Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

i HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

FCE-SOSHCo

FAKULTI KEJURUTERAAN AWAM

UiTM CAWANGAN PULAU PINANG

13500 PULAU PINANG

1ST Edition

Copyright@ 2017 by the Universiti Teknologi MARA, Pulau Pinang.

All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical including photocopy, recording or any information storage and retrieval system, without permission in writing from the publisher.

e-ISBN NO. 978-967-084-26-7

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

ii HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

FACULTY OF CIVIL ENGINEERING

HIRARC GUIDELINES

FOR CIVIL ENGINEERING

PROGRAM

Prepared by:

ANAS IBRAHIM ROZAINI RAMLI DALIAH HASAN

MD FAIZAL ZAKARIA KAY DORA ABD GHANI

MOHD RAFE ABDUL MAJID

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

iii HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

ACKNOWLEDGEMENT

First and foremost, all praises be to Allah the

Almighty for His showers of blessing throughout

the process of completing the HIRARC

Guidelines for Civil Engineering Program. The

authors would like to express sincere gratitude to

the management team of Faculty of Civil

Engineering for support and encouragement.

Many thanks to our colleagues from FCE Safety

and Health Committee who provided insight and

expertise that greatly assisted in completion of

HIRARC Guidelines for Civil Engineering

Program.

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

iv HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

CONTENTS

Acknowledgement iii

Contents iv

List of Abbreviation

v

Preface vi

1 HIRARC MATTERS 1

2

3

PROCESS OF HIRARC

STEP 1 C lass i f y Work Ac t iv i t ies

STEP 2 Identify Hazards

STEP 3 Assess The Risk

STEP 4 Select Risk Control

STEP 5 Review Risk Control

EXAMPLES OF HIRARC REGISTER

EXAMPLE 3.1 for Concrete Lab

EXAMPLE 3.2 for Light Structure Lab

EXAMPLE 3.3 for Heavy Structure Lab

EXAMPLE 3.4 for Hydraulics Lab

EXAMPLE 3.5 for Geotechnical Lab

EXAMPLE 3.6 for Highway & Traffic Lab

EXAMPLE 3.7 for Geology Lab

EXAMPLE 3.8 for Building Services Lab

EXAMPLE 3.9 for Environmental Lab

EXAMPLE 3.10 for Computer Lab Work

EXAMPLE 3.11 for Surveying Practical Work

EXAMPLE 3.12 for Office Work

4

5

7

10

16

21

22

23

24

25

26

27

28

29

30

31

32

33

34

4 5

REFERENCES

APPENDICES

APPENDIX A FCE HIRARC Form APPENDIX B Examples of Workplace Hazards APPENDIX C Example of Safety Work Procedure (SWP)

35

36

37

38

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

v HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

LIST OF ABBREVIATION

FCE Faculty of Civil Engineering, UiTMCPP

DOSH Department of Occupational Safety and health

OSH Occupational Safety and Health

OSHA 1994 Occupational of Safety and Health Act (ACT 514)

PPE Personal Protective Equipment

SDS Safety Data Sheet

SWP Safe Work Procedure

SOSHco Sub-Occupational Safety and Health Committee

UiTM Universiti Teknologi MARA

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

vi HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

PREFACE

This HIRARC Guidelines for Civil Engineering Program

book was prepared to provide a standard procedure on

Occupational Safety and Health (OSH) management in work

place, laboratory experiments and equipment for the needs of

students and all faculty members. This guideline was

developed systematically to satisfy the requirements stated by

Department of Occupational Safety and Health (DOSH). This

book was intended to give a full-scale view of how hazard and

risk assessment is being carried out by giving related samples

from laboratory experiments. It is hoped that this book can be

a good source of reference for the end-user in identifying

hazards, assessing the risk, and at the same time to control

the hazards.

The approach adopted in developing this book is to make a

simple note by minimizing words and giving real examples for

different types of hazard risk tasks. A special gratitude was

presented to the Safety and Health Committee of the

Faculty of Civil Engineering Universiti Teknologi MARA

Pulau Pinang as the authors of this book whom succeeded to

produce a useful yet informative guideline. The authors would

sincerely welcome any constructive critic, comments or

suggestions to improve the book in near future.

Dr Kay Dora Abd Ghani Head of Centre of Studies Faculty of Civil Engineering Universiti Teknologi MARA Pulau Pinang September 2017

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

1 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

1.0 HIRARC MATTERS

HIRARC is a short term for Hazard Identification Risk

Assessment and Risk Control. These three (3) principles

used in workplaces to manage safety and health.

According to OSHA 1994 in section 15(2)(a): “the

provision and maintenance of plant and systems of work

that are, so far as is reasonable and practicable, safe

and without risks to health.

What is Objectives of HIRARC?

To identify types of Hazards in work area

Evaluate the Risk

Suggest Risk Controls to Organization

Implementing Risk Controls, and

Review Risk Controls

What is Basic Component of HIRARC?

The basic components of HIRARC are as follows;

1. Hazard identification

2. Risk Assessment

3. Risk Control

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

2 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

4. Review of Exist Risk Control

Why HIRARC is Important?

According to Section 15 (2)(a) of OSHA 1994:

“ the provision and maintenance of plants and systems

of work that are, so far as is reasonable and practicable,

safe and without risks to health”

Who Can Conduct HIRARC?

1. Someone who’s trained to conduct HIRARC in

Organization.

2. Safety and Health committee

3. Safety and health Officer

When We Need to Conduct HIRARC?

1. The situations where hazard exists Harmful.

2. The situation is uncertain whether the controls are

available is enough or not.

3. Before implementing corrective measures or

prevention.

4. By an organization that continuously improves security

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

3 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

management.

Where to Conduct HIRARC?

In any workplace that is likely to be hazardous and

needs to be controlled.

How to conduct HIRARC?

Briefly, HIRARC can be implemented in the following

steps:

Step 1. Classify work activities

Step 2. Perform hazard identification

Step 3. Get the risk level

Step 4. Control high risk

Step 5. Review the effectiveness of controls

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

4 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

2.0 PROCESS OF HIRARC

The process of HIRARC start from classify activities,

identify hazards, assess the risk, select risk control and

review the risk control.

Classify activities/ work/ task

Identify hazards

Assess the risk

Select risk control

Review the risk control exist

*Note: All the process of HIRARC documented in FCE

HIRARC Form (Appendix A) based on types of activities

works or workplace.

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

5 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

STEP 1: CLASSIFY ACTIVITIES WORK

How to classify the activities work?

