Fit-up & Welding Visual Inspection Report

2
RMER BUDGET TERMINAL FUEL HYDRANT EXTENSION BAYS G15, G16 & G FIT-UP & WELDING VISUAL INSPECT CLIENT: CAFHI MAIN CONTRACTOR: WEC PROJECT NO: P4218 AREA: ISO DWG NO.: DATE : LINE CLASS: REPORT NO. : SPOOL NO.: PREPARE BY : S.NO JOINT NO. HEAT NO-1 HEAT NO-2 SIZE WPS NO FIT UP GAP (MM) FIT UP CHECKED BY WELD DATE CHECKED BY WELD DATE DIA THK . A B C D DATE WEC CAFHI W1 W2 WEC CAFHI W1 W2 1 2 NOTE: DURING FIT UP JOINTS SHALL BE FREE FROM RUST PIPE INTERNAL CLEANLINESS CHECKED ONLY QUALIFIED WELDER WILL BE USED FILLER WIRE / ELECTRODE BATCH: INTERPASS TEMP. MAINTAINED: CHECKED BY:WEC QA/QC INSPECTOR REVIEWED & APPROVED BY:CAFHI NAME: NAME: DESIGNATION DESIGNATION SIGNATURE SIGNATURE DATE DATE PIPE LGHT. (mm) TYPE OF WELD ROOT WELDER NUMBER CAPPING WELDER NUMBER C A B D

description

Fit up welding report form

Transcript of Fit-up & Welding Visual Inspection Report

Sheet1FORMER BUDGET TERMINAL FUEL HYDRANT EXTENSION BAYS G15, G16 & G17FIT-UP & WELDING VISUAL INSPECTION REPORTCLIENT: CAFHIMAIN CONTRACTOR: WECPROJECT NO: P4218AREA:LOCATION :DATE :ISO DWG NO.:DATE:LINE CLASS:REPORT NO.:SPOOL NO.:PREPARE BY:S.NOJOINT NO.PIPE LGHT.(mm)HEAT NO-1HEAT NO-2SIZEWPS NOTYPE OF WELDFIT UP GAP (MM)FIT UPCHECKED BYROOT WELDER NUMBERWELD DATECHECKED BYCAPPING WELDER NUMBERWELD DATEFINAL VISUALCHECKED BYREMARKSDIATHK .ABCDDATEWECCAFHIW1W2WECCAFHIW1W2WECCAFHI12NOTE:DURING FIT UP JOINTS SHALL BE FREE FROM RUSTPIPE INTERNAL CLEANLINESS CHECKEDONLY QUALIFIED WELDER WILL BE USEDFILLER WIRE / ELECTRODE BATCH:INTERPASS TEMP. MAINTAINED:CHECKED BY:WEC QA/QC INSPECTORREVIEWED & APPROVED BY:CAFHINAME:NAME:DESIGNATIONDESIGNATIONSIGNATURESIGNATUREDATEDATE

CABD

Sheet2

Sheet3

MBD0006607F.dwg