First Baptist Church Donelson Nashville, Tennessee.

19
First Baptist Church Donelson First Baptist Church Donelson Nashville, Tennessee Nashville, Tennessee

Transcript of First Baptist Church Donelson Nashville, Tennessee.

Page 1: First Baptist Church Donelson Nashville, Tennessee.

First Baptist Church Donelson First Baptist Church Donelson Nashville, Tennessee Nashville, Tennessee

Page 2: First Baptist Church Donelson Nashville, Tennessee.

QualificationsQualifications 29 Years of Experience (1981- 2010)29 Years of Experience (1981- 2010) Exclusively Serving the Church Market Specializing in Exclusively Serving the Church Market Specializing in

RenovationsRenovations Church Interiors is a licensed corporation in the State of North Church Interiors is a licensed corporation in the State of North

Carolina. Church Interiors serves churches from New York to Carolina. Church Interiors serves churches from New York to Florida and all states east of the Mississippi. Also included is Florida and all states east of the Mississippi. Also included is Texas and Louisiana. We have been in business since 1981, and Texas and Louisiana. We have been in business since 1981, and have participated in over 10,000 partial or complete have participated in over 10,000 partial or complete renovations.renovations.

Church Interiors has an unlimited general contractor's license in Church Interiors has an unlimited general contractor's license in the State of Tennessee (#00061818). All of our projects are the State of Tennessee (#00061818). All of our projects are covered by a general liability policy (#BOP9027389) in the covered by a general liability policy (#BOP9027389) in the amount of $5,000,000.00. All workers on the job site are fully amount of $5,000,000.00. All workers on the job site are fully covered individually and backed up by a worker's compensation covered individually and backed up by a worker's compensation policy (#WC9035340). policy (#WC9035340).

Church Interiors has rendered services to over 100 renovations Church Interiors has rendered services to over 100 renovations in the Nashville area alone.in the Nashville area alone.

Church Interiors is endorsed and recommended by Lifeway Church Interiors is endorsed and recommended by Lifeway Christian Books Stores and The Lifeway Architectural Christian Books Stores and The Lifeway Architectural DepartmentDepartment

Page 3: First Baptist Church Donelson Nashville, Tennessee.

ConstructionConstructionA. DemolitionA. Demolition

1. Remove existing sound control table.1. Remove existing sound control table.2. Demo front wall as needed to remove old baptistery.2. Demo front wall as needed to remove old baptistery.3. Remove old grill cloth from 2 boxes on sanctuary ceiling, choir ceiling.3. Remove old grill cloth from 2 boxes on sanctuary ceiling, choir ceiling.

B. ConstructionB. Construction1. Build Sound Booth1. Build Sound Booth

a. Frame new sound booth in same location.a. Frame new sound booth in same location.b. Install sheetrock in the inside and wainscot on the outside with b. Install sheetrock in the inside and wainscot on the outside with an oak cap. an oak cap.

c. Install laminated counter top with six drawers underneath.c. Install laminated counter top with six drawers underneath.2. Baptistery2. Baptistery

a. Reframe as needed for new baptistery.a. Reframe as needed for new baptistery.b. Install new plumbing for baptistery.b. Install new plumbing for baptistery.

c. Furnish, deliver and Install a new fiber glass (Dry Minister) c. Furnish, deliver and Install a new fiber glass (Dry Minister) baptistery model #8 D/E with window. Overall width 3’-7 ½”, height 3’-6”, baptistery model #8 D/E with window. Overall width 3’-7 ½”, height 3’-6”, length 11’-5”, and depth 3’-5”.length 11’-5”, and depth 3’-5”.

d. Baptistery will be pre-plumbed.d. Baptistery will be pre-plumbed.e. Baptistery to have Aqua-Seal.e. Baptistery to have Aqua-Seal.f. Install 5.5 KW auto fill system with drain and overflow.f. Install 5.5 KW auto fill system with drain and overflow.g. Repair front wall where it was demoed for baptistery installation.g. Repair front wall where it was demoed for baptistery installation.