The activities work can be classify based on;

1. Workplace or location – laboratory, office,

construction site, computer lab, studio

2. Procedure of experiment – specific gravity test,

concrete cube test, BOD test, Tensile test

3. Procedure of equipment – uses of mobile crane,

forklift, cutter machine

Tips:

The work activities selected for HIRARC register must be:

1. not too big e.g. manufacturing a car;

2. not too small e.g. fixing a nut; or

3. defined task e.g. loading, packing, mixing,

fixing the door

The workplace selected for HIRARC Register must be:

1. Specific area – Concrete Lab, IDP Office,

Computer Lab

2. Not too small area – small store, Janitor room

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

6 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

3. Easy to in and exit

4. The place not declared as caution/ restricted

area – TNB sub-station

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

7 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

STEP 2: IDENTIFY HAZARD

Generally, Hazard describe as a source or a situation

with a potential of harm in terms of human injury or

health, damage to properties, damage to environments

or a combination of these.

What is the different between hazard, danger and

risk?

Danger is relative exposure to hazard and meanwhile,

risk is combination of the likelihood of an occurrence of a

hazardous event with specified period or in specified

circumstances and the severity of injury or damage to

the health of people, property, environment or any

combination of these caused by the event.

Types of Hazard

Generally, hazards can be divided into three (3) main

groups;

A. Safety Hazards - is any force strong enough to

cause injury, or damage to Property.

B. Health hazards - is any agent that can cause

illness to an individual.

C. Environmental Hazards – pollution release to the

environment that may cause harm or deleterious

effects.

(source: DOSH HIRARC Guideline 2008)

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

8 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

To facilitate hazard identification, it can be categorized

as follows;

1. Chemical Hazard

2. Physical Hazard

3. Biological Hazard

4. Ergonomics Hazard

5. Psychosocial Hazard

6. Mechanical Hazard

7. Electrical Hazard

What are The Sources of Hazard?

The main sources of hazard are from unsafe act and

unsafe condition.

How to identify Hazards?

We can identify hazards by doing these activities;

1. Workplace Inspections

2. Discussions & Interview

3. Internal & external Audit

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

9 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

4. OSH Training

We can also identify the hazards by refer to these

documents below;

1. Accident Statistics or report

2. Policy – UiTM Safety Policy, UiTM Policy

3. Legal – OSHA 94, FMA 67

4. Manual – Lab manual, equipment manual

5. SOP – Standard Operating Procedure

6. ERP – Emergency Response Plan

7. SDS – Safety Data Sheet

8. Feedback & complaint

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

10 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

STEP 3: ASSESS THE RISK

Risk assessment is the process of evaluating the risk to

safety and health arising from hazards at work.

How to assess risk in the workplace?

Step 1: Look for hazards.

Step 2: Decide who might be harmed and how.

Step 3: Evaluate the likelihood (probability) and the

severity (consequence) risks and decide whether the

existing precautions are adequate or whether more

should be done.

A. Likelihood – this value is based on the likelihood

of an event occurring.

You can ask the question “How many times has this

event happened in the past?”

Assessing likelihood is based on worker experience,

analysis or measurement.

Likelihood levels range from “most likely” to

“inconceivable.”

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

11 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

TABLE A: Likelihood level (Based on UiTM OSH

Manual 2016)

LIKELIHOOD EXAMPLES RATING

Most Likely The most likely result of

the hazard / event being

realized

5

Possible Has a good chance of

occurring and is not

unusual.

4

Conceivable Might be occur at

sometimes in future

3

Remote Has not been known to

occur after many years.

2

Inconceivable Is practically impossible

and has never occurred.

1

B. Severity – it can be divided into five categories.

Severity are based upon an increasing level of

severity to an individual’s health, the environment

or to property. Table B indicates severity by using

the following table;

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

12 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

TABLE B: Severity Level (Based on UiTM OSH

Manual 2016)

HUMAN ESTIMATE

LOSS (RM)

UiTM

REPUTATION

RATING

Fatal > 10,000 Becomes an issue

at the level of the

Ministry of Higher

Education

5

Permane

nt

disability

< 10,000 Becomes an issue

among the public

Universities

4

Major

Injury

(>4

days

MC)

< 1,000 Becomes an issue

to the clients

3

Minor

Injury

(1 day

MC)

< 100 Discussion at the

management level

2

First aid

only

< 10 Slightly affected 1

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

13 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

C. Risk Assessment

Procedure using Risk Matrix (TABLE C);

1. Find the severity column that best describes the

outcome of risk.

2. Then follow the likelihood row to find the description

that best suits the likelihood that the severity will occur.

3. The risk level is given in the box where the row and

column meet.

Risk can be calculated using the following formula:

Relative Risk = Likelihood X Severity

The relative risk value can be used to prioritize necessary

actions to effectively manage work place hazards. Table

D determine priority based on the following Risk Priority

Number (RPN) in Table D.

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

14 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

TABLE C: Risk Matrix (Based on UiTM OSH Manual 2016)

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

15 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

TABLE D: Relative Risk

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

16 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

STEP 4: SELECT RISK CONTROL

“Risk control is the process used to identify all

practicable measures for eliminating or reducing the

likelihood of injury, illness or disease in the workplace, to

implement the measures and to continually review the

measures in order to measure their effectiveness.”

What is the matter that must be consider in

implementing risk control?

1. Review measures regularly and modify if necessary.

2. Comply with national laws and regulations.

3. Reflect good management practice.

4. Consider the current state of knowledge.

5. Include information or reports from organizations

related i.e., DOSH, OSH services.

What is Hierarchy of Control?

The hierarchy is in a descending order from the control

measure which gives the greatest level of safety, but

they may be used in combination. Generally the order is;

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

17 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

1. Elimination most effective

2. Substitution

3. Engineering Control

4. Administration Control

5. Personal Protective Equipment least effective

Tips* Administrative control and PPE should be

considered only as “back-up” control measures.

1. Elimination

Getting rid of a hazardous job, tool, process,

machine or substance is perhaps the best way of

protecting workers.

Example; a salvage firm might decide to stop buying and

cutting up scrapped bulk fuel tank due to explosion

hazards.

2. Substitution

Sometimes doing the same work in a less

hazardous way is possible.

Example; a hazardous chemical can be replaced with a

less hazardous one. Controls must protect workers from

any new hazards that are created.

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

18 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

3. Engineering Control

a. Redesign – jobs and processes can be

reworked to make them safer.

Example; container can be made easier to hold and lift.

b. Isolation – if a hazard cannot be eliminated

or replaced, it can sometimes be isolated, contained or

otherwise kept away from workers.

Example; an insulated and air-conditioned control room

can protect operators from a toxic chemical.

c. Automation – dangerous processes can be

automated or mechanized. Example; computer-

controlled robots can handle spot welding operations in

car plants. Care must be taken to protect workers from

robotic hazards.

d. Barriers – a hazard can be blocked before it

reaches workers.

Example; special curtains can prevent eye injuries from

welding arc radiation. Proper equipment guarding will

protect workers from contacting moving parts.

e. Absorption – baffles can block or absorb

noise. Lockout systems can isolate energy sources during

repair and maintenance. Usually, the further a control

keeps a hazard away from workers, the more effective it

is.

f. Dilution – some hazards can be diluted or

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

19 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

dissipated.

