Extreme Cold Climate Home
Thanks/Recognition
● Special thanks to Dr. Joe Lstiburek and Betsy
Pettit AIA, principals of Building Science Corp,
and the DOE Building America Program for the
engineering, architectural drawings and support.
John Woodward , who was our technical advisor on the project ,Marquam George who helped us with the air tightness testing and he gave us the idea to attach the corners to the house . Phil Kaluzza who helped us with the heating and the HRV unit .
Special Thanks to these guys from HCA Housing Department for all there help
● This project was funded through BIA, and
constructed by Hydaburg Cooperative Assoc.,
Housing Dept.
Extreme Cold Climate Design
The important design changes from conventional
construction are:
● Placement and design of the thermal envelope
and weather barriers
● Energy target selected for a Low-Income
Housing project.
Gable/Thermal View
100 Year Design Lifespan
The purpose of installing the insulation to the exterior
of the structural framing and sheathing is:
● Keep the structural part of the building warm & dry,
substantially increasing durability
● Prevent poor thermal performance due to moisture
damage
● Eliminate thermal bridging
● Provide a continuous insulation layer around the
conditioned space
● Enhance insulation installation quality control
● Prevent condensing surfaces inside of the exterior
sheathing
Energy Efficiency
● This building rates 96% on the AHFC
Home Energy Rating System or a high
5*+.
● Design Heat Loss 9004 Btu/hr
● Estimated Space Heating Cost $200 per
yr
Structural Deck in Progress
Structural Deck Complete
Insulation Deck
Insulation Deck – structural
joists
Insulation Deck (hand saw)
1st layer floor Insulation
2nd layer floor Insulation
Insulation Deck Complete
Layout for Routered Grooves
PEX Layout 8” Centers
Jig for Return
Routering Complete
Site Manufactured 1
Site Manufactured 2
Site Manufactured 3
Main Floor PEX Install
Heat Loops Main Floor
Wire Staples for PEX
Main Floor PEX & Decking
PEX Heat Loops Complete
Screwing Down Floor Decking
Layout is Important
PEX Repair in Bathroom
PEX/Utility Room/Main Floor
Building Exterior Walls
Ext Wall Sheathing
12 ft Walls Complete
Ledger/Fire Blocking
Beam support 2nd Floor
Upstairs Floor Joists
Rafter Jig
Rafter Jig Peak & Gusset
Rafter Jig Heel
Rafters Complete
Rafter Setup
Rafter Installation Complete
Rafter Sheathing
Upstairs Gable View
Drainage Plane
Drainage Plane Complete
Bevel Roof Foam
Roof Insulation & False Rafters
More Roof Layers
Screwing down False rafters
Rafter Tails & Lookouts
False Rafter Detail/Screws
Rafter Tails/Beveled roof Foam
False Rafters Complete
Roof Decking
Sheathing & Tarpaper
Tarpaper Complete
Metal Roofing Installation
Metal Roofing Complete
Bottom Sill Corner Patch
Corner Patch Membrane flashing
Flashing/Bottom Sill & Jamb
Flashing with Corner Patch
Prep For Window Installation
Sill Dam
Jamb Flashing
Head Flap
Membrane Flashing – no face seal
Window Extension Boxes
Jamb Extension
Wall Foam
Sealing Cracks
Wall Insulation Layers
Corner Blocking
Furring Corner Detail
Furring Strips Near Completion
Gable View
Cedar Cladding Preserve 4 sides
Lap Cedar Cladding
More Lap Cedar
Window/Siding Detail
Window Installation Complete
Cedar Cladding Complete
Bock for Primary Heat & DHW
Primary Heat Source/Bock BCS 32
Circulation Pump Taco 007
Upstairs Heat Loops
Upstairs Separate Temp Zone
Vanguard Brass Manifolds
DW & Floor Heat Manifold
Assembly
Floor Heat Manifold & PEX Heat Loops
Fantech HRV - SH 704
Inside View/Small HRV
Domestic Water Plastic Manifolds
One Piece PEX DW
Tub/Plumbing Install on Ext Wall
Conventional Inside Finish
Utility Room
Finishing Up Downstairs
Upstairs
Air-Tightness Testing
Air-Tight House
Finished House
Finished House/Back View
Finished House/Gable