concurrency Management Or dinance (BMC 13.70)
Transportation Impact Fee Ordinance (BMC 19.06)
Public Works Development Guidelines and Improvement Standards
Bellingham Comprehensive Plan, Transportation Eleme nt
Public Works Transportation Planning Staff
In addition to the transportation planning documents listed above, specific Public Works administrative staff are responsible for the implementation of the Transportation Concurrency Management Program and can be reached by telephone at (360) 778-7900 between 8:00am and 5:00pm, Monday through Friday, or by email, listed below. Chris Comeau, AICP, Transportation Planner [email protected]
Brent Baldwin, AICP, Development Review Manager [email protected]