Culvert Fishway Planning and Design GuidelinesPart I – Design Drawings for Fishway Projects
Ross Kapitzke James Cook University School of Engineering and Physical Sciences
April 2010 – VER2.0
Fish Passage Planning and Design
VER2.0 -/04/10
School of Engineering and Physical Sciences • Ross Kapitzke • fishways\I_design drawings for fishway projects -/4/10
Culvert fishway guidelines: Part I – Project fishway design drawings
James Cook University School of Engineering and Physical Sciences Culvert Fishway Planning and Design Guidelines Part I – Design Drawings for Fishway Projects Contents
APPENDIX I1 – UNIVERSITY CREEK PROTOTYPE CULVERT FISHWAYS 1
APPENDIX I2 – BRUCE HIGHWAY CORDUROY CREEK TO TULLY BOX CULVERT AND PIPE CULVERT BAFFLE FISHWAYS: MAUNSELL DRAWINGS 2
VER2.0 -/04/10
School of Engineering and Physical Sciences • Ross Kapitzke • fishways\I_design drawings for fishway projects -/4/10
Culvert fishway guidelines: Part I – Project fishway design drawings
APPENDIX I1 – UNIVERSITY CREEK PROTOTYPE CULVERT FISHWAYS
Drawing Title
University Creek Reaches, Crossings and Prototype Fishways
University Creek Prototype Fishways – Creek Reaches and Crossings
University Creek Prototype Fishways – Reach 2 Crossings and Fishways
Discovery Drive Prototype Fishway # 1 and Prototype Fishway # 4
University Creek Discovery Drive box culvert fishways – General arrangement
Discovery Drive box culvert – Prototype Fishway # 1 – Offset Baffle fishway
Discovery Drive box culvert – Prototype Fishway # 4 – Corner “EL” Baffle fishway
Douglas Arterial Project Prototype Fishway # 2
University Creek Douglas Arterial Project crossing – Layout plan
Douglas Arterial Project diversion drain and rock ramps – General arrangement
Douglas Arterial Project bridge crossing – Elevation
Douglas Arterial Project – Prototype Fishway # 2 – Rock ramp layout
Douglas Arterial Project – Prototype Fishway # 2 – Rock ramp details
Solander Road Prototype Fishway # 3
University Creek Solander Road pipe culvert – Prototype Fishway # 3 – Plan
Solander Road pipe culvert – Prototype Fishway # 3 – Long section
Solander Road pipe culvert – Prototype Fishway # 3 – Rock ramp detail
Solander Road pipe culvert – Prototype Fishway # 3 – Pipe and apron fishways
Solander Road pipe culvert – Prototype Fishway # 3 – Offset Baffle fishway
Solander Road pipe culvert – Prototype Fishway # 3 – Corner “Quad” Baffle fishway
Notes These are prototype facilities in which the baffle fishway devices are constructed of light duty materials to suit adaptation and performance evaluation, and which include provisions for monitoring and access that will not normally be incorporated into field installations of culvert fishway facilities
These drawings have been prepared specifically for use on the University Creek prototype fishways. They are not standard drawings and the designs are not necessarily applicable to other locations. Users should make their own site-specific evaluation and design arrangements and should seek specialist input on fish passage design as required.