Example; ventilation systems can dilute toxic gasses before they reach operators.

4. Administrative Controls

a. Safe Work Procedures (SWP) – workers

can be required to use standardized safety practices. The

employer is expected to ensure that workers follow these

practices. Work procedures must be periodically

reviewed with workers and updated.

b. Supervision and Training – initial training

on safe work procedures and refresher training should

be offered. Appropriate supervision to assist workers in

identifying possible hazards and evaluating work

procedures.

c. Job rotations and reschedule task – it can

reduce the time that workers are exposed to a hazard.

For example, workers can be rotated through jobs

requiring repetitive tendon and muscle movements to

prevent cumulative trauma injuries. Noisy processes can

be scheduled when no one is in the workplace.

d. Housekeeping, repair and maintenances

programs – housekeeping includes cleanings, waste

disposal and spill cleanup. Tools, equipment and

machinery are less likely to cause injury if they are kept

clean and well maintained.

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

20 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

e. Hygiene – hygiene practices can reduce the

risk of toxic materials being absorbed by workers or

carried home to their families. Street clothing should be

kept in separate lockers to avoid being contaminated by

work clothing. Eating areas must be segregated from

toxic hazards. Eating should be forbidden in toxic work

areas. Where applicable, workers should be required to

shower and change clothes at the end of the shift.

5. Personal Protective Equipment

- Personal Protective equipment (PPE) and

clothing is used when other controls measures are not

feasible and where additional protection is needed.

- Workers must be trained to use and maintain

equipment properly.

- The employer and workers must understand the

limitations of the personal protective equipment.

- The employer is expected to require workers to

use their equipment whenever it is needed.

- Care must be taken to ensure that equipment is

working properly.

- Otherwise, PPE may endanger a worker’s health

by providing an illusion of protection.

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

21 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

STEP 5: REVIEW RISK CONTROL EXIST

A review follow-up is always essential. Review is an

important aspect of any risk management process. It is

essential to review what has been done to ensure that

the controls put in place are effective.

Inspect, evaluate and monitor hazard controls during

inspections, routine maintenance, and other activities.

Ask the following questions;

a. have the risk controls exist solved the problem?

b. is any risk to workers posed by the risk controls

contained?

c. are all new hazards being identified?

d. are significant, new hazards appropriately controlled?

e. are accident reports being analyzed?

f. are any other risk control required?

(source: DOSH HIRARC Guidelines 2008)

Lastly, each HIRARC must be fully documented and

completed by using FCE HIRARC Register Form.

(Appendix A)

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

22 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

3.0 EXAMPLES OF HIRARC REGISTER

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

23 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3.1: HIRARC Register for Concrete Lab

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

S RPN = LxS RC

Vibration

Carpel

tunnel

syndrome

3 3 9 II

NoiseHearing

Impairment4 16 III

Mineral dust cancer 4 4 I

heavy liftingsprain

muscle3 12 II

2 R Repeatitive works stress 3 9 II

3 R Lifting the rodsprain

muscle3 9 II

4 R Lifting the mouldsprain

muscle3 9 II

5 R Heat stress dehydrate 2 10 II

6 R Slip & fall (wet floor) injury 3 6 II

1 Inconceivable

2 Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health Estimate loss (RM) UiTM Reputation

1 First A id only Slightly effected

2 M inor injury (1 day M C) Discussion at the management level

3 M ajor injury (> 4 days M C) Becomes an issue to the clients

4 Permanent disability Becomes an issue among the public Universities

5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education

Is practically impossible and has never occurred

Has not been known to occur after many years

M ight be occur at sometime in future

Has a good chance of occurring and is not unusual

The most likely result o f the hazard/ event being relized

Title of Activity : Slump Test

Function / Department : Structural Division

Job performed by : Student

Prepared by / Date : Aliah Binti Abu / 10 Sept. 2017 Checked by / Date : Daliah Hasan / 15 Sept. 2017 Approved by / Date : Anas Ibrahim / 16 Sept. 2017

Lab manual

Fabric Glove, Safety Boot, lab

manual

none

Safety Boot

Section : Concrete Lab

Assessor: Habibullah (PJ)

L

15 - 25

RISK ASSESSMENT

Into lerable

Fabric Glove, Lab manual

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.

Recommendation

Person in Charge/Due

date/ Status

Risk Priority Number ( RPN )

Recommended Risk

Control

Take frequent break

(SWP)

1 - 4 I Tolerable

A M EDIUM risk requires a planned approach to

contro lling the hazard and applies temporary measure if

required. Actions taken must be documented on the risk

assessment Form including date for completion.

R = Routine

NR = Non Routine

2

SWP & buddy system

Significant5 - 12 II

Measure the height of the collapse

Clean the all apparatus

Description

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Sub-ActivityNo.

HAZARD IDENTIFICATION

Compact each layer

Insert material into the mold of 3

layers

Existing Risk Control

RISK CONTROL

Type

housekeeping (wipe up

spills immediately)

1. drink plenty of water

2. Take frequent breaks

Risk Level Action and Time Scale

Hazard Effect

Likelihood

Fabric Glove,Safety Boot,

Lab manual

A HIGH risk requires immediate action to contro l the

hazard as detailed in the hierarchy of contro l. Actions

taken must be Documented on the risk assessment

form Including date for completion.

III

Lab manual 4 use small buckle (SWP)

1. prepare SWP for slump

test.

2. Implementing task

rotation and time limits on

this activity.

4 use ear plug

Satisfied1

SWP & buddy system

Risk Category

( RC )

< 10

< 100

Prepare sample : Concrete mix R1none

Fabric Glove, face mask N95

Type of Activity

Lift up the mold

Severity of Harm ( S )

< 1000

< 10,000

> 10,000

Aliah / 10 Oct. 17/ in

progress

Aliah / 12 Sept. 17/

completed

3

3

3

5

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

24 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3.2: HIRARC Register for Light Structure Lab

Function / Department :

Title of Activity :

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Job performed by : Student

Prepared by / Date :

S RPN = LxS RC

1 R

2 R

3 R

4 RRepeatitive

workstress 2 6 II

5 RFalling

Object

Minor

Injury2 4 I

6 RRepeatitive

workstress 2 6 II

7 RFalling

Object

Minor

Injury2 4 I

1 Inconceivable

2 Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Efforts shall be made to reduce the risk.

Risk reduction measures should be implemented

within a defined time period.