3. Grill Cloth3. Grill Clotha. Install new grill cloth on 2 boxes on sanctuary ceiling, choir a. Install new grill cloth on 2 boxes on sanctuary ceiling, choir ceiling. ceiling.

Page 4: First Baptist Church Donelson Nashville, Tennessee.

PaintingPaintingFurnish all labor, materials, and expenses to provide the following Furnish all labor, materials, and expenses to provide the following

painting per the following specifications:painting per the following specifications: 1. All walls shall be sanded, caulked and dusted clean prior to any 1. All walls shall be sanded, caulked and dusted clean prior to any

finish applications. finish applications. 2. We will remove any loose caulking around trim and re-caulk all 2. We will remove any loose caulking around trim and re-caulk all

trim throughout to facilitate good quality finish in all areas to be trim throughout to facilitate good quality finish in all areas to be painted.painted.

3. All walls, ceiling and trim shall receive two coats of paint or as 3. All walls, ceiling and trim shall receive two coats of paint or as many as needed to achieve a good quality journeyman level of many as needed to achieve a good quality journeyman level of work. All paint materials will be top of the line as manufactured work. All paint materials will be top of the line as manufactured by ICI Dulux or Sherwin Williams Paints. We will leave paint by ICI Dulux or Sherwin Williams Paints. We will leave paint formulas and one gallon of each color for the church’s future use.formulas and one gallon of each color for the church’s future use.

4. Our painters will be responsible for touch-up work as needed 4. Our painters will be responsible for touch-up work as needed throughout the duration of work done by Church Interiors, Inc.throughout the duration of work done by Church Interiors, Inc.

AREAS TO PAINT (walls, ceiling and trim):AREAS TO PAINT (walls, ceiling and trim):Main sanctuaryMain sanctuaryChancel / Pulpit areaChancel / Pulpit areaBalconyBalconyNarthexNarthex

Page 5: First Baptist Church Donelson Nashville, Tennessee.

PaintingPainting

Page 6: First Baptist Church Donelson Nashville, Tennessee.

Floor CoveringFloor CoveringA. A. Furnish, deliver and install our high quality 20-year warranty Churchlon Ovation Furnish, deliver and install our high quality 20-year warranty Churchlon Ovation carpet direct glue down wall to wall for the following areas:carpet direct glue down wall to wall for the following areas:

Main Sanctuary Floor. Main Sanctuary Floor. Steps and landings leading up to the balcony.Steps and landings leading up to the balcony. Balcony Steps and Risers.Balcony Steps and Risers. Border treatment in the vestibuleBorder treatment in the vestibule

Churchlon Ovation is a 40-oz. extremely durable, 100% nylon cut and loop style Churchlon Ovation is a 40-oz. extremely durable, 100% nylon cut and loop style

commercial carpet and has a 20 year wear warranty. Because of its unique commercial carpet and has a 20 year wear warranty. Because of its unique construction, it will show less tracking, have better appearance retention, will reflect construction, it will show less tracking, have better appearance retention, will reflect sound better, will be more durable, and will help hide soil better than standard cut sound better, will be more durable, and will help hide soil better than standard cut pile carpet. Ovation is an ideal floor covering for worship areas. Churchlon Ovation pile carpet. Ovation is an ideal floor covering for worship areas. Churchlon Ovation is constructed on a 1/8" gauge with 12 stitches per inch with a density factor of 5,929 is constructed on a 1/8" gauge with 12 stitches per inch with a density factor of 5,929 ounces per cubic yard. Churchlon Ovation has permanent anti-static control and has ounces per cubic yard. Churchlon Ovation has permanent anti-static control and has been treated with Teflon. been treated with Teflon.

