7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 1/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 1/27-
Mod. 151-204/66
FlexiHybrid
All System Type
Field commissioning
Tests Sheets Report
IDU
ODUs Type
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 2/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 2/27-
Mod. 151-204/66
MW LINK ACCEPTANCE REPORT
Customer: .......................................... Country: .......................................
Link: .......................................... Work Order: .......................................
Equipment: ..........................................
Identification Station A: ..........................................
Identification Station B: ..........................................
The commissioning of the referred link has been concluded on..........................................
The attached test sheets show the results of the tests carried out
We here undersign to certificate that the link under test fully complies with the technical specificationsas per contract.
For NSN For Customer
Name: Name:
.......................................... ..........................................
Signature: Signature:
.......................................... ..........................................
DATE ..........................................
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 3/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 3/27-
Mod. 151-204/66
Relevant remarks:
Relevant notes for Station A: ..........................................
Relevant notes for Station B: ..........................................
Common Notes ..........................................
For NSN For Customer
Name: Name:
.......................................... ..........................................
Signature: Signature:
.......................................... ..........................................
DATE ..........................................
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 4/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 4/27-
Mod. 151-204/66
Index
1
REVISION LIST ............................................................................................................... 5
2 TEST INSTRUMENT LIST............................................................................................... 6
2.1. Tools and Test Instruments.......................................................................................... 6
3 CONFIGURATION NOTES.............................................................................................. 8
3.1. Operating Mode ........................................................................................................... 8
3.2. ODUs and Modem Module connection ........................................................................ 8
4 INSTALLATION CHECK LIST ......................................................................................... 9
4.1. Installation Check List Summary.................................................................................. 9
5 SYSTEM CONFIGURATION SUMMARY...................................................................... 10
5.1. Terminal Station Configuration Type.......................................................................... 10
5.2. Summary of Configurations Station A ........................................................................ 11
5.3. Summary of Configurations Station B........................................................................ 12
5.4.
IDU’s – ODU’s Cables................................................................................................ 13
5.5. Antenna’s system....................................................................................................... 13
5.5.1. ODUs and Mounting Type(1) ................................................................................... 13
5.5.2. Antenna’s and Polarization .................................................................................... 13
6 SYSTEM COMPOSITION SUMMARY........................................................................... 14
6.1. IDUs Composition and Serial number........................................................................ 14
6.1.1. Station A................................................................................................................. 14
6.1.2. Station B................................................................................................................. 15
6.1.3. Device Information ................................................................................................. 16
6.2. Device Information (Starting Information) .................................................................. 16
6.3. Other Networking Configuration................................................................................. 16
6.4.
CPU SW Reprogramming Data.................................................................................. 17
6.5.
Status Panel Information............................................................................................ 18
6.5.1. ODU Tx Power Configuration................................................................................. 20
6.6. E1 Channel Mapping.................................................................................................. 21
6.7. Ethernet available ports ............................................................................................. 22
6.8. STM-1 available ports ................................................................................................ 22
7 SYSTEM CHECK AND MEASURE................................................................................ 23
7.1.1. Breakers / Fuse Used............................................................................................. 23
7.2. DC Voltage Power supply .......................................................................................... 23
7.2.1. Access Level Configuration and check of Management Ports Connection............ 24
7.3. PDH / SDH Local LoopBack Ports Check.................................................................. 25
7.4. Eth Local Connectivity Ports Check ........................................................................... 25
7.5.
