Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers,...

80
Facilities Location, Layout and Planning

Transcript of Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers,...

Page 1: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Facilities Location, Layout and Planning

Page 2: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

FACILITY PLANNINGFACILITY PLANNING• The placement of facility – customers,

suppliers, other links in the supply chain

• Resources

• Strategy – 99cents Only example

• Access to customers

• Government impacts

Page 3: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Objectives of Facility LayoutObjectives of Facility Layout

Minimize material handling costsMinimize material handling costs Utilize space efficientlyUtilize space efficiently Utilize labor efficientlyUtilize labor efficiently Eliminate bottlenecksEliminate bottlenecks Facilitate communication and interaction Facilitate communication and interaction

between workers, between workers and between workers, between workers and their supervisors, or between workers and their supervisors, or between workers and customerscustomers

Reduce manufacturing cycle time or Reduce manufacturing cycle time or customer service timecustomer service time

Page 4: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Objectives of Facility LayoutObjectives of Facility Layout

Eliminate waste or redundant movementEliminate waste or redundant movement Facilitate the entry, exit, and placement of Facilitate the entry, exit, and placement of

material, products, or peoplematerial, products, or people Incorporate safety and security measuresIncorporate safety and security measures Promote product and service qualityPromote product and service quality Encourage proper maintenance activitiesEncourage proper maintenance activities Provide a visual control of operations or Provide a visual control of operations or

activitiesactivities Provide flexibility to adapt to changing Provide flexibility to adapt to changing

conditionsconditions Increase capacityIncrease capacity

Page 5: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Questions on Layout Questions on Layout PlanningPlanning

• How should the facility be laid out?

• Does my layout cause unnecessary movement/excess travel time?

• Does my work flow in a logical manner?

• Does size dictate layout or does layout/product flow dictate the size?

Page 6: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Process LayoutProcess Layout Machines grouped by process they performMachines grouped by process they perform

Product LayoutProduct Layout Linear arrangement of workstations to Linear arrangement of workstations to

produce a specific productproduce a specific product

Fixed Position LayoutFixed Position Layout Used in projects where the product cannot Used in projects where the product cannot

be movedbe moved

Basic Types of LayoutsBasic Types of Layouts

Page 7: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Manufacturing Process LayoutManufacturing Process Layout

L

L

L

L

L

L

L

L

L

LM

M

M

M

D

D

D

D

D

D

D

D

G

G

G

G

G

G

A A AReceiving andShipping Assembly

Painting Department

Lathe DepartmentMilling

Department Drilling Department

Grinding Department

P

P

Page 8: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Manufacturing Process LayoutManufacturing Process Layout

L

L

L

L

L

L

L

L

L

LM

M

M

M

D

D

D

D

D

D

D

D

G

G

G

G

G

G

A A AReceiving andShipping Assembly

Painting Department

Lathe DepartmentMilling

Department Drilling Department

Grinding Department

P

P

Page 9: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Manufacturing Process LayoutManufacturing Process Layout

L

L

L

L

L

L

L

L

L

LM

M

M

M

D

D

D

D

D

D

D

D

G

G

G

G

G

G

A A AReceiving andShipping Assembly

Painting Department

Lathe DepartmentMilling

Department Drilling Department

Grinding Department

P

P

Page 10: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

A Product LayoutA Product Layout

InIn

OutOut

Page 11: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Fixed-Position LayoutsFixed-Position LayoutsTypical of projectsEquipment, workers, materials, other

resources brought to the siteHighly skilled laborOften low fixed Typically high variable costs

Page 12: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Designing Process LayoutsDesigning Process Layouts

Minimize material handling costs Block Diagramming

Minimize nonadjacent loads Use when quantitative data

is available

Relationship Diagramming Based on location preference between areas Use when quantitative data is not available