Rating Nature of Injury / ill health Estimate loss (RM) UiTM Reputation

1 First A id only < 10 Slightly effected

2 M inor injury (1 day M C) <100 Discussion amongst UiTM management level Work should not be started until the risk has been

3 M ajor injury (> 4 days M C) <1000 Be a customer inquiry reduced. Considerable resources may have to be

4 Permanent disability <10,000 Be a question amongst Universities allocated to reduce the risk. Where the risk invo lves

5 Fatal >10,000 Be a KPT enquiry work in progress, urgent action must be taken.

Hanum Binti Mohamad / 10 Sept. 2017 Checked by / Date : Daliah Hasan / 18 Sept. 2017 Approved by / Date : Anas Ibrahim / 18 Sept. 2017

Assessor: Habibullah (PJ)

Section : Concrete lab

Likelihood

lab manual

lab manual

3

2

3

2

lab manual, safety shoes

lab manual, safety shoes

DEFLECTION OF FIXED END BEAM

Hazard Effect

Risk Priority Number ( RPN )

Do by grouping

Satisfied

Satisfied

Do by groupingPJ / 14 Sept. 17/

completed

Existing Risk Control

STRUCTURAL DIVISION

RISK CONTROL

Recommendation

Person in Charge/Due

date/ StatusL

SignificantII

Type

Type of Activity

The most likely result o f the hazard/ event being relized

FCE-HAZARD IDENTIFICATION, RISK ASSESSMENT & CONTROL ( HIRARC ) REGISTER

Sub-ActivityNo.

HAZARD IDENTIFICATION

Place load on the load hanger on the

material.

1 - 4 I Tolerable

Severity of Harm ( S )

Risk Level Action and Time ScaleRisk Category

( RC )

R = Routine

NR = Non Routine

No additional contro ls required. M onitoring required to

ensure existing contro ls are maintained.

15 - 25

RISK ASSESSMENT

Into lerableIII

5 - 12

Recommended Risk

Control

2

Has not been known to occur after many years

M ight be occur at sometime in future

Has a good chance of occurring and is not unusual

Increase the load and record reading.

Repeat step 3 to 5 until complete the

experiments.

Uninstall all apparatus and stacking

neatly.

Record reading at dial gauge.

Falling

Object

Minor

Injury

Install dial gauge and load hanger.

Identify type of material for experiment.

Install material to existing support. Make

sure all the screws are

tightened.(depend on type of support)I Satisfied

PJ / 14 Sept. 17/

completed

Description

Is practically impossible and has never occurred

lab manual, Safety shoes 2 4

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

25 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3.3: HIRARC Register for Heavy Structure Lab

Title of Activity : BENDING TEST ( REACTION FRAME )

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Prepared by / Date :

S RPN = LxS RC

2 R

Fallen object,(

lifting by overhead

crane)

major injury

on head4 12 II

3 RPieces and dust hit

eyes

blind / minor

injury4 4 I

4 R Falling object major injury 3 12 II

5 R Heat stress Dehydrate 2 4 I

6

7

1 Inconceivable

2 Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health UiTM Reputation

1 First A id only < 10 Slightly effected

2 M inor injury (1 day M C) < 100 Discussion at the management level

3 M ajor injury (> 4 days M C) < 1000 Becomes an issue to the clients

4 Permanent disability < 10,000 Becomes an issue among the public Universities

5 Fatal > 10,000 Becomes an issue at the level o f the M inistry o f Higher Education

I Satisfied

Wilson/ 15 Sept. 17 /

completed

Pieces and dust hit

arm, eyes, fingers

and fall

Rblind, minor

injury

Safety gloves, googles, mask,

LAB MANUAL1 4

Estimate loss (RM)

1 Switch on the machine & Computer R Short circuit

major injury,

electric

shock

Description

Is practically impossible and has never occurred

Has not been known to occur after many years

M ight be occur at sometime in future

3

1

4

2

1

4

Function / Department : Structural Division

Wilson Wilfred / 12 Sep. 2017

Checked by / Date : Rossefendy (JKKP) / 17 Sept. 2017 Approved by / Date : Anas Ibrahim / 17 Sept. 2017

Section : Heavy Structure LabJob performed by : Student

safety shoes

Satisfied

A HIGH risk requires immediate action to contro l the hazard as

detailed in the hierarchy of contro l. Actions taken must be

Documented on the risk assessment form Including date for

completion.

III

I

Hazard Effect

Likelihood

Safety googles and safety

helmet/ LAB MANUAL

Safety gloves / LAB MANUAL 4

1. Need provide SWP for

whole process

2. Safety Shoes

1. Faizul/ 10 Oct. 17/ in

progress 2. Wilson/ 15 Sept.

17 / completed

Satisfied

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Sub-ActivityNo.

HAZARD IDENTIFICATION

Place the concrete sample on the

machine

Existing Risk Control

RISK CONTROL

4

Type

Type of Activity

Place the failed sample in the provided

container

Test running until sample failed

L

Clean the machine after used

Severity of Harm ( S )

Risk Level Action and Time ScaleRisk Category

( RC )

R = Routine

NR = Non RoutineRisk Priority Number ( RPN )

Significant

Has a good chance of occurring and is not unusual

The most likely result o f the hazard/ event being relized

5 - 12 II

Recommended Control

Measure

1 - 4 I Tolerable

A M EDIUM risk requires a planned approach to contro lling the

hazard and applies temporary measure if required. Actions taken

must be documented on the risk assessment Form including

date for completion.

Satisfied

Assessor: Faizul (PJ)

15 - 25

RISK ASSESSMENT

Into lerable

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.

Recommendation

Person in Charge/Due date/

Status

Safety gloves, LAB MANUAL,

safety helmet

Safety gloves, googles, mask,

LAB MANUAL, safety helmet

Ekzos(ventilation system)

Take out the sample after test

Measure the crack of the sample

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

26 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3.4: HIRARC Register for Hydraulics Lab

Function / Department : Water Division

Title of Activity : Hydrometer Test

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Job performed by : Student

Prepared by / Date :

S RPN = LxS RC

1 R

2 R

3 R

4 R

5 R

6 R

7 R

8 R rushing to finish the test Stress 1 2 I

Rating Likeihood

1 Inconceivable

2 Remote/unlikely

3Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health

1 First A id only Slightly effected

2 M inor injury (1 day M C) Discussion at the management level

3 M ajor injury (> 4 days M C) Becomes an issue to the clients

4 Permanent disability Becomes an issue among the public Universities

5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education

ISatisfied (Job rotation or

frequent rest breaks)

UiTM Reputation

Broken Glass injury

Repetitive works

Musculoskelet

al disorder

(MSD)

lab manual, Safety glove

teamwork

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Assessor: Abdul Malek Ishak (PJ)

Section : Hydraulic Lab

Faradiba Binti Fadhil / 6 Sept. 2017 Checked by / Date : Suzana Ahmad (JKKP-FKA)/ 10 Sept. 17 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17

HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL

Recommendation

No. Sub-Activity Type Hazard EffectRecommended Risk

Control

Person in Charge/Due date/

StatusExisting Risk Control L

Faradiba/ 8 Sept. 17/

CompletedNeed wear Safety ShoesII623

2

Repeat the procedure (step 3 to 5) three

times

Follow above procedure for other given

liquids also.