End To End Connectivity Ports Check ....................................................................... 25 7.6. Manual Switch Protection Check ............................................................................... 26
7.7. Background BER Test................................................................................................ 27
7.7.1. Long Term Background BER test Evaluation with Test Instrument. ...................... 27
7.7.2. Result of Quality evaluation using the Error-Sec-Count Graph Facility.................. 27
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 5/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 5/27-
Mod. 151-204/66
1 REVISION LIST
Date Ed Note
01/2008 01 First Issue
07/2008 02 Second Issue (equipment configuration up to 63xE1)
11/2008 03 Third Issue
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 6/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 6/27-
Mod. 151-204/66
2 TEST INSTRUMENT LIST
2.1. Tools and Test Instruments
Basic Test Instruments suggested for Line-up and commissioning(*) Choice the proper test instrument related to the tributary Interface Type, and DDF Interface
Test Instruments Note
Personal Computer / Laptop (MinimumHW Requirements)(Suggested Qty 2 in case of test forETH Ports)
• CPU Pentium 1,6 Ghz or higher
• 256 Mbyte RAM minimum (Suggested 512)
• Color monitor with resolution of 1024x768 at least• Video card with minimum resolution of 1024x768
• 10 Gbyte Hard-disk minimum
• CD-ROM drive
• Mouse
• RS-232C serial portEthernet network card (RJ45 interface)
Personal Computer / Laptop (SWRequirements)
• Microsoft Windows XP Professional or MicrosoftWindows 2000 Professional
• TCP/IP communication protocol installed
• Microsoft office 2000 / XP or 2003
• Web Browser program with Java environment installed
o Microsoft Internet Higher than Explorer 5.5 orMozilla Firefox (latest version is preferred)
o Java Runtime environment (Version 1.6. orlatest version is preferred)
• HyperTerminal application SW (embedded windowsapplication)
• FTP cliento FileZilla version 2.2.32 or higher
Multimeters Suggested Analogic or Digital Multimeter
PDH / SDH signal Analyzer
Suggested for only PDH ports: Acterna/JDSU EDT 135PDH testerSuggested for PDH and SDH Ports: SDH signal analyzer
for E1 / E3 / STM 1 / STM 4, type Acterna/JDSU ANT-5 orequivalent (if required with optical SDH Ports)
Accessories Note
RS232 PC serial cablePin to Pin (Sub D9 Male / Sub D9 Female)Or USB / Sub D9 Female Serial Cable adapter (for PCwithout Serial Port Connection)
Alignment Cable BNC / Banana (must be build in Field)
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 7/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 7/27-
Mod. 151-204/66
Adaptors Note
RJ45 Adaptor Female / Female RJ45 Adaptor
Series of coax adaptor(E1 Testing with 75 ohm impedance onDDF side or Electrical STM-1 Interface)
Various adaptor for electrical Interface, e.g:BNC (m) / 1.6-5.6 (f), 1.0-2.3 (m) / 1.6-5.6 (f)1.6-5.6 male/male, 1.6-5.6 female / femaleOther adaptor related to DDF type, System Impedancecabling and, Test instrument interface.
Series of Optical Adaptors(only if optical interface is equipped)
Various adaptor for optical Interface.Type and end connectors related to ODF type, SystemInterface and Test instrument interface.
Test Cable Note
ETH Cat 5e cable type RJ45 Straight and Cross type both end cabled (all wire)ETH Cat 5e cable type RJ45
One Cable side cabled with RJ45 Connector; other cableside open
Tests CablesType and end connectors related to DDF type, SystemImpedance cabling and, Test instrument interface.
Optical Pig tails (only if optical interfaceis equipped)
Type and end connectors related to ODF type, SystemInterface and Test instrument interface.
Tools Note
Optical Cleaning Kit
RJ45 Connectors Crimping Tool(suggested)
Technical Tools bag
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 8/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 8/27-
Mod. 151-204/66
3 CONFIGURATION NOTES
3.1. Operating Mode
On the system configuration the Operating Mode define the Link System type. During the “Link WizardConfiguration” is request Select one of the following mode:
• “Standard” Mode for 1+0 Not protected System
• “Protect non-diversity” mode for 1+1 Hot Stand By System
• “Protect diversity” mode for 1+1 Frequency Diversity or Cross Polarization System
• “East-west” mode for 2+0 System / Ring Configuration System
• “East-east” mode for 2+0 configuration (available only with the Gigabit Ethernet unit)
•
NoteThe “ Protect non-diversity” mode configuration is independent from the number ofantennas used for the terminal station.
3.2. ODUs and Modem Module connection
• For Standard mode the default Modem Unit, must be connect on the lower position, identified byEast side
• For Protection mode the Modem Unit on the lower position is identified by East side (suggestedto use for main channel) and the modem unit on the upper position must be identified by West side (suggested to use for protection channel).
• For East-West mode the Modem Unit on the lower position is identified by East side and themodem unit on the upper position must be identified by West side
ODU connection for Not Protected system type
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 9/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 9/27-
Mod. 151-204/66
4 INSTALLATION CHECK LIST
4.1. Installation Check List Summary
Fill the requested form with requested data according to the installed system and verify the data withthe ones reported in the Installation Manual and Project Specifications.
Station A Station B
Indoor assembly Yes No N.A. Yes No N.A.
IDU-ODU Cables Yes No N.A. Yes No N.A.Power supply Yes No N.A. Yes No N.A.
Antennas Assembly Yes No N.A. Yes No N.A.
ODUs Assembly Yes No N.A. Yes No N.A.
