FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production...

15
1 FAC, 4/16/07 D. Schultz e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    217
  • download

    0

Transcript of FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production...

Page 1: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

1FAC, 4/16/07D. Schultz

e-Beams Systems Update

People ARR Linac Installation Undulator Production MMF Operations

David Schultz

Page 2: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

2FAC, 4/16/07D. Schultz

New responsibilities in Linac and Undulator

Jose Chan is the new Cost Account Manager for LCLS Injector and Linac Systems, taking over from Eric Bong.

Geoff Pile is the new Cost Account Manager for Undulator Systems at ANL, taking over from Steve Milton.

Page 3: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

3FAC, 4/16/07D. Schultz

Injector Accelerator Readiness Review

Page 4: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

4FAC, 4/16/07D. Schultz

Injector Accelerator Readiness Review

Safety Assessment DocumentThe LCLS SAD for Injector Commissioning was approved Jan. 24th.

Accelerator Readiness Review (ARR)The ARR for Injector Commissioning was held October 31st.The committee (in part) reconvened March 14th.The four pre-start items were cleared when the ARR report was released.Four comments from the SSO were also addressed.

Approval to operate was given April 4th.

Page 5: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

5FAC, 4/16/07D. Schultz

Injector Commissioning

First electrons from the gun4/5/07

Courtesy P. Emma

Injector Commissioning is underway.Commissioning has been impeded by faulty hardware

Problems with profile monitors, toroids, FCWorking on improving QA, in the shops, with vendors and during installation.

Page 6: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

6FAC, 4/16/07D. Schultz

2007 Commissioning

BC1

BLM

LXL1

Ins/SAB

Wall

Laser

stopper

Sector 20

Sector 21

See P. Emma’s talk

Page 7: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

7FAC, 4/16/07D. Schultz

SLAC linac tunnelSLAC linac tunnel research yardresearch yard

Linac-0L =6 m

Linac-1L 9 m

Linac-2L 330 m

Linac-3L 550 m

BC1L 6 m

BC2L 22 m

DL2 DL2 L L =275 m=275 m

‘Wall region’

undulatorL =130 m

6 MeV 135 MeV 250 MeV 4.30 GeV 13.6 GeV

Linac-XL =0.6 m

21-1b,c,d

...existinglinac

L0-a,b

rfgun

21-3b24-6dX

25-1a30-8c

Now commissioning 2007 down

Installation Schedule

Page 8: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

8FAC, 4/16/07D. Schultz

Draft LCLS Installation and Commissioning Time-Line

April 12, 2007 rmb

AAAA SSSS OOOO NNNN DDDD JJJJ FFFF MMMM AAAA MMMM JJJJ JJJJ AAAA SSSS OOOO NNNN DDDD JJJJ FFFF MMMM AAAA MMMM JJJJ JJJJ

Drive-Drive-Laser Laser

InstalleInstalledd

Drive-Laser Drive-Laser CommissioniCommissioni

ng ng

Gun/Inj/BC1 Gun/Inj/BC1 CommissioniCommissioni

ng ng

Gun/Inj./BC1 Gun/Inj./BC1 InstallInstall

linac/BC2 linac/BC2 Install Install

Linac/BC2 Linac/BC2 CommissioniCommissioni

ng ng

LTU/Und/LTU/Und/Dump Dump

FEE/NEH FEE/NEH Install Install

2006200620062006 2007200720072007

LTU/und.LTU/und.hall hall

“ready”“ready”

ControlsControlsCheckout Checkout

LTU/und. LTU/und. CommissioniCommissioni

ng ng

First First Spont. Spont. LightLight

AAAA SSSS

CD-CD-4a4a

OOOO NNNN DDDD JJJJ FFFF MMMM

2008200820082008 2009200920092009PPS

PPS

ControlsControlsCheckoutCheckout

CheckoutsCheckouts

’’08 inst. 08 inst. sched. under sched. under developmentdevelopment

Page 9: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

9FAC, 4/16/07D. Schultz

’07 Downtime Installation

Sept., Oct., Nov. 2007, a very tight schedule.Installation of BC2 and L3, not L2.Installation to support BTH-West

Cable plant installation through the BSYCoordinated through the AD downtime scheduleIRR held March 16th.

Kicker magnet design is still ongoing.Cable plant inst. schedule is tight.Scheduling and coordination between the different disciplines will be vital. See breakout talks

Page 10: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

10FAC, 4/16/07D. Schultz

’08 Installation LTU/Undulator/Dump

Readiness for early occupancy held at Nov. 1, 2007Begin installation with:

MetrologyBeamline supportsCable plant

Installation scheduling to be coordinated by R. M. Boyce

Installation contracts need to go to bid this summer.

Need to complete designs to support these.See breakout talk

Page 11: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

11FAC, 4/16/07D. Schultz

Undulator Systems Components

Quadrupole magnets on order.Beam Finder Wire going to procurement.

Wire card a SLAC responsibility, design underway. Support/Mover system going to procurement.RF Beam Position Monitor in development.

Prototype being brazed.Vacuum Chamber – next slide

These systems are all near the critical path.

WPM/HLS FDR was held March 22nd See G. Pile’s talk

Page 12: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

12FAC, 4/16/07D. Schultz

Undulator vacuum chamber - 4-Weld Design

Two competing designs were carried to the prototype stage.

Review of the Undulator Vacuum Chamber Design Options, Feb. 22nd

The 4-Weld design was selected to remain the baseline.

Early 4-Weld prototype

2 full size prototypes have been produced and tested.

Vacuum properties, mag. permeability, surface coating process, look good.

Fabrication schedule identified as a problem. Ordering materials now, preparing the fab. bid

package

Page 13: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

13FAC, 4/16/07D. Schultz

Undulator Magnetic Measurement

35 undulators have been accepted at the vendors.20 undulators are at SLAC.

All undulators will be at SLAC by July.The MMF is in a production mode, but behind schedule.

3 undulators finished magnetically, but not RFI. 1 undulator in fine tuning, 1 in rough tuning.

Production rate is approaching 1 per week. Learning to deal with the exceptional cases.

See breakout talk

Page 14: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

14FAC, 4/16/07D. Schultz

The ’07 downtime Linac installation schedule is very tight.

Hardware availability is being closely monitored Kicker magnet, cable plant, are concerns

Controls checkout (last) is at risk. The Undulator vacuum chamber is still on the critical path.

This schedule is being pushed. RFBPM production schedule is close to critical.

The MMF is in production. Need to solidly demonstrate throughput.

Issues

Page 15: FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.

15FAC, 4/16/07D. Schultz

end