2 4

Compare specific gravities of the given

liquids.teamwork 2 satisfied

Type of Activity

R = Routine DescriptionRisk Priority Number ( RPN ) Risk Category

( RC )

Risk Level Action and Time Scale NR = Non Routine Is practically impossible and has never occurred

Has not been known to occur after many years

1 - 4 I Tolerable

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.

M ight be occur at sometime in future

Has a good chance of occurring and is not unusual

The most likely result o f the hazard/ event being relized

5 - 12 II Significant

A M EDIUM risk requires a planned approach to contro lling

the hazard and applies temporary measure if required.

Actions taken must be documented on the risk assessment

Form including date for completion.

Severity of Harm ( S )

Estimate loss (RM)

< 10

III Into lerable

A HIGH risk requires immediate action to contro l the hazard

as detailed in the hierarchy of contro l. Actions taken must be

Documented on the risk assessment form Including date for

completion.

< 1000

< 10,000

> 10,000

< 100

15 - 25

Place tall glass cylinders on the flat

working surface

Fill with a liquid and allow air to rise to

the top

Carefully insert the hydrometer and

allow it to settle in the centre of the

cylinder.

Read the scale,after the hydrometer has

settled at the bottom of the free

watersurface

Record the reading and take out the

hydrometer.

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

27 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3 5: HIRARC Register for Geotechnical Lab

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Job performed by : Student

Prepared by / Date :

S RPN = LxS RC

1 R Wrong lifting muscle pain 2 6 II

2 R Hot environment Heat stress 2 8 II

3 R Direct sun exposure Dehydrate 2 8 II

4 R hit by Hammer injury 2 2 I

5 R Ergonomic back pain 2 6 II

6 R

entanglement between

hammer and rod during

weight fall freely.

Injury 2 8 II

7

8

9 R Wrong lifting musle pain 2 6 II

Rating Likeihood

1Inconceivable

2 Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health UiTM Reputation

1 First A id only Slightly effected

2 M inor injury (1 day M C) Discussion at the management level

3 M ajor injury (> 4 days M C) Becomes an issue to the clients

4 Permanent disability Becomes an issue among the public Universities

5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education

R

None 4

1. SWP,

2. Safety briefing by

instructor before

experiment started.

1. PJ / 6 Oct.17 / in progress

2. PJ / 8 Sept. 2017/

completed

Teamwork 2 2 4 I Satisfied

Function / Department : Geotren Division

Title of Activity : JKR Probe Test

Assemble the JKR probe set up.

Repititive works stress

< 100

15 - 25 III Into lerable

A HIGH risk requires immediate action to contro l the hazard as

detailed in the hierarchy of contro l. Actions taken must be

Documented on the risk assessment form Including date for

completion.

< 1000

< 10,000

> 10,000

The most likely result o f the hazard/ event being relized

5 - 12 II Significant

A M EDIUM risk requires a planned approach to contro lling the

hazard and applies temporary measure if required. Actions taken

must be documented on the risk assessment Form including

date for completion.

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.

Severity of Harm ( S )

Estimate loss (RM)

< 10

Action and Time Scale NR = Non Routine

Is practically impossible and has never occurred

Has not been known to occur after many years

1 - 4 I TolerableM ight be occur at sometime in future

Has a good chance of occurring and is not unusual

Type of Activity

R = Routine Description

Risk Priority Number ( RPN ) Risk Category

( RC )

Risk Level

Clean & bring back all equipment to lab. None 3

1. SWP,

2. Safety briefing by

instructor before

experiment started.

1. PJ / 6 Oct.17 / in progress

2. PJ / 8 Sept. 2017/

completed

Repeat the step 4 and 5 for the next 300

mm penetration.

Determine the allowable Bearing

capacity using correlation chart for JKR

dynamic cone penetrometer.

Lift the 5kg hammer up to the 280 mm

mark.Teamwork 3 Job rotation (SWP) 1. PJ / 6 Oct.17 / in progress

Let the weight fall freely. Repeat the act

and go on counting the no. of blows

required for 300 mm penetration.

Lab Manual 4

1. Safety briefing by

instructor before

experiment started.

2. Safety Glove

1. PJ/ 8 Sept. 17/ completed

2. Ali / 8 Sept. 17/ Completed

mark 300 mm mark on proving rod. None 4

Keep the set up vertically Safety Shoes 1 Satisfied

Person in Charge/Due date/

StatusExisting Risk Control L

Bring the JKR Probe set to site location. None 3

HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL

Recommendation

No. Sub-Activity Type Hazard EffectRecommended Risk

Control

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Assessor: Azrul Aswad (PJ)

Section : Geotechnics Lab

Ali Bin Ahmad / 6 Sept. 2017 Checked by / Date : Rozaini Ramli (JKKP-FKA)/ 10 Sept. 17 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

28 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3.6: HIRARC Register for Highway & Traffic Lab

Function / Department :

Title of Activity : SKID RESISTANCE TEST

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Prepared by / Date :

S RPN = LxS RC

Moving

traffic major injury 3 3 I

Wrong

liftingback pain 2 6 II

2 RMoving

traffic major injury 3 3 I

3 Rmoving

of skidminor injury 3 3 I

4 RRepeatit

ive stress 2 2 I

Moving

traffic

Accident,

major injury3 3 I

Falling

objectinjured 2 4 I

1 Inconceivable

2 Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health UiTM Reputation

1 First A id only Slightly effected

2 M inor injury (1 day M C) Discussion at the management level

3 M ajor injury (> 4 days M C) Becomes an issue to the clients

4 Permanent disability Becomes an issue among the public Universities

5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education

5

1

safety jacket/colour cone 1 Satisfied

RBring the equipment back to the lab

Satisfied

SatisfiedRecord the data (3 points)

Geotren Division

Bring the equipment at the site ( within

UiTM Pulau Pinang)R

lab manual 3safety briefing before

experiment

Hazard EffectType

< 10

< 100

< 1000

< 10,000

> 10,000

II

A M EDIUM risk requires a planned approach to

contro lling the hazard and applies temporary

measure if required. Actions taken must be

documented on the risk assessment Form including

date for completion.

Likelihood

lab manual, Team work

A HIGH risk requires immediate action to contro l

the hazard as detailed in the hierarchy of contro l.

Actions taken must be Documented on the risk

assessment form Including date for completion.

1

1

1

1

Satisfied

2

1 - 4 I Tolerable

Assessor: Suzana Ahmad (PJ)

NR = Non Routine

Risk Priority Number ( RPN )

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Sub-ActivityNo.

HAZARD IDENTIFICATION

Setup the equipment ( Skid Resistance

)

Place equipment on the pavement /

experiment location

Satisfied

Recommendation

Person in Charge/Due

date/ Status

III

5 - 12

Type of Activity

Severity of Harm ( S )

Risk Level Action and Time ScaleRisk

Category (

RC )

R = Routine

RISK CONTROL

Description

Is practically impossible and has never occurred

Daliah / 8 Sept. 17 /

Completed

15 - 25

RISK ASSESSMENT

Into lerable

safety shoes & jacket/colour

cone

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control

measures

Should be implemented and recorded.