ODUs Mounting Assembly Yes No N.A. Yes No N.A.
Grounding ODUs Yes No N.A. Yes No N.A.
Grounding Cables IDU-ODUs Yes No N.A. Yes No N.A.
Grounding IDUs Yes No N.A. Yes No N.A.
PDH Tributaries Cables and ETH Cables Yes No N.A. Yes No N.A.
SDH Tributaries Cables and ETH Cables Yes No N.A. Yes No N.A.
ETH Services Cables Yes No N.A. Yes No N.A.
Optical Pig Tails Cables Yes No N.A. Yes No N.A.
Alarm and Services Cables Yes No N.A. Yes No N.A.
Is the system ready for Line-up? Yes No N.A.
Corrective measures to be completed before Line-up: Yes No N.A.
Is another check necessary prior to start the Line-up? Yes No N.A.
Remarks: Please list all items to be corrected.
......................................................................
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 10/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 10/27-
Mod. 151-204/66
5 SYSTEM CONFIGURATION SUMMARY
5.1. Terminal Station Configuration Type
Units Station A Station B
1+0 system with integrated antenna (1+0)
1+0 system with independent antenna (1+0) (Note 1)
1+1 system with Hot Standby with integrated antenna (1+1 HSBY) (Note 2)
1+1 system with Hot Standby with independent antenna (1+1 HSBY) (Note 1 /2)
1+1 system with FD with integrated antenna (1+1 FD) (Note 2)
1+1 system with FD with independent antenna (1+1 FD) (Note 1)
2+0 system with ODUs on integrated antenna
2+0 system with ODUs on independent antenna (Note 1)
Other: Station A Station B
..........
..........
Note 1: The waveguide connection between ODU and antenna can be flexible or elliptical type.
Note 2: The coupler can be balanced or unbalanced.
Notes
..........
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 11/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 11/27-
Mod. 151-204/66
5.2. Summary of Configurations Station A
Items East or common data West N.A.
ODU Operational Mode .......... ..........
IDU Operational Mode .......... ..........
Modulation .......... ..........
E1/T1 N.A. N.A.
Mode .......... ..........
Max Active Channels .......... ..........
Active Channels List .......... ..........
Ethernet N.A. N.A.
Data Rate .......... ..........
STM-1 N.A. N.A.
STM-1 Active Channels .......... ..........
STM-1 Active Channels List .......... ..........
ODU
ODU Selection .......... ..........
ODU Channel / Tx Frequency .......... ..........
ODU Channel / Rx Frequency .......... ..........
Other Add Items
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 12/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 12/27-
Mod. 151-204/66
5.3. Summary of Configurations Station B
Items East or common data West N.A.
ODU Operational Mode .......... ..........
IDU Operational Mode .......... ..........
Modulation .......... ..........
E1/T1 N.A. N.A.
Mode .......... ..........
Max Active Channels .......... ..........
Active Channels List .......... ..........
Ethernet N.A. N.A.
Data Rate .......... ..........
STM-1 N.A. N.A.
STM-1 Active Channels .......... ..........
STM-1 Active Channels List .......... ..........
ODU
ODU Selection .......... ..........
ODU Channel / Tx Frequency .......... ..........
ODU Channel / Rx Frequency .......... ..........
Other Add Items
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 13/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 13/27-
Mod. 151-204/66
5.4. IDU’s – ODU’s Cables
Station A Station B
On ODU East On ODU West On ODU East On ODU West
Length .......... meters .......... meters .......... meters .......... meters
Type .......... .......... .......... ..........
5.5. Antenna’s system
5.5.1. ODUs and Mounting Type(1)
Station A Station B
Directly Connected to Antenna Directly Connected to AntennaODU Assembling mode Using Mounting Kit Using Mounting Kit
Integrate System Integrate SystemMounting Installation(if applicable) Not Integrate System Not Integrate System
1+0 1+0
1+1 Frequency Div 1+1 Frequency Div
1+1 Hot Stand By 1+1 Hot Stand By
2+0 Double Polar 2+0 Double PolarOther Other
Mounting Kit Type
(if applicable)
............... ...............
