Presentation Overview
• Historical view of our capital improvement budget• FY17 major projects• FY18 bidding/construction timeline• Facility IssuesRoofingIndian Plains – Repairs NeededWheatland – OvercrowdingPhase IV elementary air conditioning projectEnergy management initiatives
2
Historical View of our Capital Improvement Budget
3
$4,213,474
$3,970,166
$2,631,709
$1,541,591
$2,267,588
$2,480,888
$5,626,922
$3,500,000
$6,936,692
$4,073,860
$8,483,711
$4,888,985
$3,575,000
$515,000
$3,000,000
$0 $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 $8,000,000 $9,000,000
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
EMG Yearly Ave.
204 Yearly Ave.
Air Conditioning All other Improvments
Aesthetics (replace as needed) Electrical HVAC
Vinyl Tile Replacement @ WVHS %Generator install at CEC and Still
*Phase III – Elementary A.C. Project
Building Envelope Site Projects Security Audit Recommendations
%Masonry Restoration @ NVHS%EIFS Repair/Recoating @ WVHSRepair exterior doors @ WVHS#Masonry Restoration @ NVHS, Welch, Scullen, McCarty & Fischer
%Visitor Bleachers @ WVHSReplace fencing-add netting at Varsity Baseball field @ WVHS
New camera for Door #1 at all schools Proximity Card Readers at various schoolsReplacement of Video Management system @ MVHS.
Flat Roof Replacement%NVHS
Slope Roof Replacement#Kendall
Asphalt/Concrete:%Staff parking lot @WVHS%Front circle @ Hill%Asphalt play areas @ Fry & WelchConcrete repairs @ NVHS#Asphalt projects @ Granger, NV-Birkett, NVHS
*Activation of District wide emergency radio network
ADA Modification:#Band & Chorus Rooms @ WVHS
FY 17 Major Projects# Bidding Phase * In Progress % Began in FY16
4
Masonry Restoration at NVHS
Tuck pointing Extending the parapet wall
5
Flat Roof Replacement at NVHS
Applying Hot Tar Installing New Insulation
6
Wall Repair/Recoating at WVHS
Work in Progress Final Product
7
Visitor Bleacher Replacement at WVHS
Before After
8
Projects
Documents Available
Board Approves
Bid
Substantial Completion
Phase III – Elementary A. C. Proactive 10/10/16 11/21/16 8/11/17
Slope Roof Replacement @ Kendall Reactive 2/6/17 3/6/17 8/11/17
Masonry Restoration @ 5 Schools Reactive 2/20/17 3/20/17 8/11/17
Hardscape Projects @ 3 Schools Reactive 4/3/17 5/1/17 8/11/17
ADA Modification Band/Chorus @ WVHS
Reactive 4/17/17 5/15/17 8/11/17
FY 18 Bidding/Construction Timeline
9
Roof Expenses
$705,200
$592,500
$399,869
$641,200
$786,459
$1,478,800
$1,811,868
$137,894
$223,620
$127,911
$102,214
$205,455
$0 $200,000 $400,000 $600,000 $800,000 $1,000,000$1,200,000$1,400,000$1,600,000$1,800,000$2,000,000
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
EMG YEARLY AVE.Roof Repairs Roofing Replacement
10
School Roof Type AgeSuggested
Replacement Budget
Brookdale Flat 32 years 2012 $280,000
Georgetown Slope 30 years 2012 $660,000
May Watts Slope 29 years 2013 $660,000
McCarty Slope 22 years 2014 $175,000
NV-Birkett Slope 21 years 2015 $680,000
Fischer Slope 24 years 2013 $690,000
Hill Flat 25 years 2014 $280,000
WVHS Flat 25 years 2014 $950,000
Indian Plains Flat & Slope unknown 2012 $456,200
Deferred Roof Projects
11
$4,831,200
Indian Plains Alternative High School1322 North EolaAurora, Il.630-375-3375
1929/1946 Building
1964 Building
C
N S
E
W
Indian Plains – Repairs Needed
12
Indian Plains –Repairs Needed
Deteriorating MasonryWindow Replacement
13
Indian Plains – Budget OptionsCost of Repairs –
Alternative SchoolFY19
Retrofit Windows/doors including asbestos 466,800.00
Remedial Masonry Scope 189,900.00
Roof Replacement 456,200.00
New Acoustical Ceiling (1964 building) 73,200.00
New lighting (1964 building) 80,000.00
Replace Intercom & clock system 22,000.00
Sidewalk from door #7 21,300.00
Asphalt repairs 25,000.00
Replace fire alarm system 42,500.00
Complete removal of asbestos 150,000.00
1,526,900.00
Complete Building &
Site DemoFY19
Removal of all Asbestos 200,000.00
Complete Building Demo 200,000.00
Site Restoration 200,000.00
Unforeseen Conditions 50,000.00
650,000.00
14
Indian Plains – Budget Options
Cost of Repairs – Elementary School
FY19
Retrofit Windows/doors including asbestos $466,800
Remedial Masonry Scope 189,900.00
Roof Replacement 456,200.00
LMC Renovation 31,800.00
Aesthetic issues (1929/1946 building) 53,000.00
F.F. & E 80,000.00
Playground 80,000.00
Asphalt play area 21,200.00
Food Service Changes 15,900.00
Renovations to food service area 11,000.00
FY19
Carpet 106,100.00
New Acoustical Ceiling (1964 building) 73,200.00
New lighting (1964 building) 80,000.00
Replace Intercom & clock system 22,000.00
Sidewalk from door #7 21,300.00
Asphalt repairs 25,000.00
Replace fire alarm system 42,500.00
Complete removal of asbestos 150,000.00
1,925,900.00
15
Wheatland Overcrowding
S.T.E.P.S. Program
Aramark Food Service
Aramark Facility Management
District Records Storageps
NS
E
W
Kitchen
Electrical
202A
16
Elementary Air Conditioning – Phase IV
$9 Million to Complete
Initial Construction
Phases I, II & III
Phase IV 17
Energy Management Initiatives
• EnerNOC Demand Response Incentive Program. $345,000 over 5 years (Fischer, Granger, MVHS, Still, WVHS)
• Ameresco pilot of their energy management recording software (NVHS, Still, CEC)
18
Next Steps
• Prioritize Capital improvement and other district needs based on the following hierarchy:
1. Safety Related Items
2. Approved Curriculum Related needs
3. Necessary Repairs
4. Life Safety Survey Items
5. Aesthetics
• April 3rd: Presentation explaining the academic programing needs and options for Indian Plains and Wheatland.