Significant

safety shoe & jacket/colour

cone

safety shoes / lab manual

Safety Shoes

LExisting Risk ControlRecommended Risk

Control

Satisfied

Has not been known to occur after many years

M ight be occur at sometime in future

Has a good chance of occurring and is not unusual

The most likely result o f the hazard/ event being relized

Estimate loss (RM)

Section : Highway and traffic Lab

Daliah Binti Hasan / 6 September 2017 Checked by / Date : Mohd Rafe Abdul Majid / 11 Sep. 2017 Approved by / Date : Anas Ibrahim / 12 Sept. 2017

Job performed by : Lecturer

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

29 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3.7: HIRARC Register for Geology Lab

Title of Activity : Point Load Test

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Prepared by / Date :

S RPN = L x S RC

(i) Mineral dust

Silicosis /

Lung

Cancer

4 16 III

(ii) flying object (small

crush rock)Injury 2 8 II

(iii) wet floor (slip & fall) Injury 2 4 I

(iv)core bit (vibration)

Carpal

tunnel

syndrome

4 12 II

(v)noise

Hearing

impairme

nt

4 4 I

3 Rtilting of sample (falling

object)injury 1 3 I

4 Push the plunger Rflying rock due to small

explosionInjury 1 3 I

1 Inconceivable

2 Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health Estimate loss (RM) UiTM Reputation

1 First A id only < 10 Slightly effected

2 M inor injury (1 day M C) < 100 Discussion at the management level

3 M ajor injury (> 4 days M C) < 1000 Becomes an issue to the clients

4 Permanent disability < 10,000 Becomes an issue among the public Universities

5 Fatal > 10,000 Becomes an issue at the level o f the M inistry o f Higher Education

Type

Type of Activity

Severity of Harm ( S )

1

2

Likelihood

Goggle, safety shoes

A M EDIUM risk requires a planned approach to contro lling the hazard and

applies temporary measure if required. Actions taken must be

documented on the risk assessment Form including date for completion.

A HIGH risk requires immediate action to contro l the hazard as detailed in

the hierarchy of contro l. Actions taken must be Documented on the risk

assessment form Including date for completion.

3

Action and Time Scale

Hazard Effect

4

4

3

Existing Risk Control Person in Charge/Due date/ Status

RISK CONTROL

Satisfied

1. Mask N95

2. Prepare Safe Work

Procedure (SWP) for Point

load test.

Risk Level

Rossefendy / 11 sept. 17 /

Completed

Satisfied

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Sub-ActivityNo.

Slowly level the platens to avoid apply

any pressure or force to specimen

before the test.

Ali / 11 sept. 17 / completed

Risk Category

( RC )

R = Routine

NR = Non Routine

Risk Priority Number ( RPN )

Significant

Is practically impossible and has never occurred

Has not been known to occur after many years

M ight be occur at sometime in future

Has a good chance of occurring and is not unusual

The most likely result o f the hazard/ event being relized

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.

Description

III

5 - 12 II

Recommended Control

Measure

Goggle / full mask shield

1 - 4 I Tolerable

Function / Department : Geotren Division

Job performed by : Student

Lab Manual, Fabric Glove

Lab Manual, Fabric Glove,

safety shoes

L

15 - 25

RISK ASSESSMENT

Into lerable

Lab Manual

Ali Bin Amran / 6 Sept. 2017 Checked by / Date : Rozaini Binti Ramli(JKKP-FKA) / 9 Sept. 2017 Approved by / Date : Anas Ibrahim (Ketua JKKP-FKA)/ 9 sept. 17

Assessor: En. Roseffendy Ramlan

Section : Geology Lab

Satisfied. Display "wet

Floor" signs as needed.

For diametral test, core the sample so

that the length should be more than 0.5

of the depth or (L>0.5D)

For block test, cut samples into cubical

rectangle shape with length more than

0.5 of its drpth (L>0.5D) and the dpeth

should less than the width but lesser

than 0.3 of the width (0.3W<D<W).

Recommendation

Satisfied.

Implementing task rotation

and time limits on this

activity.

1. Ali / 11 sept. 17 / completed

2. Rossefendy / 10 Oct. 17 / in

progress

Rhousekeeping

Lab Manual, Fabric Glove

Lab Manual, Ear plug 1

2

3

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

30 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3.8: HIRARC Register for Building Services lab

Title of Activity : Fire Alarm System

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Job performed by : Student

Prepared by / Date :

S RPN = LxS RC

1

2

3

4 R Rushing to finish the test Stress 1 2 I

5 R Heat skin burn 2 2 I

6 R smoke asthma 2 2 I

7

8

Rating Likeihood

1Inconceivable

2 Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health

1 First A id only Slightly effected

2 M inor injury (1 day M C) Discussion at the management level

3 M ajor injury (> 4 days M C) Becomes an issue to the clients

4 Permanent disability Becomes an issue among the public Universities

5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education

Satisfied

ElectrocutionElectric shock proper plug 1 3 3 I Satisfied

Function / Department : CEPM Division

< 100

15 - 25 III Into lerable

A HIGH risk requires immediate action to contro l the hazard

as detailed in the hierarchy of contro l. Actions taken must be

Documented on the risk assessment form Including date for

completion.

< 1000

< 10,000

> 10,000

The most likely result o f the hazard/ event being relized

5 - 12 II Significant

A M EDIUM risk requires a planned approach to contro lling

the hazard and applies temporary measure if required.

Actions taken must be documented on the risk assessment

Form including date for completion.

Severity of Harm ( S )

Estimate loss (RM)

< 10

UiTM Reputation

Action and Time Scale NR = Non Routine

Is practically impossible and has never occurred

Has not been known to occur after many years

1 - 4 I Tolerable

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.

M ight be occur at sometime in future

Has a good chance of occurring and is not unusual

Type of Activity

R = Routine Description

Risk Priority Number ( RPN ) Risk Category

( RC )

Risk Level

Switch off of the main switch of training

unit.