Page 13: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Block DiagrammingBlock Diagramming Create load summary chartCreate load summary chart Calculate composite (two way) Calculate composite (two way)

movementsmovements Develop trial layouts minimizing number Develop trial layouts minimizing number

of nonadjacent loadsof nonadjacent loads

ExampleExample

Page 14: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.
Page 15: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Relationship DiagrammingRelationship Diagramming(Murther’s Grid)(Murther’s Grid)

Used when quantitative data is not available

Muther’s grid displays preferences

Denote location preferences with weighted lines

Page 16: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Relationship Diagramming Relationship Diagramming ExampleExample

ProductionProduction

OfficesOffices

StockroomStockroom

Shipping and Shipping and receivingreceiving

Locker roomLocker room

ToolroomToolroom

Page 17: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Relationship Diagramming Relationship Diagramming ExampleExample

AA AA

AA OO

OO

OOOO

OO

UU

UU UU

UU

EEXX

II

ProductionProduction

OfficesOffices

StockroomStockroom

Shipping and Shipping and receivingreceiving

Locker roomLocker room

ToolroomToolroom

A Absolutely necessaryE Especially importantIImportantO OkayUUnimportantXUndesirable

Page 18: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Relationship Diagramming Relationship Diagramming ExampleExample

11 11

11 44

44

4444

44

55

55 55

55

2266

33

ProductionProduction

OfficesOffices

StockroomStockroom

Shipping and Shipping and receivingreceiving

Locker roomLocker room

ToolroomToolroom

1 Absolutely necessary2 Especially important3 Important4 Okay5Unimportant6Undesirable

Page 19: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.
Page 20: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Facility Location Facility Location ModelsModels

Page 21: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Types Of FacilitiesTypes Of Facilities

Heavy manufacturingAuto plants, steel mills, chemical plants

Light industrySmall components mfg, assembly

Warehouse & distribution centersRetail & service

Page 22: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Factors in Heavy Manufacturing Factors in Heavy Manufacturing LocationLocation

Construction costsLand costs

Raw material and finished goods shipment modes

Proximity to raw materialsUtilities

Labor availability

Page 23: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Factors in Light Industry Factors in Light Industry LocationLocation

Construction costsConstruction costsLand costsLand costs

Easily accessible Easily accessible geographic regiongeographic region

Education & training capabilitiesEducation & training capabilities

Page 24: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Factors in Warehouse Factors in Warehouse LocationLocation

Transportation costsProximity to markets (Customers)

Page 25: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.
Page 26: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.
Page 27: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Service Location Service Location ConsiderationsConsiderations

• Labor

• Cost of Living

• Real Estate

• Construction

• Government Incentives

• Examples – Amoco, Mass St, Tattoo Parlors, Walgreen’s

Page 28: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Global Location FactorsGlobal Location Factors

Government stability Government regulations Political and economic

systems Economic stability and

growth Exchange rates Culture Climate Export import regulations,

duties and tariffs

Raw material availability Number and proximity of

suppliers Transportation and

distribution system Labor cost and education Available technology Commercial travel Technical expertise Cross-border trade

regulations Group trade agreements

Page 29: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Regional Location FactorsRegional Location Factors

Community government

Local business regulations

Government services Business climate Community services Taxes

Availability of sites Financial Services Community

inducements Proximity of suppliers Education system

Page 30: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Site Location FactorsSite Location Factors

Customer baseConstruction/

leasing costLand costSite sizeTransportationUtilities

Zoning restrictionsTrafficSafety/securityCompetitionArea business

climate Income level

Page 31: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Location IncentivesLocation Incentives

Tax credits Wal-Mart in WyandotteRelaxed government regulation

Job training Infrastructure improvement

Money

Page 32: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Locate facility at center of geographic area Based on weight and distance traveled

Establish grid-map of area Identify coordinates and weights shipped

for each location

Center-of-Gravity TechniqueCenter-of-Gravity Technique

Page 33: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Facility SummaryFacility Summary

• Why is it important?