Coupling(Only for Hot Stand By Type)
Balanced Unbalanced Balanced Unbalanced
Flexible W/G Flexible W/G
Standard Elliptical W/G Standard Elliptical W/GWG Type
Not Applicable Not Applicable(1)
Not Applicable only for system with ODU integrate with antenna
5.5.2. Antenna’s and Polarization
Station A Station B
One Antenna Single Polar Feed-horn One Antenna Single Polar Feed-horn
One Antenna Dual Polar Feed-horn One Antenna Dual Polar Feed-horn
Two Antenna Single Polar Feed-horn Two Antenna Single Polar Feed-horn Antenna System
Two Antenna Dual Polar Feed-horn Two Antenna Dual Polar Feed-horn
Antennas configuration(For two antennassystem)
Two Antennas in Space DiversityYes No
Two Antennas in Space DiversityYes No
Polarization (For singlePolar. System)
H V H V
To ODU East To ODU West To ODU East To ODU WestPolarization (For 2+0system) H V H V H V H V
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 14/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 14/27-
Mod. 151-204/66
6 SYSTEM COMPOSITION SUMMARY
6.1. IDUs Composition and Serial number
6.1.1. Station A
IDU Label Part Number P/N (Full) Serial Number
.......... .......... ..........
Basic Units Position P/N Revision Serial Number
Chassis .......... .......... ..........
Controller Card D .......... .......... ..........
Power Supply Lower B .......... .......... ..........
Power Supply Upper C .......... .......... ..........
Modem Card East H .......... .......... ..........
IF Card East H .......... .......... ..........
Modem Card West I .......... .......... ..........
IF Card West I .......... .......... ..........
I/O Modules Position P/N Revision Serial Number
Master:
.......... E .......... .......... ..........Expansion I/O module:
.......... F .......... .......... ..........
Mini I/O module:
.......... G .......... .......... ..........
Add / Other Unit/Modules: Position P/N Revision Serial Number
SFP On E .......... .......... ..........
.......... .......... .......... .......... ..........
ODUs P/N Revision Serial Number
ODU East .......... .......... ..........
ODU West .......... .......... ..........
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 15/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 15/27-
Mod. 151-204/66
6.1.2. Station B
IDU Label Part Number P/N (Full) Serial Number
.......... .......... ..........
Basic Units Position P/N Revision Serial Number
Chassis .......... .......... ..........
Controller Card D .......... .......... ..........
Power Supply Lower B .......... .......... ..........
Power Supply Upper C .......... .......... ..........
Modem Card East H .......... .......... ..........IF Card East H .......... .......... ..........
Modem Card West I .......... .......... ..........
IF Card West I .......... .......... ..........
I/O Modules Position P/N Revision Serial Number
Master:
.......... E .......... .......... ..........
Expansion I/O module:
.......... F .......... .......... ..........
Mini I/O module:
.......... G .......... .......... ..........
Add / Other Unit/Modules: Position P/N Revision Serial Number
SFP On E .......... .......... ..........
.......... .......... .......... .......... ..........
.......... .......... .......... .......... ..........
ODUs P/N Revision Serial Number
ODU East .......... .......... ..........
ODU West .......... .......... ..........
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 16/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 16/27-
Mod. 151-204/66
6.1.3. Device Information
Device Station A Station B
Model Number .......... ..........
Chassis .......... ..........
Application Version .......... ..........
6.2. Device Information (Starting Information)
Description Station A Station B
Device Name .......... ..........
Host name .......... ..........
IP Address .......... ..........
Application Version .......... ..........
Chassis .......... ..........
Add / Others Items: Active Passive
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
6.3. Other Networking Configurations
Description Station A Station B
IP Netmask .......... ..........
IP Gateway .......... ..........
Ethernet Address (MAC Address) .......... ..........
Enabled EnabledDHCP ClientDisabled Disabled
If no DCN Planning configuration is available (or in case of a stand alone link) it is suggestedto configure the following IP address
Description Station A Station B
IP Address 192.168.0.1 192.168.0.3
IP Netmask 255.255.255.0 255.255.255.0
IP Gateway (*)
DHCP Client Disabled Disabled
(*) The IP Gateway is not mandatory
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 17/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 17/27-
Mod. 151-204/66
6.4. CPU SW Reprogramming Data
Station A
Items Main Active Mirror Active
Kernel .......... ..........
Application .......... ..........
FPGA .......... ..........
ODU .......... ..........
Modes .......... ..........
Channels .......... ..........ODU East Firmware .......... ..........
ODU West Firmware .......... ..........
Bootloader .......... ..........
Modem East Firmware .......... ..........
Modem West Firmware .......... ..........
Add / Others Items:
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
Station B
Items Main Active Mirror Active
Kernel .......... ..........
Application .......... ..........
FPGA .......... ..........
ODU .......... ..........