Electrocution proper plug 1 3 3

R

R

Apply smoke by using smoke tester on

the smoke sensor

experiment isolate by

fiberglass1 Satisfied

Push the emergency/ panic button

Open the cover of the motion sensor

and create the movement in front of the

sensor

Teamwork 2 Satisfied

Apply heat by using hair dryer on the

heat sensor

experiment isolate by

fiberglass1 Satisfied

Open the magnetic contact

I

Person in Charge/Due date/

StatusExisting Risk Control L

Switch on the Fire Alarm Training Unit

Electric shockActivate the test key provided at the

breakglass

HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL

Recommendation

No. Sub-Activity Type Hazard EffectRecommended Risk

Control

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Assessor: Nurul Nor Fazlina (PJ)

Section : Building Services Lab

Amin Bin Abdul Halim / 8 Sept. 2017 Checked by / Date : Rozaini Ramli (JKKP-FKA)/ 10 Sept. 17 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

31 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3 9: HIRARC Register for Environmental Lab

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Job performed by : Student

Prepared by / Date :

S RPN = LxS RC

1

2

3

4

5

6

7

8

9 R

10 R

11

12

13

Rating Likeihood

1Inconceivable

2Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health

1 First A id only Slightly effected

2 M inor injury (1 day M C) Discussion at the management level

3 M ajor injury (> 4 days M C) Becomes an issue to the clients

4 Permanent disability Becomes an issue among the public Universities

5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education

Electric ShockR

Spill dermatitis

Nitrile glove, latex glove,

spill kit , safety glass , N95

mask

2R

Electrocution Proper plug 1

2 4 I Satisfied

Electric Shock Electrocution Proper plug 1 3

Seal QuantiTray using Tray Sealer

Transfer sealed Quantitray into

incubator (incubate for 24 hours)

Turn OFF Tray Sealer

After 24 hours, observe Quantitray using

UV lamp

< 100

15 - 25 III Into lerable

A HIGH risk requires immediate action to contro l the hazard as

detailed in the hierarchy of contro l. Actions taken must be

Documented on the risk assessment form Including date for

completion.

< 1000

< 10,000

> 10,000

The most likely result o f the hazard/ event being relized

5 - 12 II Significant

A M EDIUM risk requires a planned approach to contro lling the

hazard and applies temporary measure if required. Actions taken

must be documented on the risk assessment Form including

date for completion.

Severity of Harm ( S )

Estimate loss (RM)

< 10

UiTM Reputation

Action and Time Scale NR = Non Routine

Is practically impossible and has never occurred

Has not been known to occur after many years

1 - 4 I Tolerable

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.

M ight be occur at sometime in future

Has a good chance of occurring and is not unusual

Type of Activity

R = Routine Description

Risk Priority Number ( RPN ) Risk Category

( RC )

Risk Level

Discard sample container into

designated bin

Turn OFF Incubator and UV Lamp

3 3

Heat skin burn safety Heat Glove

R 3 I Satisfied

SatisfiedI

3 1

Discard Colilert Reagent snap pack into

designated bin

Pour (water sample + colilert reagent)

into QuantiTray

3 I Satisfied

Cap tight and shake vigorously untill all

Colilert reagent dissolved

Pour 100 mL water sample into sample

container

Snap 1 Colilert Reagent and pour into

the same container

Person in Charge/Due date/

StatusExisting Risk Control L

Power ON Tray Sealer

Power ON incubator (35°C)

HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL

Recommendation

No. Sub-Activity Type Hazard EffectRecommended Risk

Control

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Function / Department : Water Division

Title of Activity : Coliform Test

Assessor: Md. Faizal Zakaria (Science Asst. Officer)

Section : Environmental Lab

Kamal Bin Kassim / 6 Sept. 2017 Checked by / Date : Suzana (JKKP-FKA)/ 10 Sept. 17 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

32 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example 3.10: HIRARC Register for Computer Lab Works

Function / Department : Structural Division

Title of Activity : Using computer

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Job performed by : Student

Prepared by / Date : Checked by / Date : Rozaini Ramli (JKKP-FKA)/ 10 Sept. 17

S RPN = LxS RC

long hour of seating back pain 2 8 II

repeatitive work Stress / RSI 2 8 II

Radiation cancer 4 8 II

Radiation Eye sore 3 9 II

hit by falling object injury 2 4 I

Rating Likeihood

1Inconceivable

2Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health UiTM Reputation

1 First A id only Slightly effected

2 M inor injury (1 day M C) Discussion at the management level

3 M ajor injury (> 4 days M C) Becomes an issue to the clients

4 Permanent disability Becomes an issue among the public Universities

5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education

Ali / 10.10.17/ in progress

Housekeeping 2 satisfied

< 100

15 - 25 III Into lerable< 1000

< 10,000

> 10,000

The most likely result o f the hazard/ event being relized

5 - 12 II SignificantSeverity of Harm ( S )

Estimate loss (RM)

< 10

Action and Time Scale

NR = Non RoutineIs practically impossible and has never occurred

Has not been known to occur after many years

1 - 4 I Tolerable

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.M ight be occur at sometime in future

Has a good chance of occurring and is not unusual

Type of Activity

R = Routine DescriptionRisk Priority Number ( RPN )

Risk Category

( RC )

Risk Level

2

A HIGH risk requires immediate action to contro l the hazard

as detailed in the hierarchy of contro l. Actions taken must be

Documented on the risk assessment form Including date for

completion.

A M EDIUM risk requires a planned approach to contro lling

the hazard and applies temporary measure if required.

Actions taken must be documented on the risk assessment

Form including date for completion.

Printing R

Manual instruction 3Prepare SWP for whole

process

Ali / 10.1.18/ KIV

none 4rest for every 2 hrs (include

in SWP)Ali / 10.10.17/ in progress

none 2rest for every 2 hrs (include

in SWP)Ali / 10.10.17/ in progress

1 Use of Computer R

none 4 ergonomic chair

Person in Charge/Due date/

StatusExisting Risk Control L

HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL

Recommendation

No. Sub-Activity Type Hazard EffectRecommended Risk

Control

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Assessor: Azri (Computer Assistant)

Section : Computer Lab

Ali Bin Ahmad / 6 Sept. 2017 Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

33 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

EXAMPLE 3.11: HIRARC Register for Surveying Practical

Title of Activity : Traverse Surveying

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

S RPN = LxS RC

heavy load back pain 2 4 I

hit by falling object injury 2 8 II

long hour of stand back pain 1 3 I

repeatitive work Stress 2 4 I

Heat stress dehydrate 2 8 II

repeatitive work stress 2 4 I

Heat stress dehydrate 2 8 II

heavy load injury 2 4 I

hit by falling object injury 2 8 II

Rating Likeihood

1Inconceivable

2 Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health

1 First A id only Slightly effected

2 M inor injury (1 day M C) Discussion at the management level

3 M ajor injury (> 4 days M C) Becomes an issue to the clients

4 Permanent disability Becomes an issue among the public Universities

5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education

3

Description

Is practically impossible and has never occurred

Has not been known to occur after many years

M ight be occur at sometime in future

Observation works

safety briefing from

lecturer/ PJ in first week

of class

PJ / 9/9/17 (on progress)

safety briefing from

lecturer/ PJ in first week

of class

R

R

Satisfied

Drink a plenty of water

Drink a plenty of water

instruction from PJ/ lecturer

Team work

Into lerable

A HIGH risk requires immediate action to contro l the

hazard as detailed in the hierarchy of contro l. Actions

taken must be Documented on the risk assessment

form Including date for completion.