• Location analysis

• Location Criteria – global, local, regional - education

• Location and Strategy

• Location and Customers

• Layout planning

Page 34: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Project ManagementProject Managementand Operationsand Operations

Page 35: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Project Project ManagementManagement

First Essay on Project Management:1697 – “An Essay Upon Projects”

1959 HBR Article – “The Project Manager”

Air Force Manual 1964

Page 36: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Project ManagementProject ManagementIn today’s global marketplace, complexity and speed are certainties. In such an environment, a good axiom for project management is, Do It, Do It Right, Do It Right Now. Creating clear direction, efficiency, timely response, and quality outcomes requires project managers who are agile -- adept at change. The associated disciplinary areas are clearly spelled out in the following PMI definition.

“Project management is the application of knowledge, skills, tools, and techniques to a broad range of activities in order to meet the requirements of a particular project. Project management is comprised of five Project Management Process Groups – Initiating Processes, Planning Processes, Executing Processes, Monitoring and Controlling Processes, and Closing Processes.

Source: Project Management Institute - http://www.pmi.org/info/PP_AboutProfessionOverview.asp?nav=0501

Page 37: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Elements of Project Elements of Project ManagementManagement

Project teamProject team Individuals from different departments within Individuals from different departments within

companycompany Matrix organizationMatrix organization

Team structure with members from different Team structure with members from different functional areas depending on skills neededfunctional areas depending on skills needed

Project manager - Leader of project teamProject manager - Leader of project team Project Charter – high level description of what is Project Charter – high level description of what is

to be accomplished in a project and delegates to be accomplished in a project and delegates authority to project manager to implement authority to project manager to implement actions to complete projectactions to complete project

Page 38: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Project PlanningProject PlanningStatement of workStatement of work

Written description of goals, work & Written description of goals, work & time frame of projecttime frame of project

Activities require labor, resources & Activities require labor, resources & timetime

Precedence relationship shows Precedence relationship shows sequential relationship of project sequential relationship of project activitiesactivities

Page 39: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Elements of Elements of Project PlanningProject Planning

Define project objective(s)Define project objective(s) Identify activitiesIdentify activitiesEstablish precedence relationshipsEstablish precedence relationshipsMake time estimatesMake time estimatesDetermine project completion timeDetermine project completion timeCompare project schedule objectivesCompare project schedule objectivesDetermine resource requirements to Determine resource requirements to

meet objectivemeet objective

Page 40: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Work Breakdown Work Breakdown StructureStructure

Hierarchical organization of work to Hierarchical organization of work to be done on a projectbe done on a project

Project broken down into modulesProject broken down into modules Modules subdivided into Modules subdivided into

subcomponents, activities, and taskssubcomponents, activities, and tasks Identifies individual tasks, workloads, Identifies individual tasks, workloads,

and resource requirementsand resource requirements

Page 41: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Project ControlProject ControlAll activities identified and includedAll activities identified and includedCompleted in proper sequenceCompleted in proper sequenceResource needs identifiedResource needs identifiedSchedule adjustedSchedule adjustedMaintain schedule and Maintain schedule and

budgetbudgetComplete on timeComplete on time

Page 42: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

A Gantt ChartA Gantt Chart

Popular tool for project schedulingPopular tool for project scheduling Graph with bar for representing the time for Graph with bar for representing the time for

each taskeach task Provides visual display of project scheduleProvides visual display of project schedule Also shows slack for activitiesAlso shows slack for activities

Amount of time activity can be Amount of time activity can be delayed without delaying projectdelayed without delaying project

Around since 1914

Page 43: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Gantt ChartsGantt Charts

Gantt charts were employed on major infrastructure projects including the Hoover Dam and Interstate highway system and still are an important tool in project management.

Gantt described two principles for his charts:

1. measure activities by the amount of time needed to complete them

2. the space on the chart can be used the represent the amount of the activity that should have been done in that time.