Ross Kapitzke • JCU School of Engineering • University Creek culvert fishways • university creek plan showing reaches.doc -/1/09
Stream Reaches3 1
G
N
Legend - Stream Crossings A – Bridges: Bruce Highway – University Road B – Bridge: Douglas Arterial Ring Road C – Box Culvert: Hospital Access Road D – Box Culvert: Discovery Drive E – Pipe Culvert: Solander Road F – Footbridge: Vet/Biomed Science Walkway G – Causeway: Workshop Road - removed
C
A
Flow
University Creek
Western Creek
The Townsville Hospital
James Cook University
Ross River
2e
2 2c 2b 2a
University Road - Bruce Highway
Douglas ArterialRing Road
F
2d
3a3b 3c
00 500 1000
15002000
2500
3000
3500
B
DE
1500 Stream distance upstream from Ross River (m)
The Palmetum
Discovery Drive Box Culvert - D
Solander Road Pipe Culvert - E
Douglas Arterial Road Bridge - B
University Creek Prototype Fishways – Creek Reaches and Crossings
Ross Kapitzke • JCU School of Engineering • University Creek culvert fishways • university creek_reach 2 plan.doc -/1/09
200021002200
2300
Annandale
Douglas
CSIRO
James Cook University
Veterinary and Biomedical
Sciences
Medical Sciences
Angus Smith Drive
University Road – Bruce Highway
Douglas Arterial Ring Road
Discovery Drive – Eastern Access Road
James Cook Drive
Flow
Solander Road
Reach 2
Legend - Stream Crossings A – Bridges: Bruce Highway – University Road B – Bridge: Douglas Arterial Ring Road C – Box Culvert: Hospital Access Road D – Box Culvert: Discovery Drive E – Pipe Culvert: Solander Road F – Footbridge: Vet / Biomed Science Walkway
N
to Townsville
AB
C
D E
1200 Stream distance upstream from Ross River (m)
F
2e 2c 2b 2a2d
1000
11001200
1300
14001500
16001700
1800
1900
Solander Road Prototype Fishway # 3
University Creek
Douglas Arterial Project Prototype Fishway # 2
Discovery Drive Prototype Fishways # 1 and # 4
The Townsville Hospital
University Creek Prototype Fishways – Reach 2 Crossings and Fishways
JCU School of Engineering • University Creek culvert fishways • discovery drive_culvert fishway general arrangement.doc -/1/09
Wingwall Elevation
Culvert Plan View
Culvert Section
Operator access sign
Handrail and harness supports
Hinged platform 1500 x 600
Steps, platform, handrails, gate and ladder
2500
Flow 1700
Biological monitoring platform with lifting gear 1800 x 1600
Biological monitoring cage
Public access sign
6000
Public access sign
Fishway Zone 3
Removable nib wall (500mm high)
Steps, platforms and ladder
Dividing wall (500mm high)
Support posts
Flow
Barrel 3
Fishway Zone 1A
Barrel 2
Barrel 1
22 000
Biological monitoring cage and fish fence
Support posts
3600
1800Handrail
Dividing wall 3000
Fishway Zone 1A - offset baffle type
Fishway Zone 3 – corner “EL” baffle type
Barrel 1 Barrel 2 Barrel 3
3600 3600
This is a prototype facility in which the baffle fishway devices are constructed of light duty materials to suit adaptation and performance evaluation, and which includes provisions for monitoring and access that will not normally be incorporated into field installations of culvert fishway facilities
University Creek Discovery Drive Box Culvert Fishways – General Arrangement Plan, Section and Elevation
JCU School of Engineering • University Creek culvert fishways • discovery drive_offset baffle fishway_configuration.doc -/1/09
University Creek Discovery Drive Culvert Fishway –
Culvert Section showing Fishway Zones
Culvert Plan showing Fishway Zones and Monitoring Facilities
Offset Baffle Fishway in Barrel 1 – Plan View
Offset Baffle Fishway – Barrel 1 looking downstream
