Fna Body Opd
-
Upload
prasad-bld -
Category
Documents
-
view
228 -
download
0
Transcript of Fna Body Opd
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 1/15
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 2/15
OPD : Ongoing Product Development
Engineering changes involved in the current/future
production parts (i.e. Post FDJ)
Engineering changes includes ,
New model year creation :
Creation of new item in Tce by referring
previous/current model year with some changes ineither geometric or material etc.,
Study files :
In which we need to give one or more proposals to the
engineer, to find optimum solution to the issue in hand.
Then engineer will analyze the study and will come upwith the best feasible solution.
Revising the trim lines/edges and the no. of item
usage.
addition/ deletion of features.
FNA BODY CAD OPD
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 3/15
WERS :
Worldwide Engineering Release System
WERS facilitates communication
between engineering and manufacturing, consolidates worldwide
business practices, and eliminates redundant design efforts
between regions.
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 4/15
Notice number Checks Notice screens for
completeness. ECC adds
responsibility codes as required.
Designer
Primary in
FNA
(Supervisor)
Engineer
OPD WORKFLOW
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 5/15
Engineer
Release Analyst
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 6/15
Types of WERS actions :
RV – Revise action :
If there are no cost affected by the changes.It Wont have suffix bump. May or may not have cad ownership.
RP – Replace part
When there is a cost change in place.
Suffix should get bump one level (ex. A A to AB).
We will own the cad ownership.
AP/DP – Add part / Delete part
This action applicable, when the item is either added to /deleted from
the BOM in entire system (CPSC).
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 7/15
Parts affected (B) screen
indicates the items which are all
going to be affected by the
change and as well as the
replacing part.
Parts Affected by the Notice
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 8/15
Below DS level, all theassemblies are in precise
condition (i.e. item revisions are
placed to the BOM )
Above the DS level all the assy’s
in Imprecise condition (i.e. Items
are placed in to the BOM)
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 9/15
Program Node for vehicle D385
Though we have changes
only in this part, we need to
update till DS level, since
Precise state till DS level.
In the hierarchy Above the DS
level, item will be in IMPRECISEstate (differentiated by white
background), so it will trigger the
latest revision of DS to Prg.
Node.
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 10/15
NPSD ScreenEngineering Direction
for each item
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 11/15
Teamcenter (Tce) :
By using the parts affected screen from WERS, we can
search the items in Tce and open in either Catia / IDEASdepend on the master format.
As per the Engineering Direction in WERS, changes are
updated to the cad and saved back to the Teamcenter.
Using Where Used / Referenced command in Tce, the
Subsequent DI And DS are updated.
And the DS new Revision as well as old revisions are
pulled to Vismockup, To check the effect of the changes till the
DS level.
At last the parts were uploaded to PPM audit, which will
extract attributes (i.e. Rev BLK, TITLE BLK, General notes as
well as BOM )
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 12/15
CN (Change Notice) :
Once we completed the changes, all the items are frozen and Published
And kept in the CN to apply REL-P (Release for Production) status.
The Main advantage of CN is ,
Sync between WERS and Tce.
Single Master
and will carry all releasable as well as non releasable item.
Once the Affected parts were added to CN then Submitted to REL-P and
CN will be sent to the Engineer by routing the workflow.
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 13/15
Engineer as well as Tce users in the distribution list of workflow,
will get an automated mail for reviewing the Package.
Engineer either can pull the data to Vismockup/ Cad for review
the Changes, once requirements are satisfied Engineer approves
the CN and date out the ENG SO line in WACTS screen (WERS)
In few cases one more additional line in WACTS, will be added
by ECC for DPA 5 OK. Once the engineer approved the changes,
DPA person will review the data for the effects of the changes by
considering Surrogating Products and will date out the WACTS
once design satisfies his requirements.
Then Release analyst will look in to the PPM, for attributes and
BOM with respective to WERS BOM and will date out the REL
ANL line in WACTS.
By this time CN will be Released in Tce with REL-P & Effectivity
FLAG, And the Notice also released in WERS.
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 14/15
START PART – FNA
When ever need to create new parts For FNA body cad, we have to
initiate from start part which is available in Tce with the name “FNA START
PART”.
The main objective is Systematic structure of feature in the appropriate
geometric sets which will help in pointing out features at the earliest.
Ex.
Branding & Material thickness section should come into the geometric set
“DELIVERABLES”
And features used for creating mating surface boundaries should be within “MSB” geometric set.
7/28/2019 Fna Body Opd
http://slidepdf.com/reader/full/fna-body-opd 15/15