Page 44: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

A Gantt ChartA Gantt Chart| | | | |

Activity

Design house and obtain financing

Lay foundation

Order and receive materials

Build house

Select paint

Select carpet

Finish work

00 22 44 66 88 1010MonthMonth

MonthMonth11 33 55 77 99

Figure 6.2Figure 6.2

Page 45: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

CPM/PERTCPM/PERTCritical Path Method (CPM)Critical Path Method (CPM)

DuPont & Remington-Rand (1956)DuPont & Remington-Rand (1956) Deterministic task timesDeterministic task times

Project Eval. & Review Technique Project Eval. & Review Technique (PERT)(PERT)

US Navy, LockheedUS Navy, Lockheed Multiple task time estimatesMultiple task time estimates

Page 46: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

PERT/CPMPERT/CPM

Program Evaluation and Review Technique (PERT): developed in conjunction with the development of the Polaris missile program for submarines – developed by the US Navy with Lockheed as the lead contractor

Critical Path Method (CPM): developed through a joint venture between the DuPont Corporation and the Remington Rand Corporation – the original purpose was to monitor and evaluate plant maintenance management projects.

Page 47: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Project Network for a HouseProject Network for a House

3322 00

11

33

11 1111

1 2 4 6 7

3

5

Lay Lay foundationfoundation

Design house Design house and obtain and obtain financingfinancing

Order and Order and receive receive materialsmaterials

DummyDummy

Finish Finish workwork

Select Select carpetcarpet

Select Select paintpaint

Build Build househouse

Figure 6.4Figure 6.4

Page 48: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Critical PathCritical Path A path is a sequence of connected A path is a sequence of connected

activities running from start to end activities running from start to end node in networknode in network

The critical path is the The critical path is the path with the longest path with the longest duration in the networkduration in the network

Project cannot be Project cannot be completed in less than completed in less than the time of the critical the time of the critical pathpath

Page 49: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

The Critical The Critical PathPath

A:A: 1-2-3-4-6-71-2-3-4-6-73 + 2 + 0 + 3 + 1 = 93 + 2 + 0 + 3 + 1 = 9 months months

B:B: 1-2-3-4-5-6-71-2-3-4-5-6-73 + 2 + 0 + 1 + 1 + 1 = 83 + 2 + 0 + 1 + 1 + 1 = 8 months months

C:C: 1-2-4-6-71-2-4-6-73 + 1 + 3 + 1 = 83 + 1 + 3 + 1 = 8 months months

D:D: 1-2-4-5-6-71-2-4-5-6-73 + 1 + 1 + 1 + 1 = 73 + 1 + 1 + 1 + 1 = 7 months months

33

22 00

11

33

11 11

111 2 4 6 7

3

5

Lay Lay foundationfoundation

Design house Design house and obtain and obtain financingfinancing

Order and Order and receive receive materialsmaterials

DummyDummy

Finish Finish workwork

Select Select carpetcarpet

Select Select paintpaint

Build Build househouse

Page 50: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

The Critical The Critical PathPath

33

22 00

11

33

11 11

111 2 4 6 7

3

5

Lay Lay foundationfoundation

Design house Design house and obtain and obtain financingfinancing

Order and Order and receive receive materialsmaterials

DummyDummy

Finish Finish workwork

Select Select carpetcarpet

Select Select paintpaint

Build Build househouse

1 2 4 6 7

3

5

3

2 0

1

3

1 1

Start at 3 months

Start at 5 months

1

Finish at 9 months

Start at 8 months

Figure 6.6

Activity Start Times

Page 51: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Project CrashingProject Crashing Crashing is reducing project time by Crashing is reducing project time by

expending additional resourcesexpending additional resources Crash time is an amount of time an activity is Crash time is an amount of time an activity is

reducedreduced Crash cost is the cost of reducing the activity Crash cost is the cost of reducing the activity

timetime Goal is to reduce project duration at minimum Goal is to reduce project duration at minimum

costcost

Page 52: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Crashing costs increase as project duration Crashing costs increase as project duration decreasesdecreases