Baffles (250 x 38 timber) – fix to mounting boards with steel brackets (130 x 55 mm)
1700
Approx 30° Oblong baffle
Perpendicular baffle
900
700
200
2000 1500
2000
1800
500 500
Mounting boards
Box culvert corner block
1 4 5 6 7 8 9 10 11 12 13 2 3
Flow
1800
2000 1500 20002000
1000 2000
22 000
1800
Fishway Zone 1A Zone 1B
Box culvert corner block
900700 200
Oblong baffle
300
Perpendicular baffle
Dividing wall with handrail
Offset Baffle Detail
Access platforms and monitoring cage
Barrel 2
Barrel 1
Fishway Zone 1A – Offset Baffle
Flow
Fish fence
Fish fence
Barrel 3
Fishway Zone 1B – Plain culvert
Nib wallFishway Zone 3 – Corner “EL” Baffle
Fishway Zone 1A Offset Baffle
Barrel 2 Barrel 3
Hinged platform Handrails
Fishway Zone 3 Corner “EL” Baffle
Barrel 1
This is a prototype facility in which the baffle fishway devices are constructed of light duty materials to suit adaptation and performance evaluation, and which includes provisions for monitoring and access that will not normally be incorporated into field installations of culvert fishway facilities
Discovery Drive box culvert – Prototype Fishway # 1 – Offset Baffle configuration
JCU School of Engineering • University Creek culvert fishways • disovery drive_corner baffle fishway_configuration.doc -/1/09
Culvert Section showing Fishway Zones
Culvert Plan showing Fishway Zones and Monitoring Facilities
Discovery Drive box culvert – Prototype Fishway # 4 – Corner “EL” Baffle configuration
Access platforms and monitoring cage
Barrel 2
Barrel 1
Fishway Zone 1A – Offset Baffle
Flow
Fish fence
Fish fence
Barrel 3
Fishway Zone 1B – Plain culvert
Fishway Zone 3 – Corner “EL” BaffleNib wall
Corner “EL” Baffle Fishway in Barrel 3 – Plan
Corner Baffle Fishway – Barrel 3 looking downstream
1 4 5 6 7 8 9 10 11 12 13 2 3
3600 1000 200022 000
700
1000 20001000 20001000
Flow
Box culvert corner block
400
Corner “EL” baffle
300
300
600
Corner “EL” Baffle Detail
3 x Steel bracket fixings 130 x 55 mm
Box culvert corner block
17 mm structural ply baffle
300
300
300
500
100
100
900
700
Fishway Zone 1A Offset Baffle
Barrel 2 Barrel 3
Hinged platform Handrails
Fishway Zone 3 Corner “EL” Baffle
Barrel 1
This is a prototype facility in which the baffle fishway devices are constructed of light duty materials to suit adaptation and performance evaluation, and which includes provisions for monitoring and access that will not normally be incorporated into field installations of culvert fishway facilities
Ross Kapitzke • JCU School of Engineering • University Creek fishways • douglas bridge_location plan.doc -/1/09
University Creek Douglas Arterial Project Crossing – Layout Plan
1200
1400
1350
1300
1250
N
Discovery Drive – Eastern Access Road
to Townsville
University Road – Bruce Highway
to James Cook University
to Ayr
to Condon
Douglas Arterial Ring Road
The Townsville Hospital
University Creek
Flow
Legend
1300 Stream distance upstream from Ross River (m)
Sewer line
Drain
Diversion drain and rock ramp fishways see detail plans
4-span, 2-lane bridge
Initial diversion drain proposal
Ross Kapitzke • JCU School of Engineering • University Creek fishways • douglas bridge_diversion drain.doc -/1/09
Douglas Arterial Project Diversion Drain and Rock Ramp Fishways – General Arrangement
1350
Rock ramp fishway see detail plans
to Ayr
1300
1200 N
Discovery Drive
to University Road –Bruce Highway
to James Cook University
to Condon
Douglas Arterial Ring Road
University Creek
Legend 1300 Stream distance upstream
from Ross River (m)
Diversion drain – earth bed
Rock revetment
4-span, 2-lane bridge
