MAHARASHTRA STATE ELECTRIGITY TRANSMISSION CO.LTD.
From,
Office of The Chief Engineer
Maharashtra State Load Dispatch CenterThane-Belapur Road, P,O. Airoli,Navi Mumbai Pin * 400 708.
Tele :91-22-27 6017 65 / 17 66
Fax :91.-22-27 6077 69
Email: [email protected] i
ReftGE/MSLDC/EA-REC/ th A A Z Z 6
To,
All the RE Generators (Participating in REC Mechanism)
All the Liaison Person/Agencies
Date: [} l FIB zois
Sub: Cut-off date for submission of REC applications by the RE generators.
Ref: 1) CERC (Terms and Conditions for recognition and issuance of Renewable Energy
Certifi cate for Renewable Energy Generation) Regulations, 2010.2) Central Electricity Regulatory Commission (Terms and Conditions for Recognition
and issuance of Renewable Energy Certificate for Renewable Energy Generation)(Second Amendment) Regulations, 2012.
3) 'Model Guidelines for Accreditation of a Renewable Energy Generation Project orDistribution Licensee, as the case may be under REC Mechanism' by CERC.
4) Thi s offi ce letter C E/M S LD C/Airoli/RE C / 664 Dtd.z8 / 03 / 20\3.
Dear Sir/Madam,
The CERC vide letter under ref (2), made the Amendment of Regulation 7(1) of thePrincipal Regulations and extended the date for submission of REC applications toCentral Agency by the eligible entity within six month from the correspondinggeneration. Provided that the application for issuance of certificates may be made on10th, 2Oth and last day of the month.
In addition to the letter under reference[3J, clause 4.2(d) 'Model Guidelines forAccreditation of a Renewable Energy Generation Proiect or DistributionLicensee, as the case may be under REC Mechanism' have made provision to establishprotocol for receipt of information and maintenance of the record of meter readings for RE
projects.
Accordingly, to avoid last date rush of REC applications by the RE generators, SLDC have
issu6d the letter under reference [4), But it is seen that RE Generators are submittingthe REC application on few days before the sixth month of generation to SLDC.
Page I of2
Now it is once again informed about the submission procedure for REC that,
1) Cut off dates for submission of applications have been set.a) New RE Generators submitting application for the first time on 15s of
every month (in case holiday or non working day, the immediate nextworking day)
b) Monthly REC applications 20s of every month (in case holiday or nonworking day, the immediate next working day)
2) All the applications received after the cutoff date will be processed in the nextmonth.
3) All the applications with discrepancies/ shortfalls will not be accepted.
Please treat this as most important.
This document is available on SLDC website',www.mahasldc.in,,
,n"afur:
j
Copy s.w.r.to-
1. Director (OperationsJ, MSETCL, Mumbai2. The General Manager, MEDA, Yerwada, pune
3. The Deputy General Manager (REC), NLDC, New Delhi.
Copy forwarded with compliments to-1. All Superintending Engineers, O & M Circles, MSEDCL
MSLDC,Airoli
Page2 of2