Indirect costs increase as project duration Indirect costs increase as project duration increasesincreases

Reduce project length Reduce project length as long as crashing as long as crashing costs are less than costs are less than indirect costsindirect costs

Time-Cost Relationship Time-Cost Relationship

Page 53: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Life Cycle ManagementLife Cycle Management

• Long term view of projects to guide decision making – solutions that provide life time success vice short term

• Acquisition; development; production; introduction; sustainment; disposal

• Links system costs to big picture; better use of resources; minimize total cost of ownership

Page 54: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Capacity and Capacity and Aggregate Aggregate Planning Planning

Page 55: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Capacity Outputs: Capacity Outputs: ExamplesExamples

Type of BusinessInput Measures of

CapacityOutput Measures

of Capacity

Car manufacturer Labor hours Cars per shift

Hospital Available beds Patients per month

Pizza parlor Labor hours Pizzas per day

Retail storeFloor space in square feet

Revenue per foot

Page 56: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

The goal of capacity planning The goal of capacity planning decisionsdecisions

The goal of capacity planning The goal of capacity planning decisionsdecisions

(1) The capacity of the firm to produce the service or good

(2) The processes for providing the service or making the good

(3) The layout or arrangement of the work space

(4) The design of work processes to enhance productivity

Page 57: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

CapacityCapacity• The max output that an organization be

capable of producing• Measure a single facility:

– Design vs. Effective capacity– Capacity Utilization: design vs. efficient utilization

• For systems have more than one facility and flows of product– System capacity and bottleneck– Improve system capacity

Page 58: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Determinants of Effective CapacityDeterminants of Effective Capacity

• Facilities• Human considerations

– Adding people– Increasing employee motivation

• Operations– Improving operating rate of a machine– Improving quality of raw materials and

components

• External forces– Safety regulations

Page 59: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Capacity UtilizationCapacity Utilization

Measures how much of the available capacity is actually being used:

– Always <=1(percentage of usage)– Higher the better– Denominator:

• If effective capacity used: efficient utilization• If design capacity used: design utilization

actual output rateUtilization 100%

available capacity

Page 60: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Aggregate PlanningAggregate Planning• The process of planning the quantity and

timing of output over the intermediate range (3-18 months) by adjusting production rate, employment, inventory

• Master Production Schedule: formalizes the production plan and translates it into specific end item requirements over the short to intermediate horizon

Page 61: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Capacity PlanningCapacity Planning

• The process of determining the amount of capacity required to produce in the future. May be at the aggregate or product line level

• Master Production Schedule - anticipated build schedule

• Time horizon must exceed lead times for materials

Page 62: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Capacity PlanningCapacity Planning• Look at lead times, queue times, set up times, run

times, wait times, move times• Resource availability• Material and capacity - should be in synch• driven by dispatch list - listing of manufacturing

orders in priority sequence - ties to layout planning

• load profiles - capacity of each section

Page 63: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

the capacity decisions:the capacity decisions:

• When to add capacity

• How much capacity to add

• Where to add capacity

• What type of capacity to add

• When to reduce capacity

Page 64: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Capacity PlanningCapacity Planning• Rough Cut Capacity Planning -

process of converting the master production schedule into requirements for key resources

• capacity requirements plan - time-phased display of present and future capacity required on all resources based on planned and released orders

Page 65: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Capacity PlanningCapacity Planning• Capacity Requirements Planning (CRP)

- process of determining in detail the amount of labor and machine resources required to meet production plan

• RCCP may indicate sufficient capacity but the CRP may indicate insufficient capacity during specific time periods

Page 66: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Theory of ConstraintsTheory of Constraints• Every system has a bottle neck

• capacity of the system is constrained by the capacity of the bottle neck

• increasing capacity at other than bottle neck operations does not increase the overall capacity of the system

Page 67: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Theory of ConstraintsTheory of Constraints