Rock ramp fishwayssee detail plans
Rock revetment
Fill original creek channel
Retain riverine vegetation
50 m
50 m
Earth drain batter
Flow
Rainforest CRC / JCU School of Engineering • Ross Kapitzke • University Creek fishways • douglas bridge_elevation.doc -/1/09
4-span, 2-lane bridge
to Condon to Ayr
University Creek looking upstream
Q100 flood RL 14.05
Blockwork abutment protection
Overpass on Discovery Drive
University Creek Douglas Arterial Project Bridge Crossing – Elevation
Ross Kapitzke • JCU School of Engineering • University Creek fishways • douglas bridge_rock ramp layout.doc -/1/09
University Creek Douglas Arterial Project Rock Ramp Layout
Section A-A
** 300 mm drop between upstream and downstream drain bed levels (3 x 100 mm
drops at ridges) ** A
Apron rock
Rock protection to drain bank
Toe wall
Ridge rock
Ridge
Pool
Drain batter
Flow
Ridge rock 800 – 1000 mm nominal size refer detail
Rock Ramp Plan
B CD
GeofabricLow flow
Apron rock 400 – 600 mm nominal size 2000 2000 2000 3000
200 100
Apron sill level
Apron sill level
Drain bed / ridge
crest level * Drain bed level *
Geofabric strip U/S rock ridge
Flow
Ross Kapitzke • JCU School of Engineering • University Creek fishways • douglas bridge_rock ramp details.doc -/1/09
University Creek Douglas Arterial Project Rock Ramp Details
Section D-D – Drain bank protection Detail – Ridge Rock
Section B-B – Ridge
Section C-C – Apron within pool
Geofabric
Geofabric
Rock protection to drain bank
Toe wall
Geofabric
Apron rock 400 – 600 mm nominal size
Ridge rock 800 – 1000 mm nominal size
GeofabricGravel fill
Low flow
200 mm taper to drain centre over half drain width
Drain bed profile at apron
see Ridge rock detail
200 - 300
200 - 300
Nominal crest level of ridge
Nominal crest level of ridge
Apron sill level
Nominal crest level of ridge
200 at drain centre downstream of ridge
Ross Kapitzke • JCU School of Engineering • University Creek fishways • solander road fishway_overall plan.doc -/1/09
University Creek Solander Road pipe culvert – Prototype Fishway # 3 - Plan
Solander Road to Medical School & Townsville Hospital
to Veterinary and Biomedical Sciences
Culvert inlet / fishway exit works
Water pipe
Bypass fishway culvert and exit channel (future)
4–Barrel pipe culvert and causeway
NFlow
Rock ramp / cascade fishway Rock ramp ridge / cascade
Table drain and bypass entrance channel / rock ramp fishway
Batter rock
Concrete sill
Apron rock
Rock ramp ridges
Apron rock
University Creek
Apron – offset baffle fishway
Cascade rock
Batter rock
Pipe baffle fishway – offset / corner
Cascade rock Legend – rock protection
Ridge Rock (800 – 1000)
Cascade Rock (500 – 800)
Batter Rock (500 – 800)
Apron Rock (300 – 500)
This is a prototype facility in which the baffle fishway devices are constructed of light duty materials to suit adaptation and performance evaluation, and which includes provisions for monitoring and access that will not normally be incorporated into field installations of culvert fishway facilities
Ross Kapitzke • JCU School of Engineering •University Creek fishways • solander road fishway_long section.doc -/1/09
Longitudinal Section: Culvert and Fishways
University Creek Solander Road pipe culvert – Prototype Fishway # 3 – Long section
Culvert inlet / fishway exit works
Pipe baffle fishway – offset / corner
Rock ramp / cascade fishway Apron – offset baffle fishway
Zone D Zone C Zone B Zone A
4–Barrel pipe culvert, causeway and apron
Rock ramp ridges / cascades
Flow Cascade rock
Low flow
7400 6300 10 000 9000 8000
Apron rock
U/S Invert
RL 18.65
D/S Invert RL 18.5
