Fall 2015 Co-Op Overview
-
Upload
nick-campbell -
Category
Documents
-
view
87 -
download
4
Transcript of Fall 2015 Co-Op Overview
![Page 1: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/1.jpg)
Fall 2015 Co-Op OverviewNick Campbell
![Page 2: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/2.jpg)
2Emerson Confidential
Abercrombie and Fitch
● Analyzed performance data of RTU retrofit
● Developed project summary and constructed payback period
● Took part in discussion of deciding future direction of project
Worked with:Sami Zendah, Emerson Climate Technologies
Colby Mekus, Abercrombie and Fitch Store
![Page 3: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/3.jpg)
3Emerson Confidential
CEE & ASHRAE Company Status Research
● Researched, analyzed, and organized customers’ position on future CEE and ASHRAE standards
● Developed visual aids to display and communicate findings
Worked with:Sami Zendah, Emerson Climate Technologies
Pete Lee, Emerson Climate Technologies
![Page 4: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/4.jpg)
4Emerson Confidential
Carrier Projections
● Participated in creating projections for Carrier with different installations Emerson UltraTech technology
● Constructed visual aids to communicate projections and benefits to Carrier and other clients
Worked with:Sami Zendah, Emerson Climate TechnologiesSahil Popli, Emerson Climate Technologies
![Page 5: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/5.jpg)
5Emerson Confidential
Updated Customer Profiles
● Executed in depth research on Carrier and Lennox products
● Updated existing customer company profiles (previous co-op)
Worked with:Sami Zendah, Emerson Climate Technologies
![Page 6: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/6.jpg)
6Emerson Confidential
Project RTU
Worked with:Sami Zendah, Emerson Climate Technologies
Lancelot Sharpe, Emerson Climate TechnologiesEJ Siriphone, Emerson Climate TechnologiesTJ Thomas, Emerson Climate Technologies
Ben Artz, Enervise
● Design testing plan to compare variable and digital compressor efficiency
● Trouble shot RTU various times to find the best solution approach numerous problems
● Logged, organized, and analyzed raw testing data to report out
![Page 7: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/7.jpg)
7Emerson Confidential
PSS Simulation Tool
Worked with:Sami Zendah, Emerson Climate TechnologiesAditya Kiran, Emerson Climate Technologies
• Assisted in resolving tool malfunctions • Helped start new SEER and HSPF additions • Reformatted user interface and selection options
![Page 8: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/8.jpg)
8Emerson Confidential
What I Learned● Learned the basic terminology, functions, and
standards of RTUs and select HVAC systems● Familiarized myself with the controls and abilities of
Emerson’s E2 Controller and how to apply them● Developed skills necessary to execute logging
functions of Ultrasite32 program● Became aware of the abilities of the PSS Simulation
Tool● Further developed skills in Microsoft Excel and
PowerPoint● Learned and furthered skills involving
communication, organization, and project accomplishing in a business setting
![Page 9: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/9.jpg)
9Emerson Confidential
Pros and Cons
● Workload decreased towards the end
● The work was challenging and it forced me to learn ● I was depended on to meet deadlines and complete
projects● I was able to work and develop relationships with
multiple individuals throughout Emerson
PROS:
CONS:
![Page 10: Fall 2015 Co-Op Overview](https://reader031.fdocuments.net/reader031/viewer/2022013004/58703dc11a28ab4e2c8b5775/html5/thumbnails/10.jpg)
10Emerson Confidential
Final NoteNick CampbellMechanical Engineering Wright State UniversityGraduation Date: May 2018
I really enjoyed my experience here. I feel adapting to the HVAC environment was challenging, but beneficial as I learned a great
deal. I believe that this experience has equipped me with skills that will be vital in the future.