B. B. Furnish deliver and install Churchlon Reflection carpet direct glue down in the Furnish deliver and install Churchlon Reflection carpet direct glue down in the following areas: following areas: Narthex field Narthex field

Churchlon Reflection is a 38 oz extremely durable, 100% continuous filament nylon Churchlon Reflection is a 38 oz extremely durable, 100% continuous filament nylon textured heather loop style commercial carpet. Churchlon Reflection is manufactured textured heather loop style commercial carpet. Churchlon Reflection is manufactured using the Ultra Performance Backing System which gives the carpet a using the Ultra Performance Backing System which gives the carpet a lifetimelifetime edge edge ravel warranty and a ravel warranty and a lifetimelifetime wear warranty. Because of its unique construction wear warranty. Because of its unique construction Churchlon Reflection will not show tracking, have superior appearance retention and Churchlon Reflection will not show tracking, have superior appearance retention and will reflect sound better than standard cut pile carpet. will reflect sound better than standard cut pile carpet.

Page 7: First Baptist Church Donelson Nashville, Tennessee.
Page 8: First Baptist Church Donelson Nashville, Tennessee.

Border Treatment

Page 9: First Baptist Church Donelson Nashville, Tennessee.

New FurnishingsNew FurnishingsFurnish, deliver and install the following church furniture Furnish, deliver and install the following church furniture

manufactured by Rugel Church Furnishings, Jefferson City, manufactured by Rugel Church Furnishings, Jefferson City, TennesseeTennessee

Main Sanctuary floor:Main Sanctuary floor: 30 pews 12’-0”30 pews 12’-0”16 pews 15’-0”16 pews 15’-0”2 pews 9’-0”2 pews 9’-0”2 pews 10’-0”2 pews 10’-0”

Balcony:Balcony:2 pews 7’-0”2 pews 7’-0”2 pews 8’-0”2 pews 8’-0”4 pews 10’-0”4 pews 10’-0”2 pews 13’-0”2 pews 13’-0”4 pews 14’-0”4 pews 14’-0”8 pews 13’-6”8 pews 13’-6”2 pews 20’-0”2 pews 20’-0”

Page 10: First Baptist Church Donelson Nashville, Tennessee.

New Furnishings (cont.)New Furnishings (cont.) Our proposal is based on a white waterfall Our proposal is based on a white waterfall

Colonial pew end 2 ¼” thick 2 ply maple with Colonial pew end 2 ¼” thick 2 ply maple with stained caps and bases.stained caps and bases.

The pew body will be upholstered on the seat, The pew body will be upholstered on the seat, back and rear side of back. back and rear side of back.

All intermediate supports will be 1 1/2" thick, 2-All intermediate supports will be 1 1/2" thick, 2-ply solid Northern Red Oak with a stained finish. ply solid Northern Red Oak with a stained finish.

The pews will come complete with hymnbook The pews will come complete with hymnbook racks which have communion cup holders, card racks which have communion cup holders, card and pencil holders. and pencil holders.

The bookracks will be manufactured of solid The bookracks will be manufactured of solid Northern Red Oak. Northern Red Oak.

Fabric style, fabric color, and stain color to be Fabric style, fabric color, and stain color to be chosen at a later date.chosen at a later date.

Page 11: First Baptist Church Donelson Nashville, Tennessee.

General RequirementsGeneral Requirements

This renovation project includes the This renovation project includes the following general requirements:following general requirements:

General Liability Insurance $5,000,000.00General Liability Insurance $5,000,000.00 Workmen’s Compensation Insurance Workmen’s Compensation Insurance Co-ordination meetings Co-ordination meetings DumpsterDumpster Professional Clean-Up at end of project Professional Clean-Up at end of project

Page 12: First Baptist Church Donelson Nashville, Tennessee.

Proposal SummeryProposal SummeryI. ConstructionI. Construction $33,400.00$33,400.00II. Painting II. Painting $33,116.00$33,116.00III. Floor Covering III. Floor Covering $24,768.00$24,768.00IV. New Furnishings IV. New Furnishings $69,470.00 $69,470.00 V. General RequirementsV. General Requirements $ 8,500.00$ 8,500.00

Grand Total for Proposed Renovation ProjectGrand Total for Proposed Renovation Project $169,254.00$169,254.00

NOT INCLUDED:NOT INCLUDED:-Electrical -Electrical -Job Permitting -Job Permitting

ALTERNATES:ALTERNATES:Theater seating in balcony in lieu of Pews Theater seating in balcony in lieu of Pews AddAdd…………………………….$5,000.00…………………………….$5,000.00

NOTE: NOTE: This contract is for the scope of work outlined in this proposal. The church This contract is for the scope of work outlined in this proposal. The church

should add an allowance of 7% to cover unforeseen items and should add an allowance of 7% to cover unforeseen items and changes that arise during the renovation process.changes that arise during the renovation process.