Apron sill RL 18.2 Rock ridge 1 Crest RL 18.2
Rock ridge 2 Crest RL 17.8 Rock ridge 3
Crest RL 17.4
This is a prototype facility in which the baffle fishway devices are constructed of light duty materials to suit adaptation and performance evaluation, and which includes provisions for monitoring and access that will not normally be incorporated into field installations of culvert fishway facilities
Ross Kapitzke • JCU School of Engineering •University Creek fishways • solander road fishway_rock details.doc -/1/09
Solander Road pipe culvert – Prototype Fishway # 3 – Rock ramp detail
Longitudinal Section: Rock Ramp / Cascades
Section A-A: Rock Ridge 2
Low flow
Solander Road culvert, causeway and apron
Flow
Cascade rock
10 000 9000 8000
Apron rock
Rock ridge 3 Rock ridge 2 Crest RL 17.8
Apron sill RL 18.2
3600 360030002000 2000 2000 2400
Rock ridge 1 200
600
200
400
200
400
200
200
A
A
Crest RL 18.2Crest RL 17.4
Detail: Rock Ridge / Cascade
Longitudinal Section: Bypass Channel – future fishway
2 1
3000 4000 4000 4000 4000 2400
Crest 19.3 Crest 19.1 Crest 18.9 Crest 18.7 Crest 18.5
Cascade rock 500 – 800 nom size Ridge rock 800 – 1000 nom size Geofabric
Apron rock 300 – 500 nom size
Flow
Geofabric
Ridge rock 800 – 1000 nom size
200 - 300 Ridge Crest RL 17.8
600 - 700
Top of ridge RL 19.02
1
Rock ridge 2
Gravel fill
200 - 300Nominal Ridge Crest
200 - 300 500
Nom. Cascade Crest
200
Ridge rock 800 – 1000 nom size 9
1
Cascade rock 500 – 800 nom size
Apron rock 300 – 500 nom size
Geofabric Gravel fill
Low flow
Ross Kapitzke • JCU School of Engineering •University Creek fishways • solander road fishway_pipe and apron.doc -/1/09
Solander Road pipe culvert – Prototype Fishway # 3 – Pipe and apron fishways
Culvert Plan View
Section B-B: Culvert – Looking upstream
Section A-A: Culvert and apron Apron – offset baffle fishway
7400 6300
D/S Invert RL 18.5
Apron sill RL 18.2
Flow
Edge pavement RL 20.45
U/S Invert RL 18.65
Dropboard storage racks
Flow control boards – 250 x 38 timber, 2 per barrel,
mounted in dropboard guides
Offset / Corner baffle fishway
Solander Road 4–Barrel pipe culvert and causeway
Apron – offset baffle fishway
Barrel 1
Barrel 2
B
A
1800
Gauge Board
Corner “Quad” baffle fishway
Offset baffle fishway
Flow
1700 19001500
1000500
700
900
Offset baffle fishway
Corner “Quad” baffle fishway
Apron – offset baffle fishway
1200 dia. pipes
Barrel 1
Barrel 2
1800 1800
Gauge Board
Baffle boards – 150 x 50 timber, with 200 high longitudinal dividers
This is a prototype facility in which the baffle fishway devices are constructed of light duty materials to suit adaptation and performance evaluation, and which includes provisions for monitoring and access that will not normally be incorporated into field installations of culvert fishway facilities
Ross Kapitzke • JCU School of Engineering •University Creek fishways • solander road fishway_offset baffle.doc -/1/09
Solander Road pipe culvert – Prototype Fishway # 3 – Offset baffle fishway
Culvert Plan showing Fishways in Barrels and Apron
Offset Baffle Fishway in Barrel 1 – Plan View
Offset Baffle Fishway – Barrel 1 looking downstream
Oblong baffle Perpendicular baffle
150
400
100
300
1200 diameter pipe
Offset Baffle – Fixing Detail
1 2 3 4 5 6 7 8
700 200 200
Flow 400
100
300
900
700
200
900
1200 diameter pipe, 7400 long
Approx 30°
900
250
150
150
900
50
Perpendicular baffle
Oblong baffle
Baffles – cut from 16 plywood, bolted to 32 x 6 steel lugs on cradles
Cradles 1800 long. bolted to pipe – 32 x 6 steel flat bar, 4 runners with ribs at 900 crs.