< 1000

< 10,000

> 10,000

Bring the survey equipment to survey

lab

Has a good chance of occurring and is not unusual

The most likely result o f the hazard/ event being relized

UiTM Reputation

Severity of Harm ( S )

Estimate loss (RM)

< 10

< 100

15 - 25 III

1 - 4 I Tolerable

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.

5 - 12 II Significant

A M EDIUM risk requires a planned approach to

contro lling the hazard and applies temporary measure if

required. Actions taken must be documented on the risk

assessment Form including date for completion.

Type of Activity

R = Routine

Risk Priority Number ( RPN ) Risk Category

( RC )

Risk Level

2 Satisfied

Action and Time Scale NR = Non Routine

44 safety shoes PJ / 9/10/17/ completed

none 4

Team work 2

none 4

Satisfied

Team work 2 Satisfied

instruction from PJ/ lecturer 4 safety shoes PJ / 9/10/17/ completed

2 Setup equipment R

Team work 3

Recommended Risk

Control

Person in Charge/Due

date/ StatusExisting Risk Control L

1 Bring the survey equipment to site R

Team work 2 Satisfied

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

HAZARD IDENTIFICATION RISK ASSESSMENTRISK CONTROL

Recommendation

No. Sub-Activity Type Hazard Effect

Function / Department : Geotren Division

Job performed by : Lab Assistant Engineer (PJ)

Prepared by / Date : Mohd Saleh / 6 Sept. 2017 Checked by / Date : Mohd Rafe Abdul Majid (JKKP-FKA) / 12 Sep.17 Approved by / Date : Anas Ibrahim (Ketua JKKP-FKA) / 13 Sep. 2017

Assessor: Amer Khomeny (Lecturer)

Section : Surveying Lab

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

34 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Example3.12: HIRARC Register for Office Works

Function / Department : Office

Title of Activity : Office Work

Legal : ACT 514 / ACT 139 / ACT302 / ACT 127

Job performed by : Student

Prepared by / Date :

S RPN = LxS RC

Radiation Eye sore 3 9 II

hit by falling object injury 2 4 I

long hour of seating back pain 2 8 II

repeatitive work Stress / RSI 2 8 II

Radiation cancer 4 8 II

3 R hit by falling object injury 1 4 I

4 NR Electric shock electrocution 2 4 I

5 R Wet floor (slip & fall) injury 3 12 II

6

7

Rating Likeihood

1Inconceivable

2 Remote/unlikely

3 Conceivable

4 Possible

5 M ost likely

Rating Nature of Injury / ill health UiTM Reputation

1 First A id only Slightly effected

2 M inor injury (1 day M C) Discussion at the management level

3 M ajor injury (> 4 days M C) Becomes an issue to the clients

4 Permanent disability Becomes an issue among the public Universities

5 Fatal Becomes an issue at the level o f the M inistry o f Higher Education

Ali Bin Ahmad / 6 Sept. 2017

Description

Is practically impossible and has never occurred

Has not been known to occur after many years

M ight be occur at sometime in future

Checked by / Date : Rozaini Ramli (JKKP-FKA)/ 10 Sept. 17

Assessor: Nil

proper plug

L

RISK CONTROL

4

satisfied

Approved by / Date : Dr. Kay Dora Abdul Ghani (KPP FKA)/12 Sept. 17

< 100

< 1000

Has a good chance of occurring and is not unusual

The most likely result o f the hazard/ event being relized

> 10,000

Photocopying, binding, printing & faxing R1

R2 Use of Computer

Severity of Harm ( S )

< 10,00015 - 25

RISK ASSESSMENT

Into lerable

Manual instruction

A risk ident if ied as LOW may be considered as acceptable

and further reduct ion may not be necessary. However, if the

risk can be resolved quickly and eff icient ly, control measures

Should be implemented and recorded.

Housekeeping

none

Recommendation

Person in Charge/Due date/

Status

III

5 - 12 II

Recommended Risk

Control

satisfied

1 - 4 I Tolerable

Risk Level Action and Time Scale

Significant

Type

Type of Activity

none

Estimate loss (RM)

< 10

none 2

Risk Category

( RC )

R = Routine

NR = Non RoutineRisk Priority Number ( RPN )

Pantry

Housekeeping

Wash room

FCE - HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Sub-ActivityNo.

HAZARD IDENTIFICATION

4

Ali / 10.10.17/ in progress

Section : Ruang Pejabat Ting. 6 Kompleks perdana, UiTMPP

Filing

Hazard Effect

none Ali / 10.10.17/ in progress

Prepare SWP for whole

processAli / 10.10.17/ in progress

A M EDIUM risk requires a planned approach to contro lling

the hazard and applies temporary measure if required.

Actions taken must be documented on the risk assessment

Form including date for completion.

Ali / 10.10.17/ in progress

Existing Risk Control

4

2

put anti-slip mat + signage

rest for every 2 hrs (include

in SWP)

3

2

4

A HIGH risk requires immediate action to contro l the hazard

as detailed in the hierarchy of contro l. Actions taken must be

Documented on the risk assessment form Including date for

completion.

satisfied

ergonomic chair Ali / 10.1.18/ KIV

rest for every 2 hrs (include

in SWP)

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

35 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

REFERENCES

List of references

1. DOSH (2008), Guidelines for HIRARC

2. Malaysia ACT 514 (Occupational Safety and Health

Act (1994)).

3. Manual Keselamatan Dan Kesihatan Pekerjaan UiTM

(2016), Unit Pengurusan Risiko, UiTM Malaysia.

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

36 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Appendix A

FCE HIRARC REGISTER FORM

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

37 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Appendix B

EXAMPLES OF WORKPLACE HAZARDS

Hazard Workplace

(Unsafe Condition / unsafe Act)

Effects/ Consequences

broken chair fall & injury

poor lighting slip, trip & fall

sharp edge injury

heat stress dehydrate

wrong lifting back pain

noise Hearing impairment

repetitive works stress

faulty equipment stress, injury

overload job stress

wet floor slip & fall, injury

uneven floor trip & fall, injury

light from computer (radiation) Eye sore

demotivated stress

Working alone Stress / injury

Electric shock Skin burn

Working at height Fall

Heavy load Back pain

Mineral dust Lung cancer/ Silicosis

Safety and Health Committee Faculty of Civil Engineering,

Universiti Teknologi MARA Cawangan Pulau Pinang

38 HIRARC GUIDELINES FOR CIVIL ENGINEERING PROGRAM

Appendix C

EXAMPLE OF SAFE WORK PROCEDURE (SWP)

Title: Safe Work Procedure

(SWP)

FKA-EVT-2017

Authorised By: SHO

Issue Date: 10 Jan. 2017

Last Reviewed: June 2017

Next Review Date: June 2018

Page Number: 1 of 1

DO NOT use this machine/equipment unless you have been trained in its safe use and operation.