• What needs to be changed

• What to change to

• How to make the change happen

Page 68: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Theory of ConstraintsTheory of Constraints

• Identify the constraint

• Subordinate

• Inertia

• Walk the process again

• inertia of change can create new bottle necks

Page 69: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Capacity PlanningCapacity Planning

Establishes overall level of Establishes overall level of productive resourcesproductive resources

Affects lead time Affects lead time responsiveness, cost & responsiveness, cost & competitivenesscompetitiveness

Determines when and how Determines when and how much to increase capacitymuch to increase capacity

Page 70: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Capacity ExpansionCapacity Expansion

Volume & certainty of anticipated Volume & certainty of anticipated demanddemand

Strategic objectives for growthStrategic objectives for growthCosts of expansion & operationCosts of expansion & operation Incremental or one-step Incremental or one-step

expansionexpansion

Page 71: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Sales and Operations Sales and Operations Planning (S&OP)Planning (S&OP)

• Brings together all plans for business

• performed at least once a month

• Internal and external

Page 72: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Adjusting Capacity to Adjusting Capacity to Meet DemandMeet Demand

1.1. Producing at a constant rate and using inventory Producing at a constant rate and using inventory to absorb fluctuations in demand (level to absorb fluctuations in demand (level production)production)

2.2. Hiring and firing workers to match demand (chase Hiring and firing workers to match demand (chase demand)demand)

3.3. Maintaining resources for high demand levelsMaintaining resources for high demand levels4.4. Increase or decrease working hours (overtime Increase or decrease working hours (overtime

and undertime)and undertime)5.5. Subcontracting work to other firmsSubcontracting work to other firms6.6. Using part-time workersUsing part-time workers7.7. Providing the service or product at a later time Providing the service or product at a later time

period (backordering)period (backordering)

Page 73: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Demand ManagementDemand ManagementShift demand into other periodsShift demand into other periods

Incentives, sales promotions, Incentives, sales promotions, advertising campaignsadvertising campaigns

Offer product or services with Offer product or services with countercyclical demand patternscountercyclical demand patterns

Partnering with suppliers to reduce Partnering with suppliers to reduce information distortion along the information distortion along the supply chainsupply chain

Page 74: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Remedies for UnderloadsRemedies for Underloads

1. Acquire more work

2. Pull work ahead that is scheduled for later time periods

3. Reduce normal capacity

Page 75: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Remedies for OverloadsRemedies for Overloads

1. Eliminate unnecessary requirements

2. Reroute jobs to alternative machines or work centers

3. Split lots between two or more machines

4. Increase normal capacity

5. Subcontract

6. Increase the efficiency of the operation

7. Push work back to later time periods

8. Revise master schedule

Page 76: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Scheduling as part of the Scheduling as part of the Planning ProcessPlanning Process

Page 77: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

• Scheduling is the last step in the planning process?

• It is one of the most challenging areas of operations management.

• Scheduling presents many day-to-day problems for operations managers because of – Changes in customer orders

– Equipment breakdowns

– Late deliveries from suppliers

– A myriad of other disruptions

SchedulingScheduling

Page 78: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Objectives in SchedulingObjectives in Scheduling

Meet customer due dates Minimize job lateness Minimize response time Minimize completion time Minimize time in the system Minimize overtime Maximize machine or labor utilization Minimize idle time Minimize work-in-process inventory Efficiency

Page 79: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Sequencing RulesSequencing Rules

FCFS - first-come, first-served LCFS - last come, first served DDATE - earliest due date CUSTPR - highest customer priority SETUP - similar required setups SLACK - smallest slack CR - critical ratio SPT - shortest processing time LPT - longest processing time

Page 80: Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.

Critical Ratio RuleCritical Ratio Rule

CR considers both time and work remaining

If CR > 1, job ahead of scheduleIf CR < 1, job behind schedule

If CR = 1, job on schedule

time remaining due date - today’s date

work remaining remaining processing time

Ties scheduling to Gantt Chart or PERT/CPM