Flow
Solander Road 4–Barrel pipe culvert and causeway
Offset baffle fishway
Apron – offset baffle fishway
Barrel 1
Barrel 2
Flow Corner “Quad” baffle fishway
This is a prototype facility in which the baffle fishway devices are constructed of light duty materials to suit adaptation and performance evaluation, and which includes provisions for monitoring and access that will not normally be incorporated into field installations of culvert fishway facilities
Ross Kapitzke • JCU School of Engineering •University Creek fishways • solander road fishway_corner baffle.doc -/1/09
Culvert Plan showing Fishways in Barrels and on Apron
Corner “Quad” Baffle Fishway in Barrel 2 – Plan View
Corner “Quad” Baffle Fishway – Barrel 2 looking downstream
Corner “Quad” Baffle – Fixing Detail
1 2 3 4 5 6 7 8
900 200
Flow
100
900 1200 diameter pipe, 7400 long
Perpendicular baffle
150
100 350 150
1200 diameter pipe
100
350
Perpendicular baffle
Baffles – cut from 16 plywood, fixed to pipe with 3 steel brackets 130 x 55
1200 diameter pipeFlow
This is a prototype facility in which the baffle fishway devices are constructed of light duty materials to suit adaptation and performance evaluation, and which includes provisions for monitoring and access that will not normally be incorporated into field installations of culvert fishway facilities
Solander Road 4–Barrel pipe culvert and causeway
Offset baffle fishway
Apron – offset baffle fishway
Barrel 1
Barrel 2
Flow Corner “Quad” baffle fishway
Solander Road pipe culvert – Prototype Fishway # 3 – Corner “Quad” baffle fishway
VER2.0 -/04/10
School of Engineering and Physical Sciences • Ross Kapitzke • fishways\I_design drawings for fishway projects -/4/10
Culvert fishway guidelines: Part I – Project fishway design drawings
APPENDIX I2 – BRUCE HIGHWAY CORDUROY CREEK TO TULLY BOX CULVERT AND PIPE CULVERT BAFFLE FISHWAYS: MAUNSELL DRAWINGS
Drawing Title
Drainage and fish passage configuration at culvert crossings
Dwg No 401610C Fish passage plans Culverts 399714D and 399716A
Dwg No 401611B Fish passage plans Culverts 399716C and 399717D
Dwg No 399596E Drainage cross sections Chge 80 010 – 94 376
Dwg No 399597E Drainage cross sections Chge 80 010 – 94 376
Dwg No 399598E Drainage cross sections Chge 80 010 – 94 376
Dwg No 399599D Drainage cross sections Chge 80 010 – 94 376
Culvert fishway details
Dwg No 401615C Fish passage details (Control line MC000 and Existing Bruce Highway)
Dwg No 401612C Fish passage Baffle locations
Dwg No 401613B Fish passage works Baffle plate details Sheet 1 of 2
Dwg No 401614C Fish passage works Baffle plate details Sheet 2 of 2
Notes These design drawings, prepared by Maunsell, incorporate culvert fishway designs developed by James Cook University School of Engineering on the basis of fish passage planning and design studies Bruce Highway Corduroy Creek to Tully High School Provisions for fish passage – Preliminary Design Assessment Tasks 1B and 2 (Kapitzke 2007) and Bruce Highway Corduroy Creek to Tully High School Provisions for fish passage Landholder access crossing at 82 920 (Kapitzke 2008)
These drawings have been prepared for the Tully Alliance specifically for use on the Bruce Highway Corduroy Creek to Tully High School project. They are not standard drawings and the designs are not necessarily applicable to other locations. Users should make their own site-specific evaluation and design arrangements and should seek specialist input on fish passage design as required.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.
These drawings have been prepared for
the Tully Alliance specifically for use on
the Bruce H
ighway C
orduroy Creek to
Tully High S
chool. They are not standarddraw
ings and the designs are notnecessarily applicable to other locations.