FGB Natural Product Insulcap Results
-
Upload
the-wilpak-group -
Category
Business
-
view
14 -
download
2
Transcript of FGB Natural Product Insulcap Results
30
35
40
25
20
15
45
50°C
26/05/09 08:00:00 AM GMT +10:00 28/05 30/05 01/06
Insulcap® Insulation Testing
01/06/09 10:00:00 AM GMT +10:00 Time
---- Insulcap®Protected Drum °C---- Without Insulcap® Insula�on°C---- Test Condi�ons/Oven Temp °C
Table1. Summary of 30˚C Hea�ng Period Insulcap® Start Time: 26/05/09 09:56:37.974 AM End Time: 26/05/09 05:02:42.38 PM minutes Dura�on: 07h 11m 22.38s 431.373
Probe Max ˚C Min ˚C Av ˚C SD Hea�ng Rate ˚/min
Oven 36.335 18.39 31.429 1.817 insulated drum 20.746 18.723 19.744 0.599 0.0047 Factor of rate difference control drum 25.72 21.246 23.583 1.365 0.0104 2.2
Table 2. Summary of 40˚C Hea�ng Period
Start Time: 26/05/09 05:03:06.474 PM End Time: 27/05/09 08:30:32.75 AM minutes Dura�on: 15h 27m 26.28s 927.438
Probe Max ˚C Min ˚C Av ˚C SD Hea�ng Rate ˚/min
Oven 49.513 30.722 46.238 1.862 insulated drum 28.394 20.77 24.743 2.225 0.0082 Factor of rate difference control drum 40.257 25.744 34.431 4.234 0.0156 1.9
Table 3. Summary of Cooling Period
Start Time: 27/05/09 08:31:00 AM End Time: 01/06/09 07:54:34.377 AM minutes Dura�on: 4d 23h 23m 34.38s 7163.573
Probe Max ˚C Min ˚C Av ˚C SD Cooling Rate ˚/min
Oven 41.59 14.912 17.584 2.026 0.0037 insulated drum 28.543 19.27 23.651 2.873 0.0013 Factor of rate difference control drum 40.372 15.843 21.012 5.648 0.0264 20.4
Insulcap® Insulation Testing Results Summary