Modes .......... ..........
Channels .......... ..........
ODU East Firmware .......... ..........ODU West Firmware .......... ..........
Bootloader .......... ..........
Modem East Firmware .......... ..........
Modem West Firmware .......... ..........
Add / Others Items:
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 18/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 18/27-
Mod. 151-204/66
6.5. Status Panel Information
Station A
Description East West
Gen. Alarm Status Red Green
Modem Status Lock Unlock Lock Unlock
Transmitter .......... ..........
TxPower .......... ..........
Far End TxPower .......... ..........RSL .......... ..........
Far End RSL .......... ..........
Signal/Noise .......... ..........
Active Receiver .......... ..........
Tx Frequency .......... ..........
Rx Frequency .......... ..........
Polarization .......... ..........
Mode .......... ..........
Mode 2 .......... ..........
Local IP .......... ..........
Local Host .......... ..........
Remote IP .......... ..........
Remote Host .......... ..........
Remote IP 2 .......... ..........
Remote Host 2 .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
Note: the available data depend on the Link configuration and system release. Mark only the availabledata.
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 19/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 19/27-
Mod. 151-204/66
Station B
Description East West
Gen. Alarm Status Red Green
Modem Status Lock Unlock Lock Unlock
Transmitter .......... ..........
TxPower .......... ..........
Far End TxPower .......... ..........
RSL .......... ..........
Far End RSL .......... ..........
Signal/Noise .......... ..........
Active Receiver .......... ..........
Tx Frequency .......... ..........
Rx Frequency .......... ..........
Polarization .......... ..........
Mode .......... ..........
Mode 2 .......... ..........
Local IP .......... ..........
Local Host .......... ..........
Remote IP .......... ..........
Remote Host .......... ..........
Remote IP 2 .......... ..........Remote Host 2 .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
.......... .......... ..........
Note: the available data depend on the Link configuration and system release. Mark only the availabledata.
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 20/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 20/27-
Mod. 151-204/66
6.5.1. ODU Tx Power Configuration
Station A Station B
ODU East ODU West ODU East ODU West
Start Tx Power setting .......... dBm .......... dBm .......... dBm .......... dBm
Current Tx Power (2)
.......... dBm .......... dBm .......... dBm .......... dBm
Station A Station B APC Config
ODU East ODU West ODU East ODU West
Enabled Enabled Enabled Enabled Adaptive Power Control Disabled Disabled Disabled Disabled
RSL Low Threshold .......... .......... .......... ..........
RSL High Threshold .......... .......... .......... ..........
RSL Maximum Threshold .......... .......... .......... ..........
CER Threshold .......... .......... .......... ..........
TxPower Maximum .......... .......... .......... ..........
TxPower Minimum .......... .......... .......... ..........
Step Size .......... .......... .......... ..........
Enabled Enabled Enabled EnabledUpdate Far End Thresholds
Disabled Disabled Disabled Disabled
.......... .......... .......... .......... ..........
.......... .......... .......... .......... ..........
.......... .......... .......... .......... ..........
Note: the available data depend on the Link configuration and system release. Mark only the availabledata.
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 21/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 21/27-
Mod. 151-204/66
6.6. E1 Channel Mapping
E1 Mapping Type Station A Station B
Custom
42MA and 21EX <-> All East
16MA and 16EX <-> All East
2MA and 16EX <-> All East
All Repeater (Pass-through)
All Ring
STM1 <-> All East
STM1 <-> All Ring
42MA and 21EX <-> Ring
16MA and 16EX <-> Ring
2MA and 16EX <-> Ring
Other ..........
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32
33 34 35 36 37 38 39 40
41 42 43 44 45 46 47 48
49 50 51 52 53 54 55 56
AvailableE1 Ports
Station A
57 58 59 60 61 62 63
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32
33 34 35 36 37 38 39 40
41 42 43 44 45 46 47 48
49 50 51 52 53 54 55 56
AvailableE1 Ports
Station B
57 58 59 60 61 62 63
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 22/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 22/27-
Mod. 151-204/66
6.7. Ethernet available ports
Eth Ports Station A Eth Ports Station B
1 2 3 4 1 2 3 4
SFP SFP
Available NotAvailable Available Not Available
SFP Type Electrical Optical SFP Type Electrical Optical
SFP Model .......... SFP Model ..........
