Sheet1FORMER BUDGET TERMINAL FUEL HYDRANT EXTENSION BAYS G15, G16 & G17FIT-UP & WELDING VISUAL INSPECTION REPORTCLIENT: CAFHIMAIN CONTRACTOR: WECPROJECT NO: P4218AREA:LOCATION :DATE :ISO DWG NO.:DATE:LINE CLASS:REPORT NO.:SPOOL NO.:PREPARE BY:S.NOJOINT NO.PIPE LGHT.(mm)HEAT NO-1HEAT NO-2SIZEWPS NOTYPE OF WELDFIT UP GAP (MM)FIT UPCHECKED BYROOT WELDER NUMBERWELD DATECHECKED BYCAPPING WELDER NUMBERWELD DATEFINAL VISUALCHECKED BYREMARKSDIATHK .ABCDDATEWECCAFHIW1W2WECCAFHIW1W2WECCAFHI12NOTE:DURING FIT UP JOINTS SHALL BE FREE FROM RUSTPIPE INTERNAL CLEANLINESS CHECKEDONLY QUALIFIED WELDER WILL BE USEDFILLER WIRE / ELECTRODE BATCH:INTERPASS TEMP. MAINTAINED:CHECKED BY:WEC QA/QC INSPECTORREVIEWED & APPROVED BY:CAFHINAME:NAME:DESIGNATIONDESIGNATIONSIGNATURESIGNATUREDATEDATE