Page 13: First Baptist Church Donelson Nashville, Tennessee.
Page 14: First Baptist Church Donelson Nashville, Tennessee.

AudioAudio

We will install a YAMAHA M7CL-48 48 We will install a YAMAHA M7CL-48 48 channel digital console in the channel digital console in the sanctuary sanctuary

We will also install five new AUDIX We will also install five new AUDIX MB1250 choir microphones and new MB1250 choir microphones and new cable cable

We will also pull and terminate all We will also pull and terminate all new microphone/signal cabling. new microphone/signal cabling.

Page 15: First Baptist Church Donelson Nashville, Tennessee.

AudioAudio We will install two TANNOY I7 We will install two TANNOY I7

low profile column monitors low profile column monitors one each on the side walls of one each on the side walls of the choir; these speakers are the choir; these speakers are designed to have even designed to have even vertical coverage and wide vertical coverage and wide horizontal coverage to help horizontal coverage to help support the choir as needed support the choir as needed

We will also install a new QSC We will also install a new QSC CX302 power amplifier to CX302 power amplifier to drive the new choir monitors. drive the new choir monitors.

Page 16: First Baptist Church Donelson Nashville, Tennessee.

VideoVideo

Install 2 60” flat screen plasma monitors Install 2 60” flat screen plasma monitors on left and right side of baptistry openingon left and right side of baptistry opening

Provide all cabling for this installationProvide all cabling for this installation Provide video switcher - scalerProvide video switcher - scaler Includes all equipment, labor, engineering, Includes all equipment, labor, engineering,

delivery, installation and training.delivery, installation and training.

Page 17: First Baptist Church Donelson Nashville, Tennessee.

Electronic Dimming SystemElectronic Dimming System This dimming system will have 12 scenes with multiple This dimming system will have 12 scenes with multiple

preset zones of lightpreset zones of light 4 Entry stations with preset easy on buttons4 Entry stations with preset easy on buttons This Electronic Dimming System allows full control of the This Electronic Dimming System allows full control of the

entire lighting system from master locations such as an entire lighting system from master locations such as an audio and video booth.audio and video booth.

It controls such individual areas (zones) of the sanctuary It controls such individual areas (zones) of the sanctuary nave, choir, sconces, pulpit, altar, cross, communion table, nave, choir, sconces, pulpit, altar, cross, communion table, instrument areas and balcony.instrument areas and balcony.

Dimmers pay for themselves. Dimmers pay for themselves. Dimming the lights 25% will save 20% on electrical costs Dimming the lights 25% will save 20% on electrical costs

and makes incandescent lights lasts 4 times longer and and makes incandescent lights lasts 4 times longer and dimming the lights 50% returns a 40% savings on dimming the lights 50% returns a 40% savings on electricity and incandescent lights will last 20 times longer. electricity and incandescent lights will last 20 times longer.

Page 18: First Baptist Church Donelson Nashville, Tennessee.

Audio/Video Proposal SummaryAudio/Video Proposal Summary

AudioAudio $35,435.00$35,435.00

VideoVideo $11,491.00$11,491.00

DimmingDimming $ 7,434.00$ 7,434.00

A/V TotalA/V Total $54,360.00$54,360.00

Page 19: First Baptist Church Donelson Nashville, Tennessee.

Renovation SummaryRenovation Summary

Sanctuary $169,254.00Sanctuary $169,254.00 Audio/Video Audio/Video $ 54,360.00$ 54,360.00

Total Renovation $223,614.00Total Renovation $223,614.00