6.8. STM-1 available ports
STM-1 Port Station A STM-1 Port Station B
Available Not Available Available Not Available
Port Type Electrical Optical Port Type Electrical Optical
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 23/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 23/27-
Mod. 151-204/66
7 SYSTEM CHECK AND MEASURE
7.1.1. Breakers / Fuse Used
Breakers Type (max current value) Station A Station B
Fuse on Power supply Main Module (Lower) .......... Amperes .......... Amperes
Fuse on Power supply Secondary Module (Upper)(1)
.......... Amperes .......... Amperes
(1) If applicable
7.2. DC Voltage Power supply
Station A Station B
Power Supply on unit lower .......... Volt (DC) .......... Volt (DC)
.......... Volt (DC) .......... Volt (DC)Power Supply on unit upper
N.A. N.A.
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 24/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 24/27-
Mod. 151-204/66
7.2.1. Access Level Configuration and check of Management Ports Connection
Station A
UserLog-In
PasswordLog-In
Accesson Serial Port
Accesson ETH Port
Access Level 1(Monitor)
.......... .......... OK OK
Access Level 2(Operator)
.......... .......... OK OK
Access Level 3(Administrator)
.......... .......... OK OK
Access Level 4(Integrator)
.......... .......... OK OK
Station B
UserLog-In
PasswordLog-In
Accesson Serial Port
Accesson ETH Port
Access Level 1(Monitor)
.......... .......... OK OK
Access Level 2(Operator)
.......... .......... OK OK
Access Level 3(Administrator)
.......... .......... OK OK
Access Level 4(Integrator)
.......... .......... OK OK
The factory default accesses are
Default access value User Log-In Password Log-In
Monitor monitor monitor
Operator operator col1ma
Administrator administrator d1scovery
Integrator integrator p1nacate
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 25/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 25/27-
Mod. 151-204/66
7.3. PDH / SDH Local LoopBack Ports Check
Port Type Station A Station B
PDH OK N.A. OK N.A.
STM1-e OK N.A. OK N.A.
STM1-o OK N.A. OK N.A.
7.4. Eth Local Connectivity Ports Check
Port Type Station A Station BETH OK N.A. OK N.A.
.......... OK N.A. OK N.A.
.......... OK N.A. OK N.A.
7.5. End To End Connectivity Ports Check
Port Type From Station A to B From Station B to A
PDH OK N.A. OK N.A.
STM1-e OK N.A.
OK N.A.
STM1-o OK N.A. OK N.A.
ETH OK N.A. OK N.A.
.......... OK N.A. OK N.A.
.......... OK N.A. OK N.A.
.......... OK N.A. OK N.A.
.......... OK N.A. OK N.A.
.......... OK N.A. OK N.A.
.......... OK N.A. OK N.A.
For PDH or SDH port use the PDH/SDH signal analyzer. For ETH port use two laptop connected onboth end port and check the connectivity with a Ping Test.
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 26/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
902-111/12Nokia SiemensNetworks
FlexiHybrid Equipment
Field Commissioning Tests Sheets - 26/27-
Mod. 151-204/66
7.6. Manual Switch Protection Check
Only for protected system
Result on Station A Result on Station B
From East to West OK OK
From West to East OK OK
Manual switch check applicable only for protect system
Test with Manual SW forcing operations.
After all switching tests have been performed; all system switches should beset as for project definition
7/21/2019 FLEXI HYBRID Commissioning_Tests_Sheets_Report.pdf
http://slidepdf.com/reader/full/flexi-hybrid-commissioningtestssheetsreportpdf 27/27
Rep. Data 31/01/2008 Ed. 1 Em./Var. 01/08 Firma
Esec. Contr Ed. 2 Em./Var. 07/08 Firma
Ed. 3 Em./Var. 11/08 Firma
7.7. Background BER Test
Testing Mode
Two BER Test Instrument (Both-end Terminal Station)One Test Instrument on Station A and Loop back on Station BOne Test Instrument on Station B and Loop back on Station AUsing Errors-Sec-Count Graph Facility
Note: It is suggested to use only one of the above mentioned testing modes.
7.7.1. Long Term Background BER test Evaluation with Test Instrument.
Port Type Port / Trib on test Result
PDH .......... OK
STM1-e .......... OK
STM1-o .......... OK
.......... .......... OK
.......... .......... OK
Result Description
..........
7.7.2. Result of Quality evaluation using the Error-Sec-Count Graph Facility
Result On Station A
Estimated Period Average Value of ES Result Accepted
Last .......... Hours .......... Yes No
Result On Station B
Estimated Period Average Value of ES Result Accepted
Last .......... Hours .......... Yes No